S No. | Agency Name | Sector Name | Project Name | Date Of Approval | Cost Original | Cost Anticipated | Expenditure |
1. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | DEVELOPMENT OF GWALIOR AIRPORT PHASE 01 | 10/2021 | 446.12 | 446.12 | 421.18 |
2. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | UPGRADATION OF JABALPUR AIRPORT | 6/2016 | 412.24 | 412.24 | 391.85 |
3. | BHARAT PETROLEUM CORPORATION LIMITED | PETROLEUM | CITY GAS DISTRIBUTION NETWORK PROJECT AT SATNA AND SHAHDOL | 4/2019 | 332.38 | 332.38 | 99.49 |
4. | CENTRAL PUBLIC WORKS DEPARTMENT | SOCIAL JUSTICE | CENTRE FOR DISABILITY SPORTS | 2/2019 | 170.99 | 170.99 | 73.8 |
5. | GAS AUTHORITY OF INDIA LIMITED | PETROLEUM | SETTING UP OF 10 MW ELECTROLYSER FOR PRODUCING GREEN HYDROGEN | 9/2021 | 231 | 211 | 103.5 |
6. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | CGD PROJECT AT REWA DISTRICT | 10/2018 | 177 | 177 | 109.48 |
7. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION OF DINDORI-SAGARTOLA-KABICHABUTRA (MP-CG BORDER) SECTION OF NH -45 FROM KM 0+00(DESIGN) | 1/2022 | 329.14 | 319.09 | 52.7 |
8. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | BALANCE WORK FOR REHABILITATION AND UPGRADATION OF SATNA-BELA SECTION OF NH-75 FROM KM. 155.0 TO KM. | 11/2017 | 392.33 | 470.72 | 441.41 |
9. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | 2L+PS OF THIKRI ANJAD SECTION OF NH-347B | 11/2017 | 249.05 | 249.05 | 221.19 |
10. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF MIHONA BYPASS, LAHAR BYPASS, DABOH BYPASS and BHANDER BYPASS (TOTAL LENGTH 20.60 KM) | 3/2022 | 179.19 | 179.19 | 47.91 |
11. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UMARIYA TO SHAHDOL SECTION OF NH-78 IN MADYA PRADESH KM 68/4 TO 142/200 | 3/2015 | 511.83 | 511.83 | 478.84 |
12. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION and WIDENING OF JHARKHEDA- BERASIA - DHOLKHEDI FROM DESIGN KM 0+000 TO KM 87+900 (DESIGN | 3/2022 | 365.21 | 365.21 | 112.27 |
13. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION OF NASRULLAGANI-REHTI-BUDHNI SCCTION TO 2-LANE WITH PAVED SHOULDER FROM KM 0+150 TO KM | 12/2021 | 305.12 | 305.12 | 71.47 |
14. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UPGRADATION OF KURWAI–MUNGAOLI–CHANDERI ROAD SECTION OF NH-346, FROM DESIGN CHAIN | 3/2022 | 386.49 | 386.49 | 77.42 |
15. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION OF REWA-SIRMOUR ROAD TO 2L + PS | 3/2018 | 162.56 | 162.56 | 138.51 |
16. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION OF JIRAPUR-SUSNER-MP-RJ B | 1/2022 | 239.72 | 232.22 | 73.4 |
17. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF KAITHI-PADARIA KALA BYPASS, PATNA-TAMOLI BYPASS, JASO BYPASS , NAGOD BYPASS (TOTAL L | 3/2022 | 158.36 | 158.36 | 22.68 |
18. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | BALANCE WORK FOR REHABILITATION AND UP-GRADATION OF SIDHI-SINGRAULI FROM KM 82.400 TO KM 187.993 SEC | 12/2020 | 529.44 | 529.44 | 155.96 |
19. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | JABALPUR TO HIREN RIVER SECTION OF NH-12 IN MADHYA PRADESH KM 11/400 TO 66/400 | 11/2015 | 628.45 | 628.45 | 501.7 |
