S.No. | PROJECT NAME | 1 | 2 LANE + PS ASTHAMODE - TIVATYAL [DESIGN CH. KM 24.300 - 62.00] [KM 134.98-172.95 OF NH-63]
|
2 | 2 LANE + PS PIMPLNER TO SATANA -[DESIGN CHAINAGE KM 21.427 TO 64.00 ] OF NH-752G]
|
3 | 2-LANE WITH PAVED SHOULDER CONFIGURATION OF LAMBASINGI TO PADERU SECTION (KM 205+000 TO KM 253+974) OF NH-516E
|
4 | 2-LANE WITH PS OF BEWAR TO NEAR KARRI VILLAGE SECTION OF NH-92 FROM KM.0.00 TO 30.00 UNDER GNHCP
|
5 | 2-LANE WITH PS OF NEAR KARRI VILLAGE TO ETAWAH SECTION OF NH-92 FROM KM.30.000 TO 57.346 UNDER GNHCP
|
6 | 2L+PS FOR WORK OF NH-325 (BALOTRA TO SANDERAO VIA JALORE) BY CONSTRUCTION OF BYPASSES:(1) ASOTRA- BRAHMDHAM BYPASS (2) SIWANA BYPASS (3) MOKALSAR BYPASS (4) MAJOR REALIGNMENT AT KATHADI (5) MAJOR REAL
|
7 | 2L+PS FROM KM. 0+000 TO KM. 32+000 (MUDIGUBBA TO PUTTAPARTHI) OF NH-342
|
8 | 2LPS FROM GONDIGUDA TO ARAKU BHALLAGUDA KM 27.480 TO KM 51.772 SECTION OF NH 516E
|
9 | 2LPS FROM KM36.400 TO KM. 107.224 OF NH167BG FROM DUTTALUR TO KAVALI SECTION
|
10 | 2LPS OF CHAPRATHIPALEM TO LAMBASINGI SECTION OF NH 516E
|
11 | 2LPS OF KOYYURU TO CHAPRATHIPALEM SECTION OF NH 516E
|
12 | 4 LANE FROM KM 56.400 TO KM 120.300 FROM B.KOTHAPALLI JUNCTION TO GORANTLA OF NH 716G
|
13 | 4 LANE WITH PAVED SHOULDER FROM KM 0.000 TO KM 51.119 OF TADIPATRI TO MUDDANUR OF NH67
|
14 | 4 LANING OF ITANAGAR TO BANDARDEWA SECTION OF NH-415 FROM KM 40+430 TO KM 51+735 (PACKAGE B) ON EPC MODE IN THE STATE OF ARUNACHAL PRADES
|
15 | 4-LANE WITH PAVED SHOULDERS FROM KM 32/0 TO KM 79/650 (DESIGN CHAINAGE KM 32+000 TO KM 78+760) PUTTAPARTHI KODURU SECTION OF NH-342
|
16 | 4-LANNING OF NH17 AND NEW NO. NH66 FROM KM 161/600 TO 205/400 UNDER HYBRID ANNUITY MODE
|
17 | 4-LANNING OF NH17 AND NEW NO. NH66 FROM KM 241/300 TO 281/300 UNDER HYBRID ANNUITY MODE
|
18 | 44 LANE DIVIDED CARRIAGEWAY OF BARMER BYPASS OF NH-15 (NEW NH-68) IN THE STATE OF RAJASTHAN ON EPC MODE.
|
19 | 4L+PS OF NH -58 FROM BEAWAR-GOMTI (OLD CH KM 58.245 TO KM. 108.600) PKG-I.
|
20 | 6 LANING FROM KM 9.90 TO KM 19.948 (ARAMGARH-SAMSHABAD SECTION) OF HYDERABAD-SAMSHABAD SECTION OF NH-44 IN THE STATE OF TELANGANA
|
21 | AJANTHA TO BULDHANA
|
22 | AKOLA TO AKOT
|
23 | AMDI TO SAONER
|
24 | ARDHAPUR TO HIMAYATNAGAR
|
25 | AURANGABAD TO SILLOD
|
26 | BALANCE WORK OF CONSTRUCTION OF TWO/FOUR LANE WITH PAVED SHOULDER FROM KM 422.000 TO 523.600 ( CHITRADURGA TO SHIVAMOGGA ) OF NH-13 IN THE STATE OF KANATAKA ON EPC MODE.
|
27 | BALANCE WORK OF CONTSRUCTION OF TWO/FOUR LANE WITH PAVED SHOULDER FROM KM. 54.370 TO KM. 101.400 (BIDAR TO HUMNABAD SECTION) OF NH50 IN THE STATE OF KARNATAKA ON EPC MODE
|
28 | BALANCE WORK OF REHABILITATION AND UP-GRADATION TO NH-166F FROM MAHAD JUNCTION (AT KM 123/400 ON NH-66) TO RAIGAD FORT UP TO CHITTAA DARWAZA, PACHAD TO TOMB OF JIJAUMATA AND HIRKANIWADI CONNECTOR [LEN
|
29 | BALANCE WORK OF REHABILITATION AND UPGRADING TO 2LANE/2LANE WITH PAVED SHOULDER CONFIGURATION AND STRENGTHENING FROM FROM KM 343.80 TO 400.33 OF GOWRIBIDANUR CHIK BALLAPUR SECTION IN THE STATE OF KARN
|
30 | BARELA-MANDLA SECTION OF NH-12A IN MADHYA PRADESH KM 22/8 TO KM 89/6 OF NH-12A
|
31 | BHANDARA TO GHOTITOK
|
32 | BHOGAN KHURD TO KASHEDI
|
33 | BYPASS ROAD TO ADONI TOWN CONNECTING NH-167 (HAGARI - JADCHARLA ROAD) FROM KM.62/700 TO 71/400 IN KURNOOL
|
34 | CONSTRUCTION OF 2 LANE BARPETA BYPASS FROM KM 77+900(BARADI) TO KM 86+150( DEURIKUCHI) (LENGTH=8.25KM) ON NH-427 IN THE STATE OF ASSAM UNDER EPC MODE(JOB NO.427/AS/2022-23/245)
|
35 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 163.59 TO KM 206.66 (PACKAGE 5) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHW
|
36 | CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER FROM KM 55.6 TO KM 90.7 (EXISTING CHAINAGES) OF NH-766C (COMPLETE REALIGNMENT OF 13.76 KM) WITH 2 MAJOR BRIDGES ACROSS SHARAVATHI BACKWATERS IN THE STATE OF
|
37 | CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER NORTHERN BYPASS PHASE-II OF KOTA CITY FROM DESIGN CHAINAGE KM.0/0 (KM. 178+300 OF SH-33) TO KM 12/915 (KM. 236+800 OF NH-52) ON EPC MODE IN THE STATE OF RAJA
|
38 | CONSTRUCTION OF 2-LANE MAJOR BRIDGE INCLUDING APPROACHESOVER BRAHMAPUTRA BETWEEN MAJULI ON NORTH BANK AND JORHAT ON SOUTH BANK, LENGTH OF BRIDGE 6812.5 METRE (PACKAGE II) ON NH-715 K IN THE STATE OF A
|
39 | CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER GANGTOK BYPASS ROAD FROM RANIPOOL TO BURTUK (L=23.316KM) IN THE STATE OF SIKKIM
|
40 | CONSTRUCTION OF 2L+PS FROM PASARLAPUDI-DHINDI (105/700 TO 127.500 OF NH-214) OF NH-216
|
41 | CONSTRUCTION OF 4 LANE FLYOVER AT NAGPUR RTO CHOWK TO NAGPUR UNIVERSITY CAMPUS FROM CH 2/250 TO 5/100 AND 4 LANE FLYOVER AT WADI/MIDC JUNCTION FROM KM 8/360 TO KM, 10/300 ON NH 53 IN STATE OF MAHARASH
|
42 | CONSTRUCTION OF 4 LANE GAURIPUR BYPASS ON NH-17 IN THE STATE OF ASSAM
|
43 | CONSTRUCTION OF 4 LANE ROB AND ITS APPROACHES AT THE LEVEL OF CROSSING (L C NO. 29-B) OF KM 29 (EKANGANSARAI) AT NH-110(NEW NH-33) & RAILWAY KM 32.63 OF FATWA(FUT) - ISLAMPUR (IPR) SECTION IN THE STAT
|
44 | CONSTRUCTION OF 4 LANE ROB WITH APPROACHES IN LIEU OF LC NO. RV-172 AT KM 176.00 OF NH-201 (PRESENT NH-26) AT KESINGA INCLUDING LAND ACQUISITION IN THE STATE OF ODISHA ON EPC MODE UNDER ANNUAL PLAN 20
|
45 | CONSTRUCTION OF 4 LANE WITH PAVED SHOULDERS THIRUVAYARU BYPASS IN BETWEEN EXISTING KM.55/926 TO 62/680 IN NH 226EXTN. (NEW NH 136)
|
46 | CONSTRUCTION OF 4 NOS GRADE SEPARATOR BETWEEN KM. 281.000 TO KM 307.600 KM. 286.400 KUMHARI KM. 299.000 TRANSPORT NAGAR KM. 302.000 POWER HOUSE KM. 304.000 CHANDRA MOURA CHOWK TO KM. 305.00 SUPELA OF
|
47 | CONSTRUCTION OF 4-LANE GREEN FIELD HIGHWAY FROM KM. 35.000 TO KM. 49.155 OF NH-731A WITH PAVED SHOULDERS ON HYBRID ANNUITY MODE IN THE STATE OF UTTAR PRADESH
|
48 | CONSTRUCTION OF 4-LANE HIGHWAY WITH PAVED SHOULDERS FROM KM 49.155 TO KM 74.700 OF NH-731A ON HYBRID ANNUITY MODE IN THE STATE OF UTTAR PRADESH
|
49 | CONSTRUCTION OF 5 HL BRIDGES AT KM 379/000 (PANGAM), KM 439/400 (POTTERU), KM 444/237 (KONGURUKONDA), KM 457/075 (MV-90) AND KM 468/150 (MV-96) OF NH-326 (MALKANGIRI-MOTU ROAD) IN THE STATE OF ODISHA.
