S No. | Sector Name | Agency Name | Project Name | Date Of Approval | Cost Original | Cost Anticipated | Expenditure |
1. | CIVIL AVIATION | AIRPORT AUTHORITY OF INDIA LIMITED | CONSTRUCTION OF NEW GREEN FIELD AIRPORT AT HOLLONGI ITANAGAR ARUNACHAL PRADESH | 2/2019 | 645.63 | 645.63 | 653.89 |
2. | POWER | NATIONAL HYDRO-ELECTRIC POWER CORPORATION | SUBANSIRI LOWER H.E.P (8X250 MW) (NHPC) | 9/2003 | 6285.33 | 21247.54 | 20446.64 |
3. | POWER | NATIONAL HYDRO-ELECTRIC POWER CORPORATION | DIBANG MULTIPURPOSE PROJECT 2880 MW ARUNACHAL PRADESH | 2/2023 | 31876.39 | 31876.39 | 2283.05 |
4. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | TWO-LANING OF HAYULIANG– HAWAI BYPASS ROAD ON EPC BASIS FROM DESIGN KM. 51.825 TO KM. 63.131 EXISTI | 1/2017 | 256.66 | 256.66 | 0 |
5. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | 4-LANING OF ITANAGAR TO BANDARDEWA SECTION OF NH-415 FROM KM 51+700 TO KM 59+199 (PACKAGE-C) ON EPC | 6/2020 | 437.6 | 437.6 | 287.36 |
6. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 206.66 TO KM 247.05 (PACKAGE | 3/2019 | 486.7 | 486.7 | 474.23 |
7. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | JORAM – KOLORIANG ROAD FROM EXISTING KM 50.050 TO KM 70.00 (PKG-3) | 8/2020 | 228.71 | 228.71 | 95.21 |
8. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | LADDA - BASAI | 2/2021 | 445.96 | 445.96 | 103.94 |
9. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | DOGINALA - GAU | 12/2020 | 242.3 | 242.3 | 21.47 |
10. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | WIDENING OF EXISTING ROAD TO 2 LANE WITH PAVED SHOULDER FROM HUKANJURI TO KHONSA SECTION OF NH-315A | 3/2021 | 182.55 | 182.55 | 108.23 |
11. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | 4 LANING OF ITANAGAR TO BANDARDEWA SECTION OF NH-415 FROM KM 40+430 TO KM 51+735 (PACKAGE B) ON EPC | 6/2020 | 496.47 | 496.47 | 122.09 |
12. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | CONSTRUCTION OF TWO LANE WITH PAVED SHOULDERS OF JORAM KOLORIANG ROAD (NH 713) ON EPC BASIS FROM EXI | 2/2017 | 167.28 | 167.28 | 144.91 |
13. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | CONSTRUCTION OF 2-LANING WITH HARD SHOULDERS OF DEMWE-BRAHMAKUND SECTION OF NH-13 FROM CH.0.00 KM TO | 9/2020 | 353.9 | 353.9 | 41.82 |
14. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | CONSTRUCTION OF 2-LANING WITH HARD SHOULDERS OF ARROWA-KHUPA-HAYULIANG SECTION OF NH-113 FROM CH.68. | 8/2020 | 301.06 | 301.06 | 125.54 |
15. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | TWO LANING OF JORAM KOLORIANG ROAD (NH 713) ON EPC BASIS FROM DESIGN KM. 138+000 TO KM. 154+036 [EX | 2/2017 | 180.57 | 180.57 | 139.45 |
16. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | JORAM – KOLORIANG ROAD FROM EXISTING KM 70.00 TO KM 88.700 (PKG-4) | 8/2020 | 294.04 | 294.04 | 136.02 |
17. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | CONSTRUCTION OF 2-LANE ROAD WITH PAVED SHOULDERS FROM KM16.00 OF ROING-HUNLI SECTION TO KM 21.500 OF | 3/2017 | 1718.59 | 1718.59 | 656.26 |
18. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 163.59 TO KM 206.66 (PACKAGE | 3/2019 | 450.65 | 450.65 | 354.86 |
19. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 117.56 TO KM 163.59 (PACKAGE | 3/2019 | 543.05 | 543.05 | 521.56 |
20. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | JORAM – KOLORIANG ROAD FROM EXISTING KM122.600 TO KM138.00 (PKG-7) | 8/2020 | 184.88 | 184.88 | 84.11 |
21. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 247.05 TO KM 284.92 (PACKAGE | 3/2019 | 560.39 | 560.39 | 579.66 |
22. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | TADADEGE - HENKAR | 2/2021 | 550.45 | 550.45 | 109.7 |
23. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 77.95 TO KM 117.56 (PACKAGE | 3/2019 | 421.48 | 421.48 | 365.83 |
24. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | CONSTRUCTION OF 2 LANING OF EXISTING HUNLI-ANINI ROAD ON EPC BASIS FROM DESIGN KM 106.200 TO KM 120. | 12/2016 | 200.44 | 200.44 | 153.84 |
25. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | BALANCE WORK 2-LANING OF LALPUL MANMAO CHANGLANG ROAD (NH-215) ON EPC MODE IN THE STATE OF ARUNACH | 2/2021 | 588.09 | 588.09 | 374.13 |
26. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | JORAM – KOLORIANG ROAD FROM EXISTING KM104.850 TO KM 122.60 (PKG-6) | 8/2020 | 199.03 | 199.03 | 101.75 |
27. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | CONSTRUCTION OF 2 LANING OF EXISTING HUNLI-ANINI ROAD ON EPC BASIS FROM DESIGN KM 53.500 TO KM 92.50 | 9/2016 | 568.92 | 568.92 | 508.65 |
| Total | 27 | |