20. | Madhya Pradesh Metro Rail Co Limited | URBAN DEVELOPMENT | BHOPAL METRO RAIL | 11/2018 | 6941.4 | 6941.4 | 1994.51 |
21. | Madhya Pradesh Metro Rail Co Limited | URBAN DEVELOPMENT | INDORE METRO RAIL | 11/2018 | 7500.8 | 7500.8 | 2731.68 |
22. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4LBERKHEDI TO GODPEHRA NH-44 | 2/2022 | 524.84 | 524.84 | 1979.88 |
23. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF HARDA - BETUL (PKG-I) FROM KM.0 TO KM.30 [HARDA - TEMAGAON] | 9/2021 | 774.16 | 893.08 | 439.08 |
24. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF INDORE - BOREGAON (PKG-III) [BALWARA TO DHANGAON] FROM KM. 42.260 TO KM. 82.660 OF NH347BG AND | 1/2021 | 1001.69 | 1001.69 | 379.04 |
25. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF SAGAR - MOHARI FROM KM.8 TO KM.50 (PKG-I) | 3/2021 | 790.78 | 790.78 | 959.68 |
26. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | BALANCE WORK OF 4L OF NAURADEHI SANCTUARY DE-SCOPED STRETCH OF HIRAN RIVER TO SINDOOR RIVER FROM KM. | 1/2021 | 178.18 | 178.18 | 97.59 |
27. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | PACKAGE-23 CONSTRUCTION OF DELHI-VADODARA EIGHT LANE ACCESS- CONTROLLED EXPRESSWAY FROM BAWDI VILLAG | 3/2019 | 1047 | 1047 | 1169 |
28. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | PACKAGE-24 CONSTRUCTION OF EIGHTLANE ACCESS- CONTROLLED EXPRESSWAY CARRIAGEWAY FROM RANNI VILLAGE TO | 2/2019 | 847 | 847 | 920.5 |
29. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L GREENFIELD RUDHI TO DESHGAON (PKG V OF BETUL-KHANDWA/DESHGAON) - N/04015/06003/MP | 11/2018 | 521.21 | 521.21 | 19.48 |
30. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF UJJAIN TO BADNAWAR FROM KM 26.900 TO KM 96.00 OF NH-752D | 10/2020 | 1352.56 | 1352.56 | 690.65 |
31. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | BALANCE WORK FOR FOUR LANING OF ITARSI TO BETUL SECTION OF NH69 FROM KM 63.000 TO KM 137.00 (DESIGN | 12/2017 | 950.27 | 950.27 | 615.08 |
32. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF HARDA - BETUL (PKG-II) FROM KM. 30.00 TO KM.81.00 [TEMAGAON TO CHICHOLI] | 2/2023 | 520.28 | 520.28 | 274.43 |
33. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 2L PS OF SATNA - MAIHAR SECTION OF NH-135BG FROM KM 80.800 TO KM 120.125 | 1/2021 | 428.04 | 328.77 | 322.86 |
34. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | KATNI BYPASS FROM KM. 359.50 TO KM. 378.50 | 9/2019 | 194.4 | 194.4 | 154.22 |
35. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | INDORE - HARDA (PKG-III) [NANASA TO PIDGAON SECTION FROM KM 95.000 TO KM 142.445] | 10/2021 | 1146.22 | 1146.22 | 481.85 |
36. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 2- LANE WITH PAVED SHOULDERS OF HINOTIYA TO MEHULWA FROM DESIGN KM 27+000 9OF EXISTING SH-19 KM 26+5 | 8/2021 | 581.65 | 581.65 | 96.3 |
37. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY CARRIAGEWAY FROM RAJASTHAN/MP BORDER TO JODM | 12/2017 | 217.96 | 884 | 2298 |
38. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | INDORE - HARDA (PKG-I) [INDORE TO RAGHAV GARH FROM KM. 0.25 TO KM. 26.903] | 1/2022 | 1011.29 | 1011.29 | 97.69 |
39. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DHANGAON - BORGAON SECTION (KM 81.000 TO KM 139.000) [INDORE - EDLABAD PKG IV] | 11/2018 | 831 | 831 | 810.3 |
40. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF OBEDULLGANJ - BUDNI SECTION FROM KM. 8.400 TO KM. 20.700 IN RATANPANI WILDLIFE AREA OF NH - 69 | 2/2022 | 417.51 | 417.51 | 149.73 |
41. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY CARRIAGEWAY FROM JODMI VILLAGE TO BANI VILLA | 12/2017 | 1094.97 | 1094.97 | 1188 |
42. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | PACKAGE-25 CONSTRUCTION OF EIGHTLANE ACCESS- CONTROLLED EXPRESSWAY CARRIAGEWAY FROM MIYATI VILLAGE T | 2/2019 | 996.27 | 996.27 | 1079 |
43. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY CARRIAGEWAY FROM BANI VILLAGE TO BARDAWADI V | 12/2017 | 656.98 | 840 | 1103 |
44. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF ADDITIONAL 3 LANE WITH PAVED SHOULDER (DESIGN LENGTH 8.87 KM) AS REALIGNMENT OF BAKA | 7/2022 | 209.29 | 209.29 | 59.74 |
45. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF (I) 4-LANE HIGHWAY FROM VIDISHA TO HINOTIYA FROM KM. 0.000 TO KM. 27.000 (LENGTH=27 | 9/2022 | 1000.63 | 1000.63 | 94.24 |
46. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY CARRIAGEWAY FROM BARDAWADI VILLAGE TO MANDSA | 10/2019 | 743.88 | 743.89 | 832 |
47. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | INDORE - EDLABAD (PKG-II) [TEJAJINAGAR TO BALWARA] | 1/2022 | 1162.8 | 1162.8 | 373.31 |
48. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF KHEDAKHAJURIYA TO SUHAGADI FROM KM. 41.400 TO KM. 89.200 OF NH-148NG (PKG-II) | 1/2020 | 876.37 | 876.37 | 321.35 |
49. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | BALANCE WORK OF 4L OF INDORE-GUJARAT/MP BORDER FROM KM 106.210 TO KM 115.250 (START AND END POINT OF | 8/2019 | 323.51 | 323.51 | 48.2 |
50. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | PACKAGE-21 CONSTRUCTION OF EIGHTLANE ACCESS- CONTROLLED EXPRESSWAY CARRIAGEWAY FROM KAMLIYA VILLAGE | 2/2019 | 990.97 | 990.97 | 1092 |
51. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF CHANDESARA TO KHEDAKHAJURIYA FROM KM. 0.000 TO (-) 750 AND KM 0.000 TO KM 41.400 OF NH-752D | 1/2020 | 909.84 | 909.84 | 340.24 |
52. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF 4-LANE FROM BARELA TO MANEGAON SECTION OF NH-30 FROM DESIGN CH. 2.900 TO DESIGN CH. | 12/2022 | 652.33 | 652.33 | 146.19 |
53. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | ADDITIONAL WORKS (2VUPS, MR-10 JUNCTION FLYOVER AND UNDERPASS) IN SIX LANE INDORE-DEWAS SECTION OF N | 8/2022 | 207.77 | 207.77 | 33.29 |
54. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF SUHAGADI TO BARDIYA AMRA FROM KM. 89.200 TO KM. 135.351 OF NH-752D (PKG-III) | 1/2020 | 823.05 | 823.05 | 291.07 |
55. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF HARDA - BETUL (PKG-III) FROM KM. 81.00 TO KM.121.248 [CHICHOLI - BETUL] | 9/2021 | 814.04 | 947.29 | 430.06 |
56. | NATIONAL THERMAL POWER CORPORATION | POWER | SHAJAPUR 325MW SOLAR PV PROJECT | 6/2022 | 1530.49 | 1530.49 | 588.26 |
57. | NORTHERN COAL FIELDS LIMITED | COAL | BLOCK-B EXPANSION OPENCAST PROJECT | 7/2019 | 998.71 | 998.71 | 290.18 |
58. | NORTHERN COAL FIELDS LIMITED | COAL | NIGAHI EXPANSION OCP (15 TO 25 MTPA) | 11/2020 | 1729.68 | 1729.68 | 526.43 |
