Agency wise details of projects in Assam
S No.Agency NameSector NameProject NameDate Of ApprovalCost OriginalCost AnticipatedExpenditure
1.AIRPORT AUTHORITY OF INDIA LIMITEDCIVIL AVIATIONCONSTRUCTION OF NEW INTEGRATED TERMINAL BUILDING AT LGBI AIRPORT GUWAHATI 12/201611422333501.37
2.HINDUSTAN PETROLEUM CORPORATION LIMITEDPETROLEUMSETTING UP OF NEW RAIL FED POL FACILITY AT KAMARDANGA, ASSAM 3/2023384.04384.0427.65
3.HINDUSTAN PETROLEUM CORPORATION LIMITEDPETROLEUMCONSTRUCTION OF LPG FACILITIES AT KAMARDANGA, ASSAM 3/2023156.36156.36.81
4.HLL Infra Tech Services LimitedHEALTH AND FAMILY WELFAREALL INDIA INSTITUTE OF MEDICAL SCIENCE AT GUWAHATI, ASSAM 5/2017875860734.5
5.INDIAN OIL CORPORATION LIMITEDPETROLEUMCAPACITY EXPANSION OF DIGBOI REFINERY FROM 0.65 TO 1.0 MMTPA 6/202276876841.26
6.INDIAN OIL CORPORATION LIMITEDPETROLEUMEXPANSION OF GUWAHATI REFINERY FROM 1 TO 1.2 MMTPA ALONG WITH INSTALLATION OF CATALYTIC REFORMING UN5/2021412509.84351.63
7.INDIAN OIL CORPORATION LIMITEDPETROLEUMREVAMPING OF FACILITIES AT EXISTING GUWAHATI TERMINAL, ASSAM 3/2022277277134.63
8.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF 2-LANE MAJOR BRIDGE INCLUDING APPROACHESOVER BRAHMAPUTRA BETWEEN MAJULI ON NORTH BAN2/2021925.47925.47176.55
9.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF MANGALDOI BYPASS (NH-15) STARTING AT CH 26+400 AND TERMINATING AT CH 41+505 UNDER RA3/2022535.03535.030
10.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS4-LANING OF DERGAON TOWN 3/2020287.63287.63405.95
11.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSJOGIGHOPA BRIDGE 8/2021746.76746.76254.95
12.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSDEVELOPMENT OF EXTERNAL TRUNK CONNECTIVITY AND INTERNAL INFRASTRUCTURE WORKS AT MULTI MODEL LOGISTIC2/2020592.06592.06256.49
13.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS2 LANE WITH PAVED SHOULDER FROM KM 16+900 (BOGAPANI) TO KM 27+150 (GOLAI GAON) ON EXISTING DIBRUGARH1/2023356.65356.65103.86
14.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSDIBRUGARH-LAHOAL-CHABUA BYPASS PACKAGE-3 1/2023458.59458.5986.88
15.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSSRIRAMPUR - DHUBRI PKG-1 3/2022613.89613.895.44
16.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSTULUNGIA-JOGIGHOPA-PAIKAN ROAD PKG-7 3/2021286.72286.7262.4
17.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSTWO- LANE WITH PAVED SHOULDER CONFIGURATION OF IMPHAL - MOREH SECTION OF NH-39 FROM KM 330 TO KM 3509/2019761.54761.54430.31
18.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS4-L DHUBRI PHULBARI BRIDGE WITH APPROACH ROAD 11/20204997.044997.041876.77
19.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSBILASIPURA-GUWAHATI ROAD PKG-8 3/20231457.591457.59192.61
20.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS4 LANING FROM JAMUGURI TO BISWANATH CHARIALI FROM KM 182 TO KM 208 OF NH-52 1/1991520.01520.01297.81
21.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSDIBRUGARH-LAHOAL-CHABUA BYPASS PACKAGE-2 4/2022170.95170.9590.91
22.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS4-LANING OF HAPACHARA - TULUNGIA SECTION 3/2020220.2220.2212.18
23.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSWIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 27+701 (SIMEN CHAPORI) TO KM 55+000 (NAG3/2023562.05562.0578.05
24.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS4 LANING OF JORHAT TO JHANJI SECTION FROM KM. 453.00 TO KM. 491.08 (DESIGN KM 403.200 TO KM 454.240)6/2015437.39437.39252.96
25.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS2-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- IB) 3/2020216.49216.49101.02
26.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSWIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN3/2023860.37860.37219.45
27.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSDABOKA BYPASS OF DABOKA - PAROKHAOWA PKG -1 1/2023516.88516.8878.64
28.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSFOUR LANING OF NUMALIGARH TO JORHAT SECTION FROM KM. 402.500 TO KM. 453.000 (DESIGN KM 403.200 TO KM5/2015454.89814.56565.28
29.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSFOUR LANING OF SRIRAMPUR-DHUBRI PKG-2 3/2022909.02909.02308.16
30.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSDIBRUGARH-LAHOAL-CHABUA BYPASS PACKAGE-1 3/2022215.27215.27105.4
31.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS4 LANING OF NH-37 SECTION BETWEEN DEMOW TO END OF MORAN BYPASS (FROM KM. 534.800 TO KM. 561.700) O1/2016294.17294.17292.4
