S No. | Agency Name | Sector Name | Project Name | Date Of Approval | Cost Original | Cost Anticipated | Expenditure |
1. | AHMEDABAD METRO RAIL | URBAN DEVELOPMENT | AHMEDABAD METRO RAIL PROJECT PHASE II | 3/2019 | 5384.17 | 5384.17 | 2830.04 |
2. | AHMEDABAD METRO RAIL | URBAN DEVELOPMENT | AHMEDABAD METRO RAIL PROJECT PHASE 1 | 11/2014 | 10773 | 12924.55 | 12177.38 |
3. | AHMEDABAD METRO RAIL | URBAN DEVELOPMENT | SURAT METRO RAIL PROJECT | 3/2019 | 12020.32 | 12020.32 | 4448.73 |
4. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | DEVELOPMENT OF NEW GREENFIELD AIRPORT AT DHOLERA, AHMEDABAD (GUJARAT). PHASE-1. | 6/2022 | 1305 | 751.01 | 80.26 |
5. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | C/O NEW GREENFIELD AIRPORT AT HISSAR, RAJKOT, GUJARAT | 1/2018 | 1405 | 1405 | 1206.58 |
6. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | EXTENSION OF TERMINAL BUILDING, PTT, APRON AND CAR PARK AT SURAT AIRPORT. | 8/2018 | 353.25 | 353.25 | 310.58 |
7. | GAS AUTHORITY OF INDIA LIMITED | PETROLEUM | SUSTAINED EVACUATION OF GAS FROM GANDHAR FIELDS BY INSTALLING A GAS COMPRESSOR AND PIPELINE CONNECTI | 9/2018 | 225.54 | 247.9 | 239.68 |
8. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | PETROCHEMICAL AND LUBE INTEGRATION PROJECT AT GUJARAT REFINERY | 9/2020 | 18936 | 18936 | 7061.16 |
9. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | INSTALLATION OF NEW BITUMEN UNIT ALONG WITH ALLIED FACILITIES AT GUJARAT | 1/2022 | 328 | 328 | 14.46 |
10. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | ACRYLICS OR OXO-ALCOHOL PROJECT AT GUJARAT REFINERY | 11/2019 | 5251 | 5894 | 3923.97 |
11. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | AUGUMENTATION OF SALAYA MATHURA CRUDE OIL PIPELINE SYSTEM | 10/2020 | 1614 | 1614 | 869.36 |
12. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION AND STRENGTHENING TO 2 LANE PS FROM KM 95/500 TO KM 129/775 OF NH 168 G IDAR BHILODA SA | 9/2022 | 237.28 | 237.28 | .34 |
13. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF SIGNATURE BRIDGE BETWEEN DWARKA AND BEY DWARKA AND ITS APPROACHES IN THE STATE OF GU | 8/2017 | 962.43 | 978.93 | 892.54 |
14. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UP GRADATION OF NEWLY DECLARED NH 341 TO TWO LANE WITH PAVED SHOULDER CONFIGURATION BETWEEN KM. 65.4 | 3/2018 | 351 | 270 | 220.75 |
15. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION TO TWO LANE WITH PAVED SHULDER CONFIGUARATION FROM KM 00 TO 47 OF NH 351 MAHUVA TO BADHA | 12/2022 | 173.06 | 219 | 0 |
16. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF MISSING LINKS (SINGLE LANE) IN LAKHPAT GADULI HAJIPIR ODMA KHAVDA DHOLAVIRA MAUVANA | 10/2018 | 400.76 | 394.44 | 287.04 |
17. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | DEVELOPMENT OF CHILODA GANDHINAGAR SARKHEJ OF NH 147 OLD NH 8C FROM KM 0/0 TO KM 44/042 IN THE STATE | 12/2017 | 867.97 | 913.49 | 793.77 |
18. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF ROB WITH APPROACHES IN LIEU OF L C NO 165 OF AHMEDABAD PALANPUR BETWEEN RAILWAY STAT | 6/2020 | 166.21 | 166.21 | 97.12 |
19. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION OF DHORAJI JAMKANDORNA KALAVAD SECTION OF NH 927D FROM DESIGN CHAINAGE KM 00 TO KM 58.11 | 10/2022 | 246.6 | 291 | 0 |
20. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | SANCHORE - SANTALPUR FROM KM 99.000- KM 130.073 OF NH-754K (AJ-RGBS-PACKAGE-4) | 2/2020 | 778.15 | 785.67 | 511.14 |
21. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | JUNAGADH BYPASS | 10/2017 | 232.49 | 375.58 | 334.28 |
22. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | UP-GRADATION TO 4-LANE WITH PAVED SHOULDER OF BHIMASAR JUNCTION OF NH-41 TO ANJAR BHUJ UPTO AIRPORT | 3/2022 | 1373.06 | 1373.06 | 337.53 |
23. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF VEJALLKA VILLAGE TO START OF DSIR ZONE OF AHMEDAB | 5/2020 | 691.52 | 691.52 | 452.79 |
24. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF BAL WORKS OF TALAJA - MAHUVA FROM 54.990 KM. TO 100.450 KM. OF OLD NH-8E (PACKAGE-II) | 3/2021 | 536.03 | 536.03 | 414.52 |
25. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF SINDHREJ VILLAGE (CH. 22.00 TO CH. 48.52) SECTION | 5/2020 | 882 | 882 | 493.37 |
26. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | WIDENING TO 6L OF EXISTING 4L JETPUR - GONDAL - RAJKOT SECTION FROM KM. 117.600 TO KM. 185.00 ON NH- | 9/2023 | 2070.44 | 2070.44 | 55.95 |
27. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 31 | 11/2019 | 1604.06 | 1604.06 | 1207.06 |
28. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION TO 4L PS DIVIDED CARRIAGEWAY FROM PATAN (NEAR RAJPUR) TO GOJARIYA FROM KM 52.000 TO KM 1 | 12/2021 | 1181.34 | 1181.34 | 250.85 |
29. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING OF BHAVNAGAR-TALAJA SECTION OF NH-8E FROM KM. 7.090 TO KM. 53.585 (DESIGN CH FROM KM. 6. | 5/2016 | 998.18 | 998.18 | 802.04 |
30. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY FROM KM 103.400 TO KM 128.000 OF VADODARA MU | 3/2021 | 1259 | 1910 | 129.88 |
31. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF BAL WORKS OF MAHUVA TO KAGVADAR FROM 100.450 KM. TO 140.470 KM. OF NH-8E (PKG- III) | 3/2021 | 485.75 | 485.75 | 313.83 |
32. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | SIX LANNING FROM KM. 401.200 TO 494.410 OF NH-8 ON HYBRID ANNUITY MODE UNDER NHDP-V(PKG VI)REG. | 1/2017 | 1251.11 | 1361 | 664.92 |
33. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 30 | 11/2019 | 1669.56 | 1669.56 | 820.96 |
34. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF DHROL-BHADRA-PATIYA SECTION FROM 0.000 TO KM 13.600 AND BHADRA PATIYA - PIPALIYA SECTION FROM | 5/2020 | 971.03 | 971.03 | 455.63 |
35. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 26 | 9/2020 | 1542.02 | 1542.02 | 661.7 |
36. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 27 | 9/2020 | 1185.69 | 1185.69 | 689.91 |
37. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING OF UNA TO KODINAR OF NH-8E FROM KM. 180.478 TO KM 221.610 (PACKAGE-V) IN THE STATE OF GU | 5/2016 | 763.08 | 763.08 | 460.24 |
38. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L KODINAR - VERAVAL (PACKAGE VI) FROM KM. 222.400 TO KM. 230.00 (KODINAR BYPASS) OF NH-8E (NH 51 NE | 3/2022 | 162.73 | 162.73 | 104.79 |
39. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4-LANNING OF KODINAR TO VERAVAL SECTION OF NH-8E FROM KM 221.610 TO KM 263.000 | 7/2016 | 829.97 | 829.97 | 399.08 |
40. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF EIGHT LANE VADODARA KIM EXPRESSWAY FROM KM 254.430 TO KM 279.000 (KIM TO ANKLESHWAR | 3/2018 | 1161.39 | 1404 | 418.51 |
41. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF EIGHT LANE EXPRESSWAY FROM KM 190.000 TO KM 217.500 GANDEVA TO ENA SECTION OF VADODA | 7/2020 | 1710.3 | 1927 | 362.81 |
42. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | SANCHORE - SANTALPUR FROM KM 4.888 - KM 35.000 OF NH-754K (AJ-RGBS-PACKAGE-1) | 2/2020 | 606.51 | 657 | 453.89 |
43. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF SARDAR PATEL RING ROAD TO SINDHREJ VILLAGE (CH. 0 | 5/2020 | 690.3 | 690.3 | 589.31 |
44. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF DSIR ZONE OF AHMEDABAD DISTRICT TO ADHELAI VILLAG | 5/2020 | 894 | 894 | 619.48 |
45. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | SANCHORE - SANTALPUR FROM KM 67.000- KM 99.000 OF NH-754K (AJ-RGBS-PACKAGE-3) | 2/2020 | 752.3 | 766.2 | 451.11 |
46. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY FROM KM 217.500 TO KM 254.430 OF VADODARA MU | 7/2020 | 2271.86 | 3916 | 518.25 |
47. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING OF KAGAVADAR - UNA SECTION OF NH-8E FROM KM 139.915 TO KM 180.478 (PACKAGE-IV) IN THE ST | 5/2016 | 723.64 | 723.64 | 558.89 |
48. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 28 | 9/2020 | 1198.55 | 1198.55 | 700.17 |
49. | NATIONAL THERMAL POWER CORPORATION | POWER | BHUJ SOLAR 300MW (TRANCHE-IV WIND SOLAR HYBRID) | 11/2022 | 1442.6 | 1442.6 | 80.6 |
50. | NATIONAL THERMAL POWER CORPORATION | POWER | KHAVDA 1200MW (4X300MW) IN KHAVDA RE PARK | 6/2023 | 6283.81 | 6283.81 | 244.77 |
51. | NATIONAL THERMAL POWER CORPORATION | POWER | KHAWDA 1255MW SOLAR PROJECT (KHAWDA SOLAR PARK) | 9/2022 | 7179.54 | 7179.54 | 854.13 |
52. | NATIONAL THERMAL POWER CORPORATION | POWER | DAYAPAR WIND- III (HYBRID TRANCHE-V) | 5/2023 | 1095.01 | 1095.01 | 75.46 |
53. | NATIONAL THERMAL POWER CORPORATION | POWER | GUJARAT 200 MW (GUVNL TENDER) | 1/2021 | 842.27 | 842.27 | 494.72 |
