SELECT PROJECT
S.No.
PROJECT NAME
1
CONSTRUCTION OF 2 LANE WITH PAVED SHOULDERS (BARAMULLA BYPASS) GREENFIELD BYPASS FROM EXISTING CH. KM 47+020 TO KM 56+720 AND DESIGN CH. FROM 48+500 TO 62+600 (TOTAL LENGTH= 14.100 KM) ON ROAD SRINAGA
2
CONSTRUCTION OF 4 LANE WITH PAVED SHOULDER (PATTAN BYPASS) GREENFIELD BYPASS FROM EXISTING CH. KM 24+320 TO KM 33+760 AND DESIGN CH. FROM KM 24+400 TO KM 35+300, TOTAL LENGTH= 10.900 KM ON ROAD SRINAG
3
CONSTRUCTION OF 4 LANE WITH PAVED SHOULDER FROM (DESIGN CH. 14+200 TO 24+400), (DESIGN CH. 35+300 TO 44+294) AND (DESIGN CH. 44+958 TO 48+500) OF TOTAL LENGTH 22.736 KMS (NH-01) IN THE UT OF JAMMU
4
CONSTRUCTION OF REALIGNMENT BETWEEN PANDRASS- PASHKYUN (TOTAL LENGTH 27.10 KM) ON ROAD ZOZILA-KARGIL -LEH (NH-1) I.E. DRASS ALIGNMENT (9.30 KM) KHARBOO REALIGNMENT (6.30 KM) AND KARGIL ALIGNMENT (11
5
IMPROVEMENT/CONSTRUCTION OF EXISTING CLASS 5 ROAD TO NH INTERMEDIATE LANE SPECIFICATION WITH HARD SHOULDER FROM EXISTING KM 76+340 TO KM 134+940 (DESIGN CHAINAGE FROM KM 76+300 TO KM 133+000) OF NH-50
6
IMPROVEMENT/CONSTRUCTION OF EXISTING CLASS-5 ROAD TO NH INTERMEDIATE LANE SPECIFICATION WITH HARD SHOULDER FROM EXISTING KM 134+940 TO KM 169+970 (DESIGN CHAINAGE FROM KM 133+000 TO KM 166.000) OF NH
7
REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM DESIGN CHAINAGE KM 162.800 TO KM 198.18 UNDER 31 BRTF ON AKHNOOR POONCH ROAD NH 144A IN THE UT OF JAMMU AND KASHMIR UNDER PROJECT SA
8
REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 102 TO KM 134 DESIGN CHAINAGE KM 90 TO KM 116 UNDER 31 BRTF ON AKHNOOR POONCH ROAD NH 144A UNDER PROJECT SAMPA
9
REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 134.95 TO KM 166.100 (DESIGN CHAINAGE KM 116.98 TO KM 146.700) (PACKAGE-VI) UNDER 31 BRTF ON AKHNOOR-POONCH ROA
10
REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 30.000 TO KM 49.150 DESIGN CHAINAGE KM 30.000 TO KM 46.450 INCLUDING KANDI TUNNEL UNDER 31 BRTF ON AKHNOOR PO
11
REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 64.535 TO KM 85.385 (DESIGN CHAINAGE KM 55.800 TO KM 74.350) (PACKAGE-III) UNDER 31 BRTF ON AKHNOOR-POONCH ROA
12
REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 166.100 TO KM 192.98 (DESIGN CHAINAGE KM 146.700 TO KM 162.800) INCLUDING CONSTRUCTION OF BHIMBER GALI TUNNEL (TO
13
REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 49.150 TO KM 64.535 (DESIGN CHAINAGE KM 46.450 TO KM 55.800) INCLUDING CONSTRUCTION OF SUNGAL TUNNEL (TOTAL LENG
14
WIDENING AND STRENGTHENING OF RAFIABAD-KUPWARA-CHOWKIBAL-TANGDHAR-CHAMKOT (NH-701) ROAD FROM DESIGN CH. FROM 0+000 TO 51+000 TO TWO LANES WITH PAVED SHOULDERS UNDER PROJECT BEACON IN THE UT OF JAMMU &