SELECT PROJECT


S.No.PROJECT NAME
1(I) CONSTRUCTION OF FOUR/SIX LANING FROM KM 132.375 TO KM 158.058 (TOTAL NEW ALIGNMENT LENGTH OF 20.683 KM) OF DABOKA- DIMAPUR SECTION (DIMAPUR BYPASS) OF NH-36 AND 39
2(II) CONSTRUCTION OF DIMAPUR BYPASS (ASSAM PORTION) OF 4/6 LANE PAVEMENT ON EPC BASIS FROM EXISTING KM 159.400 OF NH-36 TO EXISTING KM 102.500 OF NH-39 AND UPTO END POINT OF ASSAM PORTION [DESIGN KM 1
32 LANE WITH HARD SHOLDER , REHABILITATION AND UP GRADATION OF SECTION FROM KM 242.0 TO KM 298.0 OF NH 223 (NEW NH 4) (PACKAGE II)
42 LANE WITH PAVED SHOULDER FROM KM 16+900 (BOGAPANI) TO KM 27+150 (GOLAI GAON) ON EXISTING DIBRUGARH TO LEDO SECTION WITH PROPOSED DIGBOI BYPASS SECTION-4
52 LANE WITH PAVED SHOULDER FROM KM 27+150 (GOLAI GAON) TO KM 47+682 (LEDO) ON EXISTING DIBRUGARH TO LEDO SECTION WITH PROPOSED MARGHERITA - LEDO BYPASS PACKAGE-5
62 LANE WITH PAVED SHOULDER FROM KM 399.00 TO KM 430.00 OF KARANPARYAG TO CHAMOLI UNDER CHARDHAM PARIYOJNA
72 LANE WITH PAVED SHOULDER FROM KM 430.00 TO KM 468.00 OF CHAMOLI TO PAINI UNDER CHARDHAM PARIYOJNA
82 LANING FROM MANU-SIMLUNG PKG-2
92 LANING OF KOHIMA - JESSAMI SECTION (PACKAGE II)
102 LANING OF KOHIMA - JESSAMI SECTION (PACKAGE V)
112-LANING FROM JOLAIBARI - BELONIA
122-LANING FROM YAINGANGPOKPI TO FINCH CORNER (PKG-I)
132-LANING FROM YAINGANGPOKPI TO FINCH CORNER (PKG-II)
142-LANING OF CHANGTONGYA TO LONGLENG ROAD OF NH-702 (PKG-I)
152-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- 2A)
162-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- 2B)
172-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- 4A)
182-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- 4B)
192-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- IB)
204 LANE WITH PAVED SHOULDER AGARTALA BYPASS (WESTERN SIDE) CONNECTING NH-8
214 LANING FROM JAMUGURI TO BISWANATH CHARIALI FROM KM 182 TO KM 208 OF NH-52
224 LANING FROM RANGAGARA TO KALIABHOR TINALI FROM KM 297.00 TO KM 315.315 OF NH-37 ON EPC BASIS.
234 LANING OF NH 37 SECTION BETWEEN END OF MORAN BYPASS TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM. 561.700-KM. 580.778) ON EPC MODE.
