SELECT PROJECT


S.No.PROJECT NAME
1 CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF CHAKABAMA-ZUNHEBOTO ROAD FROM EXISTING KM 25.760 TO KM 52.370 [DESIGN KM. 25.000 TO KM. 50.000] (DESIGN LENGTH - 25.00 KM) IN THE STATE OF NAGALAND UND
2 CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF CHAKABAMA-ZUNHEBOTO ROAD FROM EXISTING KM 52.370 TO KM 79.040 [DESIGN KM. 50.000 TO KM. 75.000] (DESIGN LENGTH - 25.00 KM) IN THE STATE OF NAGALAND UND
3 CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF PFUTSERO-PHEK ROAD FROM EXISTING KM 40.090 TO KM65.300 [DESIGN KM. 40.000 TO KM. 62.558] (DESIGN LENGTH - 22.558 KM) IN THE STATE OF NAGALAND UNDER SAR
42 LANING FROM KM. 40.00 TO KM. 58.27 OF CHANGLANG/ TIRAP DISTRICT BOUNDARY TO CHANGLANG OF NH-52B IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP
52 LANING FROM LONGDING TO KANUBARI OF NH-52B FROM KM 0 TO KM 47.213 IN ARUNACHAL PRADESH
62 LANING FROM PASIGHAT TO PANGIN SECTION OF NH-229 FROM KM 0 TO KM 28
72 LANING FROM PASIGHAT TO PANGIN SECTION OF NH-229 FROM KM 41.3 TO KM 58.42 (EXISTING KM 42 TO KM 59)
82 LANING OF KOHIMA - JESSAMI SECTION (PACKAGE I)
92 LANING OF KOHIMA - JESSAMI SECTION (PACKAGE III)
102 LANING OF KOHIMA - JESSAMI SECTION (PACKAGE IV)
112 LANING OF SINGER RIVER TO SIZOH NALA IN ARUNACHAL PRADESH ON EPC BASIS
122 LANING WITH PAVED SHOULDER OF AGARTALA-UDAIPUR SECTION OF NH-44 FROM KM 6.800 TO KM 55.00 IN THE STATE OF TRIPURA.
132-LANING FROM MANU-SIMLUNG ( PKG I)
142-LANING FROM MANU-SIMLUNG ( PKG III)
152-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (1A PACKAGES)
162-LANING OF EXISTING AKAJAN LIKABALI BAME ROAD ON EPC BASIS FROM DESIGN KM. 12.000 TO KM. 33.000 (EXISTING 12.000 TO KM. 36.000) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE PROJECT
172-LANING OF KHOWAI -AGARTALA SECTION FROM DESIGN KM 31.300 TO KM 45.300 OF NH-208A PKG-3
182-LANING OF KHOWAI -AGARTALA SECTION FROM DESIGN KM 6.500 TO KM 19.300 OF NH-208A PKG-1
192-LANING WITH PAVED SHOULDER OF NH-52 FROM KM 583.450.TO KM 605.600(EXISTING CHAINAGE FROMKM.583.450TOKM.595.00)FROM PASIGHAT TO BOMJUR IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE.
204 LANING FROM KALIABOR TINALI TO DOLABARI SECTION FROM KM 0.0 TO KM 17.3 OF NH 37A INCL. ADDITIONAL BRIDGE, REHABILITATION OF EXISTING BRIDGE AND APPROACHES OF BOTH BRIDGES ON EPC BASIS
214-LANING OF DERGAON TOWN
22BORDUMSA NAMCHIK (BURIDEHING - JAIRAMPUR) ROAD ON NH-52B (NEW NH-215) FROM KM. 0.15 (STARTING CHAIN AGE NEAR BURIDEHING BRIDGE) TO KM. 22.380 IN THE STATE ARUNACHAL PRADESH ON EPC BASIS.
23CHANGTONGYA TO LONGLENG ROAD PKG-2
24CONSTRUCTION OF 2 LANE WITH HARD SHOULDER FROM DESIGN CHAINAGE KM 283.000 TO KM 325.440 (5- LEGGED JUNCTION AT OLD AKHEGWO) TO (AKASH BRIDGE) OF AKEGWO- JESSAMI SECTION OF NH-202 PACKAGE-1
25CONSTRUCTION OF 2 LANING OF EXISTING HUNLI-ANINI ROAD ON EPC BASIS FROM DESIGN KM 37.500 TO KM 53.500 (EXISTING40.160KM TO 56.320 KM) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE.
