S No. | Agency Name | Sector Name | Project Name | Date Of Approval | Cost Original | Cost Anticipated | Expenditure |
1. | BHARAT COKING COAL LIMITED | COAL | MOONIDIH XV SEAM UG | 8/2011 | 1230.27 | 1230.27 | 587.43 |
2. | BHARAT COKING COAL LIMITED | COAL | PATHERDIH 2.5 NLW COAL WASHERY | 10/2015 | 243 | 334.27 | 94.11 |
3. | BHARAT COKING COAL LIMITED | COAL | MADHUBAND NLW WASHERY | 8/2010 | 289.45 | 302 | 299.38 |
4. | BHARAT COKING COAL LIMITED | COAL | MURAIDIH UG TURN-KEY PROJECT | 2/2011 | 339.88 | 339.88 | 151.04 |
5. | BHARAT COKING COAL LIMITED | COAL | NORTH TISRA AND SOUTH TISRA EXPANSION OCP (6MTY) | 2/2014 | 555.52 | 555.52 | 379.46 |
6. | CENTRAL COAL FIELDS LIMITED | COAL | SIRKA OCP | 5/2020 | 222.82 | 222.82 | 139.31 |
7. | CENTRAL COAL FIELDS LIMITED | COAL | EPR TAPIN SOUTH OCP | 11/2020 | 230.41 | 230.41 | 18.14 |
8. | CENTRAL COAL FIELDS LIMITED | COAL | TETARIAKHAR EXPANSION OCP | 11/2019 | 243.52 | 243.52 | 44.35 |
9. | CENTRAL COAL FIELDS LIMITED | COAL | EPR ROHINI KARKATA OCP | 1/2021 | 1020.42 | 1020.42 | 82.92 |
10. | CENTRAL COAL FIELDS LIMITED | COAL | EXPANSION OF KARO OCP | 1/2022 | 908.47 | 908.47 | 135.49 |
11. | CENTRAL COAL FIELDS LIMITED | COAL | EXPANSION OF ASHOK OCP | 5/2021 | 2898.28 | 2898.28 | 173.9 |
12. | CENTRAL COAL FIELDS LIMITED | COAL | CHURI BENTI UG (0.81 MTY) | 8/2007 | 163.51 | 163.51 | 133.28 |
13. | CENTRAL COAL FIELDS LIMITED | COAL | EXPANSION OF KONAR OCP | 1/2022 | 799.34 | 799.34 | 319.76 |
14. | CENTRAL COAL FIELDS LIMITED | COAL | KARMA OCP (1.0MTY) | 6/2009 | 162.46 | 162.46 | 95.75 |
15. | CENTRAL COAL FIELDS LIMITED | COAL | EPR PUNDI OCP | 11/2020 | 713.35 | 713.35 | 236.57 |
16. | CENTRAL COAL FIELDS LIMITED | COAL | KOTRE BASANTPUR PACHMO OCP | 8/2020 | 861.06 | 625.4 | 330.52 |
17. | CENTRAL COAL FIELDS LIMITED | COAL | RAJRAPPA RCE OCP ( 3.0 MTY) | 12/2009 | 510.85 | 510.85 | 488.31 |
18. | CENTRAL COAL FIELDS LIMITED | COAL | JHARKHAND LAIYO OCP | 8/2020 | 764.57 | 764.57 | 145.67 |
19. | CENTRAL COAL FIELDS LIMITED | COAL | REVISED PROJECT REPORT MAGADH EXPANSION OCP | 8/2020 | 7254.37 | 7254.37 | 1044.7 |
20. | CENTRAL COAL FIELDS LIMITED | COAL | UCE OF EPR OF NORTH URIMARI OCP | 7/2021 | 778.8 | 778.8 | 669.65 |
21. | CENTRAL COAL FIELDS LIMITED | COAL | CHANDRAGUPT OCP | 8/2020 | 973.5 | 973.5 | 7.95 |
22. | CENTRAL COAL FIELDS LIMITED | COAL | EXPANSION PROJECT AMRAPALI OCP | 8/2020 | 5136.15 | 5136.15 | 600.07 |
23. | CPWD OF HIGHER EDUCATION | DEPARTMENT OF HIGHER EDUCATION | 2000 BOYS HOSTEL(1000 DOUBLE BEDDED ROOM) AT ISM DHANBAD | 9/2012 | 171.86 | 171.86 | 174.48 |
24. | EAST CENTRAL RAILWAYS | RAILWAYS | KODERMA-TILAIYA (NL), ECR | 4/2002 | 459.91 | 1625.87 | 1576.06 |
25. | EAST CENTRAL RAILWAYS | RAILWAYS | GOMOH - FLYOVER FOR DOWN TRAINS | 1/2018 | 487.73 | 487.73 | 227.96 |
26. | EAST CENTRAL RAILWAYS | RAILWAYS | GARHWA ROAD - RAIL OVER RAIL | 3/2017 | 262.71 | 262.71 | 167.49 |
27. | EAST CENTRAL RAILWAYS | RAILWAYS | DOUBLING OF PRADHANKHUNTA JN -PATHERDIH BAZAR-BHOJUDIH | 11/2022 | 202 | 349.22 | 0 |
28. | EAST CENTRAL RAILWAYS | RAILWAYS | PARASNATH-MADHUBAN-GIRIDIH | 3/2019 | 816.03 | 902.86 | 2.93 |
29. | EASTERN COAL FIELDS LIMITED | COAL | HURA - C OC (3 MTY) | 10/2015 | 359.69 | 859.41 | 316.19 |