54. | NATIONAL THERMAL POWER CORPORATION | POWER | DAYAPAR WIND ENERGY PROJECT 200MW | 7/2022 | 1316.02 | 1316.02 | 190.59 |
55. | NATIONAL THERMAL POWER CORPORATION | POWER | DAYAPAR WIND ENERGY PROJECT 150MW | 11/2021 | 937.8 | 937.8 | 689.82 |
56. | NATIONAL THERMAL POWER CORPORATION | POWER | 150 MW SOLAR PV PROJECT IN GUJARAT (LIMBDI, MESANKA AND RADHANPUR) | 5/2021 | 674.92 | 674.92 | 405.9 |
57. | NORTH WESTERN RAILWAY | RAILWAYS | TARANGA HILL ABU ROAD VIA AMBAJI NEW LINE | 7/2022 | 1695.82 | 1695.82 | 378.25 |
58. | NUCLEAR POWER CORPORATION OF INDIA LIMITED | ATOMIC ENERGY | KAKRAPAR ATOMIC POWER PROJECT - 3 AND 4 | 10/2009 | 11459 | 22517 | 21222 |
59. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | CONSTRUCTION OF TWO PRODUCED WATER TREATMENT PLANTS (PWTP) AT BECHARAJI AND SOBHASAN INSTALLATION OF | 7/2021 | 320.2 | 187.61 | 88.33 |
60. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | RESTORATION OF GAS TERMINAL, PHASE-I (PART-A), HAZIRA PLANT | 5/2022 | 249.43 | 249.43 | 47.71 |
61. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | REVAMPING OF SV STATIONS, GAS TERMINAL AND KRIBHCO TERMINAL | 11/2022 | 837.34 | 837.34 | 14.64 |
62. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | REDEVELOPMENT OF SOBHASAN COMPLEX | 8/2021 | 885.63 | 1286.67 | 333.25 |
63. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | OLD PIPE LINE REPLACEMENT (OPRP) GROUP-A | 7/2021 | 173.03 | 169.84 | 93.88 |
64. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | KALOL REDEVELOPMENT PROJECT | 8/2022 | 1487.41 | 1487.41 | 655.45 |
65. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | REDEVELOPMENT OF SANTHAL FIELD | 2/2017 | 1162.56 | 1162.56 | 1079.74 |
66. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | REDEVELOPMENT OF LINCH FIELD | 4/2021 | 631.03 | 860.04 | 233.76 |
67. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | COMMERCIAL POLYMER FLOODING PROJECT IN BECHRAJI FIELD | 1/2022 | 621.4 | 621.4 | 81.7 |
68. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | KHAVDA-2, GUJARAT- ESTABLISHMENT OF KHAVDA POOLING STATION-2 (KPS2) IN KHAVDA RE PARK | 3/2023 | 966.79 | 966.79 | 15.3 |
69. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | KHAVDA PHASE-II-PART C, GUJARAT- TRANSMISSION SCHEME FOR EVACUATION OF 4.5 GW RE INJECTION AT KHAVDA | 3/2023 | 2820.99 | 2820.99 | 534.03 |
70. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | ESTABLISHMENT OF KHAVDA POOLING STATION 3 (KPS3) IN KHAVDA RE PARK | 3/2023 | 922.3 | 922.3 | 68.71 |
71. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TRANSMISSION NETWORK EXPANSION IN GUJARAT ASSOCIATED WITH INTEGRATION OF RE PROJECTS FROM KHAVDA POT | 3/2023 | 815.12 | 815.12 | 1.87 |
72. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | KHAVDA PHASE-II-PART B, GUJARAT- TRANSMISSION SCHEME FOR EVACUATION OF 4.5 GW RE INJECTION AT KHAVDA | 3/2023 | 1167.55 | 1167.55 | 205.35 |