26CONSTRUCTION OF 2 LANING OF EXISTING HUNLI-ANINI ROAD ON EPC BASIS FROM DESIGN KM 106.200 TO KM 120.00(EXISTING KM 111.60 TO KM 126.875) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE
27CONSTRUCTION OF 2 LANING OF EXISTING HUNLI-ANINI ROAD ON EPC BASIS FROM DESIGN KM 53.500 TO KM 92.500 (EXISTING KM 56.320 TO KM 97.650) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE
28CONSTRUCTION OF 2 LANING OF EXISTING HUNLI-ANINI ROAD ON EPC BASIS FROM DESIGN KM 92.500 TO KM 106.500 (EXISTING KM 97.670 TO KM 111.600) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE.
29CONSTRUCTION OF 2-LANE ROAD FROM EXISTING KM 21.500 OF HUNLI-ANINI ROAD( NEAR ITHUN BRIDGE) TO KM 37.500 IN THE STATE OF ARUNACHAL PREDESH ON EPC MODE.
30CONSTRUCTION OF 2-LANE ROAD FROM EXISTING KM. 37.500 OF HUNLI-ANINI ROAD (NEAR ITHUN BRIDGE) TO KM. 53.50 IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE.
31CONSTRUCTION OF 2-LANE WITH HARD SHOULDER OF PEREN-DIMAPUR SECTION ON NH129A FROM DESIGN KM109.494 TO KM126.775 PKG-1
32CONSTRUCTION OF CHHIATHLANG -SERCHHIP BYPASS (PKG-1) ON AIZAWL-TUIPANG SECTION OF NH-54
33CONSTRUCTION OF MAJOR BRIDGE OVER HUMPHREY STRAIT CREEK BETWEEN KM. 129.420 TO KM. 130.600 OF NH 4 CONNECTING MIDDLE AND NORTH ANDAMAN ISLANDS
34CONSTRUCTION OF MECHI BRIDGE AND APPROACHES ON INDIA-NEPAL BORDER LINKING KAKARVITTA AND PANITNAKI IN INDIA UNDER ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) MODE
35CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF CHAKABAMA-ZUNHEBOTO ROAD FROM EXISTING KM 00.000 TO KM 25.760 [DESIGN KM. 00.000 TO KM. 25.000] (DESIGN LENGTH - 25.00 KM) IN THE STATE OF NAGALAND UNDE
36CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF CHAKABAMA-ZUNHEBOTO ROAD FROM EXISTING KM 79.040 TO KM 100.345 [DESIGN KM. 75.000 TO KM. 95.000] (DESIGN LENGTH - 20.00 KM) IN THE STATE OF NAGALAND UND
37CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF CHAKABAMA-ZUNHEBOTO ROAD FROM EXISTING KM100.345 TO KM 122.250 [DESIGN KM. 95.000 TO KM. 115.534] (DESIGN LENGTH - 20.534 KM) IN THE STATE OF NAGALAND U
38CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD FROM EXISTING KM 00.000 TO KM 20.456 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH - 20.00 KM) IN THE STATE OF NAGALAND UND
39CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD FROM EXISTING KM 41.065 TO KM 60.345 [DESIGN KM. 40.000 TO KM. 59.000] (DESIGN LENGTH - 19.00 KM) IN THE STATE OF NAGALAND UND
40CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF PFUTSERO-PHEK ROAD FROM EXISTING KM 19.900 TO KM40.090 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH - 20.00 KM) IN THE STATE OF NAGALAND UNDER SARDP
41CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF SELLING-DULTE SECTION OF NH-06 (PKG-II)
42CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF SELLING-DULTE SECTION OF NH-06 (PKG-IV)
43CONSTRUCTION OF TWO LANE WITH PAVED SHOULDERS OF JORAM KOLORIANG ROAD (NH 713) ON EPC BASIS FROM EXISTING KM 88.700 TO KM 104.850 [DESIGN KM. 77.363 TO KM. 92.363] (DESIGN LENGTH 15 KM) IN THE STATE O
44CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD FROM EXISTING KM 00.000 TO KM19.900 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH - 20.00 KM)
45CONSTRUCTION, OPERATION AND MAINTENANCE OF Z-MORH TUNNEL INCLUDING APPROACHES ON NH-01 SRINAGAR-SONAMARG SECTION CONNECTING NH-01 IN THE UT OF J&K ON DESIGN, BUILD, FINANCE, OPERATE & TRANSFER (DBFOT)
46DABOKA KATHKATI PACKAGE-2
47DABOKA KATHKATI PACKAGE-4
48DEMBUEN - BRUNI
49DIBRUGARH-LAHOAL-CHABUA BYPASS PACKAGE-1
50DIBRUGARH-LAHOAL-CHABUA BYPASS PACKAGE-2
51DONIPAWA TO ASHAJIPORA BYPASS PKG-7
52DULTE- KWALKULH - CHAMPAI PKG.1
53DULTE- KWALKULH - CHAMPAI PKG.3
54FOUR LANING FROM GOHPUR TO HOLONGI SECTION FROM KM 264.10 OF NH 52 TO KM 20.37 OF NH 52A
55FOUR LANING OF BALACHERA-HARANGAJAO SECTION OF NH-54 (EXT) FROM KM 275.00 TO KM 244.000 IN THE STATE OF ASSAM ON EPC MODE
56FOUR LANING OF DIMAPUR KOHIMA ROAD FROM DESIGN KM 138.775 TO KM 152.490 (EXISTING KM 140.000 TO KM 156.000) EXCLUDING DIMAPUR AND KOHIMA BYPASS IN THE STATE OF NAGALAND
57FOUR LANING OF NH-52 FROM END OF BISWANATH CHARIALI BY-PASS (KM 208.00) TO GOHPUR (KM 265.50) (TOTAL LENGTH =57.50 KM) IN THE STATE OF ASSAM ON EPC BASIS UNDER SARDP-NE
58FOUR LANING OF NUMALIGARH TO JORHAT SECTION FROM KM. 402.500 TO KM. 453.000 (DESIGN KM 403.200 TO KM 454.240) EXCEPT DERGAON BYPASS (WITH TOLL PLAZA)
59FUNDED ) 2 LANING FROM CHANGLANG DISTRICT BOUNDARY -KHONSA (42.844KM) SECTION OF NH-52B IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE
60IMPHAL – MOREH (PACKAGE 4)
61IMPHAL – MOREH PACKAGE- 3
62IMPROVEMENT/ WIDENING TO TWO LANING WITH PAVED SHOULDER OF UDAIPUR-SABROOM SECTION FROM KM 55.00 TO KM 128.712 OF NH-44 IN THE STATE OF TRIPURA UNDER SARDP-NE PHASE ‘A’
63IMPROVEMENT/WIDENING TO 2 LANING OF STRETCH FROM KHONGSANG TO TAMENGLONG OF NH-137
64IMPROVEMENT/WIDENING TO 2-LANE WITH EARTHEN SHOULDERS FROM RANIKOR TO NONGJRI EXISTING CHAINAGE FROM 0+000 TO 31+700 (DESIGN LENGTH-33.250 KM)
65JIA BHARALI BRIDGE ALONG WITH ITS APPROACH ROAD
66JORAM – KOLORIANG ROAD FROM EXISTING KM 70.00 TO KM 88.700 (PKG-4)
67JORAM – KOLORIANG ROAD FROM EXISTING KM104.850 TO KM 122.60 (PKG-6)
68KAILASHAHAR TO KHOWAI PKG-2
69KAILASHAHAR TO KHOWAI PKG-3
70KAILASHAHAR TO KHOWAI PKG-5
71KARGIL-ZANSKR PACKAGE-5
72KARGIL-ZANSKR PACKAGE-6
73KARGIL-ZANSKR PACKAGE-7
74KHELLANI-KHANABAL PKG-6
75MARIAM - PEREN (PKG 2A)
76MARIAM - PEREN PKG-2B
