Status: RCC work below plinth at Terminal Building is in progress.
Present status of project:- The Whole project consists of following major works.
(1) Construction of New Integrated Terminal Building and Allied Works on Engineering Procurement and Construction (EPC) Mode:- (a)Terminal Building:- RCC work below at plinth level is in progress. (b) Multilevel Car Parking: RCC Columns (above plinth) upto ground floor roof slab bottom completed and formwork for 1st floor slab is in progress. (iii) Utility : RCC work below plinth is in progress.
(2) Architectural and Engineering Consultancy Services for Development of New Integrated Civil Enclave at Agra Airport :- work in progress.
(3) C/o Airfield pavement work (Extension of RWY, Link TWY, Parallel TWY, Apron, GSE, RESA, Levelling and grading of basic strip / beyond basic strip area, Operational drainage system, Perimeter road, Cooling pit, Provision of Roller Gates, etc. :- Award Stage. Financial Bid opened on 06.06.2025.
(4) Construction of Boundary Wall (Eccentric Footing ) and Watch Towers for New Civil Enclave at Agra Airport: work in progress. | |