|
50 | CONSTRUCTION OF 6 LANE BRIDGE ON GANGA ON NH-96 AND ITS APPROACHES IN PHAPHAMAU ALLAHABAD ON EPC MODE
|
51 | CONSTRUCTION OF 6-LANE ELEVATED / EXTRA DOSE CABLE BRIDGE ON RIVER GANGA PARALLEL TO AND WESTERN SIDE OF DIGHA-SONEPUR RAIL CUM-ROAD BRIDGE OF NH 139W IN THE STATE OF BIHAR
|
52 | CONSTRUCTION OF A NEW 4 LANE BRIDGE PARALLEL TO EXISTING MG SETU WITH ITS APPROACHES FROM KM 0.00 TO KM 14.500 ACROSS RIVER GANGA ON NH 19 AT PATNA IN THE STATE OF BIHAR
|
53 | CONSTRUCTION OF A NEW 4 LANE MAJOR BRIDGE ACROSS RIVER KOSI AT PHULAUT INCLUDING RHABILITATION AND UPGRADATION OF EXISTING BIRPUR-BIHPUR SECTION OF NH-106 FROM KM 106 TO 136 TO 2- LANE PAVED SHOULDER
|
54 | CONSTRUCTION OF AMETHI BYPASS (PART-II) AT KM.30.050 OF NH-931 UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
|
55 | CONSTRUCTION OF BALRAMPUR BYPASS WITH 2L FLEXIBLE PAVEMENT CONFIGURATION FROM KM.223.000 OF NH-330 TO KM.328.300 OF NH-730 UNDER EPC MODE
|
56 | CONSTRUCTION OF BASTI RING ROAD (PHASE-I) WITH 4L CONFIGURATION FOR BASTI CITY IN THE STATE OF UTTAR PRADESH ON HAM MODE
|
57 | CONSTRUCTION OF BHABHUA BYPASS FROM CH. 10+800(DESIGN CH. 10+800) TO CH. 19+860 (DESIGN CH. 18+150) AND CHAND BYPASS FROM CH. 38+060 (DESIGN CH. 36+250) TO CH. 40+460 (DESIGN CH. 38+650) AND WIDENING
|
58 | CONSTRUCTION OF BYPASS FOR PROVIDING INTER CONNECTIVITY AMONG (NHS) AROUND THE PRATAPGARH CITY (PRATAPGARH BYPASS) ON EPC MODE
|
59 | CONSTRUCTION OF BYPASS ON NH-59 FROM KM 336/350 TO 349/910 (13.56 KM) NEAR BERHAMPUR TOWN INCLUDING 4-LANE ROB IN THE STATE OF ODISHA.
|
60 | CONSTRUCTION OF BYPASS ROAD TO BALANGIR TOWN FROM KM 72/400 (DESING KM 0/0) TO KM 79/800 (DESIGN KM 11/670) OF NH-26 IN THE STATE OF ODISHA.
|
61 | CONSTRUCTION OF BYPASS TO GUDIYATHAM TOWN IN KM 23/100 – 29/250 INCLUDING LA AND SHIFTING OF NH-234 (MANGALORE -VILLUPURAM ROAD) (NEW NH-75)
|
62 | CONSTRUCTION OF BYPASS TO KHORDHA TOWN FROM KM 294/000 TO 300/300 ON NH-57 INCLUDING LA IN THE STATE OF ODISHA ON EPC MODE.
|
63 | CONSTRUCTION OF BYPASS TO MADURAI - ACHAMBATHU - VIRATIPATHU IN KM 6/850 - 10/382 OF NH 49 EXTN. (NEW NH 85) INCLUDING LA & SHIFTING OF UTILITIES
|
64 | CONSTRUCTION OF BYPASS TO NAYAGARH TOWN FROM KM 235.469 TO 252.482 OF NH-57 INCLUDING LAND ACQUISITION IN THE STATE OF ODISHA.
|
65 | CONSTRUCTION OF ELEVATED CORRIDOR FROM KM. 135.650 TO 136.300 ON 63, FROM KM. 249 TO KM. 250.050 ON OLD NH4 AND FROM KM. 192.910 TO KM. 193.350 ON NH218 FROM DECONGESTION OF TRAFFIC IN RANICHENNAMMA C
|
66 | CONSTRUCTION OF FOUR LANE HIGHWAY WITH PAVED SHOULDER FROM KM.74.700 TO KM.112.950 OF NH-731A (I/C YAMUNA BRIDGE) ON HAM IN THE STATE OF UTTAR PRADESH.
|
67 | CONSTRUCTION OF FOUR LANE PINJORE BYPASS FROM KM 0.00 TO 7.70 ON EPC MODE.
|
68 | CONSTRUCTION OF FOUR LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LEVEL CROSSING NO. RV-71 AT KM 435 ON NH-217 (NEW NH-353) AT KHARIAR INCLUDING LAND ACQUISITION UNDER NH(O) IN ANNUAL PLAN 2021-22
|
69 | CONSTRUCTION OF FOUR-LANE CONCRETE ROAD FROM POLICE HEADQUARTER GONDIA CITY TO RAWANWADI VILLAGE (BIRSI AIRPORT JUNCTION) FROM DESIGN KM 0.000 TO KM 15.781 (EXISTING KM 39/720 OF NH-753 TO EXISTING K
|
70 | CONSTRUCTION OF FOUR-LANE ELEVATED VIADUCT FROM KM.4+634 TO KM.6+345 ON NH-24A INCLUDING RETAINING WALL, SERVICE LANE, AT GRADE ROAD AND IMPROVEMENT OF JUNCTIONS, ON EPC MODE
|
71 | CONSTRUCTION OF JASRA BYPASS WITH FOUR LANE PAVED SHOULDER CONFIGURATION FROM KM. 379.670 ON NH-76 (NEW NH-35) TO KM. 18.000 ON NH-27 (NEW NH-30) ON EPC MODE
|
72 | CONSTRUCTION OF KAITHI-PADARIA KALA BYPASS, PATNA-TAMOLI BYPASS, JASO BYPASS , NAGOD BYPASS (TOTAL LENGTH 15.44 KM) TO 2-LANE WITH PAVED SHOULDERS FLEXIBLE PAVEMENT ON NH-943 IN THE STATE OF MADHYA PR
|
73 | CONSTRUCTION OF KUND BYPASS FROM EXISTING KM 33+130 TO KM 41+260 (EXISTING LENGTH: 8.130 KM); DESIGN CHAINAGE: KM 35+130 TO KM 47+700 (DESIGN LENGTH: 12.570 KM) FOR NH-109
|
74 | CONSTRUCTION OF MAJOR BRIDGE ACROSS MANJRA RIVER NEAR YESGI VILLAGE @ KM, 166/500 ON NH 63 TQ BILOLI DIST NANDED IN STATE OF MAHARASHTRA. ON EPC MODE
|
75 | CONSTRUCTION OF MAJOR BRIDGE ACROSS SHARAVATHI BACKWATERS AND APPROCHES BETWEEN AMBARGODU AND KALASAVALLI NEAR SIGANDHUR IN SAGAR TALUK ON NH 369E IN THE STATE OF KARNATAKA ON EPC MODE.(JOB NO. NH-369
|
76 | CONSTRUCTION OF MAJOR BRIDGE AT KM 180.865 ACROSS RIVER KRISHNA ON NH-167 HAGARI – JADERCELA SECTION IN THE STATE OF KARNATAKA [JOB NO. NH-167/KNT (13)/2016-17-009-S&R (B)]
|
77 | CONSTRUCTION OF MANGALDOI BYPASS (NH-15) STARTING AT CH 26+400 AND TERMINATING AT CH 41+505 UNDER RANGIA NH DIVISION ( L= 15.105 KM) IN THE STATE OF ASSAM. JOB NO. 15/AS/2021-22/234
|
78 | CONSTRUCTION OF MARIAHU BYPASS WITH FOUR LANE PAVED SHOULDER CONFIGURATION (KM.53.540 TO KM.59.200) OF NH-135A ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
79 | CONSTRUCTION OF MIHONA BYPASS, LAHAR BYPASS, DABOH BYPASS and BHANDER BYPASS (TOTAL LENGTH 20.60 KM) TO 2-LANE WITH PAVED SHOULDER FROM ON MIHONA-BHANDER-MP/UP BORDER SECTION OF NH 552E IN THE STATE O
|
80 | CONSTRUCTION OF MISSING LINKS (SINGLE LANE) IN LAKHPAT GADULI HAJIPIR ODMA KHAVDA DHOLAVIRA MAUVANA GADKABET SANTALPUR ROAD ALONG THE INDO PAKISTAN BOARDER IN THE STATE OF GUJARAT (NEWLY DECLARED NATI
|
81 | CONSTRUCTION OF NEW 4-LANE BRIDGE (PARALLEL TO EXISTING VIKRAMASHILA SETU)FROM KM 8+920 TO KM 13+375(INCLUDING APPROACH ROAD 35M NAUGACHHIA SIDE &53 M BHAGALPUR SIDE)ACROSS RIVER GANGA ON NEWLY DECLAR
|
