S.No. | PROJECT NAME | 1 | 2 LANE WITH PAVED SHOULDER CONFIGURATION FROM SEETHARAMAPURAM TO DUTTALURU SECTION OF NH-167 BG FROM KM. 0/000 TO KM. 36/400 (36.400 KM)
|
2 | 2 LANING FROM KANUBARI TO START OF BOGIBEEL BRIDGE APPROACHES OF NH-52B(EXTN) IN ASSAM
|
3 | 2 LANING OF BAMEETHA TO SATNA SECTION OF NH-75 FROM KM. 57+400 TO KM. 155+000 IN THE STATE OF MP
|
4 | 2L+PS FROM KM 148/170 TO 211 /100 (DEVAL- DUNGARPUR-HIRATA - VARDA-SAGWARA) SECTION OF NH-927A. PKG-IV
|
5 | 2L+PS OF THIKRI ANJAD SECTION OF NH-347B
|
6 | 4 LANING OF BATHALAPALLI TO MUDIGUBBA SECTION (DESIGN CHAINAGE KM. 96.300 TO 129.300) INCLUDING BATHALAPALLI BYPASS (DESIGN CH. KM. 96.300 TO 102.300) OF NH-42
|
7 | 4 LANING OF NH 415 FROM DESIGN CHAINAGE 29/500 TO 40/400 (ITANAGAR TO BANDARDEWA SECTION) IN THE STATE OF ARUNACHAL PRADESH UNDER ANNUAL PLAN 2016-17 ON EPC MODE PACKAGE-A
|
8 | 4-LANING OF LAMBRA-SHAHKOT SECTION OF NH-71 FROM KM 12.00 TO 44.600
|
9 | 4-LANING OF ITANAGAR TO BANDARDEWA SECTION OF NH-415 FROM KM 51+700 TO KM 59+199 (PACKAGE-C) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH [JOB NO. 415/AR. P/2020-21/030]
|
10 | 4-LANING OF MOGA -TALLEWAL SECTION OF NH-71 FROM KM 77.200 TO 114.00
|
11 | 4L+PS OF BEAWAR-ASIND SECTION (KM 30.00 TO KM 74.00) OF NH-158 (GNHCP) WORLD BANK. PKG-II
|
12 | 4L+PS OF NH -58 FROM BEAWAR-GOMTI (OLD CH KM 108.600 TO KM 144 KM 158.419 TO KM 173.300 PKG-II.
|
13 | 4L+PS OF RAS-BEAWAR SECTION (KM 0.00 TO KM 30.00) OF NH-158 (GNHCP) WORLD BANK. PKG-I.
|
14 | AHMADPUR TO PIMPLA
|
15 | AHMEDNAGAR TO BARAMATI
|
16 | AKKALKOT TO DHUDHNI
|
17 | AKOT TO ANJANGAON
|
18 | ALLAHABAD TO UP/MP BORDER SECTION OF NH-27 IN UTTAR PRADESH
|
19 | ALLAHGANJ TO MIRANPUR KATRA SECTION OF NH-730C FROM KM.52.770 TO 114.00
|
20 | ALWAR NUH SECTION ON EPC MODE IN THE STATE OF RAJASTHAN.
|
21 | ANJANGAON TO MAH/MP BORDER
|
22 | ARNI TO NAIGAINBANDI
|
23 | BAHRAICH BYPASS TO RUPAIDHA SECTION NH-28C IN UTTAR PRADESH KM 99 TO150
|
24 | BALANCE WORK 2-LANING OF LALPUL MANMAO CHANGLANG ROAD (NH-215) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH
|
25 | BALANCE WORK FOR "IMPROVEMENT OF EXISTING SINGLE INTERMEDIATE LANE ROAD OF NH-44 TO BE 2-LANE ROAD WITH PAVED SHOULDER FROM KM 230/200 TO KM 247/000, KM 261.504 TOTAL LENGTH 30.28KM OF NH-44 IN THE ST
|
26 | BALANCE WORK FOR REHABILITATION AND UPGRADATION OF SATNA-BELA SECTION OF NH-75 FROM KM. 155.0 TO KM. 202.040 TO FOUR LANE WITH PS ON ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) MODE
|
27 | BALANCE WORK OF 2-LANING OF LONGDING– TISSA- KHONSA ROAD (NH-215) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH [JOB NO. 215/AR. P/2019-20/028]
|
28 | BAMNI TO NAVAEGAON
|
29 | BARABANKI TO JUNCTION WITH MDR 13 NEAR JARWAL SECTION OF NH-28C IN UTTAR PRADESH KM 0 TO 43
|
30 | BARASGAON TO RAHATEE
|
31 | BHADGAON TO CHALISGAON
|
32 | BHOKAR TO SARSAM
|
33 | BODHWAD TO STATE BORDER
|
34 | CHALISGAON TO NANDGAON
|
35 | CHIKALI TO DHAD
|
36 | CHIKALI TO KHAMGAON
|
37 | CHIKLI TO TAKARKHED
|
38 | CHIMUR TO WARORA
|
39 | CITTORGARH-NEEMACH (4L) OF NH-79 AND NIMBAHARA PRATAPGARH (2L+PS) OF NH-113 UNDER PPP.
|
40 | CONST. OF CANACONA BYPASS FROM KM.68/00 (CH.00/00) TO KM. 85/740 (CH. 7/740 ON PANAJI - MANGALORE SECTION) OF NH-17 (NEW NH-66) IN THE STATE OF GOA ON EPC MODE.
|
41 | CONST. OF MISSING LINK BETWEEN KM. 11/680 TO KM. 14/020 AND WIDENING OF EXISTING TWO LANE ROAD
|
42 | CONSTN FOR FOUR LANING OF BABATPUR-VARANASI SECTION OF NH-56 (231) KM 263.00 TO 280.25 (EPC MODE)
|
43 | CONSTN. OF 4 LANING IN KM.69.00 TO 100.00 DESIGN RD 94.600 TO 125.920 PACKAGE IV (EPC)
|
44 | CONSTN. OF 4 LANING IN KM.99.00 TO 114.375 PACKAGE-V (EPC) INCLUDING BHIWANI BYPASS
|
45 | CONSTRUCTION OF 1 ROB CUM FLYOVER FROM KM 136.200 TO 137.800 AND 2 FLYOVERS
|
46 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 0.00 TO KM 44.35 (PACKAGE 1) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHWAYS
|
47 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 117.56 TO KM 163.59 (PACKAGE 4) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHW
|
48 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 206.66 TO KM 247.05 (PACKAGE 6) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHW
|
49 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 247.05 TO KM 284.92 (PACKAGE 7) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHW
|
50 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 284.92 TO KM 314.25 (PACKAGE 8) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHW
|
51 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 314.25 TO KM 351.383 (PACKAGE 9) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGH
|
52 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 44.35 TO KM 77.95 (PACKAGE 2) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHWAY
|
53 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 77.95 TO KM 117.56 (PACKAGE 3) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHWA
|
54 | CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER FROM KM. 168 TO 183.783 (YESEMYONG TO UNGER) ON MOKOKCHUNG TO TULI SECTION OF NH-61 UNDER EPC MODE IN THE STATE OF NAGALAND.
