Agency wise details of projects in Bihar
S No.Agency NameSector NameProject NameDate Of ApprovalCost OriginalCost AnticipatedExpenditure
1.AIRPORT AUTHORITY OF INDIA LIMITEDCIVIL AVIATIONCONSTRUCTION OF NEW DORNESTIC TERMINAL BUILDING AND OTHER STRUCTURES, PHASE I AND II 5/20181216.91216.91029.05
2.AIRPORT AUTHORITY OF INDIA LIMITEDCIVIL AVIATIONDARBHANGA:DEVELOPMENT OF NEW CIVIL ENCLAVE AT DARBHANGA, BIHAR. SH- CONSTRUCTION OF NEW TERMINAL BUI7/2024911.66911.66113.58
3.BHARAT PETROLEUM CORPORATION LIMITEDPETROLEUMCITY GAS DISTRIBUTION PROJECTS AT GOPALGANJ SIWAN WEST CHAMPARAN EAST CHAMPARAN AND DEORIA DISTRICTS12/202239193919382.99
4.BHARAT PETROLEUM CORPORATION LIMITEDPETROLEUMCITY GAS DISTRIBUTION PROJECTS AT DARBHANGA, MADHUBANI, SUPAUL, SITAMARHI AND SHEOHAR DISTRICTS 12/202236383638390.34
5.Bihar Urban Infrastructure Development Corporation LtdWATER RESOURCESSEWERAGE SYSTEM WITH SEWER NETWORK PATNA KARMALICHAK 3/2017277.42277.42355.31
6.Bihar Urban Infrastructure Development Corporation LtdWATER RESOURCESSAIDPUR SEWER NETWORK PATNA 4/2015268.63493.85491.13
7.Bihar Urban Infrastructure Development Corporation LtdWATER RESOURCESI AND D AND STP WORKS FOR BHAGALPUR 10/2017254.13413.29126.67
8.Bihar Urban Infrastructure Development Corporation LtdWATER RESOURCESSEWER NETWORKS SPS AND STP HAJIPUR 3/2018305.19305.19346.46
9.Bihar Urban Infrastructure Development Corporation LtdWATER RESOURCESSEWERAGE SYSTEM AND STP FOR DIGHA ZONE, PATNA 8/2017824824385.33
10.Bihar Urban Infrastructure Development Corporation LtdWATER RESOURCESSEWER NETWORKS, SPS AND STP, MUNGER 3/2018294.02522.85428.7
11.Bihar Urban Infrastructure Development Corporation LtdWATER RESOURCESSEWERAGE SYSTEM AND STP FOR KANKARBAG ZONE PATNA 8/2017578.89578.89165.88
12.Bihar Urban Infrastructure Development Corporation LtdWATER RESOURCESSEWER NETWORK SPS AND STP BEGUSARAI 3/2018230.06230.06261.47
13.CPWD OF HIGHER EDUCATIONDEPARTMENT OF HIGHER EDUCATIONPERMANENT CAMPUS FOR IIM BODH GAYA 9/2018375375342.18
14.CPWD OF HIGHER EDUCATIONDEPARTMENT OF HIGHER EDUCATIONCONSTRUCTION OF ACADEMIC AND RESIDENTIAL COMPLEX UNDER PHASE-II FOR THE CAMPUS OF IIT PATNA 2/2016496.18460390.15
15.EAST CENTRAL RAILWAYSRAILWAYSKHAGARIA-KUSHESHWAR ASTHAN (NL) (ECR) 4/1997614.45614.45483.57
16.EAST CENTRAL RAILWAYSRAILWAYSKIUL - GAYA DOUBLING PROJECT 12/20152462.111771.071896.91
17.EAST CENTRAL RAILWAYSRAILWAYSJAYNAGAR-BIJALPURA INCLUDING EXTENSION BIJALPURA-BARDIBAS(NEPAL) GC 4/2009819783.83566.62
18.EAST CENTRAL RAILWAYSRAILWAYSSAGAULI VALMIKINAGAR DOUBLING 109.7 KM 4/20161215.541215.541595.74
19.EAST CENTRAL RAILWAYSRAILWAYSBARAUNI- BACHWARA 3RD AND 4TH LINE 7/2022486486135.31
20.EAST CENTRAL RAILWAYSRAILWAYSHAJIPUR-SUGAULI VIA VAISHALI (NL), ECR 4/20032066.782087.362454.59
21.EAST CENTRAL RAILWAYSRAILWAYSMUZAFFARPUR SAGAULI DOUBLING 100.60 KM 4/20161586.2213001487.54
22.EAST CENTRAL RAILWAYSRAILWAYSSAKRI-HASANPUR ROAD (NL) 4/1999325735.2604.94
23.EAST CENTRAL RAILWAYSRAILWAYSFATUHA-ISLAMPUR INCL. MM FOR EXTENSION OF NEW LINE FORM BIHARSHARIF-BARBIGHA, DANIYAWAN-BIHARSHARIF,4/19911473.32722.162794.05
24.EAST CENTRAL RAILWAYSRAILWAYSJHAJHA - BATIA (UMBRELLA WORK PB#23/2018-19/NR) 2/2019496.47496.4722.55
25.EAST CENTRAL RAILWAYSRAILWAYSSAMASTIPUR-DARBANGHA 5/2015519.33519.33651.94
26.EAST CENTRAL RAILWAYSRAILWAYSSONENAGAR BYE PASS LINE FROM CHIRALAPOTHU TO BAGHA BISHUNPUR 10/2022234223.6922.57