82 | CONSTRUCTION OF NEW FOUR LANE BYPASS TO PARBHANI CITY (PARWA TO ASOLA) KM 463/265 TO KM 481/180 (DESIGN CH. 19+220 TO CH. 34+434) (LENGTH-15.214 KM) SECTION OF NH-61 ON EPC MODE IN THE STATE OF MAHARA
|
83 | CONSTRUCTION OF NEW ROAD AT THE MISSING LINK PORTION OF NH-81 ALONG THE APPROVED ALIGNMENT BETWEEN HARISHCHANDRAPUR EASTER APPROACH OF KALINDRI-BRIDGE, IN THE DISTRICT OF MALDA. (JOB NO. 081-WB-2015
|
84 | CONSTRUCTION OF PRATAPGARH BYPASS (EXTENSION) CONNECTING NH-31 TO NH-330
|
85 | CONSTRUCTION OF PROPOSED 4_LANE REVELGUNJ BYPASS NH-19 IN THE STATE OF BIHAR ON EPC MODE CONNECTING NH 19 TO 85 ORIGIN
|
86 | CONSTRUCTION OF RAEBARELI RING ROAD (PHASE-2) WITH FOUR LANE CONFIGURATION FOR RAEBARELI CITY IN THE STATE OF UTTAR PRADESH ON HYBRID ANNUITY MODEL (HAM) BASIS
|
87 | CONSTRUCTION OF REHABILITATION AND UPGRADING TO 2 LANES/2 LANE(FOR LOT-I-KM 40.00 TO KM 65.400 AND KM 76.300 TO KM 79.400) WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF SITAMARHI-JAYNAGAR-NA
|
88 | CONSTRUCTION OF RING ROAD FOR RAEBARELI CITY (PHASE -I) ON EASTERN SIDE OF NH 24B
|
89 | CONSTRUCTION OF ROAD FROM KM 0/0 TO 72/0 OF NH-26 SUCH AS 4 LANE FROM KM 0/0 TO 21/0 (BARGARH TO BARPALI) AND 2L+PS FROM KM 21/0 TO 72/0 (BARPALI TO BOLANGIR)
|
90 | CONSTRUCTION OF ROB AND ITS APPROACHES IN LIEU OF LEVEL CROSSING NO 10 B T AT KM 307 050 OF NH 60 BHIMGARH
|
91 | CONSTRUCTION OF ROB WITH APPROACHES IN LIEU OF L C NO 165 OF AHMEDABAD PALANPUR BETWEEN RAILWAY STATION KARJODA AND PALANPUR NH 58 IN THE STATE OF GUJARAT
|
92 | CONSTRUCTION OF SHOHRATGARH BYPASS ON NH-730 UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
|
93 | CONSTRUCTION OF SIX LANE ELEVATED CORRIDOR FROM KM. 508.000 TO KM. 513.150 INCLUDING APPROACHES ON NH-66
|
94 | CONSTRUCTION OF SIX LANE ELEVATED CORRIDOR FROM KM.7.950 (UPPAL) TO KM.14.200 OF NH-163 TO DE-CONGEST THE URBAN LIMITS OF HYDERABAD-BHOOPALAPATNAM SECTION ON EPC MODE IN THE STATE OF TELANGANA
|
95 | CONSTRUCTION OF SIX LANE FLYOVER AT KATRAJ JUNCTION AT KM, 3/880 OF NH 548-DD (VADGAON - KATRAJ - KONDHWA - MANTARWADI CHOWK - LONI KALBHOR - THEUR PHATA - LONIKAND ROAD) IN PUNE DIST; OF THE STATE OF
|
96 | CONSTRUCTION OF TIMMAPURAM TO GURJANAPALLE SECTION FROM KM 26.150 TO 41.161 OF NH-214(NH216)(KAKINADA BYPASS) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
|
97 | CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FOR FATEHPUR BYPASS, MANDAWA BYPASS AND JHUNJHUNU BYPASS OF NH-11 IN THE STATE OF RAJASTHAN.
|
98 | CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM.0.000 TO KM.55.610 (DESIGN KM. 0.000 TO KM. 54.048) OF NH-124D
|
99 | CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM KM.0 TO KM. 80 ON NH 548B (VIJAYAPURA-SANKESWAR SECTION) IN THE STATE OF KARNATAKA ON HYBRID ANNUITY MODE (HAM) BASIS CONTRACT
|
100 | CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER HIGHWAY FROM DESIGN CH.0.000 TO CH.49.2OO OF NH-731B ON EPC MODE
|
101 | CONSTRUCTION OR 4 LANE RANIGANJ BYPASS OF LENGTH 5 261 KM ON NH 60 NEW NH 14 FROM KM 273 00 OF NH TO KM 478 18 OF NH 2 NEW NH 16 IN PASCHIM BARDHAMAN WEST BENGAL IN EPC MODE REG JOB NO 014 WB
|
102 | DAHEGAON TO KUHI
|
103 | DAVUALAPALLY TO MALLAPALEM SECTION {DESIGN CH. KM 133+922 TO KM 154+216 (EXISTING CH. KM 133+922 TO KM 154+900)} OF NH-565
|
104 | DEVELOPMENT TO 4/6-LANNING OF NH-31 (NEW NH-10) WITH BOTH SIDE SERVICE ROADS FROM KM 569.258 TO KM 581.030 (END OF AH-02 PROJECT ON NH- 31 NEAR SHIVMANDIR TO SEVOKE ARMY CANTONMENT) IN DISTRICTS OF DA
|
105 | DEVELOPMENT/WIDENING OF TALEGAON – CHAKAN – SHIKRAPUR – NHAVARA SECTION OF NH 548DG (NHAVARA TO CHOUFULA SECTION) OF STATE HIGHWAY IN THE STATE OF MAHARASHTRA” ON EPC MODE (LENGTH 24.037 KM).
|
106 | DIGRAS DARWAH KARANJA
|
107 | DORNALA TO KUNTA JUNCTION FROM DESIGN CHAINAGE KM 244+000 TO 267+990 SECTION OF NH-765 (PACKAGE-2)
|
108 | DUMMY_THIND
|
109 | EPC- CORRIDOR APPROACH WORKS - NH (O): WIDENING EXISTING 2 LANE TO 2 LANE WITH PAVED SHOULDERS IN KM 67/2 TO 109/0 INCLUDING INTERMEDIATE LANES OF NH 363 (WARANGAL)
|
110 | ESTIMATE FOR IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER FROM RAMNAGAR TO ROSEDA FROM (KM 3.500 TO 43.000) OF NH 527 E ON EPC MODE IN STATE OF BIHAR. (JOB NO. NH-527E/2021-22/BR/50)
|
111 | ESTIMATE FOR WIDENING TWO LANE TO FOUR LANE FROM FROM KM.129.00 TO 144.00 OF NH-63 ANKOLA-GOOTY SECTION PASSING THROUGH HUBBALLI CITY LIMITS (JOB NO:NH-63-KNT-2016-17-838)
|
112 | FOUR LANING OF GAYA-HISUA-RAJGIRI-NALANDA-BIHARSHARIF SECTION (KM0.00 TO 92.935) ON NH-82 IN BIHAR
|
113 | FOUR LANING OF OTTANCHATRAM TO PALANI SECTION FROM KM 30/700 TO KM 55/000 OF NH 209(NEW NH-83) INCLUDING FOOTPATH FOR PEDESTRIAN AND WAY SIDE AMENITIES EXCEPT FROM KM 37/870 TO 38/130,KM 39/2 TO KM 41
|
114 | GUDIWADA TOWN 2 LANE ROB AND ROAD IMPROVEMENT OF NH165 IN REPLACEMENT OF LC NO 3ESPL3 AT KM 231.700 OF NH165 AND CONSTRUCTION OF 2 LANE ROB IN REPLACEMENT OF LC NO. 52 ON AT KM 230.600 OF NH165
|
115 | IMPROVEMENT AND RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS FROM KM 489.845 (NEW KM.58.125) AND KM. 537.500 (NEW KM 105.780) OF CHIKKAMAGALURU TO BILIKRE SECTION OF NH-373 IN THE STATE OF KARNAT
|
116 | IMPROVEMENT AND UP-GRADATION OF NH-227B (84 KOSI PARIKRAMA MARG) PACKAGE –I, FROM KM 228.920 (JAGARNATHPUR) TO KM 235.960/0.000 (MAKHAUDADHAM) TO KM 29.000 (SARPUR) IN THE STATE OF UTTAR PRADESH ON EP
|
117 | IMPROVEMENT AND UP-GRADATION OF NH-227B (84 KOSI PARIKRAMA MARG) PACKAGE –III, FROM KM.47.800 (GOSAIGANJ) TO KM.73.300 (BIKAPUR) IN THE STATE OF UTTAR PRADESH ON EPC BASIS.