|
55 | CONSTRUCTION OF 2-LANE MELLI MANPUR NAMCHI ROAD IN SOUTH SIKKIM
|
56 | CONSTRUCTION OF 2-LANE NAYABAZAR - LEGSHIP ROAD IN WEST SIKKIM.
|
57 | CONSTRUCTION OF 2-LANE TARKU DAMTHANG NAMCHI ROAD IN SOUTH SIKKIM.
|
58 | CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF FLEXIBLE PAVEMENT FROM KM 42.80 TO KM 60.30 ON NH NO.150 DURING 2016-17 IN THE STATE OF MIZORAM ON EPC MODE UNDER NH(O). JOB NO. 150/MZ/2016-17/107)
|
59 | CONSTRUCTION OF 4 LANE ELEVATED VIADUCT AT KM. 7.500 MUNSHI PULIA OF NH-24A
|
60 | CONSTRUCTION OF 4 LANING BY CC PAVEMENT ON KOTA-DARAH OF NH-12 FROM 256/550 TO 289/550 UNDER EPC.
|
61 | CONSTRUCTION OF 4-LANE BYPASS TO VIJAYANAGARAM TOWN ON NH43 (NEW NH26) FROM 537/6 TO 552/0 (RAIPUR-VIJAYANAGARAM SECTION) TO 4-LANE ON EPC MODE
|
62 | CONSTRUCTION OF 6.80 KM 2 LANE WITH PAVED SHOULDERS ALAPPUZHA BYPASS ON NH47 NEW NH 66 FROM KM 408.100 TO 414.900 IN THE STATE OF KERALA ON EPC BASIS WITH 50:50 COST
|
63 | CONSTRUCTION OF A NEW 2-LANE HIGHWAY FROM KM 0.00 (ON NH-54 NEAR LAWNGTLAI)
|
64 | CONSTRUCTION OF A NEW 2-LANE HIGHWAY FROM KM 38/00 TO 71/00 IN MIZORAM TO SUPPORT KALADAN MULTI MODAL TRANSIT TRANSPORT PROJECT IN PHASE 'A' OF SARDP-NE ( PACKAGE MM-II)
|
65 | CONSTRUCTION OF A NEW 2-LANE HIGHWAY FROM KM 71/00 TO 99/83 IN MIZORAM TO SUPPORT KALADAN MULTI MODAL TRANSIT TRANSPORT PROJECT IN PHASE 'A' OF SARDP-NE ( PACKAGE MM-III)
|
66 | CONSTRUCTION OF BHAGALPUR BYPASS FROM KM 124/175 TO 140/200 OF NH-80 UNDER EPC MODE
|
67 | CONSTRUCTION OF BRIDGE INCLUDING APPROACHES ACROSS RIVER ZUARI ON NH-17 (NH-66) ON PANJIM-MANGALORE SECTION IN THE STATE OF GOA ON EPC MODE. (PACKAGE-II)
|
68 | CONSTRUCTION OF FLYOVER FROM KM 604/252 TO 607/060 (MARTHANDAM JUNCTION) AND FROM KM 630/116 TO 631/650 (PARVATHIPURAM JUNCTION) OF NH 47 IN THE STATE OF TAMIL NADU
|
69 | CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS INDRAVATI RIVER ON NH-63 (ERSTWHILE NH-16) AND CONSTRUCTION OF ROAD FROM KM 267.00 TO 287.80
|
70 | CONSTRUCTION OF HL BRIDGE ACROSS GADAVARI RIVER AND ITS APPROACHES FOR MISSING LINK BETWEEN SIRONCHA IN MH AND KALESHWARAM IN AP
|
71 | CONSTRUCTION OF MAJOR BRIDGE WITH APPROACHES ACROSS PRANHITA RIVER AT KM 57.300 ON NH-63(16)
|
72 | CONSTRUCTION OF MARGOA WESTERN BYPASS FOR NH-17 (NEW NH-66 ) FROM KM. 26 /200 ( CHAINAGE 00/00) TO KM. 38/100 (CHAINAGE 11/900) (P.M. SECTION) IN THE STATE OF GOA ON EPC MODE.
|
73 | CONSTRUCTION OF NAGAUR BYPASS FROM EXISTING KM 166/260 TO KM 180/500 OF NH-65 ON EPC MODE.
|
74 | CONSTRUCTION OF PAVED SHOULDERS IN KM.81/0 TO 203/0 INCLUDING RECONSTRUCTION AND WIDENING OF CULVERTS ON NH 234
|
75 | CONSTRUCTION OF PAVED SHOULDERS INCULDING STRENGTHENING OF EXISTING CARRIAGEWAY FROM KM 0-0-51-0 I-E FOUR LANING FROM KM 34-0 TO 39-0 IN NEYVELI TOWN LIMIT
|
76 | CONSTRUCTION OF ROAD FROM KM. 1 TO KM. 49/4 OF NH-26A IN THE STATE OF MADHYA PRADESH.
|
77 | CONSTRUCTION OF ROB AND ITS APPROACHES IN LIEU OF UNMANNED LEVEL CROSSING AT KM 303.9 ON NH-60 (PANDABESHWAR).
|
78 | CONSTRUCTION OF SIGNATURE BRIDGE BETWEEN DWARKA AND BEY DWARKA AND ITS APPROACHES IN THE STATE OF GUJARAT
|
79 | CONSTRUCTION OF SILCHAR BYPASS ON NH-53 IN ASSAM
|
80 | CONSTRUCTION OF TWINS 2-LANE ROB AND ITS APPROACHES IN REPLACEMENT OF EXISTING LEVEL CROSSING GATE NO. -KA-34 (RLY KM 160/25-160/27) BETWEEN MINDAPORE BANKURA STATIONS IN KUBAI AT KM 154.617 OF NH-6
|
81 | CONSTRUCTION OF TWO LANE FLEXIBLE PAVEMENT WITH PAVED SHOULDER FROM KM 3.650 TO KM 58.325 OF NH-709 EXTN. (RAJGARH-HARIYANA BORDER) IN THE STATE OF RAJASTHAN THROUGH EPC UNDER NH(O) DURING 2017-18.
|
82 | CONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS WITH FLEXIBLE PAVEMENT ON KHALGHAT TO SARWARDEWLA ROAD (NH-347C) DESIGN LENGTH- 79.59 KM (EXCLUDING KASRAWAD, SELANI, KHARGONE & BISTAN BYPASSES) IN T
|
83 | DASTAPUR TO KARANJA
|
84 | DEORI TO AMGAON
|
85 | DEULGAON SAKARSHA TO MEHKAR
|
86 | DEVELOPMENT AND OPERATION OF BIKANER- SURATGARH SECTION OF NH-15 BY 2L+PS IN THE STATE OF RAJASTHAN THROUGH PUBLIC PRIVATE PARTNERSHIP ON "DBFOT" BASIS.(DIV-BIKANER)
|
87 | DEVELOPMENT OF 4-LANING SECTION OF NH-31 FROM KM 551.36 (GHOSHPUKUR) TO KM 563.26 (BIHAR MORE, BAGDOGRA) IN DARJEELING DISTRICT, WEST BENGAL ON EPC MODE. (PROJECT LENGTH - 11.90 KM) UNDER ANNUAL PLAN
|
88 | DEVELOPMENT OF CHILODA GANDHINAGAR SARKHEJ OF NH 147 OLD NH 8C FROM KM 0/0 TO KM 44/042 IN THE STATE OF GUJARAT TO SIX LANE WITH PAVE SHOULDER WITH BOTH SIDE CONTINUOUS SEVICE ROAD
|
89 | DEVELOPMENT TO FOUR LANE WITH PAVED SHOULDERS OF SHAHKOT-MOGA SECTION OF NH-71 (NEW NH-52) FROM EXISTING KM.44.600 TO 77.200 INLUDING CONST.OF DHARAMKOT BYPASS IN THE STATE OF PUNJAB.
