S No. | Agency Name | Sector Name | Project Name | Date Of Approval | Cost Original | Cost Anticipated | Expenditure |
1. | AHMEDABAD METRO RAIL | ROAD TRANSPORT AND HIGHWAYS | 4-LANING OF KASHIPUR-SITARGANJ SECTION | 11/2012 | 605.84 | 605.84 | 0 |
2. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | CONSTRUCTION OF DOMESTIC PASSENGER TERMINAL BUILDING AT DEHRADUN AIRPORT, DEHRADUN | 7/2018 | 456.86 | 456.86 | 483.93 |
3. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED S | 12/2017 | 200.34 | 200.34 | 141.39 |
4. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING SINGLE/INTERMEDIATE LANE TO 2LANE WITH PAVED S | 11/2017 | 266.52 | 266.52 | 153.44 |
5. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | RECONSTRUCTION WITH GEOMETRIC IMPROVMENT OF EXISTING INTERMEDIATE LANE TO 2 LANE WITH PAVED SHOULDER | 8/2016 | 234.88 | 234.88 | 174.51 |
6. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | WIDENING OF EXISTING SINGLE LANE ROAD TO TWO LANE WITH PAVED SHOULDERS CONFIGURATION FROM KM. 235.00 | 12/2017 | 248.22 | 248.22 | 146.17 |
7. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING SINGLE/INTERMEDIATE LANE TO 2 LANE WITH EAR | 2/2018 | 418.88 | 418.88 | 264.67 |
8. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED S | 12/2017 | 257.34 | 257.34 | 156.63 |
9. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | RECONSTRUCTION WITH GEOMETIC IMPROVEMENT OF SINGLE LANE TO 2- LANE WITH PAVED SHOULDER CONFIGURATION | 11/2017 | 283.51 | 283.51 | 196.03 |
10. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | RECONSTRUCTION WITH GEOMETIC IMPROVEMENT OF EXISTING TWO LANE TO 2- LANE WITH PAVED SHOULDERS CONFIG | 11/2017 | 232.81 | 232.81 | 151.7 |
11. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UP GRADATION OF 2 LANE/ 2 LANE WITH PAVED SHOULDER FROM EXISTING KM. 172.900 TO K | 2/2018 | 293.68 | 293.68 | 201.2 |
12. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UPGRADATION OF 2 LANE WITH PAVED SHOULDER FROM EXISTING KM. 195.175 TO KM. 220.00 | 3/2018 | 460.73 | 461 | 0 |
13. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF KUND BYPASS FROM EXISTING KM 33+130 TO KM 41+260 (EXISTING LENGTH: 8.130 KM); DESIGN | 5/2018 | 248 | 248 | 111.85 |
14. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED S | 6/2017 | 282.08 | 282.08 | 206.46 |
15. | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF 4.5 KM LONG SILKYARA TUNNEL BETWEEN KM 25.40 TO 50.25 KM (TUNNEL WORK) | 3/2018 | 1383.78 | 1383.78 | 581 |
16. | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | ROAD TRANSPORT AND HIGHWAYS | 2 LANE WITH PAVED SHOULDER FROM KM 399.00 TO KM 430.00 OF KARANPARYAG TO CHAMOLI UNDER CHARDHAM PARI | 3/2018 | 403.36 | 403.36 | 337.72 |
17. | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION AND UPGRADATION OF EXISTING ROAD TO 2 LANE WITH PAVED SHOULDER FROM KM 368.00 TO KM 399 | 3/2018 | 274.31 | 274.31 | 251.61 |
18. | NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION Ltd. | ROAD TRANSPORT AND HIGHWAYS | 2 LANE WITH PAVED SHOULDER FROM KM 430.00 TO KM 468.00 OF CHAMOLI TO PAINI UNDER CHARDHAM PARIYOJNA | 3/2018 | 417.24 | 417.24 | 344.2 |
19. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L POANTA SAHEB–MEDNIPUR FROM KM. 435.65 TO KM. 458.65 OF NH-07(PKG-1) | 6/2022 | 524.54 | 683.26 | 72.74 |
20. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L MEDINIPUR TO BALLUPUR FROM KM. 458.65 TO KM. 487.65 OF NH-07(PKG-2) | 3/2022 | 1092.9 | 1092.9 | 460.62 |
21. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4L OF DUDHADHARI ELEVATED FLYOVER (MUZAFFARNAGAR –HARIDWAR SECTION) FROM KM 356.450 TO KM 353.800 OF | 5/2021 | 154.52 | 154.52 | 150.26 |
22. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION AND 4L OF HARIDWAR BYPASS FROM KM 0.000 (KM 188.100 OF NH-58) TO KM. 15.100 (KM 5.100 OF | 8/2021 | 1377.79 | 1377.79 | 678.86 |
23. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANNING OF RAMPUR- KATHGODAM SECTION OF NH-87 FROM KM 42.791 (DESIGN CHAINAGE 43.446) TO KM 88 | 3/2016 | 720 | 1145.44 | 534.64 |
24. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | ACCESS ROAD/BRIDGE CONNECTIVITY FROM NH-09 AT KM.40 NEAR JAGBUDA BRIDGE (INDIA) TO BOUNDARY PILLAR | 5/2022 | 314.31 | 314.31 | 115.56 |
25. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 6L ACCESS-CONTROLLED HIGHWAY OF DAAT KALI TUNNEL - DEHRADUN OF GANESHPUR – DEHRADUN SECTION FROM KM. | 3/2021 | 169.08 | 169.08 | 92.46 |
26. | NATIONAL THERMAL POWER CORPORATION | POWER | TAPOVAN-VISHNUGAD HEP (4X130MW) | 11/2006 | 2978.48 | 7103 | 6298.38 |
27. | NATIONAL THERMAL POWER CORPORATION | POWER | LATA-TAPOVAN HYDRO ELECTRIC POWER PROJECT 3X57 MW | 7/2012 | 1527 | 1527 | 149.93 |
28. | RAIL VIKAS NIGAM LTD. | RAILWAYS | RISHIKESH - KARNAPRAYAG NEW LINE | 4/2011 | 16216 | 24659 | 17320.17 |
29. | THDC INDIA LIMITED | POWER | VISHNUGAD PIPALKOTI HYDRO ELECTRIC PROJECT | 8/2008 | 2491.58 | 3860.35 | 3644.03 |
30. | THDC INDIA LIMITED | POWER | TEHRI PUMPED STORAGE PLANT(1000MW) | 7/2006 | 1657 | 4825.6 | 6287.05 |
31. | Uttarakhand Pey Jal Nigam | WATER RESOURCES | INTERCEPTION AND DIVERSION WITH STP AT RISHIKESH | 3/2017 | 158 | 158 | 105.75 |
| Total | 31 | |