73. | RAIL VIKAS NIGAM LTD. | RAILWAYS | JUNAGARH -VISAVADAR (42.28) KM | 6/2022 | 492.83 | 492.83 | 0 |
74. | SATLUJ JAL VIDYUT NIGAM LIMITED | POWER | Bagodara Solar Power Project | 5/2021 | 339.35 | 339.35 | 329.08 |
75. | WESTERN RAILWAY | RAILWAYS | VIRAR SURAT ROAD OVER BRIDGE IN LIEU OF LEVEL CROSSING NOS 60 64 66 68 69 71 74 75 77 81 AND 82 ALON | 3/2012 | 248.26 | 528.49 | 116.25 |
76. | WESTERN RAILWAY | RAILWAYS | NADIAD-PETLAD (37.26 KM) | 5/2022 | 335.34 | 461.91 | 1.63 |
77. | WESTERN RAILWAY | RAILWAYS | MEHSANA PALANPUR DOUBLING PROJECT 65.10 KMS | 4/2018 | 537.31 | 537.31 | 417.48 |
78. | WESTERN RAILWAY | RAILWAYS | NEW BG LINE BETWEEN NALIYA-JAKHAU PORT | 2/2023 | 410.46 | 410.46 | 0 |
79. | WESTERN RAILWAY | RAILWAYS | BHUJ-NALIYA(GC) WITH EXTENSION FROM NALIYA TO VAYOR (WR) | 4/2008 | 318.24 | 1531.55 | 547.52 |
80. | WESTERN RAILWAY | RAILWAYS | SAMNI-JAMBUSAR (24.08 KM) | 5/2022 | 216.72 | 349.93 | 21.03 |
81. | WESTERN RAILWAY | RAILWAYS | KALOL-KADI-KATOSAN ROAD (37.23 KM) | 6/2022 | 279.23 | 346.94 | 77.56 |
82. | WESTERN RAILWAY | RAILWAYS | ANAND GODHRA DOUBLING PROJECT 79 KMS | 4/2017 | 692.25 | 692.26 | 293.22 |
83. | WESTERN RAILWAY | RAILWAYS | NEW BG LINE INTERSECTION (5 NOS) BETWEEN GERATPUR-SANAND & BOTAD-AHMEDABAD (16.51 KM) (PB#29/NR/202 | 10/2022 | 437.21 | 437.21 | 0 |
84. | WESTERN RAILWAY | RAILWAYS | HIMMATNAGAR-KHEDBRAHMA (54.83 KM) | 6/2022 | 354.99 | 482.43 | 78.66 |
85. | WESTERN RAILWAY | RAILWAYS | 4TH LINE BETWEEN BAREJADI NANDEJ (GERATPUR)- SANAND (38.20 KM) (AHMEDABAD BYPASS). | 2/2023 | 961.67 | 961.67 | 0 |
86. | WESTERN RAILWAY | RAILWAYS | PETLAD-BHADRAN (22.5 KM) | 5/2022 | 202.5 | 307.12 | 2.09 |
87. | WESTERN RAILWAY | RAILWAYS | ADRAJ MOTI-VIAJAPUR (39.75 KM) | 5/2022 | 296.54 | 296.54 | 0 |
88. | WESTERN RAILWAY | RAILWAYS | RAJKOT-KANALUS (111.20 KM) | 10/2021 | 1011.72 | 1080.57 | 222.78 |
89. | WESTERN RAILWAY | RAILWAYS | SAMLAYA-TIMBA ROAD (53.53 KM) | 2/2023 | 401.48 | 670.17 | 14.53 |
90. | WESTERN RAILWAY | RAILWAYS | MEHSANA-PALANPUR (65.1 KM) | 9/2020 | 529.3 | 537.31 | 47.67 |
91. | WESTERN RAILWAY | RAILWAYS | VIJAPUR-AMBLIYASAN (41.53 KM) | 5/2022 | 309.81 | 415.38 | 75.32 |
92. | WESTERN RAILWAY | RAILWAYS | QUADRUPLING BETWEEN GANDHIDHAM - ADIPUR WITH Y CONNECTION AT ADIPUR FOR PROVIDING DIRECT ENTRY TOWAR | 2/2023 | 152.44 | 152.44 | 0 |
93. | WESTERN RAILWAY | RAILWAYS | MIYAGAM-KARJAN-DABHOI-SAMLAYA (GC) | 4/2011 | 844.1 | 844.1 | 503.35 |
94. | WESTERN RAILWAY | RAILWAYS | MODASA- SHAMLAJI NEW LINE ( MM OF AHMEDABAD-HIMMATNAGAR-UDAIPUR (299.2 KM)) | 9/2012 | 261.68 | 261.68 | 0 |
95. | WESTERN RAILWAY | RAILWAYS | NATHDWARA-NEW NATHDWARA NEW LINE ( MM OF AJMER-CHITTAURGARH-UDAIPUR) | 6/2013 | 166.33 | 166.33 | 8.43 |
| Total | 95 | |