S No. | Agency Name | Sector Name | Project Name | Date Of Approval | Cost Original | Cost Anticipated | Expenditure |
1. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | UDAIPUR AIRPORT- CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING | 6/2023 | 887 | 887 | 35.07 |
2. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | CONSTRUCTION OF NEW TERMINAL BUILDING AT JODHPUR AIRPORT | 5/2022 | 480 | 480 | 61.25 |
3. | HINDUSTAN PETROLEUM CORPORATION LIMITED | PETROLEUM | CGD PROJECT IN TONK, SAWAI MADHOPUR, DAUSA, KARAULI | 3/2022 | 1751 | 1751 | 117.15 |
4. | HINDUSTAN PETROLEUM CORPORATION LIMITED | PETROLEUM | SETTING UP OF PETROCHEMICAL EVACUATION MARKETING TERMINAL (PEMT) AT BARMER | 12/2023 | 461.05 | 461.05 | .14 |
5. | HPCL Rajasthan Refinery Limited(JV) | PETROLEUM | RAJASTHAN REFINERY PROJECT | 10/2017 | 43129 | 72937 | 44265.95 |
6. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | CGD PROJECT AT JHUNJHUNU, SIKAR AND NAGAUR DISTRICTS | 3/2022 | 575 | 575 | 70.81 |
7. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | NEW MUNDRA-PANIPAT CRUDE OIL PIPELINE | 12/2021 | 9028 | 9028 | 4925.5 |
8. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FOR FATEHPUR BYPASS, MANDAWA BYPASS AND JHUNJHUNU BYPAS | 3/2022 | 186.29 | 186.29 | 71.69 |
9. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FROM CHARBHUJA AT DESIGN KM 0.00 (EXISTING KM 150.00) TO | 2/2022 | 838.43 | 838.43 | 70.87 |
10. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | 2L+PS FROM KM 148/170 TO 211 /100 (DEVAL- DUNGARPUR-HIRATA - VARDA-SAGWARA) SECTION OF NH-927A. PKG- | 2/2021 | 240.99 | 240.99 | 183.39 |
11. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | 4L+PS OF RAS-BEAWAR SECTION (KM 0.00 TO KM 30.00) OF NH-158 (GNHCP) WORLD BANK. PKG-I. | 7/2020 | 319.09 | 319.09 | 128.67 |
12. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION OF TWO LANE PAVED SHOULDER FROM SHAHPURA TO THANAGAZI OF NH-248A ON EPC MODE IN THE STAT | 3/2022 | 174.34 | 174.34 | 52.08 |
13. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILATION AND UPGRADATION TO 2 LANE WITH PAVED SHPULDERS CONFIGURATION OF BEAWAR-ASIND SECTION (K | 8/2020 | 196.23 | 196 | 160.74 |
14. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | 4L+PS OF BEAWAR-ASIND SECTION (KM 30.00 TO KM 74.00) OF NH-158 (GNHCP) WORLD BANK. PKG-II | 8/2020 | 216.72 | 216.72 | 181.21 |
15. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | 44 LANE DIVIDED CARRIAGEWAY OF BARMER BYPASS OF NH-15 (NEW NH-68) IN THE STATE OF RAJASTHAN ON EPC M | 12/2021 | 451.66 | 451.66 | 301.78 |
16. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | 2L+PS FOR WORK OF NH-325 (BALOTRA TO SANDERAO VIA JALORE) BY CONSTRUCTION OF BYPASSES:(1) ASOTRA- BR | 12/2021 | 411.4 | 411.4 | 123.61 |
17. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION AND REHABILITATION TO TWO LANE WITH PAVED SHOULDER OF GHAGARIYA- MUNABAO SECTION FROM KM | 12/2022 | 235.15 | 235.15 | 46.29 |
18. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | Sagwara Bypass and Garhi- Partapur Bypass of NH-
927A in the State of Rajasthan. | 3/2022 | 187.65 | 187.65 | 33.57 |
19. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION AND REHABILITATION TO TWO LANE WITH PAVED SHOULDER OF BARMER GHAGARIYA SECTION FROM KM 0 | 3/2022 | 304.87 | 304.87 | 189.31 |
20. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER NORTHERN BYPASS PHASE-II OF KOTA CITY FROM DESIGN CHAINAG | 3/2022 | 317.74 | 317.74 | 93.23 |
21. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION TO TWO LANE PAVED SHOULDER OF KOTHUN-LALSOT-KAROLI-DHOLPUR ROAD NH-23 (OLD NH-11B) IN TH | 12/2021 | 150.11 | 150.11 | 34.33 |
22. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UP-GRADATION TO TWO LANING WITH PAVED SHOULDER OF AJMER-NAGAUR SECTION BY EXECUTING BALANCE WORK FRO | 3/2020 | 255.23 | 255.23 | 240 |
23. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | 4L+PS OF NH -58 FROM BEAWAR-GOMTI (OLD CH KM 58.245 TO KM. 108.600) PKG-I. | 12/2020 | 379.23 | 379.23 | 207.12 |
24. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | WIDENING OF PACHPADRA-BAGUNDI SECTION TO 4 LANE FROM KM 73/60 TO 95/70 OF NH-25 ON EPC MODE IN THE | 1/2022 | 194.88 | 194.88 | 52.69 |
25. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | 4L+PS OF NH -58 FROM BEAWAR-GOMTI (OLD CH KM 108.600 TO KM 144 KM 158.419 TO KM 173.300 PKG-II. | 12/2020 | 339.65 | 339.65 | 204.23 |
26. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | SANGARIYA (NEAR CHAUTALA)-RASISAR (NEAR BIKANER) (PHASE-I) (AJ/SR-PACKAGE-1) | 2/2019 | 738.9 | 738.9 | 880.38 |
27. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-09) (CH. 247.310 TO CH. 292.950) [JUNCTION WITH M | 11/2019 | 1658.06 | 1658.06 | 157.39 |
28. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 2L PS SRIGANGANAGAR TO RAISINGHNAGAR (DESIGN CHAINAGE -0.500 KM TO DESIGN CHAINAGE 101.000 KM) (PACK | 9/2021 | 672.35 | 672.35 | 328.24 |
29. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-7) | 10/2019 | 662.08 | 662.08 | 73.76 |
30. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | ADDITIONAL STRUCTURES ON 6LGURGAON-JAIPUR SECTION OF NH-48 BETWEEN KM 42.700 TO KM 273.00 | 8/2022 | 409.64 | 409.64 | 146.4 |
31. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF KARWAR (KM. 281.980 OF NH-62 NAGAUR ROAD) TO DANGIYAVAS OF JODHPUR RING ROAD (PKG-II) | 11/2021 | 736.75 | 736.75 | 147.04 |
32. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-16) (CH. 427.300 TO CH.452.420) [MAJOR BRIDGE OVE | 11/2019 | 952.57 | 952.57 | 892.27 |
33. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-14) (CH. 388.420 TO CH. 419.000) [JUNCTION WITH N | 11/2019 | 1119.35 | 1119.35 | 1355.54 |
34. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING OF DANGIAWAS (KM 96.595 TO NH-112) TO JAJIWAL (KM 283.500 OF NH 65 NAGAUR ROAD) SECTIO | 12/2017 | 1308.73 | 1308.73 | 637.1 |
35. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-8) | 10/2019 | 839.63 | 839.63 | 139.05 |
36. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-12) (CH. 331.030 TO CH. 359.170) [MAJOR BRIDGE ON | 11/2019 | 1425.02 | 1425.02 | 1302.31 |
37. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L GREENFIELD SPUR FROM DELHI-VADODARA GREENFIELD EXPRESSWAY NEAR BANDIKUI TO JAIPUR | 3/2022 | 1636.15 | 1636.15 | 488.18 |
38. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-15) (CH. 419.000 TO CH.427.300) [JUNCTION WITH NH | 7/2020 | 1788.69 | 1788.69 | 647.73 |
39. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION/ UP-GRATION OF FOUR/TWO LANE WITH PAVED SHOULDER OF NH68 FROM TANOT-RAMGARH BHADASAR-JA | 2/2018 | 741.86 | 649 | 663.37 |
40. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-10) (CH. 292.950 TO CH. 319.400) [END OF INTERCHA | 11/2019 | 1272.97 | 1272.97 | 510.54 |
41. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-11) (CH. 319.400 TO CH. 331.030) [HARDEOGANJ VILL | 11/2019 | 1640.1 | 1640.1 | 1152.03 |
42. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-13) (CH. 359.170 TO CH. 388.420) [JUNCTION WITH S | 11/2019 | 1341.36 | 1341.36 | 1033.65 |
43. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | SIX-LANNING OF GREENFIELD PROPOSED UDAIPUR BYPASS PKG-IV | 4/2017 | 894 | 929.32 | 915.67 |
44. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | SANGARIYA (NEAR CHAUTALA)-RASISAR (NEAR BIKANER) (PHASE-I) (AJ/SR-PACKAGE-2) | 2/2019 | 755.16 | 755.16 | 885.71 |
45. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-6) | 10/2019 | 846.59 | 846.59 | 106.59 |
46. | NATIONAL HYDRO-ELECTRIC POWER CORPORATION | POWER | 300 MW SOLAR POWER PROJECT UNDER CPSU SCHEME | 5/2022 | 1677.12 | 1677.12 | 653.15 |
47. | NATIONAL THERMAL POWER CORPORATION | POWER | BHENSARA 320 MW | 1/2021 | 1221.73 | 1221.73 | 719.49 |
