Package 1: Work Completed on 10.11.2022. final bill paid.
Package 2: Critical Works required for operationalization is completed.Apart from this ATC Control Tower cum technical block is completed( civil & Electrical works). In PTB truss & Roofing work(COMPLETED) as well as structural steel frame work for facade( supporting strcuture completed) and stair case to mezzanine floor is also completed.AHU rooms structural work is completed,glazing (physical progress:99%) & ACP work are in progress(physical progress:99%). P.C.C work is completed in arrival and departure area.Tiles work100% completed in arrival area, and 100% completed in departure area.City side varandah flooring work has been completed and BHS work is completed. Residential colony, Dog Kennel, Transit Hostel and E & M Block are completed & operationalized ,deep cleaning is in progress and MEP, fire fighting and HVAC etc. testing and commisioning is under process.
Physical Progress (%) MAY 2024
Package 1- 100%
Package 2- 99 %
Employement Manpower: MAY 2024
Package 1: 209587 Nos. (Cummulative)
Package 2: 212000 Nos. (Cummulative) | Package 1: Work Completed on 10.11.2022. final bill paid.
Package 2: Critical Works required for operationalization is completed.Apart from this ATC Control Tower cum technical block 5th floor roof slab work is completed and roof truss works including tower work are also completed Glazing work in top floor & finishing works are in progress. In PTB truss & Roofing work is in progress.In residential colony , Block C finishing works such as painting,sanitary fittings in the residential building completed. Finishing work in Dog Kennel is in proress.
Physical Progress (%) March 2024
Package 1- 100%
Package 2- 89.00%
Employement Manpower: March 2024
Package 1: 209587 Nos. (Cummulative)
Package 2: 151856 Nos. (Cummulative) |