|
90 | DHAD BHOKARDAN TO BHOKARDHAN SILLOD
|
91 | DHANGIPIMPRI TO JALNA AND AMBAD CHOWK TO MANTH CHOWK
|
92 | ENGINEERING, PROCUREMENT, AND CONSTRUCTION OF REHABILITATION AND UPGRADING TO 2-LANES/2 -LANE WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING (KM 0 TO KM 69.6) OF NH-30A
|
93 | FARDAPUR TO JALGAON
|
94 | FORMATION OF BYPASS ROAD TO KADIRI TOWN FROM ON NH42
|
95 | FOUR LANING OF 5.122 KM OF NH9(NEW NH 65) FROM KM 269.900(DESIGN CH0.0) TO KM 275/622(DESIGN CH 5.122) I.E, CONNECTING NH9(1.40KM) WITH NH5(3.60KM) INCLUDING 6 LANE ELIVATED FLYOVER FROM BHAVANIPURAM
|
96 | FOUR LANING WIDENING AND STRENGTHENING OF NH-29E FROM KM 81.420 TO 99.00 SONAULI - GORAKHPUR ROAD (JANGAL KAUDIYA TO MOHADDIPUR SECTION).)
|
97 | FOUR LANNING OF NH-4A(NH-748) FROM KM 118 TO 125 INCL.FOUR LANE KHNDEAPAR BRIDGE
|
98 | GADCHIROLI TO MUL
|
99 | GOHARGANJ TO BHOPAL SECTION OF NH-12 IN MADHYA PRADESH KM 43 TO 93
|
100 | HELWAK TO KARAD
|
101 | HIMAYATNAGAR TO PHULSAWANGI
|
102 | IMPROVEMENT AND UP-GRADATION OF EXISITING CARRIAGEWAY TO TWO LANE WITH PAVED SHOULDER FROM KM 0.00 TO KM 55.00 OF NH-227A
|
103 | IMPROVEMENT FROM KM 0 TO KM 68.0 (KANAKTORA TO JHARSUGUDA SECTION) TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDERS INCLUDING BY PASS AT BELPAHAR AT KM 52 OF NH 200 (NEW NH 49 FROM KM 197.300 TO KM 265.300
|
104 | IMPROVEMENT OF CITY PORTION OF KOHIMA AND DIMAPUR CITY OF NH-39 IN THE STATE OF NAGALAND UNDER EPC MODE DURING 2016-17 ( PACKAGAE -I DIMAPUR CITY FROM KM 106.90 TO 124.20)
|
105 | INDAPAUR TO AGARDANDA
|
106 | INDO-NEPAL BORDER TO RUDHAULI SECTION OF NH-233 IN UTTAR PRADESH KM 0/0 TO 65/870
|
107 | JABALPUR TO HIREN RIVER SECTION OF NH-12 IN MADHYA PRADESH KM 11/400 TO 66/400
|
108 | JAHIRABAD TO LATUR
|
109 | JALGAON TO BHADGAON
|
110 | JALGAON TO NANDURA
|
111 | JALKOT TO TOGRI
|
112 | JINTUR TO PARBHANI
|
113 | JUNCTION WITH MDR-13 NEAR JARWAL TO BAHRAICH SECTION OF NH-28C IN UTTAR PRADESH KM 43 TO 93
|
114 | KAIJ TO KUSALAM
|
115 | KALMAB TO RALEGAON
|
116 | KALMATH TO ZARAP
|
117 | KARAD TO TAGAON
|
118 | KARAD TO VITA
|
119 | KARASWADA TO BAMBOLIM
|
120 | KATOL TO WARUD
|
121 | KHAMGAON TO DEULGAON SAKARSHA
|
122 | KHAMGAON TO SHEGAON
|
123 | KHERDA TO NAGZARI
|
124 | KOLHA TO NASRATPUR
|
125 | KOTHARI TO DHANORA
|
126 | KUMBHARI PHTA TO DEULGAON RAJA
|
127 | KUNDRAL TO WAZAR
|
128 | KUSUMBA TO MALEGAON
|
129 | LATUR TO PANGAON
|
130 | MAJALGAON TO KAIJ
|
131 | MALEGAON TO RISOD
|
132 | MALEWADA TO CHIMUR
|
133 | MANGAON TO DIGHI PORT
|
134 | MANGAWA-MP/UP BORDER SECTION OF NH-27 (4L) IN MP
|
135 | MANGRUPHIR TO MAHAN
|
136 | MANJUSUMBA TO CHUMBALI
|
137 | MANSAR TO SALAIKHURD
|
138 | MANTHA TALUKAS BORDER TO PARTUR
|
139 | MEHKAR TO AJISPUR
|
140 | MEHKAR TO CHIKALI
|
141 | MOPA AIRPORT
|
142 | MORSHI TO ACHALPUR
|
143 | MORSHI TO MAH/MP BORDER
|
144 | MUL TO CHANDRAPUR
|
145 | MULAKALACHERUVU TO MADANAPALLE SECTION OF NH42 FROM KM 202.050 TO KM 245.640 EXCLUDING RETAINED STRETCH FROM KM 208.270 TO KM 209.970 KM 220.190 TO KM 221.620
|
146 | NAGAJ TO VAIJAPUR
|
147 | NAGAUR-BIKANER OF NH-11 (2L+PS) UNDER PPP.
|
148 | NAGAUR-BIKANER SECTION FROM KM 177.00 TO KM 267.325 ON NH-89
|
149 | NAGBHID TO ARMORI
|
150 | NAIGAONBANDI TO MANGRULPIR
|
151 | NANDGAON TO MORSHI
|
152 | NASHIK TO PETH
|
153 | NETRA VILLAGE TO MANDORE SECTION OF NH-65 KM 267+500 TO 296+070 (4L) UNDER EPC.