|
118 | IMPROVEMENT AND UP-GRADATION TO TWO LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM. 420.00 (SHOHRATHGARH) TO KM. 454.00 (USKA BAZAR) OF NH-730 IN THE STATE OF UTTAR PRADESH (EPC) BASIS
|
119 | IMPROVEMENT AND UP-GRADATION TO TWO LANE WITH PAVED SHOULDER/FOUR LANE CONFIGURATION FROM EXISTING KM 130.000 TO KM 191.000 (DESIGN KM 131.500 TO KM 188.735, DESIGN LENGTH 57.235 KM) OF NH-227A (NEAR
|
120 | IMPROVEMENT AND UPGRADATION TO TWO LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM 55.00 TO KM 90.00 (DESIGN LENGTH 34.76) OF NH-227A (NEAR CHHAPIA VILLAGE TO NEAR SIKRIGANJ) IN THE STATE OF U
|
121 | IMPROVEMENT AND UPGRADATION TO TWO LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM 90.00 TO 130.00 (DESIGN LENGTH 39.15) OF NH-227A ( NEAR SIKRIGANJ TO BARHALGANJ) IN THE STATE OF UP ON EPC MO
|
122 | IMPROVEMENT AND WIDENING TWO LANNIG WITH PAVED SHOULDER OF NATIONAL HIGHWAY 127B FROM KM 31.500 (GOERAGRE) TO KM 63.224 PACKAGE-II IN STATE OF MEGHALAYA
|
123 | IMPROVEMENT OF 2 LANE WITH PAVED SHOULDER OF STRETCH FROM BIKRAMGANJ DAWATH MELAYABAGH NAWANAGR -DUMROW OF NH-120(CH-201.665 TO KM 240.200) EXCLUDING DAWATH BYPASS UNDER EPC MODE IN THE STATE OF BIHAR
|
124 | IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER FROM JUNCTION OF NH-22 NEAR HAJIPUR TO JUNCTION OF NH-122 AT BACHHWARA VIA MAHNAR AND MOHIUDDIN NAGAR FROM KM 0.00 TO 29+730 OF NH 122B IN THE STATE OF BIHA
|
125 | IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF BH/WBBORDER-AMDABAD-MANIHARI SECTION FROM DESIGN KM 0+000 TO KM23+945 OF NH-131 A (TOTAL LENGTH-23.945 KM) ON EPC MODE INTHE STATE OF BIHAR. (JOB NO. NH
|
126 | IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF NH 122B FROM KM 29.730 TO KM 72.348 IN STATE OF BIHAR UNDER EPC MODE
|
127 | IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF NH-319A FROM KM 0 TO KM 45 IN STATE OF BIHAR UNDER EPC MODE
|
128 | IMPROVEMENTS AND RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS FROM KM 243.20 TO KM 290.20 OF NH-234 IN THE STATE OF KARNATAKA THROUGH EPC MODE ( JOB NO NH234/KNT/2016-17/815)
|
129 | INDAPUR TO VADPALE
|
130 | JALANDHAR-HOSHIARPUR SECTION OF NH-70 [NEW NH NO. 3] FROM EXISTING KM 11.400 TO KM 49.200
|
131 | KANTE TO WAKED
|
132 | KARAD PATAN CHIPLUN GUHAGAR
|
133 | KARWANDI TO RAJURI
|
134 | KOLDE TO KHETIYA
|
135 | KOPARGAON TO SAVALI VIHIR SECTION
|
136 | KURNOOL/KADAPA BORDER-JAMMALAMADUGU SECTION OF NH-167K I.E. DESIGN CH. KM 248+010 TO KM 269+900
|
137 | KURUDWADI TO PANDHARPUR
|
138 | MALE VILLAGE TO PUNE RAIGARH DISTRICT BORDER
|
139 | MHASWAD TO TEMBHURNI
|
140 | NANDED TO JALKOT
|
141 | NASRATPUR TO BARASGAON
|
142 | NH 167 B KADAPA NELLORE BORDER TO CSPURAM I.E. FROM KM 58.635 TO KM 99.409
|
143 | NH-30-BHADRACHALAM TO KONTA SECTION 2LPS
|
144 | NH165 FROM KM 0.000 TO KM 64.020 PAMARRU TO AKIVEEDU SECTION TO TWO LANE WITH PAVED SHOULDERS
|
145 | NH167AD FROM MACHERLA TO DACHEPALLI FROM KM.0.000 TO 43.659 TO 2LPS
|
146 | NH440 RAYACHOTY TOVEMPALLI 2LPS
|
147 | ONSTRUCTION OF 4-LANE FLYOVER AT AMBERPET-X ROAD, HYDERABAD ON NH-202 IN THE STATE OF TELANGANA
|
148 | PADERU BYPASS (KM 0+000 TO KM 13+000) OF 2- LANE WITH PAVED SHOULDER ON NH-516E
|
149 | PAITHAN TO SHIRUR
|
150 | PALPHATA TO PHULAMBARI
|
151 | PANCHARAL TO MANDANGHAR
|
152 | PANDHARPUR TO SANGOLA
|
153 | PANGAON TO DHARMAPURI AND PARALI TO INJEGAON 2L+PS
|
154 | PARLI PIMPLA DAHIGUDA
|
155 | PEN TO KHOPOLI
|
156 | PROCUREMENT, AND CONSTRUCTION OF REHABILITATION AND UPGRADING TO 2 LANES/2 LANE(FOR LOT-III-KM 156.500 TO KM 219.945) WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF SITAMARHI-JAYNAGAR-NARAHIA
|
157 | PROJECTS- REHABILITATION AND UPGRADATION OF NH-731A FROM KM 0.00 TO KM.35.00
|
158 | PUNE RAIGARH DISTRICT BORDER TO MANGAON
|
159 | PUNE TO MALE VILLAGE
|
160 | R/U TO 2-LANE WITH PS OF BEWAR TO ALLAHGANJ SECTION OF NH-730C FROM KM.0.00 TO 52.770 UNDER GNHCP
|
161 | RALEGAON TO RAMTIRTH
|
162 | RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS FROM DS. CH. 442+180 (EX. KM 448.00) TO DS. CH.485+240 (EX. KM 494.000) OF HULIYAR TO KB CROSS SECTION AND FROM KM DS. CH. 532+100 (EX.KM 533.150) TO DS
|
163 | RECONSTRUCTION WITH GEOMETIC IMPROVEMENT OF EXISTING TWO LANE TO 2- LANE WITH PAVED SHOULDERS CONFIGURATION FROM EXISTING KM. 126.73 TO 135.075 KM.143.75 TO 163.00(PITHORAGARH-TANAKPUR PROJECT ROAD)
|
164 | RECONSTRUCTION WITH GEOMETIC IMPROVEMENT OF SINGLE LANE TO 2- LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM. 163.00 TO KM 194.800(DESIGN CHAINAGE 160.88 TO 192.320) OF NH-125 IN THE STATE OF
|
165 | RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM. 52.200 TO KM 92.880 OF NH-125 IN THE STATE OF UTTARAKHAND UN
|
166 | RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM KM. 268.00 TO 300.00 OF NH-58 IN THE STATE OF UTTARAKHAND UNDER EPC MODE
|
167 | RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM KM. 300 TO 338 OF NH-58
|
168 | RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM KM. 300 TO 338 OF NH-58 IN THE STATE OF UTTARAKHAND UNDER EPC MODE
|
169 | RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING SINGLE/INTERMEDIATE LANE TO 2 LANE WITH EARTHEN SHOULDER CONFIGURATION FROM EXISTING KM 16.545 TO KM 33.130 KM 41.260 TO KM 57.975 (DESIGN CH
|
170 | RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING SINGLE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM. 92.880 TO KM 121.550 (DESIGN CHAINAGE KM 91.550 TO KM 120.45
|
171 | RECONSTRUCTION WITH GEOMETRIC IMPROVMENT OF EXISTING INTERMEDIATE LANE TO 2 LANE WITH PAVED SHOULDER CONFIGURATION FROM KM. 1.95 TO 28.600N (EXCLUDING THE STRTC H FROM KM 13.800 TO KM 18.550 OF NH-94
|
172 | REHABILATION AND UPGRADATION TO TWO LANES WITH PAVED SHOULDER CONFIGURATION FROM WATUR TO CHARTHANA SECTION OF NH 752 I FROM KM 0.00 TO KM 27.00 (DESIGN CHAINAGES) ON EPC MODE IN THE STATE OF MAHARASH
|
173 | REHABILITATION / UPGRADATION TO 4 LANE WITH PAVED SHOULDER OF EXISTING SECTION IN SILLOD TOWN WITH DESIGN CH. (KM54+500 TO KM 60+679) [LENGTH=6.179 KM] SECTION OF NH 753F (AURANGABAD-JALGAON ROAD) ON
|
174 | REHABILITATION AND UP GRADATION FROM KM. 121/0 TO 154/0 OF NAKAREKAL – MALLAMPALLY SECTION OF NH-365 TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF TELANGANA
|
175 | REHABILITATION AND UP GRADATION OF 2 LANE/ 2 LANE WITH PAVED SHOULDER FROM EXISTING KM. 172.900 TO KM. 194.150 (DESIGN CHAINAGE KM. 49.300 TO KM. 70.300) ON DHARASU TO YAMUNOTRI ROAD OF NH- 134 (OLD N
|
176 | REHABILITATION AND UP GRADATION TO 2 LANE WITH PAVED SHOULDER OF NH-703A FROM MAKHU (DESIGN CH 0 000)
|
177 | REHABILITATION AND UP-GRADATION FOR TALERE A?? GAGANBAWDAA?? KOLHAPUR ROAD (NH-166G) STRETCHES START FROM DESIGN CH. 6.00 KM TO DESIGN CH. 11.00 KM AND DESIGN CH.19.300 KM (START OF KARUL GHAT) TO DES
|
178 | REHABILITATION AND UP-GRADATION FROM KM. 0.000 TO KM. 40.390 OF NH-730S (MAHARAJGANJ – NICHLOUL – THUTHIBARI) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
|
179 | REHABILITATION AND UP-GRADATION OF JINTUR- SHIRAD SHAHAPUR SECTION KM 258.300 TO KM 306.300 [DESIGN CHAINAGE KM 0/00 (JINTUR) TO KM 48/00 (SHIRAD SHAHPUR) (LENGTH - 48.00 KM)] OF NH-752 I TO TWO LANES
|
180 | REHABILITATION AND UP-GRADATION OF MUDKHED TO NANDED SECTION FROM KM. 372+000 TO KM 388+400 OF NH 161A I.E. NANDED-BHOKAR-HIMAYATNAGAR-KINWAT-MAHUR-ARANI ROAD (DESIGN CHAINAGE FROM KM 372+000 (MUDKHED
|
181 | REHABILITATION AND UP-GRADATION OF SABALKHED TO ASHTI SECTION FROM KM 37+900 TO KM 55+100 AND CHINCHPUR TO JAMKHED SECTION FROM KM 70+000 TO KM 72+922 OF NH-561 TO TWO LANE WITH PAVED SHOULDER/ FOUR L
|
182 | REHABILITATION AND UP-GRADATION OF VALIGONDA TO THORRUR SECTION TO TWO LANE WITH PAVED SHOULDERS FROM KM 39.180 TO KM 108.300 OF NH-930P IN THE STATE OF TELANGANA ON ENGINEERING, PROCUREMENT AND CONST
|
183 | REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION OF MAHUD SANGOLA ROAD NH 965 G 159+400 TO 161+900AND 162+400 TO 183+960 (DESIGN CHAINAGE FROM KM. 32/300 TO KM. 34/800 AND K
|
184 | REHABILITATION AND UP-GRADATION TO 4 LANE ROAD WITH PAVED SHOULDER CONFIGURATION OF SECTION FROM UNDEWADI KADE PATHAR (CH. 102+050)- DESHMUKH CHOWK (CH. 113+400) AND DHAWAN PATIL CHOWK (BARAMATI) (CH.