77OUR LANNNING OF DOLABARI TO JAMUGURI SECTION FROM KM 17.300 OF NH 37A TO KM 182.00 OF NH52 IN THE STATE OF ASSAM UNDER SARDP-NE , PHASE'A' ON EPC MODE
78RANIKOR-MAHESHKHOLA- BAGHMARA (RMB) PKG-3
79REHABILITATION AND UP-GRADATION OF ROAD FROM DESIGN KM 11.800 TO KM 25.250 OF KAILASHAHAR-KURTI BRIDGE SECTION TO 2- LANE WITH PAVED SHOULDER (PACKAGE-II)
80REHABILITATION AND UPGRADATION OF ROAD FROM DESIGN KM 0.00 TO KM 11.800 OF KAILASHAHAR-KURTI BRIDGE SECTION TO 2-LANE (PKG- I )
81RHENOK-RORAHTHANG-PAKYONG ON NH 717A
82STRENGTHENING OF CHURAIBARI - AGARTALA SECTION OF NH-08
83TULUNGIA-JOGIGHOPA-PAIKAN PKG-5
84TWO LANING OF AKAJAN LIKABALI BAME ROAD ON EPC BASIS FROM EXISTING KM 71.000 TO KM 99.000 (DESIGN KM. 65.810 TO KM. 91.928) IN THE STATE OF ARUNACHAL PRADESH
85TWO LANING OF EXISTING HAYULIANG HAWAI ROAD ON EPC BASIS FROM DESIGN KM. 17.000 (KHUPA) TO KM. 34.000 [EXISTING KM 16.950 TO KM 34.310 (HAYULIANG HAWAI ROAD)] IN THE STATE OF ARUNACHAL PRADESH
86TWO LANING OF EXISTING HAYULIANG HAWAI ROAD ON EPC BASIS FROM DESIGN KM. 34.000 TO KM. 51.825 [EXISTING KM 26.625 TO KM 45.050 (HAYULIANG HAWAI ROAD)] IN THE STATE OF ARUNACHAL PRADESH
87TWO LANING OF EXISTING KHUPA HAYULIANG HAWAI ROAD ON EPC BASIS FROM DESIGN KM. 0.000 (KHUPA) TO KM. 17.000 [EXISTING KM 95.800 OF (KHUPA HAYULIANG ROAD) TO KM 8.970 (HAYULIANG HAWAI ROAD)]
88TWO- LANE WITH PAVED SHOULDER CONFIGURATION OF IMPHAL - MOREH SECTION OF NH-39 FROM KM 330 TO KM 350.00 IN THE STATE OF MANIPUR.(PACKAGE-1)
89TWO- LANE WITH PAVED SHOULDER CONFIGURATION OF IMPHAL - MOREH SECTION OF NH-39 FROM KM 350.00 TO KM 395.680 IN THE STATE OF MANIPUR.
90TWO-LANING OF JORAM – KOLORIANG ROAD (NH-713) FROM DESIGN KM. 20+000 TO KM. 32+050 [EXISTING KM 20.000 TO KM 35.150
91TWO-LANING OF JORAM – KOLORIANG ROAD (NH-713) FROM DESIGN KM. 32+050 TO KM. 44+000 [EXISTING KM 35.150 TO KM 50.050]
92UP-GRADATION TO 4-LANE WITH PAVED SHOULDER OF JAMMU-AKHNOOR SECTION OF NH-144A FROM CANAL HEAD (KM 0.800) TO GANESH VIHAR (KM 6.000) OF 5.2 KM LENGTH IN THE STATE OF JAMMU KASHMIR TO BE EXECUTED ON
93WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 65.00 TO KM 125.00 (PACKAGE-2) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON EP
94WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENT FROM KM 0.000 TO KM 16.990 ON CHENANI – SUDHMAHADEV SECTION OF NH-244 IN THE STATE OF JAMMU AND KASHMIR
95WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM CH.75.330KM TO CH.88.00KM (DESIGN CH.71.800 TO 84.100 KM) OF JOGIGHOPA BRIDGE APPROACH (NEAR PANCHARATNA)- AGIA (NEAR NICHINTA) SECTION (PKG. 6)
96WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 66.00 TO KM 81.00 (DESIGN CHAINAGE 65.923 TO 80.930) OF DOKMOKA-LORINGTHEPI SECTION-3 OF NH29