244 LANING OF JORHAT TO JHANJI SECTION FROM KM. 453.00 TO KM. 491.08 (DESIGN KM 403.200 TO KM 454.240)
254 LANING OF NH-37 SECTION BETWEEN DEMOW TO END OF MORAN BYPASS (FROM KM. 534.800 TO KM. 561.700) ON EPC MODE.
264-L DHUBRI PHULBARI BRIDGE WITH APPROACH ROAD
274-LANING OF HAPACHARA - TULUNGIA SECTION
28AKASH BRIDGE - JESSAMI SECTION PKG-2
29BADARPUR – CHURAIBARI PKG-6
30BILASIPURA- GUWAHATI ROAD PKG-1
31BILASIPURA- GUWAHATI ROAD PKG-2
32BILASIPURA-GUWAHATI ROAD PKG-10
33BILASIPURA-GUWAHATI ROAD PKG-8
34BILASIPURA-GUWAHATI ROAD PKG-9
35CHAMPAK NAGAR TO KHAYERPUR SECTION (DESIGN KM 242+500 TO KM 261+610)
36CHANGTONGYA TO LONGLENG ROAD PKG-2
37CHURACHANPUR TUIVAI PKG-3
38CONSTRUCTION AND UPGRADATION OF EXISTING ROAD TO 2 LANE WITH PAVED SHOULDER FROM KM 368.00 TO KM 399.00 OF LAMERI TO KARANPARYAG
39CONSTRUCTION AND UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER FROM KM27.200 (END OF RONGLI BYPASS) TO KM37.600(NEW ROLEP BRIDGE) OF RHENOK-MENLA SPUR ( II B)
40CONSTRUCTION AND UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER FROM NEW ROLEP BRIDGE AT KM 37.600 TO CHOCHENPHERI AT KM 52.00 OF RONGLI TO CHOCHENPHERI (PKG-II C)
41CONSTRUCTION AND UPGRADATION OFEXISTINGROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT OF KAFER- LAVA MORE SECTION FROM KM 40.00 TO KM 61.100 (PKG-VA)
42CONSTRUCTION AND UPGRADATION OFEXISTINGROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT OF SECT. FROM PEDONG BYPASS TO RESHI BORDER KM 79.700 TO KM96.254 (LAVA MORE-RISHI BORDER )PKG
43CONSTRUCTION FOR MITIGATION MEASURES KM 368.00-UTTARAKHAND-TO KM 433.00 ON NH-07-PKG-1
44CONSTRUCTION FOR MITIGATION MEASURES KM 450.00-UTTARAKHAND-TO KM 468.00 ON NH-07-PKG-3
45CONSTRUCTION FOR MITIGATION MEASURES PKG-2
46CONSTRUCTION OF (I) CONNECTING ROAD FROM Z-MORH TUNNEL TO ZOJILA TUNNEL AND (II) 14.150 KM LONG BI-DIRECTIONAL TUNNEL ACROSS ZOJI LA PASS ON SONAMARG-KARGIL SECTION OF NH-01 ON EPC MODE IN THE UNION T
47CONSTRUCTION OF 2 LANE WITH HARD SHOULDER FROM DESIGN CHAINAGE KM 283.000 TO KM 325.440 (5- LEGGED JUNCTION AT OLD AKHEGWO) TO (AKASH BRIDGE) OF AKEGWO- JESSAMI SECTION OF NH-202 PACKAGE-1
48CONSTRUCTION OF 2-LANE ROAD FROM KM 33 TO KM 65.00 OF AKAJAN-LIKABALI-BAME ROAD IN ARUNACHAL PRADESH
49CONSTRUCTION OF 2-LANE ROAD WITH PAVED SHOULDER (GREENFIELD ALIGNMENT) OF EXISTING STRETCH BETWEEN LEGSHIP - GYALSHING FROM KM75.00 TO KM 90.210 (PKG-6I)
50CONSTRUCTION OF 2-LANE ROAD WITH PAVED SHOULDERS FROM KM16.00 OF ROING-HUNLI SECTION TO KM 21.500 OF HUNLI-ANINI ROAD (GREENFIELD ALIGNMENT) (NH-313)(TOTAL LENGTH= 74.863 KM) IN ARUNACHAL PRADESH UNDE
51CONSTRUCTION OF 2-LANE SPECIFICATION ROAD WITH PAVED SHOULDER AS REALIGNMENT (GREENFIELD ALIGNMENT) OF EXISTING STRETCH BETWEEN LEGSHIP - GYALSHING FROM KM58.840-KM75.00 (PKG- V)
52CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM KM 0.000 TO KM 16.000 OF STRETCH SINGTAM – TARKU OF NH-510 ON EPC BASIS UNDER SARDP –NE PHASE ‘A’ IN THE STATE OF SIKKIM
53CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM KM 16.000 TO KM 32.500 OF STRETCH TARKU – RABONGLA OF NH-510 ON EPC BASIS UNDER SARDP –NE PHASE ‘A’ IN THE STATE OF SIKK
54CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF KOHIMA-BYPASS ROAD FROM DSIGN KM32.0 TO KM43.454 [DESIGN LENGTH=11.454] (PKG.- 4)
55CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF KOHIMA-BYPASS ROAD FROM DESIGN KM 0.00 TO KM 10.500 [DESIGN LENGTH- 10.500 KM] PACKAGE- I
56CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF KOHIMA-BYPASS ROAD FROM DESIGN KM10.500 TO 21.00KM [DESIGN LENGTH- 10.500 KM] PACKAGE- 2
57CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF KOHIMA-BYPASS ROAD FROM DESIGN KM21.0 TO KM32.0 [DESIGN LENGTH=11.0 KM] (PKG.- 3)
58CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF NEW GREEN FIELD ALIGNMENT FROM CHOCHENPHERI AT KM 52.000 TO HELIPAD NEAR MENLA AT KM82.00 OF RHENOK-MENLA SPUR (PKG-3A)
59CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF SHILLONG WESTERN BYPASS STARTING FROM NH-06 NEAR LADUMSAW (EXISTING KM 60.900 OF OLD NH-40) TO NH106 (OLD NH-44E), KM 0+000 TO KM 12+800 PACKAGE-1
60CONSTRUCTION OF 2-LANE WITH PAVED SHOULDERS OF SHILLONG WESTERN BYPASS STARTING FROM NH-06 NEAR LADUMSAW (EXISTING KM 60.900 OF OLD NH40) TO NH106 (OLD NH 44E) (PACKAGE-III), FROM KM 24+700 TO KM 38+2
61CONSTRUCTION OF 2-LANING WITH HARD SHOULDER ROAD OF UKHRUL - TOLOI - TADUBI SECTION OF NH-102A FROM DESIGN CHAINAGE 50.850 KM TO 81.870 KM (PACKAGE -3)
62CONSTRUCTION OF 2-LANING WITH HARD SHOULDER ROAD OF UKHRUL - TOLOI - TADUBI SECTION OF NH-102A FROM DESIGN CHAINAGE 81.870 KM TO 105.825 KM PACKAGE -4
63CONSTRUCTION OF 2-LANING WITH HARD SHOULDERS OF ARROWA-KHUPA-HAYULIANG SECTION OF NH-113 FROM CH.68.550 TO CH.91.633
64CONSTRUCTION OF 2-LANING WITH HARD SHOULDERS OF DEMWE-BRAHMAKUND SECTION OF NH-13 FROM CH.0.00 KM TO 18.464KM ON EPC
65CONSTRUCTION OF 4-LANE PANCHGRAM BYPASS FROM DESIGN CHAINAGE KM 15+500 ON NH-37 (OLD NH-53) AT KALINAGAR PT.-II VILLAGE TO DESIGN CHAINAGE KM 27+300 AT CROSSING WITH NH-6 (OLD NH-44) NEAR SIDDESWAR PT
66CONSTRUCTION OF 4.5 KM LONG SILKYARA TUNNEL BETWEEN KM 25.40 TO 50.25 KM (TUNNEL WORK)
67CONSTRUCTION OF MAJOR BRIDGE OVER MIDDLE STRAIT CREEK BETWEEN KM. 106.590 TO KM. 107.762 OF NH 223 (NEW NO. NH 4)
68CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD FROM EXISTING KM 20.456 TO KM 41.065 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH - 20.00 KM) IN THE STATE OF NAGALAND UND
69CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD FROM EXISTING KM 60.345 TO KM 98.065 [DESIGN KM. 59.000 TO KM. 86.835] (DESIGN LENGTH - 27.835 KM) IN THE STATE OF NAGALAND UN
70CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF SELLING-DULTE SECTION OF NH-06 (PKG-I)
71CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF SELLING-DULTE SECTION OF NH-06 (PKG-III)
72CONSTRUCTION/UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM RANIPOOL TO PAKYONG FROM KM 0.000 TO KM 16.167 OF NH-717A ON EPC BASIS UNDER SARDP-NE PHASE
73CONSTUCTION/UPGRADATION OF EXISTING HIGHWAY TO 2 LANE WITH PAVED SHOULDER FROM KM 0.00 TO KM 13.00 NH-717A BAGRAKOT-KAFER IV A.