|
154 | NH 79 CHITTORGARH NEEMUCH MP BORDER FOUR LANING AND NH 113 NIMBAHERA PRATAPGARH TWO LANING
|
155 | NH 79 OF CHITTORGARH NEEMUCH MP BORDER KM 183 000 TO KM 221 400 BY FOUR LANING WITH PAVED SHOULDER AND NIMBAHERA PARTAPGARH KM 5 400 TO KM 80 000 BY TWO LANING
|
156 | NH167B FROM KM 99.103 CS PURAM TO KM 143.320 MALAKONDA TO 2LPS
|
157 | NH167B FROM KM.143.320 MALAKONDA TO 189.050 SINGARAYAKONDA ON NH 16 TO TWO LANE WITH PAVED SHOULDERS
|
158 | NILAJPHATA TO BHANDARA
|
159 | OMREGA TO AUSA
|
160 | OSMANNAGAR TO KUNDRAL
|
161 | PAHUR TO BODHWAD
|
162 | PARBHANI TO GANGKHED
|
163 | PARSHURAM GHAT TO ARAWALI
|
164 | PARTUR TO MAJALGAON
|
165 | PATGAON KHOPOLI SECTION I
|
166 | PATRADEVI TO KARASWADA 4L
|
167 | PIMPLA TO MANJARSUMBHA
|
168 | PROPOSED DEVELOPMENT FOR ROAD CORRIDOR COMPONENT OF AH-02 INVOLVING NH-327B, NH-31C, NH-31 NH-10 ON SUB-REGIONAL ROAD CONNECTIVITY AMONG BANGLADESH, BHUTAN, INDIAN NEPAL UNDER THE LOAN ASSISTANCE
|
169 | PROPOSED DEVELOPMENT FOR ROAD CORRIDOR COMPONENT OF AH-48 INVOLVING NH-717, NH-31, NH-31C, NH-317A ON SUB-REGIONAL ROAD CONNECTIVITY AMONG BANGLADESH, BHUTAN, INDIAN NEPAL UNDER THE LOAN ASSISTANCE
|
170 | R AND U FROM KM 385.00 TO KM 420.000 TO 2- LANE WITH PS (EXCLUDING ROB AND ITS APPROACHES AT KM.404.950 & MAJOR BRIDGES AT KM.387.360 AND KM.409.610 ) OF NH-730
|
171 | R AND U OF KHUTAR -LAKHIMPUR SECTION (KM 82.00 TO KM140.00) OF NH-730 TO 2L WITH PS
|
172 | R AND U OF LAKHIMPUR - SISIYA SECTION (KM140.00 TO 188.800) OF NH-730 TO 2L WITH PS
|
173 | REHABILATION AND UPGRADATION OF NH-222(61) FOM KM 342.00 TO 444.00
|
174 | REHABILATION AND UPGRADATION TO 2 LANE WITH PAVED SHPULDERS CONFIGURATION OF BEAWAR-ASIND SECTION (KM 74.00 TO KM 116.750 ) OF NH 158 IN THE STATE OF RAJASTHAN PKG-III.
|
175 | REHABILIATION OF 4-LANE 5.575 KM LONG,4-LANE MG SETU OVER GANGA RIVER ON NH-19 FROM KM 212.72 TO KM 218.95
|
176 | REHABILITAITON AND UPGRADATION OF REPALLE TO EEPPURPALEM SECTION FROM KM 128/927 TO KM 195/000 OF NH214A(NEW NH216) TO TWO LANE WITH PAVED SHOULDER UNDER NHDP-IV ON EPC BASIS
|
177 | REHABILITATION UPGRADATION OF NH214(NH216) FROM KM41.161 TO KM59.800(GURJANAPALLI TO POLEKURU SECTION) NH4(NH216) FROM KM70.400 TO KM105.170(KOMAGIRI TO PASARLAPUDI SECTION) TO TWO LANE WITH PAVED
|
178 | REHABILITATION & UPGRADATION OF NH-67 FROM KM 641.000 TO KM 695.000 (DORNALA T JUNCTION TO ATMAKUR SECTION) IN THE STATE OF
|
179 | REHABILITATION AND UP GRADATION OF NH-12A FROM KM191.422-KM 242.300 CHILPI- KAWARDHA SECTION.
|
180 | REHABILITATION AND UP GRADATION OF NH-544E FROM KM 56/803 TO KM 99/179 OF MADAKASIRA TO SIRA SECTION (TILL AP/KNT BORDER) TO TWO LANE WITH PAVED SHOULDER IN THE STATE OF ANDHRA PRADESH UNDER NH(O) ON
|
181 | REHABILITATION AND UP-GRADATION OF EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2L+PS FLEXIBLE PAVEMENT FROM KM 119+650 (END OF CHANDIAGHAT REALIGNMENT) TO KM 163+850(AT JUNCTION WITH NH-30 KATNI B
|
182 | REHABILITATION AND UP-GRADATION OF NH-149 FROM KM 0.00 TO KM 68.280 (PALLAHARA-PITRI JUNCTION) IN THE STATE OF ODISHA TO 2-LANE WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS.
|
183 | REHABILITATION AND UP-GRADATION OF NH-214 (NEW NH-216) FROM KM 0.0 TO 26.150(KATHIPUDI TO START OF KAKINADA BYPASS SECTION)
|
184 | REHABILITATION AND UP-GRADATION OF NH-221 (NEW NH-30) FROM KM 0.0 TO 32.735(IBRAHIMAPATNAM TO CHANDRAGUDEM SECTION) IN THE STATE OF ANDHRA PRADESH TO TWO LANE WITH PAVED SHOULDER UNDER NDP-IV
|
185 | REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER OF MUDKI-JAWAHAR SINGH WALA SECTION OF NH-254 FROM DESIGN CHAINAGE KM 0.00 TO KM 38.00 IN THE STATE OF PUNJAB ON EPC MODE [JOB NO. NH-254-
|
186 | REHABILITATION AND UP-GRADATION TO 2 LANE WITH PS 131 TO 189 OF NH-86
|
187 | REHABILITATION AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER OF ABOHAR-SITOGUNNO-DABWALI ROAD OF NH-354E FROM KM 0.000 TO KM 50.885 IN THE STATE OF PUNJAB ON EPC MODE [JOB NO. NH-354E-PB-2017-18-493]
|
188 | REHABILITATION AND UP-GRADATION TO 2LPS 81 TO 175
|
189 | REHABILITATION AND UPGRADATION OF ALLAHABAD -MIRZAPUR FROM KM 400.878 TO KM 450.000 OF NH-76E TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
190 | REHABILITATION AND UPGRADATION OF BALRAMPUR-TULSIPUR FROM KM 323.745 TO KM 351.000 OF NH-730 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
191 | REHABILITATION AND UPGRADATION OF BARAICH -SHRAWAST FROM KM 248.400 TO KM 310.000 OF NH-730 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
192 | REHABILITATION AND UPGRADATION OF EXISTING PAVEMENT TO 2 LANE WITH PS FROM KM 537.000 TO KM 564.750 (KAPTANGANJ TO PADRAUNA) OF NH-730 ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
193 | REHABILITATION AND UPGRADATION OF HARPALPUR -SUGIRA FROM KM 89.600 TO KM 133.520 OF NH-76 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
194 | REHABILITATION AND UPGRADATION OF PRATAPGARH-ALLAHABAD BYPASS ROAD AND JUNCTION SECTION OF NH-96 FROM KM 100.800 TO KM 135.230 TO 4-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADE
|
195 | REHABILITATION AND UPGRADATION OF RAMNAGAR TO SISWA BABU SECTION FROM KM 484.000 TO KM 505.120 OF NH-730 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
196 | REHABILITATION AND UPGRADATION OF TULSIPUR -BARHANI SECTION FROM KM 351.000 TO KM 385.000 OF NH-730 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
197 | REHABILITATION AND UPGRADATION OF ALLAHABAD -MIRZAPUR SECTION FROM KM 450.000 TO KM 486.770 (EXCEPT MAJOR BRIDGE AT KM.472.135) OF NH-76E TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTT
|
198 | REHABILITATION AND UPGRADATION OF BARELI TO GOHARGANJ SECTION OF NH-12 FROM EXISTING KM 193/0 TO KM 255/300 IN THE STATE OF MADHYA PRADESH TO FOUR LANES WITH PAVED SHOULDERS ON EPC MODE UNDER NHDP-III
|
199 | REHABILITATION AND UPGRADATION OF DHINDI-DIGAMARRU SECTION FROM KM126/510 TO KM135/740 OF NH214(NH216) AND DIGAMARRU-LOSARI SECTION FROM KM0/000 TO KM34/230 OF NH214A(NH216) TO TWO LANE WITH PAVED
|
200 | REHABILITATION AND UPGRADATION OF EEPURUPALEM-ONGOLE SECTION FROM KM195.000 TO 254.500 OF NH214A(NH216) TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF ANDHRA PRADESH UNDER EPC BASIS
|
201 | REHABILITATION AND UPGRADATION OF EXISTING NH-565 FROM KM.86.057 TO 133.922 OF NAGARJUNASAGAR DAM TO DAVULAPALLY SECTION IN A. P.