|
185 | REHABILITATION AND UP-GRADATION TO TWO LANE WITH PAVED SHOULDERS FROM KM 0/0 TO 72/6 OF NH-365 (NAKREKAL TO THANAMCHERLA SECTION) IN THE STATE OF TELANGANA
|
186 | REHABILITATION AND UPGRADATION FROM KM 51.600 TO KM 75.700 OF NH-321G (NUHKHAS TO ETAH SECTION) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
|
187 | REHABILITATION AND UPGRADATION OF 2 LANE WITH PAVED SHOULDER FROM EXISTING KM. 195.175 TO KM. 220.000 (DESIGN CHAINAGE KM71.300 TO KM. 95.947) EXCLUDING EXISTING CHAINAGE KM 200.300 TO KM 202.400 (DES
|
188 | REHABILITATION AND UPGRADATION OF BHOKARDAN TO KUMBHARI FATA DESIGN CH. (KM 13+500 TO 17+00) AND RAJUR TO JALNA DESIGN CH. (KM 39+850 TO 62+420) SECTION OF NH-753H TO 2LANE/4LANE CONFIGURATION ON EPC
|
189 | REHABILITATION AND UPGRADATION OF END OF AHMEDNAGAR BYPASS TO KHARWANDI KASAR SECTION OF NH-222 FROM KM 232.0 TO 284.00 IN THE STATE OF MAHARASHTRA UNDER NHDP-IV
|
190 | REHABILITATION AND UPGRADATION OF EXISTING NH-167 FROM KM 14.900 TO KM 70.00 (DESIGN CH.14.900 TO 69.700) CHINTAKUNTA TO ADONI SECTION TO TWO LANE WITH PAVED SHOULDERS EPC MODE
|
191 | REHABILITATION AND UPGRADATION OF JAMKHED TO SAUTADA SECTION OF NH548 D (FROM KM 195.375 TO KM 208.774, LENGTH – 13.399 KM) TO 2L +PS /4L CONFIGURATION WITH RIGID PAVEMENT IN THE STATE OF MAHARASHTRA
|
192 | REHABILITATION AND UPGRADATION OF KARNATATKA/AP BORDER-GOOTY SECTION FROM KM 368.920 TO KM 424.225 OF NH-63(NEW NH-67) TO FOUR LANE WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS
|
193 | REHABILITATION AND UPGRADATION OF KURWAI–MUNGAOLI–CHANDERI ROAD SECTION OF NH-346, FROM DESIGN CHAINGE 0.000 TO 81.300 KM
|
194 | REHABILITATION AND UPGRADATION OF LB-NAGAR TO MALKAPUR SECTION TO 6-LANE MAIN CARRIAGEWAY WITH SERVICE ROADS, DRAINS CUM FOOTPATH, INCLUDING VUPS AND WIDENING OF MINOR BRIDGE & ROAD SAFETY PROVISIONS
|
195 | REHABILITATION AND UPGRADATION OF NEW NH-544DD FROM DESIGN CHAINAGE KM 56.00 TO 102.20 OF KALYANDURG-MOLAKALMURU SECTION TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
|
196 | REHABILITATION AND UPGRADATION OF NH -565 FROM KM 1.00 TO 86.057 (NAKREKAL TO NAGARJUNSAGAR DAM SECTION) TO TWO-LANES WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS.(HYDERABAD)
|
197 | REHABILITATION AND UPGRADATION OF NH 216 FROM KM 3.800 TO 90.460 RAIGARH TO SARAIPALLI SECTION
|
198 | REHABILITATION AND UPGRADATION OF NH 43 KANKER TO BEDMA SECTION KM. 130 TO 180
|
199 | REHABILITATION AND UPGRADATION OF NH 78 FROM KM 373.505 TO 469.300 AMBIKAPUR TO PATHALGAON SECTION
|
200 | REHABILITATION AND UPGRADATION OF NH 78 FROM KM 469.000 TO 531.000 PATTHALGAON TO KUNKURI
|
201 | REHABILITATION AND UPGRADATION OF NH-167 FROM DESIGN KM.113.900 TO 154.479 (MALLEPALLY - HALIYA SECTION) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF TELANGANA
|
202 | REHABILITATION AND UPGRADATION OF NH-167 FROM DESIGN KM.187.723 TO 234.434 (MIRYALAGUDA TO KODAD SECTION) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF TELANGANA
|
203 | REHABILITATION AND UPGRADATION OF NH-219 FROM KM 58-600 TO KM 140-750 IN THE STATE OF ANDHRA PRADESH UNDER CORRIDOR APPROACH ON EPC MODE
|
204 | REHABILITATION AND UPGRADATION OF NH-221 FROM KM 121/0 TO 165/00 (OF VIJAYAWADA-JAGDALPUR RUDRAMPUR TO SARAPAKA) (WARANGAL)
|
205 | REHABILITATION AND UPGRADATION OF NONGSTOIN TO WAHKAJI SECTION OF PROJECT ROAD KM 0.000 TO KM 43.060 TO INTERMEDIATE LANE WITH EARTHERN SHOULDER UNDER SARDP NE PHASE A IN THE STATE OF MEGHALAYA ON EP
|
206 | REHABILITATION AND UPGRADATION OF PARLI TO SIRSALA SECTION OF NH-361F (KM 136+700 TO 115+000) (LENGTH=21.70 KM) TO TWO LANES WITH PAVED SHOULDER /FOUR LANE CONFIGURATIONS ON EPC MODE IN THE STATE OF M
|
207 | REHABILITATION AND UPGRADATION OF SATANA TO MANGRUL (CHANDWAD) SECTION OF NH752 G DESIGN CH: KM 64.000 TO CH: KM 101.140 TWO LANE WITH PAVED SHOULDER/FOUR LANE CONFIGURATION IN THE STATE OF MAHARASHTR
|
208 | REHABILITATION AND UPGRADATION OF SHIRAPUR JUNCTION TO SHIVAJI CHOWK (DESIGN CHAINAGE KM. 130+00 TO KM.144+500) SECTION OF NH-561 AND BARSHI NAKA TO JARUD PHATA (DESIGN CHAINAGE KM. 49+500 TO 59+500)
|
209 | REHABILITATION AND UPGRADATION TO 2 LANE WITH PS OF RADHAITA TO PILIBHIT SECTION OF 46.130 KM
|
210 | REHABILITATION AND UPGRADATION TO 2 LANE WITH PS OF MIRANPUR KATRA TO RADHAITA SECTION OF NH-730C FROM KM
|
211 | REHABILITATION AND UPGRADATION TO 2-LANE CONFIGURATION OF ASHYARI-SHRI KYARI SECTION (KM 50.000 TO KM 75.000) OF NH-707 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
|
212 | REHABILITATION AND UPGRADATION TO 2-LANE CONFIGURATION OF HAMIRPUR-KARNOHAL SECTION (KM 141.000 TO KM 181.000) OF NH-70 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
|
213 | REHABILITATION AND UPGRADATION TO 2-LANE CONFIGURATION OF HEWNA-ASHYARI SECTION (KM 25.000 TO KM 50.000) OF NH-707 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHC
|
214 | REHABILITATION AND UPGRADATION TO 2-LANE CONFIGURATION OF KALWAHAN-MANDI SECTION (KM 208.950 TO KM 250.592) OF NH-70 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT WIT
|
215 | REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION OF JIRAPUR-SUSNER-MP-RJ BORDER ROAD (FROM KM 0+000 TO KM 40+400, EXCLUDING 1.1KM LENGTH FROM KM 26.400 TO KM 27.500) AND INCL
|
216 | REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS CONFIGURATION OF PADERU-GONDIGUDA SECTION (KM 2.400 TO KM 27.480) OF NH-516E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
|
217 | REHABILITATION AND UPGRADATION TO 2-LANE/2-LANE WITH PAVED SHOULDERS/4-LANE CONFIGURATION OF PAONTA SAHIB-HEWNA SECTION (KM 000.000 TO KM 25.000) OF NH-707 IN THE STATE OF HIMACHAL PRADESH UNDER GN
|
218 | REHABILITATION AND UPGRADATION TO FOUR LANE ROAD FROM KM 70.500 TO KM 78.600 OF NH-92 UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
|
219 | REHABILITATION AND UPGRADATION TO INTERMEDIATE LANE CONFIGURATION OF SHRI KYARI-GUMMA SECTION (KM 75.000 TO KM 94.900) OF NH-707 IN THE STATE OF HIMACHAL PRADESH UNDER GNHCP WITH THE LOAN ASSISTANCE
|
220 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS (KM 40 TO KM 219.945) OF NH-104
|
221 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF BIRPUR - BIHPUR SECTION ( KM 0 TO KM 106) OF NH-106 IN THE STATE OF BIHAR
