S No. | Agency Name | Sector Name | Project Name | Date Of Approval | Cost Original | Cost Anticipated | Expenditure |
1. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | NSCBI AIRPORT KOLKATA: RE-CONSTRUCTION OF RIGID POSITIONS OF SECONDARY RUNWAY, 'K' AND 'A' TAXIWAY | 4/2023 | 328.3 | 328.3 | 10.17 |
2. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | CONSTRUCTION OF ATC TOWER AND TECHNICAL BLOCK AT NSCBI AIRPORT KOLKATA | 1/2016 | 458 | 458 | 242.13 |
3. | AIRPORT AUTHORITY OF INDIA LIMITED | CIVIL AVIATION | AIRSIDE CAPACITY ENHANCEMENT OF NSBI AIRPORT, KOLKATA | 1/2019 | 389.71 | 389.71 | 391.78 |
4. | BHARAT COKING COAL LIMITED | COAL | 2.0 MTPA BHOJUDIH NLW WASHERY | 12/2015 | 304.13 | 341.22 | 272.39 |
5. | CENTRAL PUBLIC WORKS DEPARTMENT | MINES | CONSTRUCTION OF BASEMENTG FLOOR10 STORIES BUILDING FOR THE STATE OF THE ART, DG, GSI AT SECTOR-V, SA | 4/2019 | 255.37 | 255.37 | 46.7 |
6. | CPWD FOR MHA | HOME AFFAIRS | NSG AT KOLKATA | 10/2014 | 162.88 | 210.83 | 182.27 |
7. | CPWD OF HIGHER EDUCATION | DEPARTMENT OF HIGHER EDUCATION | CONSTRUCTION OF TWO NOS GIRLS HOSTELS AND ONE NO BOYS HOSTEL OF 500 CAPACITY EACH G PLUS 8 STOREYED | 3/2020 | 193.83 | 193.83 | 166.05 |
8. | EASTERN COAL FIELDS LIMITED | COAL | SONEPUR BAZARI EXPANSION OC | 7/2021 | 5365.88 | 5365.88 | 442.8 |
9. | EASTERN COAL FIELDS LIMITED | COAL | RANIGANJ MASTER PLAN | 8/2009 | 2661.73 | 5146.48 | 738.28 |
10. | EASTERN COAL FIELDS LIMITED | COAL | TILABONI UG MINE | 2/2019 | 916.62 | 749.07 | 11.05 |
11. | EASTERN COAL FIELDS LIMITED | COAL | SIDULI MINE (OC AND UG) | 5/2018 | 535.18 | 535.17 | 3.91 |
12. | EASTERN COAL FIELDS LIMITED | COAL | PARASEA- BELBAID REORGANISATION UG MINE | 7/2019 | 826.42 | 389.1 | 4.47 |
13. | EASTERN COAL FIELDS LIMITED | COAL | NAKRAKONDA KUMARDIH B OCP | 8/2018 | 502.68 | 502.67 | 55.83 |
14. | EASTERN COAL FIELDS LIMITED | COAL | EXPANSION PR OF JHANJRA UG (5.00 MTY) | 4/2020 | 1210.12 | 1210.12 | 356.3 |
15. | EASTERN COAL FIELDS LIMITED | COAL | BONJEMEHARI EXPANSION OCP | 8/2021 | 570.12 | 570.11 | 45.33 |
16. | EASTERN COAL FIELDS LIMITED | COAL | SHYAMSUNDARPUR UG INCLUDING SAPI UNIT | 4/2020 | 483.65 | 483.65 | 23.86 |
17. | EASTERN COAL FIELDS LIMITED | COAL | MOHANPUR EXPANSION OC PHASE II | 11/2020 | 888.99 | 888.99 | 88.17 |
18. | EASTERN RAILWAYS | RAILWAYS | TARAKESWAR - BISHNUPUR NEW BG LINE (NL), ER | 4/2000 | 1188.91 | 1619.51 | 1026.55 |
19. | EASTERN RAILWAYS | RAILWAYS | NAHATI - RANAGHAT 3RD LINE (MM OF KALINARAYANPUR - KRISHNANAGAR) | 7/2015 | 283.54 | 283.54 | 151.15 |
20. | EASTERN RAILWAYS | RAILWAYS | Rampurhat-Murarai (29.48 km)-3rd line | 10/2014 | 218.03 | 218.03 | 67.14 |
21. | GAS AUTHORITY OF INDIA LIMITED | PETROLEUM | DURGAPUR-HALDIA PIPELINE PROJECT | 3/2017 | 1740 | 2433.15 | 1850.6 |
22. | HINDUSTAN PETROLEUM CORPORATION LIMITED | PETROLEUM | CITY GAS DISTRIBUTION IN WEST BENGAL | 3/2019 | 5830.2 | 5830.2 | 565.88 |
23. | HINDUSTAN PETROLEUM CORPORATION LIMITED | PETROLEUM | CGD PROJECT IN WEST BENGAL 11TH ROUND | 6/2022 | 2628 | 2628 | 86.46 |
24. | HINDUSTAN PETROLEUM CORPORATION LIMITED | PETROLEUM | HALDIA PANAGARH PIPELINE PROJECT | 11/2022 | 1010 | 1010 | 186.86 |
25. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | CGD PROJECT AT EAST MEDNIPORE, WEST MEDNIPORE AND JHARGRAM DISTRICTS | 3/2022 | 609 | 609 | 22.96 |
26. | INDIAN OIL CORPORATION LIMITED | PETROLEUM | 30 INCH CRUDE OIL PIPELINE IN HALDIA-BARAUNI SECTION OF PHBPL AND CONVERSION OF EXISTING 18 INCH HAL | 3/2018 | 3712 | 3696 | 2915.64 |
27. | KOLKATA METRO RAIL CORPORATION LIMITED | RAILWAYS | NEW WORK FOR CONSTRUCTION OF METRO RAILWAY FROM NOAPARA-BARASAI VIA BIMANBANDER (MTP) | 4/2010 | 2397.72 | 2397.72 | 197.2 |
28. | KOLKATA METRO RAIL CORPORATION LIMITED | RAILWAYS | EAST WEST METRO CORRIDOR KOLKATA | 2/2009 | 4874.58 | 10442.41 | 286.49 |
29. | Kolkata Metropolitan Development Authority | WATER RESOURCES | INTERCEPTION DIVERSION TREATMENT WORKS AT TOLLYS NULLAH ADI GANGA | 8/2017 | 307.12 | 653.67 | 0 |
30. | Kolkata Metropolitan Development Authority | WATER RESOURCES | INTEGRATION OF STPS WITH REHABILITATION AND O AND M OF EXISTING ASSETS | 3/2018 | 165.16 | 165.16 | 0 |
31. | Kolkata Metropolitan Development Authority | WATER RESOURCES | INTERCEPTION, DIVERSION AND TREATMENT WORKS AT HOWRAH | 8/2017 | 185.22 | 185.22 | 49.99 |
32. | Kolkata Metropolitan Development Authority | WATER RESOURCES | INTERCEPTION AND DIVERSION WITH STP AT BALLY | 10/2017 | 164.93 | 164.93 | 45.45 |
33. | Kolkata Metropolitan Development Authority | WATER RESOURCES | INTERCEPTION, DIVERSION AND TREATMENT WORKS AT BARANAGAR AND KAMARAHATI | 1/2018 | 172.1 | 172.1 | 47.2 |
34. | Kolkata Metropolitan Development Authority | WATER RESOURCES | INTERCEPTION AND DIVERSION WITH STP AT MAHESHTALA | 5/2018 | 198.43 | 224.69 | 59.95 |
35. | Kolkata Metropolitan Development Authority | WATER RESOURCES | DETAILED PROJECT REPORT FOR I AND D SEWERAGE SYSTEM AND STP FOR ASANSOL AND KULTI TOWNS | 1/2019 | 384.96 | 384.96 | 0 |
36. | Kolkata Metropolitan Development Authority | WATER RESOURCES | SEWERAGE SYSTEM AND STP WORKS AT HALISHAHR | 2/2014 | 274.76 | 274.76 | 273.17 |
37. | Kolkata Metropolitan Development Authority | WATER RESOURCES | INTERCEPTION AND DIVERSION WORKS WITH STP FOR DRAINS FALLING IN RIVER DAMODAR AT DURGAPURL | 3/2019 | 287.53 | 287.53 | 0 |
38. | Kolkata Metropolitan Development Authority | WATER RESOURCES | I AND D AND STP WORKS AT BURDWAN WEST BENGAL | 12/2018 | 234.31 | 234.31 | 0 |
39. | Kolkata Metropolitan Development Authority | WATER RESOURCES | INTERCEPTION AND DIVERSION WITH STP AT HUGHLY-CHINSURAH | 5/2018 | 160 | 154.73 | 71.26 |
40. | Kolkata Metropolitan Development Authority | WATER RESOURCES | SEWERAGE SYSTEM WITH SEWER NETWORK AT BARRACKPORE | 12/2014 | 272.32 | 272.32 | 302.81 |
41. | METROPOLITAN RAPID TRANSPORT PROJECTS | RAILWAYS | EAST WEST METRO CORRIDOR FROM HOWRAH MAIDAN TO SALT LAKE | 3/2013 | 4874.58 | 10442.41 | 8008.94 |
42. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | UPGRADATION OF NH-81 WITH A MINIMUM OF 2-LANE WITH PAVED SHOULDER CONFIGURATION STARTING FROM KM 19. | 2/2018 | 426.18 | 426.18 | 358.89 |
43. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF TWINS 2-LANE ROB AND ITS APPROACHES IN REPLACEMENT OF EXISTING LEVEL CROSSING GATE N | 6/2016 | 236.78 | 263.26 | 211.51 |
44. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | DEVELOPMENT TO 4/6-LANNING OF NH-31 (NEW NH-10) WITH BOTH SIDE SERVICE ROADS FROM KM 569.258 TO KM 5 | 3/2022 | 995.04 | 995.04 | 194 |
45. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | DEVELOPMENT OF 4-LANING SECTION OF NH-31 FROM KM 551.36 (GHOSHPUKUR) TO KM 563.26 (BIHAR MORE, BAGDO | 3/2018 | 254.3 | 254.3 | 190.29 |
46. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF NEW ROAD AT THE MISSING LINK PORTION OF NH-81 ALONG THE APPROVED ALIGNMENT BETWEEN H | 3/2016 | 271.17 | 291.2 | 169.97 |
47. | MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (STATE PWDs) | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF ROB AND ITS APPROACHES IN LIEU OF UNMANNED LEVEL CROSSING AT KM 303.9 ON NH-60 (PAND | 3/2016 | 160.27 | 213.97 | 115.7 |
48. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | SIX-LANING OF BARWA ADDA-PANAGARH | 4/2014 | 1665 | 2360.65 | 4840.33 |
49. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING OF BAL. WORKS OF BARASAT-KRISHNAGAR FROM KM.48.553 TO KM.115.272 | 12/2018 | 2375.87 | 2566.8 | 2339.23 |
50. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | SIX LANE OF PALSIT TO DANKUNI SECTION FROM 588.870 TO KM. 652.700 | 3/2020 | 2193.23 | 2314 | 1673.03 |
51. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | REHABILITATION AND UP GRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER CONFIGURATION IN PURU | 3/2018 | 841.57 | 1619.48 | 3276.42 |
52. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | 4 LANING OF NH-31D FROM GHOSHPUKUR - SALSALABARI ( KM 0.00 TO KM . 83.785) | 12/2015 | 1083 | 1414.01 | 1080.05 |
53. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | SIX LANING OF NATIONAL CORRIDOR NH19 FROM PANAGARH TO PALSIT IN THE STATE OF WEST BENGAL UNDER BHARA | 3/2021 | 2200.93 | 2200.93 | 2095.15 |
54. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | CONSTRUCTION OF NEW 4 LANE BRIDGE OVER RIVER GANGA AT DOWNSTREAM OF FARAKKA BARRAGE INCLUDING APPROA | 8/2018 | 622.04 | 622.04 | 394.52 |
55. | NATIONAL HIGHWAYS AUTHORITY OF INDIA | ROAD TRANSPORT AND HIGHWAYS | FOUR LANING OF PURULIYA BYPASS SECTION OF NH 32 IN THE STATE OF WEST BENGAL ON EPC MODE | 8/2021 | 557.55 | 557.55 | 454.07 |
56. | NATIONAL THERMAL POWER CORPORATION | POWER | DURGAPUR PP-III (2X20 MW) - NSPCL | 12/2016 | 529.68 | 679 | 567.96 |
57. | NATIONAL THERMAL POWER CORPORATION | POWER | RAMMAM-III HEPP (3X40 MW) | 9/2014 | 1381.84 | 1803 | 1042.24 |
58. | RAIL VIKAS NIGAM LTD. | RAILWAYS | NEW WORK FOR CONSTRUCTION OF METRO RAILWAY FROM NSCB AIRPORT TO NEW GARIA VIA RAJARHAT (MTP) | 4/2010 | 3951.98 | 8964.35 | 6709.27 |
59. | RAIL VIKAS NIGAM LTD. | RAILWAYS | NEW WORK FOR CONSTRUCTION OF METRO RAILWAY FROM BARANAGAR TO BARRACKPORE AND DAKSHINESHWAR (MTP) | 4/2010 | 2298.42 | 2733.86 | 368.97 |
60. | RAIL VIKAS NIGAM LTD. | RAILWAYS | NEW WORK FOR CONSTRUCTION OF METRO RAILWAY FROM JOKA TO BINOY BADAL DINESH BAGH. | 4/2010 | 2913.51 | 4834.54 | 3798.56 |
61. | SOUTH EASTERN RAILWAY | RAILWAYS | PURULIA TO KOTSHILA DOUBLING (39.1 KM) | 4/2018 | 338 | 393.83 | 128.62 |
62. | STEEL AUTHORITY OF INDIA LIMITED (SAIL) | STEEL | REBUILDING OF COKE OVEN BATTERY NO.4 OF DURGAPUR STEEL PLANT | 11/2023 | 916.78 | 916.78 | 30.33 |
| Total | 62 | |