|
202 | REHABILITATION AND UPGRADATION OF EXISTING PAVEMENT TO FOUR LANE WITH PAVED SHOULDER FROM KM 135.230 TO KM 153.00 OF NH-96 IN THE STATE OF UTTAR PRADESH
|
203 | REHABILITATION AND UPGRADATION OF HYDERABAD OUTER RING ROAD TO MEDAK SECTION OF NH-765D FROM EXISTING KM.15.970 (DESIGN KM.0.0) TO EXISTING KM.78.70 (DESIGN KM.62.92) TO TWO LANE WITH PAVED SHOULDER/F
|
204 | REHABILITATION AND UPGRADATION OF INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2 LANE PAVED SHOULDER RIGID PAVEMENT ON SHUJALPUR-ASHTA ROAD FROM KM 41+800 TO KM 82+300 ON SHUJALPUR TO ASHTA SECTION OF NEWLY
|
205 | REHABILITATION AND UPGRADATION OF KABRAI-BANDA FROM KM 178.00 TO KM 215.00 OF NH-76 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
206 | REHABILITATION AND UPGRADATION OF KALUPUR-LALTA FROM KM 285.00 TO KM 326.00 OF NH-76 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
207 | REHABILITATION AND UPGRADATION OF LOSARI-MACHAVARAM SECTION FROM KM34/230 TO KM84/550 OF NH214(NH216) TO TWO LANE WITH PAVED SHOULDERS UNDER (EPC) BASIS
|
208 | REHABILITATION AND UPGRADATION OF MACHILIPATNAM TO AVANIGADDA SECTION FROM KM84/550 - 124/200 OF NH214(NEW NH216) TO TWO LANE WITH PAVED SHOULDER IN THE STATE OF AP UNDER NHDP-IV THROUGH EPC BASIS
|
209 | REHABILITATION AND UPGRADATION OF MAU-JASRA FROM KM 326.000 TO KM 379.555 OF NH-76 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
210 | REHABILITATION AND UPGRADATION OF NEW NH-544DD (OLD SH-30) FROM DESIGN CHAINAGE KM 0.000 TO 56.000 (EX.KM 0.460 TO EX. KM 58.344) OF ANANTHAPURAMU-KALYANDURG SECTION TO TWO LANE WITH PAVED SHOULDERS O
|
211 | REHABILITATION AND UPGRADATION OF NEW NH-544E FROM KM. 0.000 TO KM 56.803 OF KODIKONDA - MADAKASIRA SECTION TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
|
212 | REHABILITATION AND UPGRADATION OF NH 111 FROM KM 163.400 TO 215.800 SHIVNAGAR TO AMBIKAPUR SECTION
|
213 | REHABILITATION AND UPGRADATION OF NH 200 FROM KM 127.500 TO 178.944 DARRIGHAT TO BANARI SECTION
|
214 | REHABILITATION AND UPGRADATION OF NH 200 FROM KM 178.944 TO 241.553 BANARI VILLAGE TO MASANIA KALA VILLAGE SECTION
|
215 | REHABILITATION AND UPGRADATION OF NH 200 FROM KM 241.553 TO 312.600 MASANIAKALA TO RENGAPALI ODISHA BORDER SECTION
|
216 | REHABILITATION AND UPGRADATION OF NH 226 E FROM 0-1 - 66-20 TO 2 LANE WITH PAVED SHOULDERS ON EPC MODE
|
217 | REHABILITATION AND UPGRADATION OF NH 78 FROM KM 531.250 TO KM 597.946 KUNKURI TO CG JH BORDER SECTION
|
218 | REHABILITATION AND UPGRADATION OF NH-111 FROM KM. 82.500 TO 163.400 (KATHGHORA TO SHIVNAGAR SECTION ) UNDER NHDP-IV
|
219 | REHABILITATION AND UPGRADATION OF NH-149 FROM KM 0.00 TO KM 68.280 (PALLAHARA TO PITRI JUNCTION) IN THE STATE OF ODISHA TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDERS UNDER NHDP IV ON EPC BASIS.
|
220 | REHABILITATION AND UPGRADATION OF NH-167 FROM DESIGN KM.157.707 TO 187.723 (DESIGN LENGTH 30.016 KMS) TO TWO LANE WITH PAVED SHOULDERS OF ALINAGAR-MIRYALAGUDA SEC ON EPC MODE IN THE STATE OF TELANGANA
|
221 | REHABILITATION AND UPGRADATION OF NH-340 FROM KM 0/0 TO KM 60/380 (DESIGN CH. 0/000 TO 60/025 EXCLUDING KM 55.600 TO 57.650(2.050KM)) (RAYACHOTY TO ANGALLU SECTION) TO TWO LANE WITH PAVED SHOULDERS ON
|
222 | REHABILITATION AND UPGRADATION OF NH-42 FROM 76/000 TO KM 102/130 (DESIGN CH. 76/000 TO 99.971 EXCLUDING KM 77.300 TO 78.350) (RAPTHADU TO BATHALAPALLI SECTION) TO FOUR LANE UNDER CORRIDOR APPROACH TH
|
223 | REHABILITATION AND UPGRADATION OF NH-42 FROM KM 4-350 TO KM 75-600
|
224 | REHABILITATION AND UPGRADATION OF NH-64 FROM KM.0.00 TO 28.110(ZIRAKPUR TO PATIALA SEC.) TO 4 LANE IN THE STATE OF PB.(EPC MODE)
|
225 | REHABILITATION AND UPGRADATION OF NH219(NEW NH42) FROM KM 244.930 TO 299.775 (MADANAPALLI PUNGANURU PALAMANERU ROAD SECTION) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
|
226 | REHABILITATION AND UPGRADATION OF NH326A FROM KM 0/0 TO 41/979 (EXCLUDING KM 2/255 TO 3/372 AND KM 36/820 TO 38/275) TO TWO LANE WITH PAVED SHOULDERS UNDER NH(O) ON EPC MODE
|
227 | REHABILITATION AND UPGRADATION OF NH565 FROM EXISTING KM 361.330(DORNALA T JUNCTION) TO KM 420.800(PENCHALAKONA JUNCTION) DESIGN KM 360.156 TO KM 402.468) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
|
228 | REHABILITATION AND UPGRADATION OF NH67 FROM KM 424.650 TO 487.693 OF GOOTY-TADIPATRI SECTION TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
|
229 | REHABILITATION AND UPGRADATION OF PILIBHIT TO PURANPUR SECTION FROM KM 0.00 TO KM 38.00 OF NH-730 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
230 | REHABILITATION AND UPGRADATION OF PUNDIBARI TO BAXIRHAT (WB/ASSAM BORDER) SECTION OF NH-31 FROM KM 770-816 OF NH-31 TO TWO LANES WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS.