|
222 | REHABILITATION and UP-GRADATION TO 2L+PS FROM KM. 0.0 TO KM. 7.80 AND KM. 35.400 TO KM. 52.345 (DESIGN LENGTH 24.745 KM. EXCEPT BIHAR PORTION) OF NH-727B (TAMKUHIRAJ TO BIHAR BORDER and BIHAR BORDER TO M
|
223 | REHABILITATION, UPGRADATION AND WIDENING OF EXISTING HIGHWAY TO RIGID PAVEMENT 2 LANE WITH PAVED SHOULDER OF NH 965DD FROM LONAND A??SHIRVAL-BHOR A??MANDANGAD-PCHRAL SECTION SHINDEWADIPHATA TO VARANDAH
|
224 | REHABILITATION/ UPGRADATION OF EXISTING HIGHWAY TO FOUR LANE STANDARDS IN KURKHEDA TOWN FROM (KM.413+257 TO KM 410+775), TWO LANE IN SHANKARPUR €“GURNULI (KM 424+00 TO KM 431+00) SECTION AND RECONSTR
|
225 | REHABILITATION/UP GRADATION OF KARANJA “ KHERDA - MURTIZAPUR SECTION TO 4LANE+PAVED SHOULDER STANDARDS FROM DESIGN KM 74+351 TO KM 102+331 (EXCLUDING OVERLAPPING PORTION WITH SAMARUDDHI MAHAMARG FROM
|
226 | REHABILITATION/UPGRADATION OF EXISTING HIGHWAY TO 2L+PS/4 LANE OF DHAWALI TO RAJOLI FROM DESIGN KM.149+476 TO 163+476 (EXISTING KM.150+000 TO 164+000), PANDHASALA TO MOHADONGRI FROM DESIGN KM.170+476
|
227 | REPANPALLI TO SIRONCHA
|
228 | Rehabilitation and up gradation to 2 lane with paved shoulder configuration from existing km. 122.00 to km 147.230 NH-94
|
229 | SARSAM TO KOTHARI
|
230 | SATARA TO MHASWAD
|
231 | SHIRUR TO KHARDA
|
232 | SILLOD TO FARDAPUR
|
233 | SOMAYAJULAPALLI – DHONE SECTION OF NH – 340B FROM KM.0/0 TO 56/200 [DESIGN CH. KM 0/00 TO KM 53/33]
|
234 | STRENGTHENING AND WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM.106.00 TO 153.00 OF NH-218 BIJAPUR HUBLI SECTION IN THE STATE OF KARNATAKA
|
235 | STRENGTHENING OF 2L+PS FROM KM 17/8 – 18/2, CONSTRUCTION OF 2L+PS FROM KM 18/2 TO KM 20/0 AND CONSTRUCTION OF 4L+PS FROM KM 20/0 TO KM 35/6 OF SALEM- THIRUPATHUR – VANIYAMBADI ROAD (NH 179A)
|
236 | STRENGTHING AND WIDINING OF EXISTING CARRIAGEWAY TO 10 M IN KM, 156/160 TO 229/160 (TEMBHURNI - KUSLAMB) SECTION OF NH 548 C I.E. TEMBHURNI KURDUWADI BARSHI KUSLAMB ROAD IN THE STATE OF MAHARASHTRA.
|
237 | Sagwara Bypass and Garhi- Partapur Bypass of NH-927A in the State of Rajasthan.
|
238 | TADIPATRI BYPASS (KM 0+000 TO KM 6+285) OF 4-LANE ON NH-67 IN ANANTAPURAMU
|
239 | UMARIYA TO SHAHDOL SECTION OF NH-78 IN MADYA PRADESH KM 68/4 TO 142/200
|
240 | UP GRADATION OF NH 130C ABHANPUR TO PAUND FROM NK KM 0.000 TO KM. 40.380 TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF CHHATTISGARH ON EPC
|
241 | UP GRADATION OF NH 930 SHERPAR TO KOHKA FROM KM 67.880 TO KM 114.860 TO TWO LANE WITH PAVED SHOULDER IN THE STATE OF CHHATTISGARH CONFIGURATION UNDER ENGINEER PROCUREMENT CONSTRUCTION EPC MODE.
|
242 | UP-GRADATION OF TIRORA-GONDIA, STATE HIGHWAY FROM EXISTING KM 163+213 (ON SH-335, TIRORA) TO KM 191+456 ( ON SH-335, GONDIA JN) [DESIGN KM.87.000 TO KM. 115.200] (CONSTRUCTION LENGTH=28.200 KM) NH 753
|
243 | UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FROM CHARBHUJA AT DESIGN KM 0.00 (EXISTING KM 150.00) TO NEECHLI ODEN (NATHDWARA) AT DESIGN CH. KM 88.800 (EXISTING KM 55.950) OF NH-162E ON EPC MODE.
|
244 | UP-GRADATION TO 4 LANE CONFIGURATION FOR THE WORK OF PETH NAKA TO SANGLI ROAD, NH-166H, FROM KM 0+000 TO KM 41+250 (DESIGN LENGTH = 41.25 KM) IN THE STATE OF MAHARASHTRA ON EPC MODE.
|
245 | UP-GRADATION TO 4 LANING OF DAULTABAD T-POINT TO MALIWADA [FROM DESIGN KM.0.000 TO KM 4.000] AND UPGRADATION TO 2 LANE WITH PAVED SHOULDERS CONFIGURATION OF DEVGAON RANGARI TO SHIVOOR [FROM DESIGN KM
|
246 | UP-GRADATION TO FOUR LANE/ TWO LANE WITH PAVED SHOULDERS CONFIGURATION OF KALYAN - MURBAD - MALSHEJ GHAT - NIRMAL ROAD NH- 61 KM 15/200 TO KM 38/00 AND FROM KM. 58/00 TO KM 84/00 (DESIGN LENGTH = 48.5
|
247 | UP-GRADATION TO TWO LANE WITH PAVED SHOULDER CONFIGURATION OF NH-354 SECTION ARIFKES-FEROZEPUR-MUKTSAR-MALAUT FROM KM 201.500 TO KM 212.500 & KM 229.690 TO KM 269.960 AND STRENGTHENING OF EXISTING PAV
|
248 | UPGRADATIOBN AND REHABILITATION OF SECTION OF NH 361 F FROM PARLI (00/000) TO GANGAKHED (30/400) TO TWO LANES WITH PAVED SHOULDER / FOUR LANE CONFIGURATIONS ON EPC MODE IN THE STATE OF MAHARASHTRA.
|
249 | UPGRADATION AND STRENGTHENING TO 2 LANE PS FROM KM 95/500 TO KM 129/775 OF NH 168 G IDAR BHILODA SAMLAJI IN THE STATE OF GUJARAT
|
250 | UPGRADATION AND WIDENING OF BILASPUR TO MUNGELI SECTION NH-130A
|
251 | UPGRADATION OF ADHALGAON-JAMKHED SECTION OF NH-548 D FROM KM 132/600 TO KM 195/375 TO TWO LANE WITH PAVED SHOULDER/FOUR LANE STANDARDS ON EPC MODE IN THE STATE OF MAHARASHTRA.
|
252 | UPGRADATION OF DHORAJI JAMKANDORNA KALAVAD SECTION OF NH 927D FROM DESIGN CHAINAGE KM 00 TO KM 58.115 TO TWO LANE WITH PS CONFIGURATION IN THE STATE OF GUJARAT ON EPC
|
253 | UPGRADATION OF DINDORI-SAGARTOLA-KABICHABUTRA (MP-CG BORDER) SECTION OF NH -45 FROM KM 0+00(DESIGN) TO KM 77.00 (DESIGN) TO TWO LANE WITH PAVED SHOULDER CONFIGRATION ALONG WITH ONE TIME IMPROVEMENT IN
|
254 | UPGRADATION OF EXHISTING 2 LANE FLEXIBLE PAVEMENT TO 2 LANE PAVED SHOULDERS RIGID PAVEMENT FROM DESIGN CHAINAGE KM 66.00 TO DESIGN KM 82.440 (START OF KOLHAPUR MUNICIPAL CORPORATION NEAR PHULEWADI TO
|
255 | UPGRADATION OF NASRULLAGANI-REHTI-BUDHNI SCCTION TO 2-LANE WITH PAVED SHOULDER FROM KM 0+150 TO KM 50+500 OF NH-146B IN THE STATE OF MADHYA PRADESH ON EPC MODE.
|
256 | UPGRADATION OF NH 130A MUNGELI TO PONDI FROM NH KM. 51.600 TO KM. 77.870 KM. 80.970 TO 96.970 TO 2 LANE WITH PAVED SHOULDERS IN THE STATE OF CHHATTISGARH ON EPC MODE
|
257 | UPGRADATION OF NH-81 WITH A MINIMUM OF 2-LANE WITH PAVED SHOULDER CONFIGURATION STARTING FROM KM 19.205 TO KM 46.550 IN THE DISTRICT OF MALDA INCLUDING COST OF LAND ACQUISITION, ON EPC MODE IN THE STA
|
258 | UPGRADATION OF TWO LANE PAVED SHOULDER FROM SHAHPURA TO THANAGAZI OF NH-248A ON EPC MODE IN THE STATE OF RAJASTHAN.
|
259 | UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM NEECHLI ODEN (NATHDWARA) AT DESIGN KM 88.800 TO BHATEWAR AT DESIGN KM 142.028 OF NH 162E IN THE STATE OF RAJASTHAN ON EPC MODE
|
260 | UPGRADATION TO 2 LANE WITH PAVED SHOULDER OF HANUMANGARH TO KENCHIYAN OF NH 54 ON EPC MODE IN THE STATE OF RAJASTHAN
|
261 | UPGRADATION TO TWO LANE PAVED SHOULDER OF KOTHUN-LALSOT-KAROLI-DHOLPUR ROAD NH-23 (OLD NH-11B) IN THE STATE OF RAJASTHAN.
