Details of ongoing projects costing Rs.150 and above in Assam
S No.Sector NameAgency NameProject NameDate Of ApprovalCost OriginalCost AnticipatedExpenditure
1.CIVIL AVIATIONAIRPORT AUTHORITY OF INDIA LIMITEDCONSTRUCTION OF NEW INTEGRATED TERMINAL BUILDING AT LGBI AIRPORT GUWAHATI 12/2016114223331948.45
2.COALCOAL INDIA LIMITEDTIRAP OCP 11/2022289.46289.46105.59
3.COALCOAL INDIA LIMITEDTIKAK EXTENSION OCP - 0.2 MTY 7/2022159.77159.7781.45
4.HEALTH AND FAMILY WELFAREHLL Infra Tech Services LimitedALL INDIA INSTITUTE OF MEDICAL SCIENCE AT GUWAHATI, ASSAM 5/2017875860796.74
5.PETROLEUMNUMALIGARH REFINERY LIMITEDDCU REVAMP PROJECT 8/2021370370255.51
6.PETROLEUMNUMALIGARH REFINERY LIMITEDPOWER RECOVERY TURBINE IN PFCCU 3/2023293.5293.597.22
7.PETROLEUMINDIAN OIL CORPORATION LIMITEDCAPACITY EXPANSION OF DIGBOI REFINERY FROM 0.65 TO 1.0 MMTPA 6/2022768768101.15
8.PETROLEUMINDIAN OIL CORPORATION LIMITEDEXPANSION OF GUWAHATI REFINERY FROM 1 TO 1.2 MMTPA ALONG WITH INSTALLATION OF CATALYTIC REFORMING UN5/2021412595.2396.15
9.PETROLEUMOIL & NATURAL GAS CORPORATION LIMITEDPIPELINE NETWORK PROJECT RUDRASAGAR 1/2023344.99344.99208.56
10.PETROLEUMINDIAN OIL CORPORATION LIMITEDREVAMPING OF FACILITIES AT EXISTING GUWAHATI TERMINAL, ASSAM 3/2022277277181.63
11.PETROLEUMNUMALIGARH REFINERY LIMITEDNUMALIGARH REFINERY EXPANSION PROJECT COIT AND PIPELINES 1/20191022890589579.31
12.PETROLEUMNUMALIGARH REFINERY LIMITEDNUMALIGARH REFINERY EXPANSION PROJECT 6 MMTPA REFINARY 1/2019123661896816357.82
13.PETROLEUMOIL INDIA LIMITEDPROJECT TO CONSTRUCT A FIELD GAS GATHERING STATION AT BAGHJAN AREA FOR COLLECTION,PROCESSING 12/2020430.76430.76320.71
14.PETROLEUMOIL INDIA LIMITEDDEVELOPMENT OF SURFACE FACILITIES FOR PRODUCTION AND EVACUATION OF CRUDE OIL AND NATURAL GAS FROM NA1/2018543.91726.93491.56
15.PETROLEUMOIL & NATURAL GAS CORPORATION LIMITEDBORHOLLA GGS LIFE EXTENSION PROJECT 9/2023198.7198.799.52
16.PETROLEUMHINDUSTAN PETROLEUM CORPORATION LIMITEDCONSTRUCTION OF LPG FACILITIES AT KAMARDANGA, ASSAM 3/2023156.36156.3644.33
17.PETROLEUMOIL INDIA LIMITEDUPGRADATION OF FACILITIES OF NUMALIGARH-SILIGURI PRODUCT PIPELINE (NSPL) FOR TRANSPORTATION OF ADDIT6/2021860860535.46
18.PETROLEUMHINDUSTAN PETROLEUM CORPORATION LIMITEDSETTING UP OF NEW RAIL FED POL FACILITY AT KAMARDANGA, ASSAM 3/2023384.04384.0497.54
19.RAILWAYSNORTH EAST FRONTIER RAILWAYBONGAIGAON-GOALPARA-GUWAHATI (176 KM) 4/20154059.654962.43668.09
20.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.SILCHAR VAIRENGTE SAIRANG ROAD PKG-2 3/20231716.211716.21989.94
21.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.BILASIPURA- GUWAHATI ROAD PKG-1 2/20241081.151081.1533.93
22.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.BILASIPURA-GUWAHATI ROAD PKG-8 3/20231457.591457.59551.88
23.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.FOUR LANNING OF BADARPUR BYPASS FROM DESIGN CHAINAGE KM 27+300 AT CROSSING WITH NH-6 2/2023574.26574.26297.7
24.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.4 LANING FROM JAMUGURI TO BISWANATH CHARIALI FROM KM 182 TO KM 208 OF NH-52 1/1991520.01520.01306.13
25.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.SILCHAR-JIRIBAM PKG-1 1/2024957.95957.950
26.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.4-LANING OF HAPACHARA - TULUNGIA SECTION 3/2020220.2220.2217.31
27.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.KARIMGANI - SUTARKANDI SECTION ON SILCHAR-CHURAIBARI PKG-7 2/2024791.79791.790
28.ROAD TRANSPORT AND HIGHWAYSMINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)CONSTRUCTION OF 4 LANE GAURIPUR BYPASS ON NH-17 IN THE STATE OF ASSAM 3/2024421.15421.150
29.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.BADARPUR – CHURAIBARI PKG-6 3/20248708700
30.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.DIBRUGARH-LAHOAL-CHABUA BYPASS PACKAGE-3 1/2023458.59458.59205.87
31.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.DABOKA KATHKATI PACKAGE-7 11/2021204.1204.1143.66
32.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 0+800 (KANDULIJAN GAON) TO KM 27+701 (SI3/2023609.16609.16323.24
33.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 55+000 (NAGABANG GAMSUK) TO KM 82+514 (OY3/2023665.47665.47213.67
34.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.CONSTRUCTION OF 4-LANE PANCHGRAM BYPASS FROM DESIGN CHAINAGE KM 15+500 ON NH-37 (OLD NH-53) AT KALIN3/2023728.97728.97290.9
35.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.4 LANING FROM RANGAGARA TO KALIABHOR TINALI FROM KM 297.00 TO KM 315.315 OF NH-37 ON EPC BASIS. 12/2015289.99289.99233.23
36.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.TAMENGLONG- MAHUR ROAD PKG-7 12/2023846.82846.82407.11