|
231 | REHABILITATION AND UPGRADATION OF PURANPUR - KHUTAR SECTION FROM KM 38.00 TO KM 82.00 OF NH-730 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
232 | REHABILITATION AND UPGRADATION OF SINDOOR RIVER TO START OF BARELI BYPASS SECTION OF NH-12 FROM EXISTING KM 130/10 TO KM 194/0 [DESIGN CH. 130.000 TO CH. 193.000] IN THE STATE OF MADHYA PRADESH TO 4L+
|
233 | REHABILITATION AND UPGRADATION OF SULTANPUR BYPASS SECTION OF NH-96 FROM KM 60.000 TO KM 90.865 TO 2-LANE WITH PAVED SHOULDER ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
234 | REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER OF MOGA (DESIGN CH 0.000) TO MAKHU (DESIGN CH 33.611) AND HARIKE (DESIGN CH 44.680) TO KHALRA (DESIGN CH 86.236) INCLUDING CONSTRUCTION
|
235 | REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION OF NANDAKUMAR-CONTAI-CHANDESHWAR ROAD FROM KM 0-25.5 AND KM 41-64.70 OF NH-116B.
|
236 | REHABILITATION AND UPGRADING TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND STRENGTHENING OF NAUPARHA TO BANGO MUNDA SECTION (KM 90 TO KM 158) OF NH 217 IN THE STATE OF ORISSA UNDER PHASE I OF NHIIP
|
237 | REHABILITATION AND UPGRADING TO 2 LANE WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF ANISHABAD- AURANGABAD- HARIHARGANJSECTION (KM 0.00 TO 154.625 ) OF NH-98 LOT-II
|
238 | REHABILITATION AND UPGRADING TO 2 LANE WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF ANISHABAD- AURANGABAD- HARIHARGANJSECTION OF NH-98 LOT-I
|
239 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF "MADHUGIRI-MULBAGAL SECTION (KM 343.800 TO KM 483.151) NH-234 IN KARNATAKA FOR LOT-II(KM 400.330 TO KM 483.151)
|
240 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF ANISABAD-AURANGABAD-HARIHARGANJ SECTION (KM 0.0 - KM 154.625) OF NH-98 IN BIHAR.
|
241 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF ANISABAD-AURANGABAD-HARIHARGANJ SECTION (KM 0.0 – KM 154.625) OF NH-98 IN BIHAR FOR LOT-II(PACKAGE NO.
|
242 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF BANKUARA- PURULIA (KM 0.000 TO KM 84.000)OF NH-60A IN WEST BENGAL
|
243 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF BHOJPUR-CHHATABAR (KM 131.000 TO KM 192.000) OF NH-200 IN ODISHA
|
244 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF LALSOT-KARAULI (KM 0.000 TO KM 85.000) OF NH-11B IN RAJASTHAN
|
245 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF NABARANGPUR-KOKSARA (KM 25.000 TO KM 80.000) OF NH-201 IN ODISHA
|
246 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF PRATAPGARH-PADI (KM 80.000 TO KM 180.000) OF NH-113 IN RAJASTHAN
|
247 | REHABILITATION AND UPGRADING TO 2 LNES-2 LANE WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF PRATAPGARH PADI SECTION
|
248 | REHABLITATION AND UPGRADATION OF AMBOLI JUNCTION (DESIGN CH. 71+530) TO AJARA (DESIGN CH.100+835) SECTTION IN THE STATE OF MAHARASHTRA.
|
249 | RISOD TO HINGOLI
|
250 | RUDHAULI TO GHAGRA BRIDGE SECTION OF NH-233 IN UTTAR PRADESH KM 65/870 TO 122/270
|
251 | SAKOLI TO BHANDARA
|
252 | SALAIKHURD TO TIRORA
|
253 | SANGOLA TO JATH
|
254 | SARAD VANI PIMPALGAON
|
255 | SATARA MURVAD PILLOV PANDHARPUR
|
256 | SELDOH TO PANVAR
|
257 | SHAHPUR PATGAON SECTION I
|
258 | SHEGAON TO DEORI PHATA
|
259 | SHEWALI (SAKRI) - NANDURBAR
|
260 | SHIROD SHAHPURER TO NANDED
|
261 | SHIVUR TO YEOLA
|
262 | SONOULI TO GORAKHPUR SECTION OF NH-29E IN UTTAR PRADESH KM 0/0 TO 80/0
|
263 | STRENGTHENING AND CONSTRUCTION OF PAVED SHOULDERS INCLUDING REHABILITATION/REPAIRING OF BRIDGES FROM KM. 325.000 TO 344.000, KM. 351.000 TO 355.000 AND FROM KM.
|
264 | STRENGTHENING AND WIDENING OF NH-44 FROM KM.173.125 TO KM. 272.241 OF NH-44 AND ALONG THE KARIMGANJ BY-PASS CONSTRUCTED BY BRO
|
265 | STRENGTHENING AND WIDENING TO 2 LANE WITH PAVED SHOULDER FROM KM 103.865 TO 142.050 (GAYA-GOH) OF NH-120
|
266 | STRENGTHENING AND WIDENING TO TWO LANE WITH PAVED SHOULDER OF NH-61 FROM KM 40.00 TO KM 72.40 UNDER EPC MODE IN THE STATE OF NAGALAND DURING 2016-17 (PACKAGE-I FROM KM 40.00 TO KM 56.00)
|
267 | STRENGTHENING AND WIDENING TO TWO LANE WITH PAVED SHOULDER OF NH-61 FROM KM 40.00 TO KM 72.40 UNDER EPC MODE IN THE STATE OF NAGALAND DURING 2016-17 (PACKAGE-II FROM KM 56.00 TO K 72.40)
|
268 | STRENGTHENING AND WIDENING WORK OF EXISTING 2-LANE TO TWO LANE WITH PAVED SHOULDER AND GEMETRIC IMPROVEMENT FROM KM 64.00 TO 97.00 OF NH-28B
|
269 | STRENGTHENING OF EXISTING TWO LANE I/C PAVED SHOULDER FROM MAO - SENAPATI FROM KM 212.325 TO KM 260.000 (47.675 KM)
|
270 | STRENGTHENING WITH PAVED SHOULDER FROM KM 30/0 TO KM 46/0, KM 54/0 TO KM 61/0, KM 69/0 TO KM 80/0 AND KM 80/0 TO KM 96/0 OF NH-39 FOR THE YEAR 2015-16 INCLUDING TOLL PLAZA 30/0 TO KM 46/0, KM 54/0 TO
|
271 | STRENGTHENING WITH PROVISION OF PAVED SHOULDER IN KM. 0.00 TO 46.470 OF NH-96(330) EPC MODE
|
272 | TAKARKHED TO JALNA
|
273 | TALEGAON TO GONAPUR
|
274 | TALGAON TO KALMATH
|
275 | TASGAON TO SHIRDHON
|
276 | TEMBHURNI PANDHARPUR MANGALWEDHA MARWADE UMDI
|
277 | TWO LANING OF GOBOK - SIJON NALLAH (CORRECSPONDING TO EXISTING CH: 27.00 TO KM75.00) IN ARUNACHAL PRADESH UNDER ARUNACHALPRADESH PACKAGE OF SARDP-NE
|
278 | UP GRADATION OF NEWLY DECLARED NH 341 TO TWO LANE WITH PAVED SHOULDER CONFIGURATION BETWEEN KM. 65.478 TO KM 162.209 BHUJ AIRPORT JN KHAVDA INDIA BRIDGE TO DHARMSHALA SECTION IN THE STATE OF GUJARAT
|
279 | UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FOR SECTION FROM KM 118.900 TO KM 156.955 BALOTRA TOSANDERAO VIA JALORE SECTION OF NH 325 (PKG-III)
|
280 | UP-GRADATION TO TWO LANE WITH PAVED SHOULDER FOR SECTION FROM KM 58.000 TO KM 91.600 (BALOTRA TO SANDERAO SECTION VIA JALORE ) OF NH 325 (PKG-II)
|
281 | UP-GRADATION TO TWO LANING WITH PAVED SHOULDER OF AJMER-NAGAUR SECTION BY EXECUTING BALANCE WORK FROM KM. 0.000 TO KM. 148.25 ON NH 89
|
282 | UPGRADATION AND REHABILITATION TO TWO LANE WITH PAVED SHOULDER OF BARMER GHAGARIYA SECTION FROM KM 0.972 TO 69.910 ON OF NH-25 EXT. IN THE STATE OF RAJASTHAN ON EPC MODE.
