S No. | Sector Name | Agency Name | Project Name | Date Of Approval | Cost Original | Cost Anticipated | Expenditure |
1. | CIVIL AVIATION | AIRPORT AUTHORITY OF INDIA LIMITED | C/O OF NITB AND ASSOCIATED WORK AT VIJAYAWADA AIRPORT | 4/2020 | 611.8 | 611.8 | 257.61 |
2. | CIVIL AVIATION | AIRPORT AUTHORITY OF INDIA LIMITED | RAJAHMUNDRY AIRPORT: CONSTRUCTION OF NEW DOMESTIC TERMINAL BUILDING AND MISCELLANEOUS WORKS INCLUD | 12/2022 | 347.15 | 347.15 | 8.07 |
3. | CIVIL AVIATION | AIRPORT AUTHORITY OF INDIA LIMITED | EXT AND STR. OF EXISTING RUNWAY 08/26 AT TIRUPATI AIRPORT | 8/2017 | 177.1 | 177.1 | 143.4 |
4. | CIVIL AVIATION | AIRPORT AUTHORITY OF INDIA LIMITED | KADAPPA AIRPORT- CONSTRUCTION OF NEW DOMESTIC TERMINAL BUILDING AND MISCELLANEOUS WORKS INCLUDING MA | 3/2023 | 265.91 | 265.91 | 0 |
5. | DEPARTMENT OF HIGHER EDUCATION | CPWD OF HIGHER EDUCATION | CONSTRUCTION OF PERMANENT CAMPUS FOR INDIAN INSTITUTE OF TECHNOLOGY TIRUPATI AT MERLAPAKA VILLAGE YE | 2/2019 | 655.34 | 655.34 | 689.31 |
6. | DEPARTMENT OF HIGHER EDUCATION | CPWD OF HIGHER EDUCATION | CONSTRUCTION OF PERMANENT CAMPUS FOR IISER AT JANGALAPALLI VILLAGE, YERPEDU MANDAL, CHITTOOR DISTRIC | 9/2019 | 588.72 | 588.72 | 594.41 |
7. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | CGD PROJECT AT KURNOOL, GUNTUR AND PRAKASAM DISTRICTS | 3/2022 | 1420 | 1420 | 55.16 |
8. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | LPG BP PROJECT CHITTOOR | 7/2019 | 167 | 200.82 | 110.26 |
9. | PETROLEUM | HINDUSTAN PETROLEUM CORPORATION LIMITED | RUF PITCH LOADING GANTRY | 10/2020 | 332.61 | 332.61 | 257 |
10. | PETROLEUM | BHARAT PETROLEUM CORPORATION LIMITED | MULTI-PRODUCT PIPELINE FROM KRISHNAPATNAM COASTAL INSTALLATION TO THE PROPOSED INSTALLATION AT HYDER | 9/2019 | 1932 | 1932 | 782.87 |
11. | PETROLEUM | HINDUSTAN PETROLEUM CORPORATION LIMITED | HP CRUDE TO OLEFINS AND AROMATICS TECHNOLOGY DEMO UNIT AT VISAKH REFINERY | 9/2021 | 160 | 160 | 3.91 |
12. | PETROLEUM | OIL & NATURAL GAS CORPORATION LIMITED | KG-DWN-98-2 CLUSTER II DEVELOPMENT PROJECT | 3/2016 | 34012 | 34012 | 28573.77 |
13. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | REVAMPING OF FACILITIES AT VIZAG TERMINAL | 4/2018 | 355 | 355 | 226.12 |
14. | PETROLEUM | HINDUSTAN PETROLEUM CORPORATION LIMITED | VISAKH REFINERY MODERNISATION PROJECT | 7/2016 | 20928 | 26264 | 25617.87 |
15. | PETROLEUM | HINDUSTAN PETROLEUM CORPORATION LIMITED | SWRO II WITH LLPH FACILITIES | 9/2019 | 196.26 | 196.26 | 146.53 |
16. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | CGD PROJECT AT SRIKAKULAM, VISAKHAPATNAM AND VIZIANAGARAM DISTRICTS | 6/2019 | 2880 | 2880 | 241.78 |
17. | POWER | POWER GRID CORPORATION OF INDIA LIMITED | TRANSMISSION SCHEME FOR SOLAR ENERGY ZONE IN ANANTHPURAM (2500MW) AND KURNOOL (1000MW) | 9/2023 | 1249 | 1249 | 0 |
18. | RAILWAYS | EAST COAST RAILWAY | KOTTAVALSA - KORAPUT DOUBLING | 4/2015 | 2499.71 | 2499.71 | 1466.94 |
19. | RAILWAYS | SOUTH CENTRAL RAILWAY | RENIGUNTA WADI GOOTY - BYPASS | 4/2016 | 302 | 302 | 34.06 |
