S No. | Sector Name | Agency Name | Project Name | Date Of Approval | Cost Original | Cost Anticipated | Expenditure |
1. | CIVIL AVIATION | AIRPORT AUTHORITY OF INDIA LIMITED | CONSTRUCTION OF NEW DORNESTIC TERMINAL BUILDING AND OTHER STRUCTURES, PHASE I AND II | 5/2018 | 1216.9 | 1216.9 | 624.1 |
2. | DEPARTMENT OF HIGHER EDUCATION | CPWD OF HIGHER EDUCATION | PERMANENT CAMPUS FOR IIM BODH GAYA | 9/2018 | 375 | 375 | 316.96 |
3. | DEPARTMENT OF HIGHER EDUCATION | CPWD OF HIGHER EDUCATION | CONSTRUCTION OF ACADEMIC AND RESIDENTIAL COMPLEX UNDER PHASE-II FOR THE CAMPUS OF IIT PATNA | 2/2016 | 496.18 | 460 | 425.2 |
4. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | INSTALLATION OF BITUMEN MANUFACTURING UNIT ALONG WITH ALLIED FACILITIES AT BARAUNI | 1/2022 | 389 | 389 | 18.33 |
5. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | CGD PROJECT AT AURANGABAD, KAIMUR AND ROHTAS DISTRICTS | 10/2018 | 176 | 176 | 133.25 |
6. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | BARAUNI REFINERY CAPACITY EXPANSION FROM 6.0 TO 9.0 MMTPA | 1/2020 | 14810 | 14810 | 8013.91 |
7. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | CGD PROJECT AT LAKHISARAI, MUNGER AND BHAGALPUR DISTRICTS | 6/2019 | 347 | 347 | 155.37 |
8. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | MUZAFFARPUR-MOTIHARI LPG PIPELINE | 6/2020 | 403 | 403 | 293.64 |
9. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | CGD PROJECT AT ARWAL, JEHANABAD, BHOJPUR AND BUXAR DISTRICTS | 6/2019 | 439 | 439 | 217.93 |
10. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | CGD PROJECT AT KHAGARIA, SAHARSA AND MADHEPURA | 6/2019 | 163 | 163 | 67.22 |
11. | PETROLEUM | GAS AUTHORITY OF INDIA LIMITED | CITY GAS DISTRIBUTION (CGD) NETWORK PATNA | 10/2017 | 359.25 | 359.25 | 286.05 |
12. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | CGD PROJECT AT MUZAFFARPUR, VAISHALI, SARAN AND SAMASTIPUR DISTRICTS | 6/2019 | 2996 | 2996 | 569.7 |
13. | PETROLEUM | INDIAN OIL CORPORATION LIMITED | CGD PROJECT AT ARARIA, PURNIA, KATIHAR AND KISHANGANJ DISTRICTS | 6/2019 | 988 | 988 | 91.48 |
14. | POWER | NATIONAL THERMAL POWER CORPORATION | BARH STPP(3X660MW) NTPC | 2/2005 | 8692.97 | 21312.11 | 22126.25 |
15. | POWER | POWER GRID CORPORATION OF INDIA LIMITED | TRANSMISSION SYSTEM FOR POWER EVACUATION FROM ARUN-3 (900MW) HEP, NEPAL OF M/S SAPDC-INDIAN PORTION | 5/2021 | 179.29 | 179.29 | 116.56 |
16. | POWER | SATLUJ JAL VIDYUT NIGAM LIMITED | BUXAR THERMAL POWER PLANT (1320 MW) | 3/2019 | 10439.09 | 10439.09 | 9476.49 |
17. | RAILWAYS | EAST CENTRAL RAILWAYS | KHAGARIA-KUSHESHWAR ASTHAN (NL) (ECR) | 4/1997 | 162.87 | 614.45 | 426.16 |
18. | RAILWAYS | EAST CENTRAL RAILWAYS | SONENAGAR BYE PASS LINE FROM CHIRALAPOTHU TO BAGHA BISHUNPUR | 10/2022 | 234 | 234 | .49 |
19. | RAILWAYS | EAST CENTRAL RAILWAYS | RAMPUR DUMRA - TAL - RAJENDRAPUL DOUBLING INCLUDING GANGA BRIDGE | 12/2015 | 1491.47 | 1491.47 | 1335.74 |
20. | RAILWAYS | NORTH EAST FRONTIER RAILWAY | NEW B.G. LINE FROM ARARIA TO GALGALIA (THAKURGUNG), NEFR | 9/2006 | 532.87 | 2650 | 2192.91 |