|
283 | UPGRADATION AND REHABILITATION TO TWO LANE WITH PAVED SHOULDER OF GHAGARIYA- MUNABAO SECTION FROM KM 69.910 TO KM 126.355 OF NH-25 EXT (DESIGN LENGTH 56.445 KM) IN THE STATE OF RAJASTHAN ON EPC MODE.
|
284 | UPGRADATION AND WIDENING OF MP BORDER TO SURAJPUR SECTION NH 43 FROM KM. 245 TO 331
|
285 | UPGRADATION OF BIAORA-MAKSUDANGARH ROAD TO 2L + PS
|
286 | UPGRADATION OF DABOH-UP BORDER ROAD TO 2L + PS
|
287 | UPGRADATION OF MAKSUDANGARH-SIRONJ ROAD TO 2L + PS
|
288 | UPGRADATION OF MORENA-PORSA ROAD TO 2L + PS
|
289 | UPGRADATION OF NEW NATIONAL HIGHWAY NO 168 TO TWO LANE WITH PAVED SIDE SHOULDER CONFIGURATION BETWEEN KM 0/0 TO 41/300 AND KM 43/250 TO 68/174( THARAD DHANERA PANTHAWADA SECTION) INCLUDING IMPROVEMEN
|
290 | UPGRADATION OF NH 930 JHALMALA TO SHERPER FROM NH KM 30.600 TO KM 67.800 TO TWOFOUR LANE WITH PAVED SHOULDERS IN THE STATE OF CHHATTISGARH ON EPC MODE
|
291 | UPGRADATION OF NH-31C WITH A MINIMUM OF 2-LANE WITH PAVED SHOULDER CONFIGURATION STARTING FROM KM 105.000 TO KM 145.632 (TOTAL LENGTH 40.632 KM) IN JALPAIGURI ON EPC MODE.
|
292 | UPGRADATION OF NH-512 WITH A MINIMUM 2-LANE WITH PAVED SHOULDER CONFIGURATION STARTING FROM CH 82.4 KM TO 99.5 KM AND MINIMUM OF 4-LANE CONFIGURATION FROM CH 104.2 KM TO CH 106.607 KM ALONG WITH COST
|
293 | UPGRADATION OF PACHORE- SHUJALPUR ROAD TO 2L + PS
|
294 | UPGRADATION OF PAWAI-SALEHA-JASSO-NAGOD ROAD TO 2L + PS
|
295 | UPGRADATION OF PORSA-BHIND ROAD TO 2L + PS
|
296 | UPGRADATION OF REWA-SIRMOUR ROAD TO 2L + PS
|
297 | UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM KM . 0/0 TO 43/900 OF KUNDAL-NAYA KHEDA-JHADOL-SOM-NALWA-DAIYA-IDAR PKG-I (1107)
|
298 | UPGRADATION TO 2 LANE WITH PAVED SHOULDER WITH RIGID PAVEMETS FROM 37/400 TO KM 66/700 ON NH 848 ON EPC MODE IN THE STATE OF GUJARAT.
|
299 | UPGRADATION TO 2LANE WITH PAVED SHOULDER FROM KM . 43/900 TO 91/0 OF KUNDAL-NAYA KHEDA-JHADOL-SOM-NALWA-DAIYA PKG-II (1108)
|
300 | VADPALE TO BHOGAN KHURD
|
301 | WADIGODRI TO DHANGRIPIMPRI
|
302 | WAKAN PALI KHOPOLI
|
303 | WAKED TO TALEGAON
|
304 | WANDS OF EXISTING SINGLE LANE TO DOUBLE LANE CARRIAGEWAY IN KM 0 TO 40 OF NH-104 IN BIHAR UNDER EPC MODE CONTRACT UNDER NH(O) (JOB NO- 0104-BR-2013-865)
|
305 | WARDHA TO ARVI
|
306 | WARDHA TO HINGAGHAT
|
307 | WASHIM TO DASTAPUR
|
308 | WIDENING AND STRENFTHENING OF EXISITNG SL IL TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDER FROM KM 256.880 TO KM 296.515 OF NH 59 ERSTWHILE NH 217 FROM KM 400.0 TO KM 439.635
|
309 | WIDENING AND STRENFTHENING OF EXISITNG SL IL TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDER INCLUDING GEOMETRICS FROM KM 68.260 TO KM 118.370 OF NH 59 ERSTWHILE NH 217 FROM KM 213.890 TO KM 264.000
|
310 | WIDENING AND STRENGHENING OF NH-65 TO TWO LANES WITH PAVED SHOULDERS FROM EXISTING
|
311 | WIDENING AND STRENGTHENING FROM 2 LANE TO 2 LANE WITH PAVED SHOULDER IN AN AGGREGATE LENGTH OF 38 KM ON SELECTED STRETCHES IN DINDIGUL NATHAM SECTION OF NH 383 IN THE STATE OF TAMIL NADU
|
312 | WIDENING AND STRENGTHENING FROM KM.15.000 TO KM, 58.600 (BHADEWARA -DRAMANDGANJ SECTION) OF NATIONAL HIGHWAY NO.135C
|
313 | WIDENING AND STRENGTHENING FROM KM.505.00 TO 538.00 OF NH-730 (EPC MODE)
|
314 | WIDENING AND STRENGTHENING OF EXISTING SL IL DL TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDER FROM KM 246.100 TO KM 321.00 OF NH 53 EXCEPT FROM KM 292.164 TO KM 307.934 AND KM 314.130 TO KM 321.0
|
315 | WIDENING AND STRENGTHENING OF EXISTING SINGLE INTERMEDIATE LANE CARRIAGEWAY TO 2 LANE CARRIAGE WAY WITH PAVED SHOULDER INCLUDING GEOMETRICS IMPROVEMENT FROM KM 118.40 TO KM 173.40 OF NH 59
|
316 | WIDENING AND STRENGTHENING OF NH-15 TO TWO LANES WITH PAVED SHOULDER FROM EXISTING KM 173/0 TO KM 249/200
|
317 | WIDENING AND STRENGTHENING OF NH-65 TO FOUR LANES WITH PAVED SHOULDERS FROM EXISTING KM 267+500 TO KM 296+070 (NETRA VILLAGE TO MANDORE SECTION) ON EPC MODE
|
318 | WIDENING AND STRENGTHENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 491/000 TO KM 525/200 OF RAIPUR - VISAKHAPATNAM SECTION OF NH-26 IN THE STATE OF ANDHRA PRADESH
|
319 | WIDENING ANDSTRENGTHENING FROM KM.505.00 TO 538.00 OF NH-730 (EPC MODE)
|
320 | WIDENING EXISTING 2 LANE TO 4 LANE WITH PAVED SHOULDER INCLUDING STRENGTHENING CARRIAGEWAY FROM KM 80/0-KM 125/0 OF SALEM TIRUPATHUR - VANIYAMBADI ROAD OF NH-179A.