27.EAST CENTRAL RAILWAYSRAILWAYSARARIA-SUPAUL (NL) 4/20081605.171605.171749.92
28.EAST CENTRAL RAILWAYSRAILWAYSRAMPUR DUMRA - TAL - RAJENDRAPUL DOUBLING INCLUDING GANGA BRIDGE 12/20152373.6416001776.7
29.INDIAN OIL CORPORATION LIMITEDPETROLEUMINSTALLATION OF BITUMEN MANUFACTURING UNIT ALONG WITH ALLIED FACILITIES AT BARAUNI 1/202238938938.25
30.INDIAN OIL CORPORATION LIMITEDPETROLEUMBARAUNI REFINERY CAPACITY EXPANSION FROM 6.0 TO 9.0 MMTPA 1/2020148101811311055.42
31.INDIAN OIL CORPORATION LIMITEDPETROLEUMCGD PROJECT AT KHAGARIA, SAHARSA AND MADHEPURA 6/201916316396.08
32.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF 6-LANE ELEVATED / EXTRA DOSE CABLE BRIDGE ON RIVER GANGA PARALLEL TO AND WESTERN SID1/20243064.453064.45142.38
33.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSPROCUREMENT, AND CONSTRUCTION OF REHABILITATION AND UPGRADING TO 2 LANES/2 LANE(FOR LOT-III-KM 156.52/2016553.3706.39712.38
34.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSIMPROVEMENT TO TWO LANE WITH PAVED SHOULDER FROM JUNCTION OF NH-22 NEAR HAJIPUR TO JUNCTION OF NH-122/2024226.15226.1514.44
35.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF BHABHUA BYPASS FROM CH. 10+800(DESIGN CH. 10+800) TO CH. 19+860 (DESIGN CH. 18+150) 2/2022179.86179.8626.15
36.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSIMPROVEMENT OF 2 LANE WITH PAVED SHOULDER OF STRETCH FROM BIKRAMGANJ DAWATH MELAYABAGH NAWANAGR -DUM3/2021178.63178.63124.52
37.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYS IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF NH-319A FROM KM 0 TO KM 45 IN STATE OF BIHAR UNDER 2/2022427.29427.29210.22
38.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF A NEW 4 LANE BRIDGE PARALLEL TO EXISTING MG SETU WITH ITS APPROACHES FROM KM 0.00 2/20192926.422926.421354.63
39.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSWIDENING AND STRENTHENING FROM KM 70.15 TO KM 121.025 OF NH-80 3/2021477.54477.54360.27
40.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF NEW 4-LANE BRIDGE (PARALLEL TO EXISTING VIKRAMASHILA SETU)FROM KM 8+920 TO KM 13+3757/20201110.231110.23478.96
41.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF 4 LANE ROB AND ITS APPROACHES AT THE LEVEL OF CROSSING (L C NO. 29-B) OF KM 29 (EKAN3/2023201.08201.0825.42
42.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF A NEW 4 LANE MAJOR BRIDGE ACROSS RIVER KOSI AT PHULAUT INCLUDING RHABILITATION AND 9/20181478.41478.4972.42
43.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSREHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS (KM 40 TO KM 219.945) OF NH-104 2/2016319.68503.28453
44.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSREHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF BIRPUR - BIHPUR1/2014675780.77764.76
45.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSESTIMATE FOR IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER FROM RAMNAGAR TO ROSEDA FROM (KM 3.500 TO 41/2022495.16495.16134.57
46.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF PROPOSED 4_LANE REVELGUNJ BYPASS NH-19 IN THE STATE OF BIHAR ON EPC MODE CONNECTING 3/2022295.24295.2493.14
47.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSWIDENING and STRENTHENING FROM KM132.895 TO KM 190.15 NH-80 3/2021566.15566.15258.29
48.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF REHABILITATION AND UPGRADING TO 2 LANES/2 LANE(FOR LOT-I-KM 40.00 TO KM 65.400 AND K2/2016178.85278.54232.61
