Project Summary
Project Summary
Sector Name : CIVIL AVIATION.
Agency Name : AIRPORT AUTHORITY OF INDIA LIMITED.
Project Name : DEVELOPMENT OF AYODHYA AIRPORT PHASE-01.

Reported Date : 15-APR-25

MOU Status : Project Under MOU for 2017-2018

Monthly Report : 5 / 2025

Cost Overrun (%)-   47.85

Time Overrun (Months)-    30

Total/Pending/Completed Milestone - 14 / 3 / 11

Cost (Rs. in Crores)

OriginalRevisedNow Anticipated
242.14328358

Expenditure (Rs. in Crores)

Cum. till Previous Financial YearCum. in Current Financial Year till last monthExpenditure in current monthCum. Expenditure till now
344.5800344.58

Date of Commissioning (mm/yyyy)

OriginalRevisedAnticipated
12/20226/20256/2025

Current Financial Year Budget (Rs. in Crores)

Budget EstimateRevised Estimate
.10

Ministry Review Date

LatestLastPhysical Progress (%)Status
99.9Ongoing

Monthly Status

Background Information

Present status of project:- The Whole project consists of following major works. (1) Construction of Pre-Engineered Buildings (PEB) And other Associated Works on Design & Build Basis (EPC):- Conditional completion certificate recorded on 26.11.24. Balance works have been descoped and to be executed through risk & cost. (2) Pavement, Grading and other works in operational area on Design & Build Basis (EPC) :- Work Completed. (3) Miscellaneous Civil and Electrical Works and other Rectification works for facilitation of passengers at Newly Constructed Terminal Building and other areas at MVI Airport Ayodhya Dham (Part I) - Provision of granite work on Footpath is in progress, Provision of ducting work has been completed, Work for ACP framing is in progress and False ceiling work of gable end is in progress, Laying of RCC pipeline for electrical works has been completed. Construction of retaining wall and view cutter near gate no. 3 is also completed. Drain with steel grating work at airside of Terminal Building completed. Road work near Gate no. 1 is in progress.Present status of project:- The Whole project consists of two no following works. (1) Construction of Pre-Engineered Buildings (PEB) And other Associated Works on Design & Build Basis (EPC):- Terminal Building inaugurated on 30.12.23 and operational since then. Terminal building - work completed except some minor works. ATC tower, Fire station & substation works completed except some minor works. PQC Road works completed. Fire alram, Fire fighting, HVAC, CCTV, internal & external electrification works & IT works etc. are in progress. Installation of GFRC Facade on Terminal Building has been completed. Fixing of GFRC works at Terminal Building and Toran dwar has been completed. Minor rectification works are in progress. (2) Pavement, Grading and other works in operational area on Design & Build Basis (EPC) :- PQC at Runway 2200m length, over-run at both ends, Apron, Isolation Bay and their Taxiway i/c shoulders has been completed. Electrical works are in progress. PQC has been completed at Runway beyond over-run of 90 m length. Construction of Drain is completed and basic strip is in progress. Construction of cooling-pit, fire pit, wind-sock, Emergency access road at RWY11 & RWY29 and road connecting fire pit, cooling pit, Localizer, GP, PDP, PDP hardstand,Fire Approach road are completed. Construction of vehicular road and other ancillary roads are in progress. Supply and installation of AGL at Runway, Taxiways, apron, Isolation Bay & taxi are completed. WDI, Perimeter light poles & High mast have been installed. PAPI installed and calibrated. Subgrade preparation, GSB, WMM, DRLC & PQC layer are completed at additional apron as per approved SOW Phase-II dated 22.07.23. Additional apron has been completed. Ayodhya Airport has been inaugurated on 30.12.23 and Airport is operational since then.

Problems

ProblemStart (mm/yyyy)End (mm/yyyy)StatusAttention RequiredRemarks

Ongoing Milestone

Completed Milestone