59. | NORTHERN COAL FIELDS LIMITED | COAL | JAYANT EXPANSION OCP 10 TO 20 MTPA | 5/2017 | 1783.09 | 1783.09 | 1551.52 |
60. | NORTHERN COAL FIELDS LIMITED | COAL | DUDHICHUA EXPANSION OCP (10 TO 20 MTPA) | 11/2017 | 1255.17 | 1255.17 | 1189.12 |
61. | RAIL VIKAS NIGAM LTD. | RAILWAYS | BUDNI-BARKHERA - 3RD LINE (33 KM) | 4/2012 | 991.6 | 2097 | 1775.59 |
62. | RAIL VIKAS NIGAM LTD. | RAILWAYS | INDORE BUDNI (INDORE JABALPUR) | 9/2018 | 4340 | 7393.75 | 942.7 |
63. | SATLUJ JAL VIDYUT NIGAM LIMITED | POWER | OMKARESHWAR FLOATING SOLAR POWER PROJECT (90 MW) | 11/2022 | 646.17 | 646.17 | 576.82 |
64. | SOUTH EAST CENTRAL RAILWAY | RAILWAYS | ANUPPUR-KATNI | 4/2015 | 1370 | 2311.02 | 1406.67 |
65. | SOUTH-EASTERN COAL FIELDS LIMITED | COAL | KANCHAN OC EXPANSION | 12/2014 | 371.04 | 371.04 | 126.14 |
66. | SOUTH-EASTERN COAL FIELDS LIMITED | COAL | RAMPUR BATURA OC (4.0 MTY) | 7/2019 | 1248.93 | 1248.93 | 467.01 |
67. | SOUTH-EASTERN COAL FIELDS LIMITED | COAL | BATURA WEST OC PROJECT (0.80 MTY) | 3/2021 | 496.28 | 496.28 | 0 |
68. | SOUTH-EASTERN COAL FIELDS LIMITED | COAL | AMADAND OPENCAST EXPANSION PROJECT | 3/2016 | 869.44 | 869.44 | 212.79 |
69. | SOUTH-EASTERN COAL FIELDS LIMITED | COAL | AMRITDHARA OC PROJECT | 2/2015 | 481.6 | 481.6 | 1.08 |
70. | SOUTH-EASTERN COAL FIELDS LIMITED | COAL | BATURA HIGHWALL PROJECT | 7/2015 | 231.92 | 231.92 | 2.26 |
71. | SOUTH-EASTERN COAL FIELDS LIMITED | COAL | RAJNAGAR OCP RPR (1.70 MTY) | 12/2014 | 357.8 | 357.8 | 86.99 |
72. | WEST CENTRAL RAILWAY | RAILWAYS | KATNI-BINA 3RD LINE (263 KM) | 6/2016 | 2478.23 | 2938 | 1341.69 |
73. | WEST CENTRAL RAILWAY | RAILWAYS | POWARKHEDA - JUJHARPUR - SINGLE LINE FLYOVER IN UP DIRECTION (15.89 KM) | 12/2016 | 199.63 | 199.63 | 0 |
74. | WEST CENTRAL RAILWAY | RAILWAYS | KATNI - SINGRAULI DOUBLING PROJECT | 12/2015 | 1763.93 | 2445.3 | 2378.92 |
75. | WEST CENTRAL RAILWAY | RAILWAYS | KATNI GRADE SEPARATOR/BYE PASS | 8/2016 | 582.13 | 1247.64 | 1080.04 |
76. | WEST CENTRAL RAILWAY | RAILWAYS | SATNA - REWA (50 KM) | 11/2015 | 500 | 500 | 0 |
77. | WEST CENTRAL RAILWAY | RAILWAYS | RAMGANJMUNDI-BHOPAL (NL),WCR | 4/2001 | 424.6 | 3032.46 | 2485.38 |
78. | WESTERN COAL FIELDS LIMITED | COAL | SHARDA UG | 7/2022 | 200.16 | 200.16 | 34.25 |
79. | WESTERN COAL FIELDS LIMITED | COAL | TAWA III UG MINE | 12/2021 | 324.25 | 324.25 | 12.29 |
80. | WESTERN COAL FIELDS LIMITED | COAL | URDHAN OC | 7/2022 | 228.42 | 228.42 | 21.53 |
81. | WESTERN COAL FIELDS LIMITED | COAL | VISHNUPURI UG TO OC | 11/2022 | 227.65 | 227.65 | 7.02 |
82. | WESTERN COAL FIELDS LIMITED | COAL | AMALGAMATED DHANKASA JAMUNIA UG (1.84 MTY) | 9/2022 | 497.01 | 497.01 | 154.15 |
83. | WESTERN COAL FIELDS LIMITED | COAL | GANDHIGRAM UG MINE | 8/2019 | 414.16 | 414.16 | 24.98 |
84. | WESTERN RAILWAY | RAILWAYS | RATLAM-MHOW-KHANDWA-AKOLA (GC) | 4/2008 | 3503.69 | 6203.51 | 3339.31 |
85. | WESTERN RAILWAY | RAILWAYS | NIMACH BADI SADRI NEW LINE PROJECT | 4/2017 | 495.18 | 495.18 | 112.03 |
86. | WESTERN RAILWAY | RAILWAYS | INDORE-DEWAS-UJJAIN (80 KMS) | 4/2016 | 700 | 603.69 | 735.16 |
87. | WESTERN RAILWAY | RAILWAYS | NIMACH-RATLAM (133 KM) | 10/2021 | 910 | 1095.88 | 434.22 |
| Total | 87 | |