|
262 | UPGRADATION TO TWO LANE WITH PAVED SHULDER CONFIGUARATION FROM KM 00 TO 47 OF NH 351 MAHUVA TO BADHADA SECTION IN THE STATE OF GUJARAT
|
263 | UPGRADATION and WIDENING OF JHARKHEDA- BERASIA - DHOLKHEDI FROM DESIGN KM 0+000 TO KM 87+900 (DESIGN LENGTH 87.90KM) OF NH-346 (INCLUDING 3 NOS. BYPASSES OF 13.10 KM) IN THE STATE OF MADHYA PRADESH UN
|
264 | VITA TO NAGAJ
|
265 | VODAREVU-CHILAKALURIPET SECTION (DESIGN CHAINAGE 0+00 TO 47+000) OF NH-167A (PACKAGE-I)
|
266 | WADI TO ASOLA
|
267 | WIDEINING TO TWO/FOUR LANE WITH PAVED SHOULDERS FROM EXISTING KM 180.60 TO KM 223.00 OF NH-63 ON NIZAMABAD-JAGADALPUR ROAD IN THE STATE OF TELANGANA
|
268 | WIDEINING TO TWO/FOUR LANE WITH PAVED SHOULDERS FROM EXISTING KM 182.120 TO KM 227.600 OF NH-167 ON HAGGIRI-JADCHERLA ROAD IN THE STATE OF TELANGANA
|
269 | WIDENING FROM 2L+PS TO 4L/4L+PS AND IMPROVEMENTS THE SELECTED STRETHCES FROM KM 26/5 - 81/2 INCLUDING CD WORKS OF NH 81 (COIMBATORE – CHIDAMBARAM)(OLD NH-67) (NAGAPATTINAM-TRICHY-COIMBATORE-GUDALUR
|
270 | WIDENING 2 LANE TO 4-LANE FROM KM 92/320 TO KM 115/320 (VAV CHOKDI-SATLASANA TO TO VRUNDAVAN CHOKDI, KHERALU) ON NH-58 IN THE STATE OF GUJARAT.
|
271 | WIDENING AND IMPROVEMENT OF EXISTING CARRIAGE WAY TO 2 LANE WITH PAVED SHOULDERS FROM KM. 86/160 TO 131/730 OF JANGAON-DUDDEDA SECTION OF NH-365B IN THE STATE OF TELANGANA ON EPC MODE
|
272 | WIDENING AND PAVED SHOULDER OF TOHANA (IN HARYANA) PUNJAB/HARYANA BORDER TO MOONAK-JAKHAL-BUDHLADA-BHIKHI FROM KM 236.600 TO 287.710 OF NH-148B
|
273 | WIDENING AND STRENGTHENING FROM DESIGN KM. 67.280 TO KM. 88.622 OF NH-727A (SALEMPUR-MAIRWA ROAD) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
|
274 | WIDENING AND STRENGTHENING FROM KM 0.00 TO KM 15.089 OF NH-334A (PURKAJI-LAKSAR-HARIDWAR ROAD) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UP.
|
275 | WIDENING AND STRENGTHENING OF EXISTING 2 LANE WITH PAVED SHOULDER TO 4 LANE WITH PAVED SHOULDER FROM KM 150/0 TO 159/0 AND KM 165/4 TO 186/0 OF NH-163 (OLD NH-202) UNDER NH(O)-TSP FOR THE YEAR 2020
|
276 | WIDENING AND STRENGTHENING OF EXISTING 2-LANE TO 2-LANE WITH PAVED SHOULDERS FROM KM.159/0 TO 165/4 AND 186/0 TO 215/0 OF NH-163 ON EPC MODE IN THE STATE OF TELANGANA
|
277 | WIDENING AND STRENGTHENING OF EXISTING CARRIAGEWAY IN 2 LANE WITH PAVED SHOULDERS FROM KM.25/0 TO 59/2 (DESIGN CH. KM.25.467 TO 59.200) OF NH-353C ON EPC MODE IN THE STATE OF TELANGANA
|
278 | WIDENING AND STRENGTHENING OF EXISTING PAVEEMNT TO TWO LANE WITH PAVED SHOULDERS FROM KM 116.00 TO KM 176.355 OF NH-75E IN THE STATE OF JHARKHAND ON EPC MODE.
|
279 | WIDENING AND STRENGTHENING OF SECTION FROM BHARTHANA CHOWK TO KODARKOOT (KM. 0.00 TO KM. 40.00) OF NH-91A ON EPC MODE
|
280 | WIDENING AND STRENGTHENING TO 2/4 LANE WITH PAVED SHOULDERS OF MAHABUBNAGAR – CHINCHOLI SECTION FROM KM 0/0 TO KM 60/255 OF NH-167N IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE(PACK
|
281 | WIDENING AND STRENGTHENING TO 2L+PS INCLUDING LA OF KANDARPUR-BALIKUDA FROM KM 277/500 TO 318/970 OF NH-55 IN THE STATE OF ODISHA UNDER ANNUAL PLAN 2021-22.
|
282 | WIDENING AND STRENGTHENING TO 4 LANE / 2-LANE WITH PAVED SHOULDERS OF MAHABUBNAGAR-CHINCHOLI SECTION FROM KM 60/255 TO KM 102/834 OF NH-167N IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC
|
283 | WIDENING AND STRENGTHENING TO 4L+PS/2L+PS FROM KM 0.000 TO 35.800 (KUAKHIA - MANGALPUR SECTION) OF NH 20 IN THE STATE OF ODISHA ON ANNUAL PLAN 2021-22."
|
284 | WIDENING AND STRENGTHENING TO TWO LANE WITH PAVED SHOULDER/TWO LANE+ PAVED SHOULDER WITH SERVICE ROAD FROM KM 98+000 TO KM 176+310 OF NH-320G IN THE STATE OF JHARKHAND UNDER EPC MODE
|
285 | WIDENING AND STRENGTHENING/ RECONSTRUCTION OF EXISTING PAVEMENT TO FOUR ALNE WITH PAVED SHOULDERS FROM KM 266.348 TO KM 283.000 OF MAHABUBNAGAR-JADCHERLA SECTION OF NH-167 ON EPC MODE IN THE STATE OF
|
286 | WIDENING AND STRENGTHENING/RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDER/ TWO LANE WITH PAVED SHOULDERS WITH SERVICE ROAD FROM KM 0+000 TO KM 42+250 (EXCLUDING DESIGN CH. 03+220 TO 04+200 & 28+350 TO
|
287 | WIDENING AND STRENGTHENLNG TO 2L+PS FROM KM 0.000 TO 40.000 (DHAUGAON- PODAMARI SECTION) OF NH 326 IN THE STATE OF ODISHA UNDER ANNUAL PLAN 2021.22.
|
288 | WIDENING AND STRENTHENING FROM KM 70.15 TO KM 121.025 OF NH-80
|
289 | WIDENING AND UPGRADATION TO FOUR LANE CONFIGURATION FROM KM.34.900 (BHADOHI) TO KM.73.134 (JAUNPUR) OF NH-135A ON EPC MODE
|
290 | WIDENING OF EXISTING SINGLE LANE / INTERMEDIATE LANE ROAD TO 2 LANE FROM KM 101 TO KM 125 OF NH 61 IN THE STATE OF NAGALAND
|
291 | WIDENING OF EXISTING SINGLE LANE ROAD TO INTERMEDIATE LANE ROAD FROM MOKOKCHUNG TO CHARE VIA DIKHU IN THE STATE OF NAGALAND
|
292 | WIDENING OF EXISTING SINGLE LANE ROAD TO TWO LANE WITH PAVED SHOULDERS CONFIGURATION FROM KM. 235.000 TO KM. 268.000 OF NH-58 INCLUDING 600M MARINE DRIVE VIADUCT PORTION NEAR BYASI
|
293 | WIDENING OF PACHPADRA-BAGUNDI SECTION TO 4 LANE FROM KM 73/60 TO 95/70 OF NH-25 ON EPC MODE IN THE STATE OF RAJASTHAN.
