S No. | Agency Name | Sector Name | Project Name | Date Of Approval | Cost Original | Cost Anticipated | Expenditure |
1. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | EXTENSION OF RUNWAY WITH BLAST PAD, RESA, TAXIWAY, APRON, GSE AREA, ISOLATION BAY, NEW DOMESTIC TERM | 6/2017 | 255.68 | 255.68 | 259.57 |
2. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | CONSTRUCTION OF NEW INTEGRATED TERMINAL BUILDING, RECONSTRUCTION OF OLD TERMINAL BUILDING, MODIFICAT | 3/2017 | 475.39 | 510 | 501.12 |
3. | BHARAT PETROLEUM CORPORATION LIMITED | PETROLEUM | INSTALLATION OF INDEPENDENT DE- AROMATIZED SOLVENTS PRODUCTION FACILITIES AT MUMBAI REFINERY | 3/2023 | 405 | 405 | 17.8 |
4. | BHARAT PETROLEUM CORPORATION LIMITED | PETROLEUM | CONSTRUCTION OF LUBE OIL BLENDING AND FILLING PLANT AT RASAYANI | 5/2022 | 423.39 | 423.39 | 113.75 |
5. | BHARAT PETROLEUM CORPORATION LIMITED | PETROLEUM | DEBOTTLENECKING AND AUGMENTATION OF CRYOGENIC FACILITIES AT URAN LPG IMPORT TERMINAL | 4/2021 | 1164.69 | 1164.69 | 337.17 |
6. | BRAHMAPUTRA BOARD | WATER RESOURCES | PROTECTION OF MAJULI ISLAND FROM FLOOD AND EROSION OF RIVER BRAHMAPUTRA | 3/2017 | 233.57 | 233.57 | 211.71 |
7. | CENTRAL RAILWAYS | RAILWAYS | AHMEDNAGAR-PARLI VAIJNATH(NL) CR | 2/1997 | 2271.5 | 4805.17 | 3698.6 |
8. | CENTRAL RAILWAYS | RAILWAYS | DAUND - MANMAD (236 KM) | 2/2016 | 1876 | 2081.27 | 1660.91 |
9. | CENTRAL RAILWAYS | RAILWAYS | SOLAPUR-TULJAPUR-OSMANABAD (UMBRELLA WORK) | 1/2019 | 904.92 | 904.92 | 772.45 |
10. | CENTRAL RAILWAYS | RAILWAYS | BARAMATI - LONAND | 2/1999 | 736.44 | 736.44 | 5.6 |
11. | CENTRAL RAILWAYS | RAILWAYS | ITARSI-NAGPUR (BAL.) - 3RD LINE (267 KM) | 2/2015 | 2449.91 | 2449.91 | 1075.83 |
12. | CENTRAL RAILWAYS | RAILWAYS | KALYAN-KASARA 3RD LINE | 4/2011 | 792.89 | 792.89 | 615.78 |
13. | CENTRAL RAILWAYS | RAILWAYS | WARDHA-SEWAGRAM NGP 3RD LINE | 4/2012 | 540.02 | 540.02 | 467.08 |
14. | CENTRAL RAILWAYS | RAILWAYS | DHULE (BORVIHIR)-NARDANA (UMBRELLA WORK) | 1/2019 | 492.76 | 492.76 | 52.5 |
15. | CENTRAL RAILWAYS | RAILWAYS | KALYAN-MURBAD VIA ULHASNAGAR (UMBRELLA WORK) | 2/2023 | 836.12 | 836.12 | 1.13 |
16. | CENTRAL RAILWAYS | RAILWAYS | WARDHA - NAGPUR - 4TH LINE (76 KM) | 2/2016 | 637.95 | 637.95 | 639.03 |
17. | CENTRAL RAILWAYS | RAILWAYS | PUNE-MIRAJ-LONDA (467 KM) | 2/2015 | 3627.47 | 6463.49 | 3267.58 |
18. | CENTRAL RAILWAYS | RAILWAYS | PACHORA-JAMNER WITH EXTENSION UPTO MALKAPUR NG TO BG | 8/2022 | 955 | 955.39 | 10.27 |
19. | CENTRAL RAILWAYS | RAILWAYS | WARDHA-NANDED MAHARASHTRA | 4/2008 | 3168.29 | 3445.48 | 2149.57 |
20. | CENTRAL RAILWAYS | RAILWAYS | WARDHA-BALHARSHAH - 3RD LINE (132 KM) | 2/2015 | 1272.19 | 1384.72 | 899.04 |
21. | CENTRAL RAILWAYS | RAILWAYS | MANMAD - JALGAON - 3RD LINE (160 KM) | 2/2016 | 1035.16 | 1035.16 | 966.22 |
22. | CPWD OF HIGHER EDUCATION | DEPARTMENT OF HIGHER EDUCATION | CONSTRUCTION OF IITB RESEARCH PARK AT IIT BOMBAY, POWAI, MUMBAI | 1/2018 | 223.37 | 230 | 216.81 |
23. | GAS AUTHORITY OF INDIA LIMITED | PETROLEUM | SETTING UP 500KTPA PROPANE DEHYDROGENATION INTEGRATED WITH POLYPROPYLENE UNIT ALONG WITH OFFSITE AND | 5/2019 | 8797 | 11256 | 3422.39 |
24. | HPOIL Gas Pvt. Ltd | PETROLEUM | HPOIL GAS PVT LTD | 3/2018 | 334 | 334 | .85 |
25. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | CGD PROJECT AT BEED, JALGAON AND JALNA DISTRICTS | 3/2022 | 865 | 865 | 18.09 |
26. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | ATF PIPELINE FROM JAWAHARLAL NEHRU PORT TRUST (JNPT) TO NAVI MUMBAI INTERNATIONAL AIRPORT (NMIA) | 9/2022 | 165 | 165 | 30.01 |
27. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | EXPANSION OF CRYOGENICS GROUP BY SETTING UP NEW MANUFACTURING FACILITY | 9/2021 | 378 | 378 | 120.07 |
28. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | ANDHERI RESIDENTIAL TOWERS MUMBAI | 6/2017 | 281.35 | 281.35 | 68.51 |
29. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | CONSTRUCTION OF ADDITIONAL TANKAGES AND ALLIED FACILITIES AT JNPT TERMINAL | 4/2022 | 341.43 | 341.43 | 173.65 |
30. | MAHARASTRA METRO RAIL CORPORATION LTD. | URBAN DEVELOPMENT | PUNE METRO RAIL PROJECT (PHASE 1) | 12/2016 | 11420 | 13656.22 | 11889.09 |
31. | METROPOLITAN RAPID TRANSPORT PROJECTS | RAILWAYS | MUMBAI URBAN TRANSPORT PROJECT PHASE-II | 4/2008 | 5300 | 918.53 | 284.75 |
32. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | KURUDWADI TO PANDHARPUR | 1/2017 | 307.63 | 307.63 | 232.57 |
33. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | SELDOH TO PANVAR | 7/2018 | 404.33 | 404.33 | 140.65 |
34. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF SIX LANE FLYOVER AT KATRAJ JUNCTION AT KM, 3/880 OF NH 548-DD (VADGAON - KATRAJ - KO | 6/2021 | 169.15 | 169.15 | 36.94 |
35. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | MANSAR TO SALAIKHURD | 1/2018 | 418.36 | 418.36 | 263.13 |
36. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UP-GRADATION OF MUDKHED TO NANDED SECTION FROM KM. 372+000 TO KM 388+400 OF NH 16 | 8/2022 | 206.54 | 206.54 | 21.36 |
37. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | WARDHA TO ARVI | 2/2018 | 313.58 | 313.58 | 230.41 |
38. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | SILLOD TO FARDAPUR | 2/2017 | 337.46 | 337.46 | 335.3 |
39. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | PANGAON TO DHARMAPURI AND PARALI TO INJEGAON 2L+PS | 3/2018 | 152.03 | 152.03 | 81.35 |
40. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | PEN TO KHOPOLI | 3/2018 | 301.39 | 301.39 | 170.12 |
41. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | SATARA MURVAD PILLOV PANDHARPUR | 1/2017 | 388.44 | 388.44 | 240.05 |
42. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | SHIROD SHAHPURER TO NANDED | 1/2017 | 211.34 | 211.34 | 136.33 |
43. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UPGRADATION OF SATANA TO MANGRUL (CHANDWAD) SECTION OF NH752 G DESIGN CH: KM 64.0 | 3/2023 | 428.8 | 428.8 | 54.11 |
44. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | PIMPLA TO MANJARSUMBHA | 1/2017 | 595.77 | 595.77 | 357.73 |
45. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | MHASWAD TO TEMBHURNI | 1/2017 | 488.6 | 488.6 | 279.42 |
46. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CHIMUR TO WARORA | 11/2016 | 467.7 | 467.7 | 323.36 |
47. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | MALE VILLAGE TO PUNE RAIGARH DISTRICT BORDER | 3/2018 | 256.15 | 256.15 | 126.62 |
48. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UP-GRADATION TO 4 LANE ROAD WITH PAVED SHOULDER CONFIGURATION OF SECTION FROM UND | 3/2022 | 778.18 | 778.18 | 135.78 |
49. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | HIMAYATNAGAR TO PHULSAWANGI | 3/2018 | 294.87 | 294.87 | 183.17 |
50. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | PANCHARAL TO MANDANGHAR | 7/2018 | 381.08 | 381.08 | 45.66 |
51. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REPANPALLI TO SIRONCHA | 3/2022 | 282.07 | 282.07 | 34.65 |
52. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UP-GRADATION TO 4 LANING OF DAULTABAD T-POINT TO MALIWADA [FROM DESIGN KM.0.000 TO KM 4.000] AND UPG | 8/2022 | 185.59 | 185.59 | 63.56 |
53. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | DHAD BHOKARDAN TO BHOKARDHAN SILLOD | 3/2018 | 336.21 | 336.21 | 236.11 |
54. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | SALAIKHURD TO TIRORA | 1/2018 | 415.25 | 415.25 | 274.02 |
55. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | WAKAN PALI KHOPOLI | 1/2017 | 376.19 | 376.19 | 118.74 |
56. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | AMDI TO SAONER | 1/2017 | 396.91 | 396.91 | 289.79 |
57. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UPGRADATION OF PARLI TO SIRSALA SECTION OF NH-361F (KM 136+700 TO 115+000) (LENGT | 2/2023 | 261.82 | 261.82 | 70.59 |
58. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF 4 LANE FLYOVER AT NAGPUR RTO CHOWK TO NAGPUR UNIVERSITY CAMPUS FROM CH 2/250 TO 5/10 | 3/2021 | 478.83 | 478.83 | 233.48 |
59. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UP-GRADATION OF TIRORA-GONDIA, STATE HIGHWAY FROM EXISTING KM 163+213 (ON SH-335, TIRORA) TO KM 191+ | 8/2021 | 288.14 | 288.14 | 63.01 |
60. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | KARAD PATAN CHIPLUN GUHAGAR | 2/2017 | 407.19 | 407.19 | 323.02 |
61. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UPGRADATION OF BHOKARDAN TO KUMBHARI FATA DESIGN CH. (KM 13+500 TO 17+00) AND RAJ | 8/2022 | 291.37 | 291.37 | 102.94 |
62. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | SATARA TO MHASWAD | 1/2017 | 653.46 | 653.46 | 369.62 |
63. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | SARSAM TO KOTHARI | 2/2016 | 545.64 | 545.64 | 232.64 |
64. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | 2 LANE + PS PIMPLNER TO SATANA -[DESIGN CHAINAGE KM 21.427 TO 64.00 ] OF NH-752G] | 9/2019 | 277.81 | 277.81 | 148.68 |
65. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF NEW FOUR LANE BYPASS TO PARBHANI CITY (PARWA TO ASOLA) KM 463/265 TO KM 481/180 (DES | 3/2022 | 496.64 | 496.64 | 0 |
66. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | 4-LANNING OF NH17 AND NEW NO. NH66 FROM KM 241/300 TO 281/300 UNDER HYBRID ANNUITY MODE | 3/2016 | 1101.58 | 1101.58 | 608.53 |
67. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CHIKALI TO DHAD | 3/2018 | 189.46 | 189.46 | 133.07 |
68. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | BARASGAON TO RAHATEE | 7/2016 | 289.11 | 289.11 | 232.56 |
69. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | MEHKAR TO AJISPUR | 1/2017 | 232.77 | 232.77 | 151.6 |
70. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | KUMBHARI PHTA TO DEULGAON RAJA | 2/2017 | 406.51 | 406.51 | 340.26 |
71. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | PALPHATA TO PHULAMBARI | 3/2018 | 227.19 | 227.19 | 141.92 |
72. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | KANTE TO WAKED | 3/2016 | 1230.02 | 1230.02 | 791.8 |
73. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UP-GRADATION OF JINTUR- SHIRAD SHAHAPUR SECTION KM 258.300 TO KM 306.300 [DESIGN | 2/2023 | 414.81 | 414.81 | 0 |
74. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | PANDHARPUR TO SANGOLA | 7/2017 | 218.38 | 218.38 | 182.63 |
75. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | JINTUR TO PARBHANI | 1/2017 | 356.66 | 356.66 | 209.48 |
76. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | BHANDARA TO GHOTITOK | 1/2017 | 392.83 | 392.83 | 274.75 |
77. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | DIGRAS DARWAH KARANJA | 1/2017 | 391.06 | 391.06 | 287.6 |
78. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION OF EXHISTING 2 LANE FLEXIBLE PAVEMENT TO 2 LANE PAVED SHOULDERS RIGID PAVEMENT FROM DESI | 12/2021 | 167.97 | 167.97 | 35.28 |
79. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | INDAPUR TO VADPALE | 1/2017 | 1202.52 | 1202.52 | 1450.82 |
80. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | KOPARGAON TO SAVALI VIHIR SECTION | 9/2022 | 195.38 | 195.38 | 29.59 |
81. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | KOLDE TO KHETIYA | 1/2017 | 509.18 | 509.18 | 283.13 |
82. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | PARBHANI TO GANGKHED | 3/2018 | 238.19 | 238.19 | 194.54 |
83. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | KOLHA TO NASRATPUR | 4/2016 | 281.78 | 281.78 | 77.83 |
84. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | SHEWALI (SAKRI) - NANDURBAR | 9/2022 | 232.59 | 232.59 | 97.7 |
85. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILATION AND UPGRADATION TO TWO LANES WITH PAVED SHOULDER CONFIGURATION FROM WATUR TO CHARTHANA | 11/2021 | 228.01 | 228.01 | 103.01 |
86. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | AKOLA TO AKOT | 1/2017 | 313.95 | 313.95 | 270.26 |
87. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATIOBN AND REHABILITATION OF SECTION OF NH 361 F FROM PARLI (00/000) TO GANGAKHED (30/400) TO | 11/2021 | 224.44 | 224.44 | 75.34 |
88. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | RALEGAON TO RAMTIRTH | 1/2017 | 210.81 | 210.81 | 210.81 |
89. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | VITA TO NAGAJ | 3/2018 | 304.58 | 304.58 | 154.68 |
90. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | WADI TO ASOLA | 1/2017 | 363.82 | 363.82 | 154.65 |
91. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | PUNE RAIGARH DISTRICT BORDER TO MANGAON | 3/2018 | 223.46 | 223.46 | 123.46 |
92. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | AHMADPUR TO PIMPLA | 1/2017 | 422.38 | 422.38 | 269.59 |
93. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | DEVELOPMENT/WIDENING OF TALEGAON – CHAKAN – SHIKRAPUR – NHAVARA SECTION OF NH 548DG (NHAVARA TO CHOU | 10/2022 | 304.68 | 304.68 | 97.09 |
94. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | PUNE TO MALE VILLAGE | 3/2018 | 228.31 | 228.31 | 100.97 |
95. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION OF ADHALGAON-JAMKHED SECTION OF NH-548 D FROM KM 132/600 TO KM 195/375 TO TWO LANE WITH | 11/2021 | 223.35 | 223.35 | 209.36 |
96. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | NANDED TO JALKOT | 12/2017 | 456.93 | 456.93 | 278.22 |
97. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | OSMANNAGAR TO KUNDRAL | 9/2017 | 344.25 | 344.25 | 194.72 |
98. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UP-GRADATION OF SABALKHED TO ASHTI SECTION FROM KM 37+900 TO KM 55+100 AND CHINCH | 12/2022 | 213.32 | 213.32 | 20 |
99. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UPGRADATION OF JAMKHED TO SAUTADA SECTION OF NH548 D (FROM KM 195.375 TO KM 208.7 | 9/2022 | 157.62 | 157.62 | 13.86 |
100. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | KARWANDI TO RAJURI | 3/2018 | 276.95 | 276.95 | 160.94 |
101. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | BALANCE WORK OF REHABILITATION AND UP-GRADATION TO NH-166F FROM MAHAD JUNCTION (AT KM 123/400 ON NH- | 7/2021 | 256.54 | 256.54 | 80.1 |
102. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | 4-LANNING OF NH17 AND NEW NO. NH66 FROM KM 161/600 TO 205/400 UNDER HYBRID ANNUITY MODE | 3/2016 | 1142.62 | 1142.62 | 1056.08 |
103. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | NILAJPHATA TO BHANDARA | 1/2018 | 420.63 | 420.63 | 219.4 |
104. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | KOTHARI TO DHANORA | 9/2018 | 301.38 | 301.38 | 240.32 |
105. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | SHIRUR TO KHARDA | 2/2017 | 381.77 | 381.77 | 199.48 |
106. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | AURANGABAD TO SILLOD | 2/2017 | 456.32 | 456.32 | 355.54 |
107. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF MAJOR BRIDGE ACROSS MANJRA RIVER NEAR YESGI VILLAGE @ KM, 166/500 ON NH 63 TQ BILOLI | 10/2021 | 188.69 | 188.69 | 111.26 |
108. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UPGRADATION OF SHIRAPUR JUNCTION TO SHIVAJI CHOWK (DESIGN CHAINAGE KM. 130+00 TO | 2/2023 | 245.61 | 245.61 | 43.39 |
109. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | BHOGAN KHURD TO KASHEDI | 9/2017 | 743.21 | 743.21 | 911.64 |
110. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | FARDAPUR TO JALGAON | 2/2017 | 456.45 | 456.45 | 427.43 |
111. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | 2 LANE + PS ASTHAMODE - TIVATYAL [DESIGN CH. KM 24.300 - 62.00] [KM 134.98-172.95 OF NH-63] | 9/2019 | 228.82 | 228.82 | 144.54 |
112. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UPGRADATION OF END OF AHMEDNAGAR BYPASS TO KHARWANDI KASAR SECTION OF NH-222 FROM | 1/2015 | 225.81 | 225.81 | 167.96 |
113. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | DAHEGAON TO KUHI | 1/2017 | 228.89 | 228.89 | 154.82 |
114. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | ARDHAPUR TO HIMAYATNAGAR | 12/2017 | 426.06 | 426.06 | 271.4 |
115. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABLITATION AND UPGRADATION OF AMBOLI JUNCTION (DESIGN CH. 71+530) TO AJARA (DESIGN CH.100+835) SE | 6/2021 | 574 | 574 | 574 |
116. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | STRENGTHING AND WIDINING OF EXISTING CARRIAGEWAY TO 10 M IN KM, 156/160 TO 229/160 (TEMBHURNI - KUSL | 11/2021 | 157.72 | 157.72 | 55.38 |
117. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | JAHIRABAD TO LATUR | 1/2017 | 461.96 | 461.96 | 329.59 |
118. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | NASRATPUR TO BARASGAON | 7/2016 | 406.54 | 406.54 | 274.3 |
119. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | SHAHPUR PATGAON SECTION I | 1/2018 | 150.79 | 150.79 | 81.14 |
120. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | PARLI PIMPLA DAHIGUDA | 2/2017 | 205.72 | 205.72 | 85.71 |
121. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | PAITHAN TO SHIRUR | 3/2017 | 341.8 | 341.8 | 226.19 |
122. | MUMBAI METRO RAIL CORPORATION LTD | URBAN DEVELOPMENT | MUMBAI METRO LINE 3 (COLABA-BANDRA-SEEPZ) | 7/2013 | 23136 | 37276 | 26636.64 |
123. | Maharashtra Rail Infrastructure Development Corporation Limited | RAILWAYS | NAGPUR- NAGBHIR RAILWAY LINE GAUGE CONVERSION PROJECT | 10/2019 | 1400 | 1400 | 282.44 |
124. | Mumbai Railway Vikas Corporation | RAILWAYS | MUMBAI URBAN TRANSPORT PROJECT IIIA | 4/2019 | 33690 | 33690 | 293.52 |
125. | NAGPUR METRO RAIL CORPORATION LTD | URBAN DEVELOPMENT | NAGPUR METRO RAIL PROJECT PHASE II | 12/2022 | 6708 | 6708 | 143.7 |
126. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | PATAS-VASUNDE PHATA - BARAMATI BYPASS | 9/2021 | 531.86 | 532.41 | 514.03 |
127. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF 8 LANING OF EXISTING 4 LANE VADAPE TO THANE FROM KM 539.202 TO KM 563.000 SECTION OF | 3/2018 | 1162.92 | 1182.87 | 288.04 |
128. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING OF AURANGABAD-PAITHAN SECTION OF NH-752E ON EPC MODE IN THE STATE OF MAHARASHTRA . | 10/2022 | 490.4 | 289 | 84.72 |
129. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | TUNNEL AT KHAMBATAKI GHAT SECTION AND ITS APPROACHES FROM EXISTING KM. 771.730 TO EXISTING KM. 782.0 | 2/2019 | 493 | 493 | 374.15 |
130. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | KHUDUS TO DHARAMPURI PACKAGE 3 SANT DNYANESHWAR MAHARAJ PALKHI MARG SECTION OF NH965 | 2/2019 | 594.75 | 613.75 | 576.62 |
131. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | BALANCE WORK OF 4 LANING OF PANVEL TO INDAPUR SECTION OF NH-66(OLD NH- 17) FROM KM 0.000 (PANVEL) TO | 1/2023 | 151.26 | 151.26 | 102.62 |
132. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF EXISTING 2/4L STRETCH FROM LONAND TO DIVE GHAT (KM 166.400 TO KM 220.900 ) OF MOHOL – ALANDI S | 1/2022 | 1833.73 | 1833.73 | 334.25 |
133. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF RAJURA-KORPANA-ADILABAD ROAD UPTO M.S. BORDER FROM KM 32.910 TO KM 89.090 OF NH-353B | 3/2022 | 1013.33 | 1111.33 | 294.65 |
134. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF NAGPUR-KATOL SECTION FROM KM. 13.00 TO KM. 62.900 OF NH-353J | 2/2021 | 1166.96 | 1251 | 943.4 |
135. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4-LANNING OF WARANGA-MAHAGAON SECTION(KM 253.7000 TO 320.580) | 3/2017 | 1059.73 | 1071 | 878.19 |
136. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | IMPROVEMENT OF EXISTING ALIGNMENT OF PANDHARPUR TOWN PART BYPASSED SECTION FROM WAKHARI TO LORD VITT | 7/2022 | 150.21 | 150.21 | 3.99 |
137. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XIII) [KM. 26.582 TO KM. 50.700] (SHIRSAD - MASVAN) | 2/2022 | 2747 | 2747 | 780.4 |
138. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XVII) [KM. 69.800 TO KM. 79.783 OF SPUR] (BHOJ - MORBE) | 9/2021 | 2208.68 | 2208.68 | 241.13 |
139. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF INDORA CHOWK TO PACHPAOLI AND AGRASEN CHOWK - ASHOKA CHOWK | 3/2023 | 998.27 | 998.27 | 30.96 |
140. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF RATNAGIRI - KOLHAPUR SECTION OF NH-166 FROM KM 0.000 TO KM 19.769 AND KM 31.000 TO KM 67.140 ( | 11/2022 | 930 | 930 | 417.14 |
141. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 6L OF KAGAL-SATARA SECTION FROM KM 658.000 TO KM 725.000 OF NH-48 (PKG-II) | 12/2022 | 1749.86 | 1749.86 | 910 |
142. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF BARAMATI TO INDAPUR (PKG-II) FROM KM. 41.400 TO KM. 84.550 OF NH-965G (SAINT TUKARAM MARG) | 9/2021 | 624.45 | 627.79 | 385.06 |
143. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CHAKUR LOHA SECTION OF NH-361 FROM KM 114.600 TO KM 187.80 | 3/2018 | 1241.38 | 2122.64 | 1588.44 |
144. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF RATNAGIRI - KOLHAPUR SECTION FROM KM 112.340 TO KM 145.300 OF NH-166 (PKG–III) | 5/2023 | 986 | 986 | 245.45 |
145. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF INDAPUR TO TONDLE (PKG-III) FROM KM.84.550 TO KM. 131.00 OF NH-965G (SAINT TUKARAM MARG) | 9/2021 | 667.66 | 666.21 | 432.52 |
146. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | NAGPUR RING ROAD PACKAGE-2 | 3/2016 | 591.66 | 591.66 | 524.42 |
147. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4-LANNING OF KODEBAD-DHAMTARI SECTION OF NH-43 (FROM KM. 43.400 TO KM. 82.209) IN THE STATE OF CHHAT | 11/2016 | 446.17 | 356.62 | 353.48 |
148. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | BALANCE WORKS OF 4L PANVEL-INDAPUR SECTION OF NH-66 (OLD NH-17) FROM KM 42.300 (KASU) TO KM 84.600 ( | 10/2022 | 332 | 332 | 184.31 |
149. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF AUSA-CHAKUR SECTION FROM KM 55.835 TO KM 114.345 OF NH-361 | 3/2018 | 1169.04 | 1693.95 | 1010.33 |
150. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF RATNAGIRI - KOLHAPUR SECTION FROM KM 67.140 TO KM 112.340 OF NH-166 (PKG – II) | 5/2023 | 839 | 839 | 203 |
151. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF FLYOVER AT KM.544.650 INCLUDING ROB ,SERVICE ROADS ,FOOTPATH FOR RCC DRAINS ON URBAN | 12/2015 | 649.5 | 649.5 | 558.29 |
152. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF EXISTING 2/4L STRETCH FROM LONAND TO DIVE GHAT (KM 166.400 TO KM 220.900 ) OF MOHOL – ALANDI S | 5/2022 | 519.93 | 519.93 | 334.25 |
153. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | MEDSHI (KM 47.700) TO WASHIM (KM 92.200) OF NH-161 IN MAHARASHTRA | 2/2018 | 1061.29 | 683.1 | 685.97 |
154. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF AKOLA - MEDSHI FROM KM. 0.00 TO KM. 47.70 OF NH-161 INCLUDING BYPASSES AT PATUR AND MEDSHI | 12/2019 | 1393.95 | 576 | 527.13 |
155. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | BAL. WORKS OF FAGNE (KM. 510.000) TO MAHARASHTRA/GUJARAT BORDER (KM. 650.794) | 12/2019 | 1654.07 | 980 | 835.19 |
156. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XI) [KM. 77.000 TO KM. 103.400] (GANJAD - TALSARI) | 5/2022 | 1260 | 1260 | 409.42 |
157. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | MOHOL TO WAKHARI PACKAGE1 SANT DNYANESHWAR MAHARAJ PALKHI MARG SECTION OF NH965 | 2/2019 | 731.89 | 731.99 | 673.05 |
158. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | WAKHARI TO KHUDUS PACKAGE2 SANT DNYANESHWAR MAHARAJ PALKHI MARG SECTION OF NH965 | 2/2019 | 362.46 | 372.46 | 346.15 |
159. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF NEW 4-LANE BRIDGE ACROSS VARSOVA CREEK AND ITS APPROACHES WITH INTERCHANGE IN THE ST | 3/2017 | 247.02 | 157.49 | 79.03 |
160. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L MITIGATION MEASURE STRUCTURES ON CH/MH BORDER TO WAINGANGA BRIDGE SECTION OF NH-53 | 2/2021 | 540.21 | 540.21 | 396.67 |
161. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4-LANNING OF BODHRE-DHULE SECTION(KM 390.000 TO 452.800) | 3/2017 | 744.64 | 1007 | 362.98 |
162. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 6L OF WAINGANGA BRIDGE - BHANDARA (INCLUDING BHANDARA BYPASS) SECTION FROM KM 485.000 TO KM 499.800 | 10/2021 | 815.77 | 815.77 | 552.42 |
163. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 6L OF KAGAL-SATARA SECTION FROM KM 592.240 TO KM 658.000 OF NH-48 (PKG-I) | 1/2023 | 1025.2 | 1025.2 | 288.08 |
164. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XIV) [KM. 3.000 TO KM. 20.200 OF SPUR] (SHIRSAD - AKLOLI) | 11/2022 | 1124 | 1124 | 238.74 |
165. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4-LANNING OF TARSOD-FAGNE(FROM KM 422.700-510.00) | 11/2016 | 1064.88 | 1021 | 862.23 |
166. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DHARAMPURI-LONAND FROM KM. 117.00 TO 166.40 (PKG-IV) ON MOHOL-ALANDI SECTION | 9/2021 | 618.45 | 618.45 | 543.77 |
167. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | INTEGRATED STRUCTURE WITH DEVELOPMENT OF OTHER ALLIED STRUCTURES ON BOTH SIDES OF CHANDNI CHOWK JUNC | 2/2019 | 397.6 | 397.6 | 370.5 |
168. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XII) [KM. 50.700 TO KM. 77.000] (MASVAN - GANJAD) | 3/2022 | 1549.02 | 1549.02 | 435.26 |
169. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | NAGPUR RING ROAD PACKAGE-1 | 3/2016 | 546 | 546 | 525.69 |
170. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XV) [KM. 20.200 TO KM. 43.000 OF SPUR] (AKLOLI - AMNE) | 11/2022 | 990 | 990 | 190.56 |
171. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XVI) [KM. 43.000 TO KM. 69.800 OF SPUR] (AMNE - BHOJ) | 11/2022 | 1450 | 1450 | 396.67 |
172. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | LIFE EXTENSION OF WALL PLATFORMS OF MUMBAI HIGH AND HEERA FIELDS | 12/2015 | 3190.69 | 3375.9 | 2961.86 |
173. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | PART REPLACEMENT PIPELINE PROJECT (PRPP) | 11/2022 | 1219.48 | 1145.1 | 0 |
174. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | DAMAN UPSIDE DEVELOPMENT PROJECT (DUDP) IN TAPTI DAMAN BLOCK | 6/2022 | 4144.41 | 4144.41 | 0 |
175. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | MUMBAI HIGH NORTH REDEVELOPMENT PHASE-IV | 4/2019 | 3228.8 | 3976.67 | 3867.19 |
176. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | PIPELINE REPLACEMENT PROJECT - VII | 1/2022 | 3183.58 | 3645.23 | 2283.93 |
177. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TS FOR EVACUATION OF 7GW RE INJECTION AT KHAVDA PS UNDER PHASE-IV PART E4 | 11/2023 | 224 | 224 | 0 |
178. | SATLUJ JAL VIDYUT NIGAM LIMITED | POWER | BIKANER SOLAR POWER PROJECT | 4/2022 | 5491.89 | 5491.89 | 2648.39 |
179. | SOUTH EAST CENTRAL RAILWAY | RAILWAYS | RAJNANDGAON - NAGPUR - 3RD LINE (SECR) | 9/2016 | 1908.51 | 3544.25 | 2537.97 |
180. | SOUTH EAST CENTRAL RAILWAY | RAILWAYS | WADSA-GADHCHIROLI NEW LINE (52.36 KM) | 6/2018 | 229 | 1886.05 | 276.43 |
181. | WESTERN COAL FIELDS LIMITED | COAL | UKNI DEEP OC | 11/2018 | 318.14 | 318.14 | 252.7 |
182. | WESTERN COAL FIELDS LIMITED | COAL | GHONSA EXPANSION DEEP OC | 3/2021 | 241.72 | 241.72 | 58.79 |
183. | WESTERN COAL FIELDS LIMITED | COAL | AMALGAMATED INDER-KAMPTEE DEEP OC (3.20 MTY) | 9/2018 | 313.34 | 313.34 | 202.78 |
184. | WESTERN COAL FIELDS LIMITED | COAL | BHANEGAON OC (1.15MTY) | 9/2022 | 494.6 | 494.6 | 98.26 |
185. | WESTERN COAL FIELDS LIMITED | COAL | MUNGOLI NIRGUDA EXTENSION (DEEP) OC | 11/2020 | 826.8 | 826.8 | 432.89 |
186. | WESTERN COAL FIELDS LIMITED | COAL | MAKARDHOKDA I EXPANSION OC | 6/2022 | 497.06 | 497.06 | 144.2 |
187. | WESTERN COAL FIELDS LIMITED | COAL | SASTI EXPANSION OC | 8/2020 | 371.59 | 371.59 | 95.71 |
188. | WESTERN COAL FIELDS LIMITED | COAL | RPR PAUNI II EXPANSION OC | 3/2023 | 464.45 | 464.45 | 178.59 |
189. | WESTERN COAL FIELDS LIMITED | COAL | GOKUL EXPANSION OC | 4/2021 | 456.95 | 456.95 | 147.9 |
190. | WESTERN COAL FIELDS LIMITED | COAL | DHUPTALA OC(SASTI UG TO OC) | 2/2019 | 720.87 | 720.87 | 176.85 |
191. | WESTERN COAL FIELDS LIMITED | COAL | KOLGAON EXPANSION (DEEP) OC | 1/2023 | 206.19 | 206.19 | 7.75 |
192. | WESTERN COAL FIELDS LIMITED | COAL | SINGHORI DEEP OC | 5/2022 | 421.84 | 421.84 | 115.89 |
193. | WESTERN COAL FIELDS LIMITED | COAL | RPR GAURI PAUNI EXPANSION OC | 3/2023 | 497.23 | 497.23 | 40.5 |
194. | WESTERN COAL FIELDS LIMITED | COAL | AMALGAMATED YEKONA-I YEKONA-II | 8/2015 | 727.28 | 727.28 | 526.01 |
195. | WESTERN COAL FIELDS LIMITED | COAL | ADASA UG TO OC (1.50 MTY) | 11/2018 | 333.43 | 333.43 | 221.52 |
196. | WESTERN COAL FIELDS LIMITED | COAL | DINESH (MAKARDHOKDA-III) OC (8.0 MTY) | 2/2020 | 1184.33 | 1184.33 | 839.36 |
197. | WESTERN COAL FIELDS LIMITED | COAL | BELLORA-NAIGAON DEEP OC | 11/2018 | 252.71 | 252.71 | 122.37 |
198. | WESTERN COAL FIELDS LIMITED | COAL | NEW MAJARI UG TO OC (3.0 MTY) | 5/2019 | 496.38 | 496.38 | 133.84 |
199. | WESTERN COAL FIELDS LIMITED | COAL | SAONER UG MINE I EXPANSION | 1/2022 | 253.51 | 253.51 | 94.38 |
200. | WESTERN COAL FIELDS LIMITED | COAL | BHATADI EXPANSION OC | 2/2020 | 729.86 | 729.86 | 158.97 |
201. | WESTERN RAILWAY | RAILWAYS | VIRAR SURAT ROAD OVER BRIDGE IN LIEU OF LEVEL CROSSING NOS 42 46A 48 52 55 102 106 108 130 AND 137 A | 3/2012 | 217.38 | 393.62 | 142.48 |
202. | WESTERN RAILWAY | RAILWAYS | MUMBAI CENTRAL VIRAR VADODARA AHMEDABAAD TRAIN PROTECTION SYSTEM 500 RKM | 3/2010 | 265.88 | 311.36 | 0 |
| Total | 202 | |