74CONSTUCTION/UPGRADATION OF EXISTING HIGHWAY TO 2 LANE WITH PAVED SHOULDER FROM KM 13.00 TO KM 25.600 NH-717A BAGRAKOT-KAFER IV B.
75CONSTUCTION/UPGRADATION OF EXISTING HIGHWAY TO 2 LANE WITH PAVED SHOULDER FROM KM 26.10 TO KM 40.00 NH-717A BAGRAKOT-KAFER IV D.
76DABOKA BYPASS OF DABOKA - PAROKHAOWA PKG -1
77DABOKA KATHKATI PACKAGE-5
78DABOKA KATHKATI PACKAGE-6
79DABOKA KATHKATI PACKAGE-7
80DAINADUBI-DARUGIRI PKG-1B
81DEVELOPMENT OF EXTERNAL TRUNK CONNECTIVITY AND INTERNAL INFRASTRUCTURE WORKS AT MULTI MODEL LOGISTICS PARK AT JOGIGHOPA IN THE STATE OF ASSAM
82DIBRUGARH-LAHOAL-CHABUA BYPASS PACKAGE-3
83DULTE- KWALKULH - CHAMPAI PKG.2
84FOUR LANING OF DIMAPUR KOHIMA ROAD FROM DESIGN KM 123.840 TO KM 138.775 (EXISTING KM 124.100 TO KM 140.000) EXCLUDING DIMAPUR AND KOHIMA BYPASS, IN THE STATE OF NAGALAND
85FOUR LANING OF EXISTING DIMAPUR KOHIMA ROAD FROM DESIGN KM 152.490 TO KM 166.700 (EXISTING KM 156.000 TO KM 172.900) EXCLUDING DIMAPUR AND KOHIMA BYPASS IN THE STATE OF NAGALAND
86FOUR LANING OF JAMMU-AKHNOOR PKG-1
87FOUR LANING OF JHANJHI JN TO DEMOW SECTION FROM KM. 491.050 TO KM. 535.250(DESIGN KM 490.800 TO KM 534.800) (WITH TOLL PLAZA)
88FOUR LANING OF SRIRAMPUR-DHUBRI PKG-2
89FOUR LANNING OF BADARPUR BYPASS FROM DESIGN CHAINAGE KM 27+300 AT CROSSING WITH NH-6
90GOHA-KHELLANI PKG-3
91HUNLI TO HAYULIANG PKG-1
92HUNLI TO ITHUN BRIDGE SECTION
93IMPHAL - KHONGSANG PKG-2
94IMPHAL - KHONGSANG PKG-3
95IMPHAL - KHONGSANG PKG-4
96IMPHAL - KHONGSANG PKG-5
97IMPHAL - KHONGSANG PKG-6
98IMPHAL-KOHIMA ROAD PKG-4B
99IMPHAL-KOHIMA ROAD PKG-5A
100IMPROVEMENT AND WIDENING TO 2-LANE WITH EARTHEN PAVED SHOULDER FROM UDAIPUR TO SRIMANTAPUR
101IMPROVEMENT AND WIDENING TO 2-LANE WITH PAVED SHOULDER OF ROAD FROM KM 101.300 TO KM 127.319 (TOTAL LENGTH 26.019 KM) I.E. THE KHOWAI –TELIAMURA-AMARPUR-HARINA-SABROOM
102IMPROVEMENT/UPGRADATION OF EXISTING 2-LANE TO 4-LANE DIVIDED HIGHWAY FROM DAILI TO KURAOPOKPI SECTION OF IMPHAL-KOHIMA ROAD (DESIGN CH.: KM 274.610 TO 287.00 ) (PKG-4B)
103IMPROVEMENT/UPGRADATION OF EXISTING 2-LANE TO 4-LANE DIVIDED HIGHWAY FROM KURAOPOKPI TO SEKMAI SECTION OF IMPHAL-KOHIMA ROAD (DESIGN CH.: KM 287.00 TO 297.700) (PKG-5A)
104IMPROVEMENT/UPGRADATION OF EXISTING 2-LANE TO 4-LANE DIVIDED HIGHWAY FROM TAPHOU KUKI TO DAILI SECTION OF IMPHAL-KOHIMA ROAD (DESIGN CH.: KM 262.175 TO 274.610) (PKG-4A)
105IMPROVEMENT/WIDENING TO 2-L WITH PAVED SHOULDER FROM (DESIGN KM 0.00 TO KM 10.670) / 4-LANING FROM (DESIGN KM 0.00 TO KM 0.930) BETWEEN SHILLONG-DAWKI (PKG-1)
