• SAPL Mainline (~421 Km): RoU Handover- 421 Km, Welding- 421 Km, Lowering- 421 Km, Hydrotest- 421 Km.
• SAPL Spurline (322 Km): RoU Handover- 322 Km, Welding- 271 Km, Lowering- 258 Km, Hydrotest-100.7 Km.
| • SAPL Mainline (~421 Km): RoU Handover- 420.9 Km, Welding- 420.9 Km, Lowering- 420.9 Km, Hydrotest- 323.8 Km.
• SAPL Spurline (321 Km): RoU Handover- 296 Km, Welding- 227.2 Km, Lowering- 191.6 Km.
|