21. | RAILWAYS | EAST CENTRAL RAILWAYS | HAJIPUR-SUGAULI VIA VAISHALI (NL), ECR | 4/2003 | 528.65 | 2066.78 | 1983.13 |
22. | RAILWAYS | EAST CENTRAL RAILWAYS | MUZAFFARPUR SAGAULI DOUBLING 100.60 KM | 4/2016 | 731.64 | 1185.73 | 1211.73 |
23. | RAILWAYS | NORTH EAST FRONTIER RAILWAY | KATIHAR-KUMEDPUR & KATIHAR-MUKURIA (64.5 KM) (UMBRELLA WORK PB#57/2019-20/NR) | 8/2022 | 745 | 745 | 0 |
24. | RAILWAYS | EAST CENTRAL RAILWAYS | JHAJHA - BATIA (UMBRELLA WORK PB#23/2018-19/NR) | 2/2019 | 496.47 | 496.47 | 1.33 |
25. | RAILWAYS | EAST CENTRAL RAILWAYS | ARARIA-SUPAUL (NL) | 4/2008 | 1605.17 | 1605.17 | 1126.36 |
26. | RAILWAYS | EAST CENTRAL RAILWAYS | JAYNAGAR-BIJALPURA INCLUDING EXTENSION BIJALPURA-BARDIBAS(NEPAL) GC | 4/2009 | 548 | 783.83 | 543.54 |
27. | RAILWAYS | EAST CENTRAL RAILWAYS | JAYANAGAR-DARBHANGA-NARKATIA GANJ(GC),ECR | 4/1997 | 324.73 | 1110 | 1196.39 |
28. | RAILWAYS | EAST CENTRAL RAILWAYS | SAKRI-NIRMALI AND JHANJHARPUR-LAUKAHABAZAR AND SAHARSA-FORBESGANJ (GC) | 4/2004 | 372.14 | 1700 | 2286.97 |
29. | RAILWAYS | EAST CENTRAL RAILWAYS | SAGAULI VALMIKINAGAR DOUBLING 109.7 KM | 4/2016 | 744.04 | 1215.54 | 1129.98 |
30. | RAILWAYS | EAST CENTRAL RAILWAYS | BARAUNI- BACHWARA 3RD AND 4TH LINE | 7/2022 | 486 | 486 | 31.23 |
31. | RAILWAYS | EAST CENTRAL RAILWAYS | FATUHA-ISLAMPUR INCL. MM FOR EXTENSION OF NEW LINE FORM BIHARSHARIF-BARBIGHA, DANIYAWAN-BIHARSHARIF, | 4/1991 | 329.39 | 1510 | 2280.77 |
32. | RAILWAYS | EAST CENTRAL RAILWAYS | SAKRI-HASANPUR ROAD (NL) | 4/1999 | 325 | 735.2 | 547.67 |
33. | RAILWAYS | EAST CENTRAL RAILWAYS | KIUL - GAYA DOUBLING PROJECT | 12/2015 | 1200.2 | 1200.2 | 1498.85 |
34. | RAILWAYS | EAST CENTRAL RAILWAYS | SAMASTIPUR-DARBANGHA | 5/2015 | 380 | 519.33 | 437.25 |
35. | RAILWAYS | EAST CENTRAL RAILWAYS | DARBHANGA - BYPASS LINE CONNECTING SHISHO HALT AND KAKARGHATI EXCL DARBHANGA YARD (7.64 KM) | 6/2019 | 983.62 | 983.62 | 290.88 |
36. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | CONSTRUCTION OF NEW LINK (NH-133B) FROM KM 0/00 (KM 200/87 OF SAHIBANJ BYPASS) IN JHARKHAND TO KM 15 | 12/2017 | 2598 | 1962.5 | 1170.44 |
37. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | BAKHTIYARPUR RAJAULI PKG-II FROM KM 54.405 TO KM 101.630 NH20 | 9/2020 | 897.45 | 897.45 | 1037.63 |
38. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | BAKHTIYARPUR RAJAULI PKG-III FROM KM 101.630 TO KM 152.520 NH20 | 9/2020 | 2156.22 | 2156.22 | 2063.98 |
39. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | FOUR LANING OF BAKHTIYARPUR - MOKAMA SECTION OF NH-31 | 12/2015 | 1167.45 | 1182.94 | 686.02 |
40. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4L GREENFIELD ALIGNMENT OF AMAS TO SHIVRAMPUR FROM 0.000 KM. TO 55.002 KM. OF NH 119 D (PKG-I) | 2/2022 | 1390.92 | 1390.92 | 3.74 |
41. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM KHARIA VILLAGE JUNCTION TO START OF EXISTI | 3/2021 | 1020.84 | 1020.84 | 84.78 |
42. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM MUNGER TO KHARIA VILLAGE JUNCTION DESIGN C | 3/2022 | 1485.66 | 1485.66 | 0 |
43. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF NH-319A FROM KM 0 TO KM 45 IN STATE OF BIHAR UNDER | 2/2022 | 427.29 | 427.29 | 74.07 |
44. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF A NEW 4 LANE BRIDGE PARALLEL TO EXISTING MG SETU WITH ITS APPROACHES FROM KM 0.00 | 2/2019 | 2926.42 | 2926.42 | 810.82 |
45. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | CONSTRUCTION OF 2 LANE BRIDGE ACROSS RIVER KOSI WITH APPROACH ROAD FROM BHEJA TO BAKAUR SECTION OF N | 10/2019 | 1101.99 | 1101.99 | 614.53 |
46. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF NEW 4-LANE BRIDGE (PARALLEL TO EXISTING VIKRAMASHILA SETU)FROM KM 8+920 TO KM 13+375 | 7/2020 | 1110.23 | 1110.23 | 93.63 |
47. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6 L OF AURANGABAD TO BIHAR-JHARKHAND BORDER (CHORDAHA) SECTION FROM KM. 180.000 TO KM. 209.827 OF N | 2/2022 | 786.81 | 787 | 0 |
48. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | TWO-LANNING WITH PAVED SHOULDER OF MAHSHKUNT-SAHARSA-PURNEA SECTION FROM EXISTING KM.89.020 (DESIGN | 3/2017 | 672.89 | 830.31 | 464.44 |
49. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | BALANCE WORK OF TWO LANING WITH PAVED SHOULDER OF PIPRAKOTHI–MOTIHARI- RAXAUL SECTION OF NH-28A FRO | 12/2018 | 333.6 | 461.41 | 460.38 |
50. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | FOUR OF SIMARIA - KHAGARIA SECTION OF NH-31 | 12/2015 | 1041.1 | 639.58 | 530.28 |
51. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | REHABILITATION AND UPGRADATION OF TWO LANING OF MAHESHKHUNT - SAHARSA - PURNEA SECTION PKG - I | 1/2018 | 573.7 | 726.99 | 432.54 |
52. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | BALANCE WORK - WB-10 (GANDAK BRIDGE) KM 402.00 TO KM 440.00 (DEVANPUR - KOTWA) | 12/2021 | 210.05 | 210.05 | 75.52 |
53. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF REHABILITATION AND UPGRADING TO 2 LANES/2 LANE(FOR LOT-I-KM 40.00 TO KM 65.400 AND K | 2/2016 | 178.85 | 278.54 | 232.61 |
54. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | BALANCE WORK OF 4- L ANING OF PATNA-GAYA-DOBHI SECTION (KM.83.00 TO KM. 127.217) OF NH-83 IN THE STA | 10/2013 | 464.09 | 464.09 | 665.67 |
55. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | FOUR LANING OF PARARIA TO MOHANIA SECTION OF NH 319 (OLD NH 30) FROM KM. 54+530 (DESIGN CHAINAGE) TO | 8/2020 | 690 | 690 | 736.77 |
56. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | PATNA-MUZZAFFARPUR | 8/2010 | 671.3 | 671.3 | 1706.41 |
57. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | SIX LANNING OF AURANGABAD TO BIHAR/JHARKHAND BORDER SECTION OF NH-19 (OLD NH-2) FROM KM. 209.827 TO | 12/2021 | 552.55 | 553 | 364.74 |
58. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM START OF EXISTING BHAGALPUR BYPASS TO RASU | 4/2022 | 1769.5 | 1769.5 | 0 |
59. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | DEVELOPMENT OF NEWLY DECLARED NH-527C FROM MAJHAULI TO CHAROUT SECTION TO 2 LANE WITH PAVED SHOULDER | 3/2018 | 496.2 | 537.17 | 336.43 |
60. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4 LANING OF BAHADURGANJ ARARIA SECTION FROM KM 49.000 TO KM 94.000 (PACKAGE-II) OF NH-327E | 3/2021 | 1143.46 | 1143 | 357.67 |
61. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF PROPOSED 4_LANE REVELGUNJ BYPASS NH-19 IN THE STATE OF BIHAR ON EPC MODE CONNECTING | 3/2022 | 295.24 | 295.24 | .49 |
62. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF NH 122B FROM KM 29.730 TO KM 72.348 IN STATE OF BIH | 2/2022 | 624.43 | 624.43 | 93.15 |
63. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4L GREENFIELD ALIGNMENT FROM KALYANAPUR TO TAL DASHRAHA OF NH-119D (PKG-III) | 2/2023 | 1358 | 1358 | 1.16 |
64. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | CONSTRUCTION OF 4 LANE ELEVATED HIGHWAY AND AT-GRADE IMPROVEMENTS AT GOPALGANJ TOWN FROM DESIGN CH: | 12/2021 | 184.9 | 185 | 135.98 |
65. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4 LANING FROM KM. 34.600 TO KM. 79.970 and 2LPS FROM KM. 79.970 TO KM. 82.000 OF NARENPUR - PURNEA S | 9/2020 | 2334.68 | 2335 | 907.53 |
66. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | SIX LANING OF AURANGABAD TO BIHAR - JHARKHAND BORDER (CHORDAHA) SECTION | 1/2018 | 895.39 | 895.39 | 1632.71 |
67. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | PERMANENT RECTIFICATION OF 3 NOS. OF BLACK SPOTS IN PROJECT HIGHWAY NH-27 OF U.P BORDER - DEWAPUR - | 12/2022 | 381.8 | 381.8 | 0 |
68. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4L GREENFIELD ALIGNMENT OF SHIVRAMPUR TO RAMNAGAR FROM KM. 55.002 TO KM. 109.300 OF NH 119 D (PKG-I | 2/2022 | 1494.31 | 1494.31 | 0 |
69. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | PROCUREMENT, AND CONSTRUCTION OF REHABILITATION AND UPGRADING TO 2 LANES/2 LANE(FOR LOT-III-KM 156.5 | 2/2016 | 553.3 | 706.39 | 602.47 |
70. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | BALANCE WORK OF 4- LANING OF PATNA-GAYA-DOBHI SECTION (KM. 39.00 TO KM. 83.00) OF NH-83 IN THE STATE | 10/2013 | 446.97 | 446.97 | 615.01 |
71. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | WIDENING AND STRENTHENING FROM KM 70.15 TO KM 121.025 OF NH-80 | 3/2021 | 477.54 | 477.54 | 117.93 |
72. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | BALANCE WORK OF 4- LANING OF PATNA-GAYA-DOBHI SECTION (KM. 0.00 TO KM. 127.217) OF NH-83 IN THE STAT | 10/2013 | 649.9 | 649.9 | 675.39 |
73. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM NEAR RASULPUR TO MIRZACHAUKI (DESIGN CH | 8/2022 | 1198.02 | 1198.02 | 0 |
74. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | CONSTRUCTION OF 4 LANE ELEVATED SECTION AND AT- GRADE IMPROVEMENTS AT BEGUSARAI TOWN SECTION OF NH-3 | 3/2022 | 312.58 | 312.58 | 96.7 |
75. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 6L OF KANHAULI RAMNAGAR PATNA RING ROAD PKG I FROM KM 0.000 TO KM 39.160 OF SH78 NEW NH131G | 9/2020 | 939.43 | 939.43 | 309.02 |
76. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | CONSTRUCTION OF A NEW 4 LANE MAJOR BRIDGE ACROSS RIVER KOSI AT PHULAUT INCLUDING RHABILITATION AND | 9/2018 | 1478.4 | 1478.4 | 732.26 |
77. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | CONSTRUCTION OF 6- LANE BRIDGE AND ITS APPROACHES ACROSS RIVER GANGA AS PART OF PATNA RING ROAD (NH- | 3/2023 | 3012.27 | 3012.27 | 0 |
78. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS (KM 40 TO KM 219.945) OF NH-104 | 1/1991 | 319.68 | 503.28 | 423.18 |
79. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF BIRPUR - BIHPUR | 1/1991 | 675 | 780.77 | 570.06 |
80. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | WIDENING and STRENTHENING FROM KM132.895 TO KM 190.15 NH-80 | 3/2021 | 566.15 | 566.15 | 91.45 |
81. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4 LANING OF GALGALIA - BAHADURGANJ SECTION FROM KM 0.000 TO KM 49.000 (PACKAGE-I) OF NH-327E. | 3/2021 | 1097.18 | 1097 | 488.66 |
82. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | SIX LANNING OF AUNTA-SIMARIA(GANGA BRIDGE WITH APPROACH ROADS) SECTION OF NH-31 | 8/2017 | 950.64 | 1168.33 | 874.58 |
83. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 4-LANNING OF CHAPRA-HAJIPUR | 1/2011 | 575 | 575 | 525.98 |
84. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | FOUR LANING OF GAYA-HISUA-RAJGIRI-NALANDA-BIHARSHARIF SECTION (KM0.00 TO 92.935) ON NH-82 IN BIHAR | 1/2014 | 1408.85 | 2138.16 | 1671.34 |
85. | URBAN DEVELOPMENT | PATNA METRO RAIL CORPORATION | PATNA METRO RAIL CORPORATION LIMITED | 2/2019 | 13365.77 | 13925.5 | 1996.1 |
86. | WATER RESOURCES | Bihar Urban Infrastructure Development Corporation Ltd | SEWERAGE SYSTEM WITH SEWER NETWORK PATNA KARMALICHAK | 3/2017 | 277.42 | 277.42 | 345.95 |
87. | WATER RESOURCES | Bihar Urban Infrastructure Development Corporation Ltd | SEWER NETWORKS SPS AND STP HAJIPUR | 3/2018 | 305.19 | 305.19 | 300.51 |
88. | WATER RESOURCES | Bihar Urban Infrastructure Development Corporation Ltd | SAIDPUR SEWER NETWORK PATNA | 4/2015 | 268.63 | 431.21 | 479.26 |
89. | WATER RESOURCES | Bihar Urban Infrastructure Development Corporation Ltd | I AND D AND STP AT CHAPPRA | 11/2018 | 236.15 | 236.15 | 129.26 |
90. | WATER RESOURCES | Bihar Urban Infrastructure Development Corporation Ltd | SEWERAGE SYSTEM AND STP FOR DIGHA ZONE, PATNA | 8/2017 | 824 | 824 | 322.5 |
91. | WATER RESOURCES | Bihar Urban Infrastructure Development Corporation Ltd | SEWERAGE SYSTEM AND STP FOR KANKARBAG ZONE PATNA | 8/2017 | 578.89 | 578.89 | 108.47 |
92. | WATER RESOURCES | Bihar Urban Infrastructure Development Corporation Ltd | SEWERAGE SCHEME AT PAHARI ZONE V PATNA | 5/2017 | 356.37 | 356.37 | 301.67 |
93. | WATER RESOURCES | Bihar Urban Infrastructure Development Corporation Ltd | SEWERAGE SYSTEM WITH SEWER NETWORK PATNA BEUR | 12/2014 | 225.77 | 398.9 | 362.52 |
94. | WATER RESOURCES | Bihar Urban Infrastructure Development Corporation Ltd | SEWER NETWORKS, SPS AND STP, MUNGER | 3/2018 | 294.02 | 294.02 | 293.74 |
95. | WATER RESOURCES | Bihar Urban Infrastructure Development Corporation Ltd | SEWERAGE TREATMENT PLANT AT PAHARI PATNA | 5/2017 | 191.62 | 191.62 | 117.3 |
96. | WATER RESOURCES | Bihar Urban Infrastructure Development Corporation Ltd | I AND D AND STP WORKS FOR BHAGALPUR | 10/2017 | 254.13 | 413.29 | 90.91 |
97. | WATER RESOURCES | Bihar Urban Infrastructure Development Corporation Ltd | SEWER NETWORK SPS AND STP BEGUSARAI | 3/2018 | 230.06 | 230.06 | 208.16 |
| Total | 97 | |