106IMPROVEMENT/WIDENING TO 2-LANE WITH PAVED SHOULDER / 4-LANING FROM (DESIGN KM 63.530 TO KM 71.520) BETWEEN SHILLONG-DAWKI (PKG-5)
107IMPROVEMENT/WIDENING TO 2-LANE WITH PAVED SHOULDER FROM (DESIGN KM 10.670 TO KM 37.550) BETWEEN SHILLONG-DAWKI (PKG-2)
108IMPROVEMENT/WIDENING TO 2-LANE WITH PAVED SHOULDER FROM (DESIGN KM 45.760 TO KM 63.530) BETWEEN SHILLONG-DAWKI (PKG-4)
109JAMMU - AKHNOOR SECTION OF NH 144A PKG-3B
110JESSAMI TO LAYNEN BRIDGE UKHRUL - JESSAMI PKG-7
111JOGIGHOPA BRIDGE
112JORAM – KOLORIANG ROAD FROM EXISTING KM 50.050 TO KM 70.00 (PKG-3)
113JORAM – KOLORIANG ROAD FROM EXISTING KM 70.00 TO KM 88.700 (PKG-4)
114JORAM – KOLORIANG ROAD FROM EXISTING KM122.600 TO KM138.00 (PKG-7)
115KAILASHAHAR TO KHOWAI PKG-4
116KARGIL-ZANSKR PACKAGE-1
117KARGIL-ZANSKR PACKAGE-2
118KARGIL-ZANSKR PACKAGE-3
119KARGIL-ZANSKR PACKAGE-8
120KARIMGANI - SUTARKANDI SECTION ON SILCHAR-CHURAIBARI PKG-7
121KEIFANG - TUVAI PKG-1
122KEIFANG - TUVAI PKG-3
123KHELLANI-KHANABAL PKG-1
124KHELLANI-KHANABAL PKG-2
125KHELLANI-KHANABAL PKG-3
126KHELLANI-KHANABAL PKG-4
127KHELLANI-KHANABAL PKG-5
128KHOWAI –TELIAMURA-AMARPUR-HARINA-SABROOM PACKAGE-2
129KHOWAI –TELIAMURA-AMARPUR-HARINA-SABROOM PACKAGE-3
130KHOWAI –TELIAMURA-AMARPUR-HARINA-SABROOM SECTION PKG-4
131LMPHAL TO JIRIBAM PKG-7
132MAJOR BRIDGE OVER MIDDLE STRAIT CREEK
133MANU-SIMLUNG ( PKG 4)
134MARAM - PEREN PKG-3
135MARIAM - PEREN (PKG 1B)
136MARIAM - PEREN PKG-1A
137MARREM KHULLEN TO JESSAMI SECTION IMPHAL- UKHRUL - JESSAMI PKG-6 (DESIGN CHAINAGE KM 95.700 TO KM 140.180)
138MERANGKONG-TAMLU-MON (MTM) PKG-5
139PACKAGE-3A
140PACKAGE-3B
141PANGO TO JORGING ROAD PKG-1
142PEREN-DIMAPUR PKG-5
143PEREN-DIMAPUR PKG-3
144PEREN-DIMAPUR SECTION PKG-2
145RANIKOR- MAHESHKHOLA- BAGHMARA PKG-2
146RANIKOR-MAHESHKHOLA- BAGHMARA (RMB) PKG-3
147RANIKOR-MAHESHKHOLA- BAGHMARA (RMB) PKG-4 (KANAI-RONGARA)
148REHABILITATION AND UP GRADATION OF SECTION FROM KM 206.00 TO KM 242.00 (NIMBUTALA TO AUSTIN CREEK) OF NH 223 (NEW NH 4) (PACKAGE IV)
149REHABILITATION AND UP-GRADATION OF ROAD FROM DESIGN KM 25.250 TO KM 36.460 (TOTAL LENGH: 11.210 KM) OF KAILASHAHAR-KURTI BRIDGE SECTION ON NH-208A TO 2-LANE WITH PAVED SHOULDER (PACKAGE-III)
150REHABILITATION AND UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT OF SECTION FROM START OF RABANGLA KM33.600 TO KM58.540 (PKG- IV)
151REHABILITATION AND UPGRADATION OF ROAD FROM KM 0.00 TO KM 18.600 OF KUMARGHAT-KAILASHAHAR SECTION