|
294 | WIDENING TO 2 LANE WITH PAVED SHOULDERS AND GEOMETRIC IMPROVEMENT OF NH-114A FROM KM 141 TO KM 184 IN THE STATE OF JHARKHAND UNDER EPC MODE
|
295 | WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM DESIGN KM 103.200 (EXISTING KM 103.200) TO DESIGN KM 116.700 (EXISTING KM 118.470) ON AP/KNT BORDER TO SIRA SECTION OF NH 544E IN THE STATE OF KARNATAKAON
|
296 | WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM DESIGN KM 103.200 (EXISTING KM 103.200) TO DESIGN KM 116.700 (EXISTING KM 118.470) ON AP/KNT BORDER TO SIRA SECTION OF NH544E IN THE STATE OF KARNATAKA ON
|
297 | WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM KM 0 TO 54 OF NH-50 UNDER EPC MODE IN THE STATE OF KARNATAKA
|
298 | WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM KM 116.800 TO 149.070(DESIGN CHANGES) ON HOSADURGA HOLALKERE SECTION OF NH173 IN THE STATE OF KARNATAKA ON EPC MODE UNDER ANNUAL PLAN 2021-22 (JOB NO. NH1
|
299 | WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM KM 34.00 TO 70.900 OF NH-150 UNDER EPC MODE IN THE STATE OF KARNATAKA
|
300 | WIDENING TO 2 LANE WITH PAVED SHOULDERS OF SIDDIPET-ELKATHURTHY SECTION FROM KM 69/978 TO KM 133/619 OF NH-765DG IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE
|
301 | WIDENING TO 2 LANE WITH PAVED SHOULDERS OF MEDAK - SIDDIPET SECTION FROM KM 0/0 TO KM 69/978 OF NH-765DG IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE
|
302 | WIDENING TO 2 LANE, RE-ALIGNMENT AND GEOMETRIC IMPROVEMENT FROM KM 11/00 TO KM 114/618 OF NH-44A IN MIZORAM UNDER PHASE A OF SARDP-NE
|
303 | WIDENING TO 2 LANES WITH PAVED SHOULDERS FROM KM 24.400 TO 27.270, 40.500 TO 41.900, 84.300 TO 88.200, 105.250 TO 112.710, 161.550 TO 166.350, 174.120 TO 176.120 AND 186.550 TO 191.900 OF NH 766C IN T
|
304 | WIDENING TO 2 LANES WITH PAVED SHOULDERS FROM KM.87/000 TO 133/720 (NATTUKAL TO THANAU JN. IN PALAKKAD) OF NH-966 (OLD NH-213) ON EPC MODE BASIS UNDER NH(O) ANNUAL PLAN 2016-17 IN THE STATE OF KERALA
|
305 | WIDENING TO 2-LANE WIH PAVED SHOULDER FROM KM. 544.20 TO 594.00 (HOSAMANE CROSS TO PANDAVAPURA) SECTION OF NH 150A
|
306 | WIDENING TO 2-LANE WITH PAVED SHOULDER FROM KM 0.00 TO 44.00 (KURU-GHAGHRA SECTION) OF NH-143A INCLUDING RE-CONSTRUCTION OF CULVERTS AND BRIDGES.
|
307 | WIDENING TO 2-LANE WITH PAVED SHOULDERS FROM KM 119/017 TO KM 161/300 ON NH 85 (OLD NH 49)
|
308 | WIDENING TO 2L+PS FROM KM 71.00 TO 104.00 (EXISTING CHAINAGES) (SARJAPUR TO PATTADKALLU) ON BHANAPUR TO GADDANAKERI SECTION NH-367 IN THE STATE OF KARNATAKA
|
309 | WIDENING TO 2LPS FROM 0/0 TO 119/0 OF NH-157 IN THE STATE OF ODISHA.
|
310 | WIDENING TO 2LPS FROM 239/9 TO 294/3 OF NH-57 (NAYAGARH TO KHURDA) IN THE STATE OF ODISHA
|
311 | WIDENING TO 2LPS FROM 269/30 TO 328/20 OF NH-49 IN THE STATE OF ODISHA
|
312 | WIDENING TO 2LPS OF RAMPACHODAVARAM - KOYYURU SECTION OF NH516E FROM KM.43.700 TO KM 113.820
|
313 | WIDENING TO 4 LANE FROM KM 51.60 TO 76.20 (HEBRI TO PARKALA) AND FROM KM 85.20 TO 88.90 (KARAVALI JUNCTION TO MALPE) OF THIRTHAHALLI UDUPI-MALPE SECTION OF NH169A IN THE STATE OF KARNATAKA ON EPC MODE
|
314 | WIDENING TO 4 LANE FROM KM. 133.00 TO 158.04 (DESIGN CHAINAGE KM. 130.88 TO 155.145) (SHIRUR CROSS TO GADDANKERI) OF NH367 IN THE STATE OF KARNATAKA ON EPC MODE. (JOB NO. NH367 KNT 2021 22 930)
|
315 | WIDENING TO 4L FROM KM.108.50 TO 139.00 OF NH-135A PKG-II (JAUNPUR TO AKBARPUR SECTION) ON HAM IN THE STATE OF UTTAR PRADESH
|
316 | WIDENING TO 4L RIGID PAVEMENT CONFIGURATION FROM KM 90.00 TO KM 100.800 OF NH-96 (KM 42.O TO KM 53.300 AS PER NEW NH-330), UNDER EPC MODE
|
317 | WIDENING TO 4L/4L+PS AND STRENGTHENING IN SELECTED STRETCHES FROM KM 0/8 TO 50/570 OF NH 532 INCLUDING CENTRE MEDIAN IN SELECTED STRETCHES, CONSTRUCTION OF CD WORKS, WIDENING AND RECONSTRUCTION OF CD
|
318 | WIDENING TO EXISTING 2 LANE WITH PAVED SHOULDER TO 4 LANE WITH PAVED SHOULDER FROM DESIGN KM 153.00 TO 168.27 (MALA GATE TO KARKALA) OF NH 169 ON SHIMOGA - MANGALORE SECTION IN THE STATE OF KARNATAKA
|
319 | WIDENING TO EXISTING SINGLE LANE /INTERMEDIATE LANE TO 2 LANE FROM KM185.00 TO KM 220.00 OF NH-61 (NEW NH-02) IN THE STATE OF NAGALAND.
|
320 | WIDENING TO EXISTING SINGRE/INTERMEDIATE RANE TO 2 LANE FROM KM 135 TO KM 147 AND FROM KM 156.00 TO KM 168 OF NH-61 (NEW NH-2) IN THE STATE OF NAGALAND
|
321 | WIDENING TO FOUR LANE WITH PAVED SHOULDER FROM DESIGN KM.49.200 TO KM.89.285 OF NH-731B ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
322 | WIDENING TO INTERMEDIATE/TWO LANE TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHANAGES KM 112.750 TO 142.00 (LIINGASUR TO MUDABAL CROSS) & FROM KM. 147.070 TO KM. 149.070 (MASKI CITY LIMIT) OF JEWARGI
|
323 | WIDENING TO TWO LANE WITH PAVED SHOULDER FROM KM 194.900 TO KM 243.200 OF NH-234 BANAVARA-HULIYAR SECTION IN KARNATAKA STATE UNDER EPC MODE’’.(JOB NO. NH-234-KNT-2017-18-870)
|
324 | WIDENING TO TWO LANE WITH PAVED SHOULDER FROM KM 4.40 TO KM 56.00 OF NH-218 BIJAPURA-HUBLI SECTION UNDER EPC MODE IN THE STATE OF KARNATAKA (JOB NO.NH-218-KNT-2016-17-836)
|
325 | WIDENING TO TWO LANE WITH PAVED SHOULDER FROM KM 544.200 TO KM 594.000 OF NH-150A HOSMANE CROSS – PANDAVAPURASECTION ON EPC MODE IN THE STATE OF KARNATAKA(JOB NO.NH-150A-KNT-2016-17-835).
|
326 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM 24.600 TO 70.063 OF MUDIGERE TO KADUR SECTION OF NH-173” ON EPC MODE IN THE STATE OF KARNATAKA (JOB.NO.NH-173-KNT-2017-18-873)
|
327 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 0.00 (DESIGN CHAINAGE 0.00) TO KM 23.338 (DESIGN CHAINAGE 23+310) OF NH-166E (MH/KNT BORDER- KANAMADI- BIJJARGI- TIKOTA SECTION) IN THE STATE OF KARNA
|
328 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 0/000 TO KM 79/300 OF KALWAKURTHY - KOLLAPUR SECTION OF NH-167K IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE UNDER NH(O)
|
329 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 0/970 TO KM 40/410 OF JANAGAON-THIRUMALAGIRI OF NH-365B (ERSTWHILE SECTION OF SH-16) IN THE STATE OF TELANGANA
|
330 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 15.525 TO KM 62.880 OF JADCHERLA-KALWAKURTHY SECTION OF NH-167 (ERSTWHILE SH-18) IN THE STATE OF TELANGANA
|
331 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 20.150 TO KM 40.00 OF BC ROAD KOTTIGEHARA SECTION OF NH-234 ON EPC MODE IN THE STATE OF KARNATAKA (JOB.NO.NH-234-KNT-2017-18-875)
|
332 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 40.00 TO KM 75.00 (EXISTING CHAINAGES) OF MANGALORE - TUMKUR SECTION OF NH-73 IN THE STATE OF KARNATAKA ON EPC MODE UNDER ANNUAL PLAN 2021-22 (JOB NO
|
333 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 40/410 TO KM 84/037OF THIRUMALAGIRI TO SURYAPET SECTION OF NH-365B (ERSTWHILE SECTION OF SH-16) IN THE STATE OF TELANGANA
|
334 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 67.00 TO 114.425 OF KALWAKURTHY-MALLEPALLY SECTION OF NH-167 (ERSTWHILE SH-18) IN THE STATE OF TELANGANA
|
335 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM. 33.13 TO KM. 40.23 AND KM. 52.00 TO KM. 71.00 (EXISTING CHAINAGES) OF BHANAPUR GADDANKERI SECTION OF NH367
|
336 | WIDENING TO TWO LANE WITH PAVED SHOULDERS OF 'BODHAN BASAR BHAINSA ' SECTION FROM KM 38/900 TO 95/300 OF NH-161BB IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE UNDER NH ( O).
|
337 | WIDENING TWO LANE WITH PAVED SHOULDERS FROM FROM KM.56.00 TO 106.00 OF NH-218 (218-KNT-2014-15-775) EPC
|
338 | WIDENING and STRENTHENING FROM KM132.895 TO KM 190.15 NH-80
|
339 | WORK OF DEVELOPMENT AND CONSTRUCTION OF ELEVATED CORRIDORFROM KM 38/660 TO KM 42/690 (ISCON JUNCTION TO START POINT OF APPROACH OF SANAND FLYOVER) OF NH-147 IN THE SATE OF GUJARAT
|
340 | WORK OF WIDENING/UPGRADATION OF 2-LANE WITH PAVED SHOULDER OF SRI MUKTSAR SAHIB TO MALOUT ROAD FROM KM 279.400 TO KM 307.060 SECTION OF NH-354 IN THE STATE OF PUNJAB ON EPC MODE. (JOB NO. NH-354-PB-20
|