48. | NATIONAL THERMAL POWER CORPORATION | POWER | NOKH PLOT-2 SOLAR PV PROJECT 245MW | 3/2022 | 1409.52 | 1409.52 | 632.99 |
49. | NATIONAL THERMAL POWER CORPORATION | POWER | CHHATTARGARH 150 MW | 2/2021 | 599.99 | 599.99 | 626.32 |
50. | NATIONAL THERMAL POWER CORPORATION | POWER | SAMBHU KI BHURJ-II SOLAR 300MW | 3/2020 | 1782 | 1782 | 1279.42 |
51. | NATIONAL THERMAL POWER CORPORATION | POWER | BHADLA-II 500MW SOLAR PV PROJECT | 6/2022 | 2598.92 | 2598.92 | 453.43 |
52. | NATIONAL THERMAL POWER CORPORATION | POWER | NOKH PLOT-3 SOLAR PV PROJECT 245MW | 3/2022 | 1426.94 | 1426.94 | 362.86 |
53. | NATIONAL THERMAL POWER CORPORATION | POWER | NOKH PLOT-1 SOLAR PV PROJECT 245MW | 3/2022 | 1352.71 | 1352.71 | 359.51 |
54. | NATIONAL THERMAL POWER CORPORATION | POWER | ANTA SOLAR 90 MW | 1/2021 | 382.22 | 382.22 | 497.17 |
55. | NEYVELI LIGNITE CORPORATION | COAL | NLCIL 300 MW SOLAR POWER PROJECT (PART OF 510 MW CPSU SCHEME) | 3/2023 | 1813 | 1813 | 155.05 |
56. | NORTH CENTRAL RAILWAY | RAILWAYS | AGRA FORT-BANDIKUI | 6/2022 | 1389.81 | 987.83 | 0 |
57. | NORTH WESTERN RAILWAY | RAILWAYS | DAUSA-GANGAPUR CITY(NL),NWR | 2/1997 | 410.08 | 970 | 1020.17 |
58. | NORTH WESTERN RAILWAY | RAILWAYS | GUDHA THATHANA MITHRI TEST TRACK FOR RDSO | 4/2019 | 528.48 | 528.48 | 303.13 |
59. | NORTH WESTERN RAILWAY | RAILWAYS | SAWAIMADHOPUR - BYPASS LINE (6.98 KM) (UMBRELLA WORK PB#57/2019-20/NR) | 12/2022 | 304 | 239.54 | 49.46 |
60. | NORTH WESTERN RAILWAY | RAILWAYS | DOUBLING BETWEEN CHURU-RATANGARH (42.81 KM) | 2/2023 | 422.6 | 422.6 | 40.44 |
61. | NORTH WESTERN RAILWAY | RAILWAYS | DEDICATED TEST TRACK FOR RDSO (PHASE II) | 11/2021 | 466.42 | 466.42 | 419.27 |
62. | NORTH WESTERN RAILWAY | RAILWAYS | GC OF NATHDWARA - DEVGARH MADARIYA (82.5KM) | 1/2023 | 968.92 | 968.92 | 56.53 |
63. | NUCLEAR POWER CORPORATION OF INDIA LIMITED | ATOMIC ENERGY | RAJASTHAN ATOMIC POWER PROJECT -7 AND 8 (2X700 MW) | 10/2009 | 12320 | 17079 | 18124 |
64. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHA | 3/2021 | 353.85 | 353.85 | 271.28 |
65. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHA | 6/2021 | 1562 | 1562 | 963.26 |
66. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHA | 5/2021 | 1184.88 | 1184.88 | 804.84 |
67. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHA | 3/2021 | 1340.81 | 1340.81 | 1240.62 |
68. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART J | 12/2022 | 331 | 331 | .89 |
69. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHA | 6/2021 | 1006 | 1006 | 842.39 |
70. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART C1 | 10/2023 | 1796 | 1796 | 66.21 |
71. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PHASE-IV PART-I (BIKANER COMPLEX) PAR | 6/2023 | 202.39 | 202.39 | .84 |
72. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TRANSMISSION SYSTEM FOR PROVIDING CONNECTIVITY TO RE PROJECTS AT BIKANER (PG), FATEHGARH-II AND BHAD | 1/2020 | 562.86 | 545.88 | 398.19 |
73. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TRANSMISSION SYSTEM SCHEME FOR EVACUATION OF POWER FROM REZ RAJASTHAN (8.1 GW) UNDER PHASE-II PART | 3/2023 | 1433.28 | 1433.28 | 298.93 |
74. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHA | 6/2021 | 713.82 | 713.82 | 583.51 |
75. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | SCHEME TO RELIEVE HIGH LOADING OF WR-NR INTER REGIONAL CORRIDOR | 2/2023 | 200.58 | 200.58 | 116.26 |
76. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART B1 | 9/2023 | 2191 | 2191 | 75.42 |
77. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TS FOR EVACUATION OF POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III, PART E1 | 8/2023 | 688.74 | 688.74 | 0 |
78. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART H | 10/2023 | 2211 | 2211 | 65.87 |
79. | POWER GRID CORPORATION OF INDIA LIMITED | POWER | TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART E2 | 11/2023 | 428 | 428 | 0 |
| Total | 79 | |