49.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYS IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF NH 122B FROM KM 29.730 TO KM 72.348 IN STATE OF BIH2/2022624.43624.43292.16
50.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSIMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF BH/WBBORDER-AMDABAD-MANIHARI SECTION FROM DESIGN KM 1/2022353.27353.2729.82
51.MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs)ROAD TRANSPORT AND HIGHWAYSFOUR LANING OF GAYA-HISUA-RAJGIRI-NALANDA-BIHARSHARIF SECTION (KM0.00 TO 92.935) ON NH-82 IN BIHAR 1/20141408.852138.161739.19
52.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYS4L GREENFIELD ALIGNMENT OF SHIVRAMPUR TO RAMNAGAR FROM KM. 55.002 TO KM. 109.300 OF NH 119 D (PKG-I2/20221494.311494.3138.28
53.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF NEW LINK (NH-133B) FROM KM 0/00 (KM 200/87 OF SAHIBANJ BYPASS) IN JHARKHAND TO KM 1512/201725981978.011427.02
54.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSBAKHTIYARPUR RAJAULI PKG-II FROM KM 54.405 TO KM 101.630 NH20 9/2020897.4510901037.63
55.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSSIX LANNING OF AURANGABAD TO BIHAR/JHARKHAND BORDER SECTION OF NH-19 (OLD NH-2) FROM KM. 209.827 TO 12/2021552.55553378.25
56.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF 4 LANE ELEVATED HIGHWAY AND AT-GRADE IMPROVEMENTS AT GOPALGANJ TOWN FROM DESIGN CH: 12/2021184.9185166.56
57.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYS4L GREENFIELD ALIGNMENT FROM KALYANAPUR TO TAL DASHRAHA OF NH-119D (PKG-III) 2/202313581358228.72
58.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSTWO-LANNING WITH PAVED SHOULDER OF MAHSHKUNT-SAHARSA-PURNEA SECTION FROM EXISTING KM.89.020 (DESIGN 3/2017672.89893.92714.74
59.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSBALANCE WORK OF TWO LANING WITH PAVED SHOULDER OF PIPRAKOTHI–MOTIHARI- RAXAUL SECTION OF NH-28A FRO12/2018333.6461.41460.38
60.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSFOUR OF SIMARIA - KHAGARIA SECTION OF NH-31 12/20151041.1639.58553.73
61.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSBALANCE WORK OF 4- LANING OF PATNA-GAYA-DOBHI SECTION (KM. 39.00 TO KM. 83.00) OF NH-83 IN THE STATE10/2013446.97740.5638.8
62.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSFOUR LANING OF BAKHTIYARPUR - MOKAMA SECTION OF NH-31 12/20151167.451182.94775.79
63.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYS4L GREENFIELD ALIGNMENT OF AMAS TO SHIVRAMPUR FROM 0.000 KM. TO 55.002 KM. OF NH 119 D (PKG-I) 2/20221390.921390.9217.54
64.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSFOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM KHARIA VILLAGE JUNCTION TO START OF EXISTI3/20211020.841020.84163.19
65.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSFOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM MUNGER TO KHARIA VILLAGE JUNCTION DESIGN C3/20221485.661485.6635.16
66.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF 2 LANE BRIDGE ACROSS RIVER KOSI WITH APPROACH ROAD FROM BHEJA TO BAKAUR SECTION OF N10/20191101.991101.99890.2
67.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSBALANCE WORK OF 4- LANING OF PATNA-GAYA-DOBHI SECTION (KM. 0.00 TO KM. 127.217) OF NH-83 IN THE STAT10/2013649.9750711.53