152REHABILITATION OF SECTION FROM KM 298.00 TO KM 330.662 PKG-8
153REHABITITATION AND UP GRADATION OF NONGSTOIN-RAMBRAI-KYRSHAI ROAD UP TO MEGHALAYA-ASSAM BORDER FROM KM 0.335 TO KM 34.039 TO 2-LANE UNDER NH(O) - NE IN THE STATE OF MEGHALAYA PACKAGE-1
154RISHI BORDER- ROLEP- MENLA PKG- 2A
155RISHI BORDER- ROLEP- MENLA PKG- 3B
156SENAPATI- IMPHAL PKG-5B
157SHILLONG WESTERN BYPASS PACKAGE-2
158SILCHAR VAIRENGTE SAIRANG ROAD PKG-1
159SILCHAR VAIRENGTE SAIRANG ROAD PKG-2
160SILCHAR-JIRIBAM PKG-1
161SPECIAL PROTECTION WORK ON REHABILITATION AND RESTORATION OF SLIDING AND SINKING ZONE FROM RANGPO TO RANIPOOL SECTION
162SRIRAMPUR - DHUBRI PKG-1
163TAMENGLONG - MAHUR PKG-1
164TAMENGLONG - MAHUR PKG-2
165TAMENGLONG - MAHUR PKG-3
166TAMENGLONG - MAHUR PKG-4
167TAMENGLONG - MAHUR PKG-5
168TAMENGLONG - MAHUR PKG-6
169TAMENGLONG- MAHUR ROAD PKG-7
170TLABUNG - LUNGLEI PKG-A
171TLABUNG - LUNGLEI PKG-B
172TULUNGIA-JOGIGHOPA-PAIKAN ROAD PKG-7
173TWO LANING OF JORAM KOLORIANG ROAD (NH 713) ON EPC BASIS FROM DESIGN KM. 138+000 TO KM. 154+036 [EXISTING KM 138.00 TO KM 158.00] IN THE STATE OF ARUNACHAL PRADESH
174TWO-LANING OF HAYULIANG– HAWAI BYPASS ROAD ON EPC BASIS FROM DESIGN KM. 51.825 TO KM. 63.131 EXISTING KM 45.050 OF HAYULIANG – HAWAI ROAD TO HAWAI TOWN IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-
175UKHRUL TOLOI TADUBI PKG-2
176UP-GRADATION TO 2-LANE WITH PAVED SHOULDER FROM KM 12.850 TO KM20.300 OF 7.450KM LENGTH ON GOHA-KHELLANI SECTION AND A LINK ROAD TO GOHA VILLAGE OF 2.016 KM ON NH-244 (PACKAGE I)
177UP-GRADATION TO 2-LANE WITH PAVED SHOULDER FROM KM 20.300 TO KM 29.030 OF 8.730 KM LENGTH ON GOHA-KHELLANI SECTION ON NH-244 (PACKAGE II)
178UP-GRADATION TO 2-LANE WITH PAVED SHOULDERS OF NGOPA - PAWLRANG SECTION OF NH 102B OF AIZAWL - IMPHAL ECONOMIC CORRIDOR FROM EXISTING CHAINAGE KM 32.796 TO KM 72.030 [DESIGN CHAINAGE KM 31.280 TO KM 6
179UP-GRADATION TO 4-LANE WITH PAVED SHOULDER OF JAMMU-AKHNOOR ROAD SECTION OF NH-144A FROM GANESH VIHAR (KM 6.000) TO KHATI CHOWK (KM 26.350) OF 20.35 KM LENGTH IN THE STATE OF JAMMU AND KASHMIR TO BE E
180UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER FROM KOHIMA TO MAO FROM KM 185.540 TO KM 211.709
181WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 125.00 TO KM 166.00 (PACKAGE-3) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
182WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 166.00 TO KM 208.00 (PACKAGE-4) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON
183WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 208.00 TO KM 250.00 (PACKAGE-5) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
184WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 250.00 TO KM 298.00 (PACKAGE-6) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
185WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 298.00 TO KM 339.00 (PACKAGE-7) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
186WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 339.00 TO KM 380.00 (PACKAGE-8) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
187WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 8.00 TO KM 65.00 (PACKAGE-1) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON EPC
188WIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN THE STATE OF ASSAM STARTING FROM KM 116.480 NEAR HANGRUM TO KM 136.500 NEAR HEJAICHAK (PACKAGE-8)
189WIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN THE STATE OF ASSAM STARTING FROM KM 136.500 NEAR HEJAICHAK TO KM 156.489 NEAR P. LEIKUL (PACKAGE-9)
190WIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN THE STATE OF ASSAM STARTING FROM KM 156.489 NEAR P. LEIKUL TO KM 176.410 NEAR BOROWAPU (PACKAGE-10)
191WIDENING TO 2 LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-I (DESIGN CHAINAGE 0+000 KM TO 34+795 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE
192WIDENING TO 2 LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-II (DESIGN CHAINAGE 34+795 KM TO 69+875 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (0)-NE
193WIDENING TO 2 LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-III (DESIGN CHAINAGE 69+875 KM TO 106+816 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE
194WIDENING TO 2-LANE WITH GEOMETRIC IMPROVEMENTS OF TURA DALU ROAD UNDER JICA FUNDING FROM KM 85.000 TO 95.000 101.000 TO 145.000 TO 2-LANES WITH PAVED SHOULDER OF TURA–DALU SECTION OF NH-51 IN THE ST
195WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 0+800 (KANDULIJAN GAON) TO KM 27+701 (SIMEN CHAPORI) OF NH-515 IN THE STATE OF ASSAM ON EPC MODE UNDER BMP (DIBRUGARH-OYAN, PACKAGE-1)
196WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 27+701 (SIMEN CHAPORI) TO KM 55+000 (NAGABANG GAMSUK) IN DHEMAJI DISTRICT IN THE STATE OF ASSAM ON EPC MODE UNDER BHARATMALA (PACKAGE-2)
197WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 55+000 (NAGABANG GAMSUK) TO KM 82+514 (OYAN) (PACKAGE-3)
198ZORINPUI- HMAWNGBU-LONGMASU (NH-502A)

Back </