30. | EASTERN COAL FIELDS LIMITED | COAL | CHITRA EAST (RCE) OCP | 8/2018 | 513.98 | 513.98 | 178.19 |
31. | EASTERN RAILWAYS | RAILWAYS | CHITRA - BASUKINATH (38.30 KM) | 1/2019 | 827.89 | 793.87 | 182.63 |
32. | GAS AUTHORITY OF INDIA LIMITED | PETROLEUM | CITY GAS DISTRIBUTION, JAMSHEDPUR | 10/2017 | 221.45 | 221.45 | 173.57 |
33. | GAS AUTHORITY OF INDIA LIMITED | PETROLEUM | CITY GAS DISTRIBUTION (CGD) NETWORK, RANCHI | 10/2017 | 226.45 | 226.45 | 257.39 |
34. | HINDUSTAN PETROLEUM CORPORATION LIMITED | PETROLEUM | CGD PROJECT IN BIHAR JHARKHAND | 6/2022 | 1377 | 1377 | 134.08 |
35. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | CGD PROJECT AT BOKARO, HAZARIBAGH AND RAMGARH DISTRICTS | 10/2018 | 613 | 613 | 226.15 |
36. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | LAYING OF NATURAL GAS PIPELINE FROM HAZARIBAGH TO RANCHI | 3/2023 | 202.07 | 202.07 | .78 |
37. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | WIDENING TO 2-LANE WITH PAVED SHOULDER FROM KM 0.00 TO 44.00 (KURU-GHAGHRA SECTION) OF NH-143A INCLU | 2/2020 | 153.01 | 153.01 | 83.6 |
38. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | WIDENING TO 2 LANE WITH PAVED SHOULDERS AND GEOMETRIC IMPROVEMENT OF NH-114A FROM KM 141 TO KM 184 I | 12/2016 | 196 | 196 | 163.97 |
39. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | WIDENING AND STRENGTHENING OF EXISTING PAVEEMNT TO TWO LANE WITH PAVED SHOULDERS FROM KM 116.00 TO K | 1/2022 | 315.21 | 315.21 | 59.59 |
40. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | WIDENING AND STRENGTHENING/RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDER/ TWO LANE WITH PAVED SHOUL | 3/2022 | 423.18 | 423.18 | .11 |
41. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | WIDENING AND STRENGTHENING TO TWO LANE WITH PAVED SHOULDER/TWO LANE+ PAVED SHOULDER WITH SERVICE ROA | 3/2022 | 514.22 | 514.22 | 0 |
42. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | BHARATMALA PARIYOJANA OF BOKARO JAINA MORE - GOLA SECTION OF NH-320 FROM KM. 21.110 TO KM. 53.600 IN | 6/2020 | 964.64 | 964.64 | 304.75 |
43. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF MIRZA CHAUKI TO FARKKA SECTION OF NH80 FROM KM 215.00 TO KM 260.00 ON HAM MODE IN THE STATE OF | 11/2021 | 1302.72 | 1302.72 | 745.92 |
44. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4-LANING OF LOHA - WARANGA SECTION OF NH-361 FROM KM. 187.800 TO KM. 244.369 (DESIGN LENGTH 56.569 K | 3/2018 | 1005.08 | 1073.1 | 699.05 |
45. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING OF KHAJURI TO WYNDHAMGANJ FROM KM 219.600 TO KM 260.483 ON NH-75 PKG SEC-V ON HAM | 4/2022 | 1232 | 1400 | 249.02 |
46. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING WITH PAVED SHOULDER OF SECTION FROM KM 53.600 (GOLA ON NH-320) TO KM 81.446 (ORMANJHI ON | 6/2023 | 1214.93 | 1324.95 | 511.85 |
47. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING OF BASUKINATH-DEOGHAR SECTION OF NH-114A FROM KM 85.081 TO KM 130.240 UNDER NHDP PHASE-I | 3/2023 | 1444.94 | 1444.94 | 0 |
48. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | SIX LANING OF BIHAR - JHARKHAND BORDER (CHORDAHA) TO GORHAR SECTION | 1/2018 | 1155.16 | 950.49 | 612.52 |
49. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF PALMA TO GUMLA SECTION OF NH23 FROM KM. 26.00 TO KM. 89.170 ON HAM MODE IN THE STATE OF JHARKH | 8/2020 | 1034 | 1699.48 | 41.5 |
50. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING OF BHOGU TO SANKHA FROM KM 147.450 TO KM 196.870 ON NH-75 PKG SEC-III | 10/2022 | 1390.77 | 1600 | 130.88 |
51. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | ELEVATED CORRIDOR IN RANCHI CITY FROM KM 0.00 TO KM 3.260 OF NH-75 INCLUDING DOWN RAMP ON NH-23 FROM | 2/2022 | 534.73 | 534.73 | 0 |
52. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING OF BARHI - KODERMA SECTION OF NH - 31 | 1/2018 | 273.46 | 276.17 | 238.33 |
53. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | HARIHARGANJ TO PARWA MODE SECTION FROM KM 23.284 TO KM 57.049 OF NH-98 | 9/2020 | 755.26 | 1039 | 524.07 |
54. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | BALANCE WORK OF RANCHI-MAHULIA SECTION OF NH-33 FROM KM 113.730 (VIKAS) TO KM 140.000 (RAMPUR) (PKG- | 1/2019 | 466.55 | 466.55 | 0 |
55. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING OF MEHGAMA HANSDIHA SECTION OF NH-33 FROM EXISTING KM 41.900 TO 93.000 IN THE STATE OF J | 12/2022 | 1443.77 | 1443.77 | 0 |
56. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L FROM KM 196.87 (SANKHA) TO KM 219.6 (KHAJURI) ON NH-75 [REHLA / GARHWA BYPASS] | 9/2020 | 748.99 | 903 | 755.74 |
57. | NATIONAL THERMAL POWER CORPORATION | POWER | CHATTI BARIATU COAL MINING PROJECT | 3/2015 | 1314 | 1783 | 0 |
58. | NATIONAL THERMAL POWER CORPORATION | POWER | KERANDARI COAL MINING PROJECT | 9/2015 | 1553 | 2804 | 0 |
59. | NATIONAL THERMAL POWER CORPORATION | POWER | BADAM COAL MINING PROJECT | 2/2019 | 501.79 | 501.79 | 20.35 |
60. | NATIONAL THERMAL POWER CORPORATION | POWER | PATRATU STPP-I (3X800MW) | 11/2017 | 17112 | 17112 | 13136.45 |
61. | NATIONAL THERMAL POWER CORPORATION | POWER | NORTH KARANPURA STPP (3X660 MW) | 2/2014 | 16242.9 | 17007 | 15292.62 |
62. | NEYVELI LIGNITE CORPORATION | COAL | PACHWARA SOUTH COAL BLOCK | 7/2013 | 1795.01 | 2242.9 | 106.36 |
63. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | DEVELOPMENT OF JHARIA CBM BLOCK (PHASE-1) | 11/2019 | 431 | 431 | 132.83 |
64. | OIL & NATURAL GAS CORPORATION LIMITED | PETROLEUM | DEVELOPMENT PLAN OF CBM - BOKARO BLOCK | 12/2015 | 823.27 | 1137.79 | 1023.39 |
65. | RAIL VIKAS NIGAM LTD. | RAILWAYS | KHARAGPUR-ADITYAPUR - 3RD LINE (132 KM) | 12/2015 | 1116 | 3270.07 | 2829.67 |
66. | RAIL VIKAS NIGAM LTD. | RAILWAYS | 3RD LINE BETWEEN DHANBAD SONNAGAR | 11/2016 | 8975 | 7906.38 | 4501.29 |
67. | SOUTH EASTERN RAILWAY | RAILWAYS | BONDAMUNDA RANCHI DOUBLING | 3/2016 | 1724.2 | 3029.04 | 1969.36 |
68. | SOUTH EASTERN RAILWAY | RAILWAYS | LODHMA TO PISKA LINK LINE BY PASSING HATIA/RANCHI WITH Y CONNECTION (17.2 KM) | 4/2018 | 428.65 | 472.5 | 265.82 |
69. | STEEL AUTHORITY OF INDIA LIMITED (SAIL) | STEEL | NEW SINTER PLANT AT BOKARO STEEL PLANT | 3/2015 | 1034.01 | 1034.01 | 851.48 |
70. | STEEL AUTHORITY OF INDIA LIMITED (SAIL) | STEEL | REVAMPING OF OLD SUB SYSTEM OF BLAST FURNACE 3 AT BOKARO STEEL PLANT | 9/2023 | 513.82 | 513.82 | 36.62 |
71. | STEEL AUTHORITY OF INDIA LIMITED (SAIL) | STEEL | UP GRADATION OF AUTOMATION SYSTEM OF HOT STRIP MILL AT BOKARO STEEL PLANT | 2/2022 | 207.74 | 207.74 | 176.25 |
72. | STEEL AUTHORITY OF INDIA LIMITED (SAIL) | STEEL | REBUILDING OF COKE OVEN BATTERY NO.6 OF BOKARO STEEL PLANT | 11/2023 | 627.31 | 627.31 | 13.4 |
| Total | 72 | |