37.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.SILCHAR VAIRENGTE SAIRANG ROAD PKG-1 2/20231256.91256.9539.19
38.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.BILASIPURA-GUWAHATI ROAD PKG-10 3/20231264.91264.9425.17
39.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.4 LANING OF JORHAT TO JHANJI SECTION FROM KM. 453.00 TO KM. 491.08 (DESIGN KM 403.200 TO KM 454.240)6/2015437.39437.39586.89
40.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.2-LANING FROM YAINGANGPOKPI TO FINCH CORNER (PKG-II) 3/2020217.5217.589.21
41.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.WIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) I3/2023904.04904.04409.15
42.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.BILASIPURA- GUWAHATI ROAD PKG-2 11/20231338.611338.61.5
43.ROAD TRANSPORT AND HIGHWAYSMINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)CONSTRUCTION OF MANGALDOI BYPASS (NH-15) STARTING AT CH 26+400 AND TERMINATING AT CH 41+505 UNDER RA3/2022535.03535.03102.23
44.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.2-LANING FROM YAINGANGPOKPI TO FINCH CORNER (PKG-I) 3/2020261.13261.1370.08
45.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.SILCHAR- CHURAIBARI PKG-5 2/20241258.131258.130
46.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.2-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- IB) 3/2020216.49216.49114.38
47.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.WIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN3/2023860.37860.37417.17
48.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.DABOKA BYPASS OF DABOKA - PAROKHAOWA PKG -1 1/2023516.88516.88242.92
49.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.FOUR LANING OF SRIRAMPUR-DHUBRI PKG-2 3/2022909.02909.02532.44
50.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.4 LANING OF NH-37 SECTION BETWEEN DEMOW TO END OF MORAN BYPASS (FROM KM. 534.800 TO KM. 561.700) O1/2016294.17294.17396.49
51.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.BILASIPURA-GUWAHATI ROAD PKG-9 3/20231000.271000.27308.11
52.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.WIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN3/2023890.33890.33467.83
53.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.FOUR LANING OF JHANJHI JN TO DEMOW SECTION FROM KM. 491.050 TO KM. 535.250(DESIGN KM 490.800 TO KM 56/2015463.49463.49517.62
54.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.DABOKA KATHKATI PACKAGE-6 9/2021625.64625.64556.44
55.ROAD TRANSPORT AND HIGHWAYSMINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)CONSTRUCTION OF 2 LANE BARPETA BYPASS FROM KM 77+900(BARADI) TO KM 86+150( DEURIKUCHI) (LENGTH=8.25K3/2023173.65173.650
56.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AUTHORITY OF INDIA6L STANDALONE FLYOVERS AT BONGAIGAON, CHAPAGURI, PATHSALA, SIMLAGURI CHOWK AND BAIHATA BYPASS JUNCTI3/2022457.72457.72366.34
57.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.DABOKA KATHKATI PACKAGE-5 3/2021288.85288.85247.78
58.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.4 LANING OF NH 37 SECTION BETWEEN END OF MORAN BYPASS TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM. 5611/2016252330.3242.97
59.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.SRIRAMPUR - DHUBRI PKG-1 3/2022613.89613.89110.76
60.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.TULUNGIA-JOGIGHOPA-PAIKAN ROAD PKG-7 3/2021286.72286.72159.3
61.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.4-L DHUBRI PHULBARI BRIDGE WITH APPROACH ROAD 11/20204997.044997.042464.49
62.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 27+701 (SIMEN CHAPORI) TO KM 55+000 (NAG3/2023562.05562.05303.89
63.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.JOGIGHOPA BRIDGE 8/2021746.76746.76344.27
64.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.DEVELOPMENT OF EXTERNAL TRUNK CONNECTIVITY AND INTERNAL INFRASTRUCTURE WORKS AT MULTI MODEL LOGISTIC2/2020592.06592.06308.87
65.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AUTHORITY OF INDIA6L STANDALONE FLYOVERS AT RAHA, DEMOW, BORGHAT, KATHIATALI JUNCTIONS AND ROB AT JAGIROAD ON STRETCHE8/2022175175209.02
66.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.2 LANE WITH PAVED SHOULDER FROM KM 16+900 (BOGAPANI) TO KM 27+150 (GOLAI GAON) ON EXISTING DIBRUGARH1/2023356.65356.65134.02
67.ROAD TRANSPORT AND HIGHWAYSNATIONAL HIGHWAYS AUTHORITY OF INDIABALANCE WORK OF 4L OF NARIMBANGLO–JATINGA JUNCTION- HARANGAJO ROAD SECTION FROM KM 0.000 TO KM 49.233/20221909.981909.98683
68.ROAD TRANSPORT AND HIGHWAYSMINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)CONSTRUCTION OF 2-LANE MAJOR BRIDGE INCLUDING APPROACHESOVER BRAHMAPUTRA BETWEEN MAJULI ON NORTH BAN2/2021925.47925.47192.5
Total68