20. | RAILWAYS | SOUTH CENTRAL RAILWAY | DOUBLING BETWEEN GOOTY-PENDAKALLU (29.225) | 3/2023 | 351.83 | 351.83 | 0 |
21. | RAILWAYS | SOUTH WESTERN RAILWAY | MALUGUR-PALASAMUDRAM (17.98 KM) (PB#29/NR/2022-23) | 9/2022 | 323.14 | 323.14 | 39.41 |
22. | RAILWAYS | SOUTH CENTRAL RAILWAY | GUNTUR-GUNTAKAL | 4/2016 | 3631 | 3887.48 | 2842.18 |
23. | RAILWAYS | SOUTH CENTRAL RAILWAY | VIJAYAWADA KAZIPET BYEPASS LINE | 4/2016 | 226.72 | 226.72 | 89.38 |
24. | RAILWAYS | SOUTH WESTERN RAILWAY | PENUKONDA-DHARMAVARAM, EXCL. DHARMAVARAM (41.5 KM) | 4/2019 | 294.67 | 307.66 | 56.95 |
25. | RAILWAYS | RAIL VIKAS NIGAM LTD. | VIJAYAWADA-GUDUR | 4/2015 | 3246.26 | 6238.67 | 5308.7 |
26. | RAILWAYS | SOUTH CENTRAL RAILWAY | KOTLPALLI-NARASAPUR (NL) (SCR) | 12/2001 | 1045.2 | 2500.98 | 1141.44 |
27. | RAILWAYS | SOUTH CENTRAL RAILWAY | NADIKUDE-SRI KALAHASTI | 4/2011 | 2288.7 | 3122.35 | 1400.78 |
28. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | CONSTRUCTION OF 4 LANE ACCESS CONTROLLED NEW GREENFIELD HIGHWAY SECTION OF NH 365BG FROM RECHARLA VI | 9/2021 | 517.05 | 655.06 | 319.29 |
29. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4 LANING OF NH 544D FROM EXISTING KM 346.300 OF NH 44 (DESIGN CHAINAGE KM 0.000) TO KM 39.380 (DESIG | 10/2022 | 907.76 | 907.76 | 205.06 |
30. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | CONSTRUCTION OF 4-LANE HIGHWAY FROM SAMARLAKOTA TO ACHAMPETA JUNCTION (FROM KM. 0.000 TO KM. 12.250 | 5/2023 | 648.75 | 648.75 | 29.39 |
31. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6-LANING OF VIJAYAWADA BYPASS FROM GOLLAPUDI (DESIGN CH. 30+000) TO CHINNAKAKANI (DESIGN CH. 47+881) | 11/2019 | 1601.1 | 1601.1 | 992.73 |
32. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF NEW NH-544DD FROM DESIGN CHAINAGE KM 56.00 TO 102.20 OF KALYANDURG | 3/2018 | 289.67 | 285.29 | 254.19 |
33. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | NH167B FROM KM 99.103 CS PURAM TO KM 143.320 MALAKONDA TO 2LPS | 12/2021 | 277.3 | 277.3 | 54.7 |
34. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | CONSTRUCTION OF 4 LANE ACCESS CONTROLLED HIGHWAY FROM CHILLAKURU CROSS ROAD TO TURPUKANUPUR KM 0+000 | 7/2022 | 909.47 | 909.47 | 97.03 |
35. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L ALURU - JAKKUVA SECTION OF NH-130CD ROAD FROM KM 365.033 TO KM 396.800 (PKG. 1) | 2/2021 | 922.5 | 1128.68 | 302.75 |
36. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | NH 167 B KADAPA NELLORE BORDER TO CSPURAM I.E. FROM KM 58.635 TO KM 99.409 | 3/2022 | 285.5 | 285.5 | 28.68 |
37. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM MALLAPALLE 176.000 KM. TO KAVULAKUNTLA 196.000 KM. PACK | 2/2023 | 909.02 | 909.02 | 27.31 |
38. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF NH219(NEW NH42) FROM KM 244.930 TO 299.775 (MADANAPALLI PUNGANURU | 9/2016 | 372.68 | 309.37 | 275.18 |
39. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L OF PONDAVAKKAM TO KANNIGAIPAIR FROM KM 96.040 TO KM 116.100 OF NH 716B (PKG-IV) | 2/2021 | 818.73 | 1105 | 209.07 |
40. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | BANGALORE CHENNAI EXPRESSWAY (PHASE-II PKG-III) FROM KM.127.000 TO KM 156.000 (BANGARUPALEM TO GUDIP | 11/2020 | 1137.74 | 1289 | 633.77 |
41. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L OF VEERA KAVERI RAJA PURAM TO PONDAVAKKAM FROM KM 61.380 TO KM 96.040 OF NH 716B (PKG-III) | 3/2021 | 1102.63 | 1303 | 502.52 |
42. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM NALLACHERUVU PALLI 96.300 KM. TO YERRAGUDIPADU 129.000 | 2/2023 | 1253.24 | 1253.24 | 69.8 |
43. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF 4-LANE BYPASS TO VIJAYANAGARAM TOWN ON NH43 (NEW NH26) FROM 537/6 TO 552/0 (RAIPUR-V | 2/2017 | 429.43 | 373.05 | 380.3 |
44. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF NEW NH-544E FROM KM. 0.000 TO KM 56.803 OF KODIKONDA - MADAKASIRA | 3/2018 | 504.19 | 504.19 | 518.99 |
45. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UP GRADATION OF NH-544E FROM KM 56/803 TO KM 99/179 OF MADAKASIRA TO SIRA SECTION | 3/2020 | 207.79 | 207.79 | 176.62 |
46. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | CONSTRUCTION OF SIX LANING OF NAIDUPETA JUNCTION - TURPUKANUPUR SECTION FROM KM.57+046 TO KM.91+927 | 7/2022 | 1398.84 | 1398.84 | 58.68 |
47. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITAITON AND UPGRADATION OF REPALLE TO EEPPURPALEM SECTION FROM KM 128/927 TO KM 195/000 OF NH | 1/2017 | 576.48 | 686.13 | 685.2 |
48. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF NH-219 FROM KM 58-600 TO KM 140-750 IN THE STATE OF ANDHRA PRADES | 3/2015 | 271.45 | 271.45 | 241.89 |
49. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | 2L+PS FROM KM. 0+000 TO KM. 32+000 (MUDIGUBBA TO PUTTAPARTHI) OF NH-342 | 3/2022 | 401.72 | 401.72 | 121.84 |
50. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF TIMMAPURAM TO GURJANAPALLE SECTION FROM KM 26.150 TO 41.161 OF NH-214(NH216)(KAKINAD | 8/2016 | 350.61 | 411.18 | 358.29 |
51. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | 4 LANE WITH PAVED SHOULDER FROM KM 0.000 TO KM 51.119 OF TADIPATRI TO MUDDANUR OF NH67 | 3/2022 | 724.17 | 724.17 | 151.76 |
52. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | 2LPS FROM GONDIGUDA TO ARAKU BHALLAGUDA KM 27.480 TO KM 51.772 SECTION OF NH 516E | 8/2020 | 296.66 | 296.66 | 53.09 |
53. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | NH165 FROM KM 0.000 TO KM 64.020 PAMARRU TO AKIVEEDU SECTION TO TWO LANE WITH PAVED SHOULDERS | 3/2020 | 529.24 | 529.24 | 55.87 |
54. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | BANGALORE CHENNAI EXPRESSWAY (PHASE-II PKG-II) FROM KM.96.000 TO KM 127.000 (BAIREDDYPALLE TO BANGAR | 3/2021 | 1942.94 | 2171 | 519.81 |
55. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4L PS FROM MANDLEM (EXISTING KM. 38.000/DESIGN KM.30.600) TO ATMAKUR (EXISTING KM.73.000/DESIGN KM 6 | 3/2023 | 887.28 | 887.28 | 19.56 |
56. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS CONFIGURATION OF PADERU-GONDIGUDA SECT | 8/2020 | 222.61 | 222.61 | 103.04 |
57. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | 2LPS FROM KM36.400 TO KM. 107.224 OF NH167BG FROM DUTTALUR TO KAVALI SECTION | 3/2021 | 423.67 | 423.67 | 77.31 |
58. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF DHINDI-DIGAMARRU SECTION FROM KM126/510 TO KM135/740 OF NH214(NH21 | 1/2016 | 386.09 | 288.76 | 264.38 |
59. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | 4 LANE FROM KM 56.400 TO KM 120.300 FROM B.KOTHAPALLI JUNCTION TO GORANTLA OF NH 716G | 3/2022 | 839.98 | 839.98 | 146.12 |
60. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L JAKKUVA – KORLAM SECTION OF NH-130CD ROAD FROM KM 396.800 TO KM 421.100 (PKG 2) | 2/2021 | 663.6 | 768 | 249.99 |
61. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM VANKARAKUNTA 45.700 KM. TO ODULAPALLE 72.000 KM. OF NH | 12/2022 | 992.89 | 992.89 | 28.26 |
62. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF EXISTING NH-565 FROM KM.86.057 TO 133.922 OF NAGARJUNASAGAR DAM T | 1/2014 | 195.45 | 385.97 | 285.3 |
63. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF LOSARI-MACHAVARAM SECTION FROM KM34/230 TO KM84/550 OF NH214(NH216 | 3/2016 | 444.84 | 459.37 | 423.36 |
64. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4L PS MYDUKUR BADVEL FROM KM 585.820 TO KM 630.960 SECTION OF NH 67 | 5/2022 | 1063.72 | 1063.72 | 239.53 |
65. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | NH167B FROM KM.143.320 MALAKONDA TO 189.050 SINGARAYAKONDA ON NH 16 TO TWO LANE WITH PAVED SHOULDERS | 3/2021 | 369.81 | 369.81 | 99.94 |
66. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4L PS FROM KURNOOL (EXISTING KM. 5.400 OF NH-40/DESIGN KM.0.000) TO MANDLEM (EXISTING KM.38.000/DESI | 3/2023 | 827.39 | 827.39 | 100.16 |
67. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM YERRAGUDIPADU 129.000 KM. TO AUDIREDDIPALLE 160.000 KM. | 2/2023 | 1200.42 | 1200.42 | 56.81 |
68. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6-LANING OF VIJAYAWADA BYPASS FROM CHINNA AVUTUPALLI (DESIGN CH.0+000) TO GOLLAPUDI (DESIGN CH. 30+0 | 11/2019 | 1226.88 | 1581.24 | 1419.23 |
69. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | COMPLETION OF BALANCE WORKS PENDING IN BIT AND PIECES (INCOMPLETE STRETCH AT 7 LOCATIONS) AND LISTED | 9/2022 | 166.52 | 166.52 | 43.74 |
70. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4L GREENFIELD ROAD CONNECTING NORTH AND SOUTH INDUSTRIAL CLUSTER OF KHANDALERU CREEK NEAR KRISHNAPAT | 8/2022 | 609.43 | 609.43 | 25.24 |
71. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L OF CHILKARARUPET BYPASS FROM KM. 357.400 TO KM. 371.920 OF NH-16 | 2/2019 | 757.45 | 757.45 | 391.78 |
72. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L OF VARADHARAJULA TO KUMARAJAPET FROM KM 0.000 TO KM 43.800 OF NH-716B (PKG-I) | 2/2021 | 1484.83 | 1768 | 729.09 |
73. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | GUDIWADA TOWN 2 LANE ROB AND ROAD IMPROVEMENT OF NH165 IN REPLACEMENT OF LC NO 3ESPL3 AT KM 231.700 | 3/2022 | 317.22 | 317.22 | 41.19 |
74. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF MACHILIPATNAM TO AVANIGADDA SECTION FROM KM84/550 - 124/200 OF NH2 | 11/2016 | 376.25 | 414.44 | 399.5 |
75. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM KODUR 0.000 KMS TO VANAVOLU 24.300 KMS OF NH 544G PACKA | 12/2022 | 912.94 | 912.94 | 60.04 |
76. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | FOUR LANING OF 5.122 KM OF NH9(NEW NH 65) FROM KM 269.900(DESIGN CH0.0) TO KM 275/622(DESIGN CH 5.12 | 10/2015 | 333.21 | 353.43 | 344.66 |
77. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | BANGALORE CHENNAI EXPRESSWAY (PHASE-II PKG-I) FROM KM.71.000 TO KM 96.000 (BETHAMANGALA IN THE STATE | 12/2020 | 1075.27 | 1307 | 573.71 |
78. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION UPGRADATION OF NH214(NH216) FROM KM41.161 TO KM59.800(GURJANAPALLI TO POLEKURU SECT | 1/2016 | 348.95 | 355.69 | 316.35 |
79. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | NH440 RAYACHOTY TOVEMPALLI 2LPS | 12/2021 | 439.82 | 439.82 | 46.03 |
80. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | MULAKALACHERUVU TO MADANAPALLE SECTION OF NH42 FROM KM 202.050 TO KM 245.640 EXCLUDING RETAINED STRE | 12/2021 | 480.1 | 480.1 | 228.62 |
81. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L KORLAM-KANTAKAPALLE SECTION OF NH-130CD ROAD FROM KM 421.100 TO KM 445.100 (PKG-3) | 2/2021 | 772.7 | 980.51 | 486.54 |
82. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L KANTAKAPALLE – SABBAVARAM SECTION OF NH-130CD ROAD FROM KM 445.100 TO KM 464.662 (PKG-4) | 2/2021 | 824.29 | 924 | 295.92 |
83. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | WIDENING TO 2LPS OF RAMPACHODAVARAM - KOYYURU SECTION OF NH516E FROM KM.43.700 TO KM 113.820 | 3/2022 | 568.12 | 568.12 | 180.63 |
84. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | CONSTRUCTION OF SIX LANING OF DEDICATED PORT ROAD TO KRISHNAPATNAM PORT (PACKAGE-I) KM 0+000 TO KM 1 | 3/2018 | 314.43 | 348.72 | 85.61 |
85. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | 2LPS OF KOYYURU TO CHAPRATHIPALEM SECTION OF NH 516E | 8/2020 | 349.29 | 349.29 | 66.67 |
86. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF NH326A FROM KM 0/0 TO 41/979 (EXCLUDING KM 2/255 TO 3/372 AND KM 3 | 3/2018 | 228.32 | 202.83 | 176.26 |
87. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4L OF MADANAPALLE TO PILERU SECTION FROM KM 0.000 TO KM 55.900 OF NH-71(PACKAGE-I) - N/05060/01002/A | 1/2022 | 1852.12 | 1787 | 391.93 |
88. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM VANAVOLU 24.300 KM. TO VANKARAKUNTA 45.700 KM. OF NH 5 | 12/2022 | 750.81 | 750.81 | 22.23 |
89. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | NH-30-BHADRACHALAM TO KONTA SECTION 2LPS | 12/2021 | 388.71 | 388.71 | 101.2 |
90. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | WIDENING AND STRENGTHENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 491/000 TO KM 525/200 OF RAIPUR | 6/2020 | 221.4 | 221.4 | 176.26 |
91. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | CONSTRUCTION OF 4 LANE ACCESS CONTROLLED NEW GREENFIELD HIGHWAY SECTION OF NH-365BG (KHAMMAM-DEVARAP | 9/2021 | 622 | 817.91 | 310.89 |
92. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | 2LPS OF CHAPRATHIPALEM TO LAMBASINGI SECTION OF NH 516E | 8/2020 | 311.22 | 311.22 | 55.06 |
93. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | FORMATION OF BYPASS ROAD TO KADIRI TOWN FROM ON NH42 | 6/2020 | 220.66 | 220.66 | 41.43 |
94. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF NH565 FROM EXISTING KM 361.330(DORNALA T JUNCTION) TO KM 420.800(P | 1/2018 | 418.03 | 386.99 | 367.88 |
95. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | CONSTRUCTION OF 1 NOS ROB, 2 NOS VUPS, SERVICE ROADS, PROVISION OF LIGHTING AND CONSTRUCTION OF OTHE | 6/2023 | 152.05 | 152.05 | 26.49 |
96. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | NH167AD FROM MACHERLA TO DACHEPALLI FROM KM.0.000 TO 43.659 TO 2LPS | 1/2022 | 403.22 | 403.22 | 124.98 |
97. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM ODULAPALLE 72.000 KM. TO NALLACHERUVUPALLI 96.300 KM. | 12/2022 | 1058.9 | 1058.9 | 28.65 |
98. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | RENIGUNTA - POYYA - NAIDUPETA KM 124.60 TO KM 183.4 OF NH 71 - N/04027/06001/AP | 3/2020 | 1863.09 | 2238 | 971.17 |
99. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L OF CHITTOOR TO THATCHUR FROM KUMARAJAPET TO VEERA KAVERI RAJA PURAM FROM KM 43.800 TO KM 61.380 O | 2/2021 | 591.99 | 703 | 63.87 |
100. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM AUDIREDDIPALLE 160.000 KM. TO MALLAPALLE 176.000 KM. PA | 1/2023 | 956.14 | 956.14 | 18.72 |
101. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF 2L+PS FROM PASARLAPUDI-DHINDI (105/700 TO 127.500 OF NH-214) OF NH-216 | 1/2017 | 263.45 | 263.45 | 208.15 |
102. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4 LANING FROM EXISTING KM 39.380 (DESIGN CH. 37.000) TO KM 74.450 (DESIGN CH. 69.000) OF MUCHUKOTA – | 10/2022 | 972.63 | 1055.23 | 139.98 |
103. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF NH-42 FROM KM 4-350 TO KM 75-600 | 3/2015 | 309.01 | 309.01 | 309.01 |
104. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4L OF PILERU TO KALUR SECTION FROM KM 55.900 TO KM 92.800 AND KM 94.500 TO KM 95.717 | 10/2023 | 1047.32 | 1047.32 | 163.46 |
105. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF KARNATATKA/AP BORDER-GOOTY SECTION FROM KM 368.920 TO KM 424.225 O | 3/2016 | 995.09 | 995.09 | 643.54 |
106. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF EXISTING NH-167 FROM KM 14.900 TO KM 70.00 (DESIGN CH.14.900 TO 69 | 11/2016 | 290.15 | 236.16 | 205.02 |
107. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | 4 LANING OF BATHALAPALLI TO MUDIGUBBA SECTION (DESIGN CHAINAGE KM. 96.300 TO 129.300) INCLUDING BATH | 3/2022 | 536 | 536 | 161.48 |
108. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADATION OF NH-340 FROM KM 0/0 TO KM 60/380 (DESIGN CH. 0/000 TO 60/025 EXCLUD | 1/2017 | 319.28 | 319.28 | 245.55 |
109. | WATER RESOURCES | Polavaram Project Authority | POLAVARAM IRRIGATION PROJECT | 2/2009 | 10151.04 | 55548.87 | 21030.82 |
| Total | 109 | |