68.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSFOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM NEAR RASULPUR TO MIRZACHAUKI (DESIGN CH8/20221198.021198.0243.77
69.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF 4 LANE ELEVATED SECTION AND AT- GRADE IMPROVEMENTS AT BEGUSARAI TOWN SECTION OF NH-33/2022312.58312.58205.99
70.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSDEVELOPMENT OF NEWLY DECLARED NH-527C FROM MAJHAULI TO CHAROUT SECTION TO 2 LANE WITH PAVED SHOULDER3/2018496.2470.18399.41
71.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSCONSTRUCTION OF 6- LANE BRIDGE AND ITS APPROACHES ACROSS RIVER GANGA AS PART OF PATNA RING ROAD (NH-3/20233012.273012.27303.67
72.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSPERMANENT RECTIFICATION OF 4 NOS. OF BLACKSPOTS ON NH 27 OF KOTWA MEHSI MUZAFFARPUR SECTION FROM 12/2022410.75410.7550.64
73.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYS6 L OF AURANGABAD TO BIHAR-JHARKHAND BORDER (CHORDAHA) SECTION FROM KM. 180.000 TO KM. 209.827 OF N2/2022786.817870
74.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSREHABILITATION AND UPGRADATION OF TWO LANING OF MAHESHKHUNT - SAHARSA - PURNEA SECTION PKG - I 1/2018573.7726.99509.99
75.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSBALANCE WORK - WB-10 (GANDAK BRIDGE) KM 402.00 TO KM 440.00 (DEVANPUR - KOTWA) 12/2021210.05210.05104.35
76.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSBALANCE WORK OF 4- L ANING OF PATNA-GAYA-DOBHI SECTION (KM.83.00 TO KM. 127.217) OF NH-83 IN THE STA10/2013464.09765.12698.25
77.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSFOUR LANING OF PARARIA TO MOHANIA SECTION OF NH 319 (OLD NH 30) FROM KM. 54+530 (DESIGN CHAINAGE) TO8/2020690690770.73
78.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSPATNA-MUZZAFFARPUR 8/2010671.3671.31830.13
79.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYS4L OF GREENFIELD ALIGNMENT FROM KM. 47.000 TO KM. 89.210 OF BALBHADARPUR TO BELA NAWDA SECTION OF NH2/20222185.752185.75595.71
80.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSFOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM START OF EXISTING BHAGALPUR BYPASS TO RASU4/20221769.51769.569.23
81.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSSIX LANNING OF AUNTA-SIMARIA(GANGA BRIDGE WITH APPROACH ROADS) SECTION OF NH-31 8/2017950.641168.331156.29
82.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYSPERMANENT RECTIFICATION OF 3 NOS. OF BLACK SPOTS IN PROJECT HIGHWAY NH-27 OF U.P BORDER - DEWAPUR - 12/2022381.8381.8119.56
83.NATIONAL HIGHWAYS AUTHORITY OF INDIAROAD TRANSPORT AND HIGHWAYS4-LANNING OF CHAPRA-HAJIPUR 1/2011575575573.48
84.NATIONAL THERMAL POWER CORPORATIONPOWERBARH STPP(3X660MW) NTPC 2/20058692.9721312.1122561.37
85.NORTH EAST FRONTIER RAILWAYRAILWAYSKATIHAR-KUMEDPUR AND KATIHAR-MUKURIA (64.5 KM) (UMBRELLA WORK PB#57/2019-20/NR) 8/20227451500356.14
86.NORTH EAST FRONTIER RAILWAYRAILWAYSNEW B.G. LINE FROM ARARIA TO GALGALIA (THAKURGUNG), NEFR 9/200626504351.544074.75
87.PATNA METRO RAIL CORPORATIONURBAN DEVELOPMENTPATNA METRO RAIL CORPORATION LIMITED 2/201913365.7713925.53318.85
88.POWER GRID CORPORATION OF INDIA LIMITEDPOWEREASTERN REGION EXPANSION SCHEME: 44 [ERES: 44] 5/20254094090
89.POWER GRID CORPORATION OF INDIA LIMITEDPOWEREASTERN REGION EXPANSION SCHEME: 43 [ERES: 43] 5/20253433430
90.SATLUJ JAL VIDYUT NIGAM LIMITEDPOWERBUXAR THERMAL POWER PLANT (1320 MW) 3/201910439.0914390.0911845.16
Total90