32.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSBILASIPURA-GUWAHATI ROAD PKG-9 3/20231000.271000.27145.82
33.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSFOUR LANING OF BALACHERA-HARANGAJAO SECTION OF NH-54 (EXT) FROM KM 275.00 TO KM 244.000 IN THE STATE10/2017818818854.65
34.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS2-LANING FROM YAINGANGPOKPI TO FINCH CORNER (PKG-II) 3/2020217.5217.558.73
35.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSWIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) I3/2023904.04904.04235.44
36.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSTULUNGIA-JOGIGHOPA-PAIKAN PKG-5 3/2021636.42418.49706.62
37.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS2-LANING FROM YAINGANGPOKPI TO FINCH CORNER (PKG-I) 3/2020261.13261.1353.85
38.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSDABOKA KATHKATI PACKAGE-7 11/2021204.1204.196.02
39.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSWIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 0+800 (KANDULIJAN GAON) TO KM 27+701 (SI3/2023609.16609.16101.79
40.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSWIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM CH.75.330KM TO CH.88.00KM (DESIGN CH.71.800 8/2020208.84208.84154.41
41.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS4 LANING FROM RANGAGARA TO KALIABHOR TINALI FROM KM 297.00 TO KM 315.315 OF NH-37 ON EPC BASIS. 12/2015289.99289.99228.85
42.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSBILASIPURA-GUWAHATI ROAD PKG-10 3/20231264.91264.9237.58
43.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSWIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN3/2023890.33890.33268.64
44.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSFOUR LANING OF JHANJHI JN TO DEMOW SECTION FROM KM. 491.050 TO KM. 535.250(DESIGN KM 490.800 TO KM 56/2015463.49463.49319.48
45.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSDABOKA KATHKATI PACKAGE-6 9/2021625.64625.64386.49
46.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS2 LANE WITH PAVED SHOULDER FROM KM 27+150 (GOLAI GAON) TO KM 47+682 (LEDO) ON EXISTING DIBRUGARH TO 3/2023643.42643.4262.77
47.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYSDABOKA KATHKATI PACKAGE-5 3/2021288.85288.85143.37
48.NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd.ROAD TRANSPORT AND HIGHWAYS4 LANING OF NH 37 SECTION BETWEEN END OF MORAN BYPASS TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM. 5611/2016252330.3146.28
49.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYS6L STANDALONE FLYOVERS AT RAHA, DEMOW, BORGHAT, KATHIATALI JUNCTIONS AND ROB AT JAGIROAD ON STRETCHE8/2022175175147.11
50.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSBALANCE WORK OF 4L OF NARIMBANGLO–JATINGA JUNCTION- HARANGAJO ROAD SECTION FROM KM 0.000 TO KM 49.233/20221909.981909.98320.61
51.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYS6L FLYOVER AT BORAGAON, GORCHUK, LOKHRA AND BASISTHA JUNCTION ON GUWAHATI BYPASS SECTION FROM KM 14612/2021300300294.62
52.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSSHRIRAMPUR (KM. 0.000) TO KOCHUGAON (KM. 30.000) OF BIJNI TO ASSAM./WEST BENGAL BORDER SECTION OF NH7/2017442.23442.23193.85
53.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYS6L STANDALONE FLYOVERS AT BONGAIGAON, CHAPAGURI, PATHSALA, SIMLAGURI CHOWK AND BAIHATA BYPASS JUNCTI3/2022457.72457.72183.95
54.NORTH EAST FRONTIER RAILWAYRAILWAYSBONGAIGAON-GOALPARA-GUWAHATI (176 KM) 4/20152232.324059.653259.69
55.NUMALIGARH REFINERY LIMITEDPETROLEUMDCU REVAMP PROJECT 8/2021370370103.43
56.NUMALIGARH REFINERY LIMITEDPETROLEUMPOWER RECOVERY TURBINE IN PFCCU 3/2023293.5293.518.59
57.NUMALIGARH REFINERY LIMITEDPETROLEUMNUMALIGARH REFINERY EXPANSION PROJECT COIT AND PIPELINES 1/20191022890587094.97
58.NUMALIGARH REFINERY LIMITEDPETROLEUMNUMALIGARH REFINERY EXPANSION PROJECT 6 MMTPA REFINARY 1/2019123661896810116.49
59.OIL & NATURAL GAS CORPORATION LIMITEDPETROLEUMGAS ASSISTED GRAVITY DRAINAGE SCHEME, KASOMARIGAON 8/2021218.38218.3879.01
60.OIL INDIA LIMITEDPETROLEUMUPGRADATION OF FACILITIES OF NUMALIGARH-SILIGURI PRODUCT PIPELINE (NSPL) FOR TRANSPORTATION OF ADDIT6/2021860860214.2
61.OIL INDIA LIMITEDPETROLEUMPROJECT TO CONSTRUCT A FIELD GAS GATHERING STATION AT BAGHJAN AREA FOR COLLECTION,PROCESSING 12/2020430.76430.76202.09
62.OIL INDIA LIMITEDPETROLEUMDEVELOPMENT OF SURFACE FACILITIES FOR PRODUCTION AND EVACUATION OF CRUDE OIL AND NATURAL GAS FROM NA1/2018543.91670.9463.96
63.POWER GRID CORPORATION OF INDIA LIMITEDPOWERNORTH EAST-NORTHERN/ WESTERN INTERCONNECTOR-I, PART-C 3/2019132615201445.15
Total63