S No. | Sector | Agency | Date Of Approval | Cost Original | Cost Overrun |
1. | POWER | THDC INDIA LIMITED | 08/2008 | 2491.58 | 1368.77 |
2. | POWER | THDC INDIA LIMITED | 07/2006 | 1657 | 3168.6 |
3. | POWER | NATIONAL THERMAL POWER CORPORATION | 11/2006 | 2978.48 | 4124.52 |
4. | RAILWAYS | RAIL VIKAS NIGAM LTD. | 04/2011 | 16216 | 8443 |
5. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 03/2016 | 720 | 425.44 |
6. | ROAD TRANSPORT AND HIGHWAYS | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | 03/2018 | 460.73 | .27 |
7. | ROAD TRANSPORT AND HIGHWAYS | NATIONAL HIGHWAYS AUTHORITY OF INDIA | 06/2022 | 524.54 | 158.72 |
| Total | 7 | |