|
321 | WIDENING FROM 2 LANE TO 4 LANE AND STRENTHENING THE EXISTING CARRIAGE WAY FROM KM 36/0 -80/0 OF SALEM - TIRUPATHUR - VANIYAMBADI ROAD (NH - 179 A)
|
322 | WIDENING FROM TWO LANE TO FOUR LANE WITH PAVED SHOULDER AND STRENGTHNING OF EXISTING PAVEMENT BETWEEN KM 459/500 TO 483/500 (ROAD CONNECTING STATUE OF UNITY DEVALIYA TO RAJPIPLA INCLUDING RECONSTRUCTI
|
323 | WIDENING FROM TWO LANE TO TWO LANE WITH PAVED SHOULDER FROM KM 34/000 TO 49/000 AND TWO LANE TO FOUR LANE WITH PAVED SHOULDER FROM KM 49/000 - 60/650 WITH STRENGTHENING IN KM 34/000 - 45/000, 46/000 -
|
324 | WIDENING OF EXISTING IL DL TO 2-LANE WITH 1.5 M WIDE PAVED SHOULDER FROM KM 0.0 TO KM 45.750 (BOLANGIR TO SONEPUR SECTION) OF NH 57 IN THE STATE OF ODISHA.
|
325 | WIDENING OF EXISTING ROAD TO 2 LANE NH STANDARDS ALONG WITH IMPROVEMENT AND REALIGNMENT FROM NECHIPU TO HOJ (311 KM), VIA SEPPA, KHODASO, SAGGALEE (PART OF TRANS ARUNACHAL HIGHWAY) IN ARUNACHAL PRADES
|
326 | WIDENING OF EXISTING ROAD TO 2 LANE WITH PAVED SHOULDER FROM HUKANJURI TO KHONSA SECTION OF NH-315A FROM DESIGN CHAINAGE KM 12.240 TO 26.342 (PACKAGE C) IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE
|
327 | WIDENING OF EXISTING SINGLE/INTERMEDIATE LANE ROAD TO 2 LANE ROAD FROM KM. 83.00 TO KM 101.00 ON NH-61 IN THE STATE OF NAGALAND ON EPC MODE UNDER NH(O) DURING 2018-19
|
328 | WIDENING OF SL TO 2 L KM. 107-184.80 SUKUMA TO KONTA ON NH 221
|
329 | WIDENING OF SL TO 2 L KM. 287.0 TO 292.0 322.0 TO 342.0 AND KM 352.0 TO 400.0 OF NH16 INCLUDING 163 CDS
|
330 | WIDENING STG.OF EXISTING TWO-LANE CARRIAGEWAY TO FOUR LANES WITH PAVED SIDE SHOULDERS OF HARIKE-ZIRA-FARIDKOT SEC.OF NH-15(NEW NH-54)
|
331 | WIDENING TO 2 LANE AND IMPROVEMENT FROM KM 100/700 TO 186/700 OF VIJAYWADA RANCI ROUTE IN ODISHA
|
332 | WIDENING TO 2 LANE AND IMPROVEMENT VIJAYWADA RANCI ROUTE FROM KM 377-700 TO 471-900 (BERHMAPUR-TAPTAPANI-RAYAGADA ROAD SH-17
|
333 | WIDENING TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDERS AND STRENGTHENING FROM KM 162.010 TO KM 224.900 OF NH-57 DL 27 KM AND IL 35.89 KM
|
334 | WIDENING TO 2 LANE PS WITH RECONSTRUCTION OF BRIDGES CULVERT IN KM. 182 TO 266 OF NH-59A
|
335 | WIDENING TO 2 LANE WITH PAVED SHOULDER FROM KM 0.00 TO 40.00 ON EPC MODE ON NH 2C
|
336 | WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM KM 79.65 TO 118.47 OF NH-150 UNDER EPC MODE IN THE STATE OF KARNATAKA
|
337 | WIDENING TO 2-LANE WITH PAVED SHOULDER IN/C GEOMETRIC IMPROVEMENT FROM KM 397.00 TO KM 422.00 ( 25 KM) ( DESIGN LENGTH KM 388.650 TO KM 410.439) ( 21.789 KM) ON CHURAIBARI - AGARTALA SECTION OF NH-4
|
338 | WIDENING TO 2-LANE WITH PAVED SHOULDER IN/C. GEOMETRIC IMPROVEMENT FROM KM 318.00 TO KM 339.940 ON CHURAIBARI-AGARTALA SECTION OF NH-44 IN THE STATE OF TRIPURA UNDER EPC MODE( JOB NO. 8(44)/TR/2016-17
|
339 | WIDENING TO 2L FROM 228/70 TO 258/70 AND 286/70 TO 327/70 OF VR ROUTE UNDER VRC IN ODISHA
|
340 | WIDENING TO 2L/2LPS FROM 131/0 TO 192/0 (BHOJPUR TO CHHATABAR) OF NH-200 UNDER NHIIP IN ODISHA
|
341 | WIDENING TO 2L/2LPS FROM 25/0 TO 80/0 (NABARANGPUR TO KOKSARA) OF NH-201 UNDER NHIIP IN ODISHA
|
342 | WIDENING TO 2LPS FROM 173/37 TO 229/40 OF NH-59 IN THE STATE OF ODISHA
|
343 | WIDENING TO 2LPS FROM 181/0 TO 239/28 (BHAWANIPATNA TO KOKSARA) OF NH-26.
|
344 | WIDENING TO 2LPS FROM 50/0 TO 140/9 OF NH-57 (SONEPUR TO MADHAPUR) IN THE STATE OF ODISHA
|
345 | WIDENING TO 2LPS FROM 58/00 TO 116/10 OF NH-153B (NAKTIDEUL TO BOUDH) IN THE STATE OF ODISHA
|
346 | WIDENING TO 4 LANE / 4 LANE WITH PAVED SHOULDERS WITH STRENGTHENING OF EXISTING CARRIAGEWAY IN KM 0/0 - 31/8 OF AVINASHI TIRUPUR AVINASHIPALAYAM OF NH 381 IN THE STATE OF TAMIL NADU
|
347 | WIDENING TO 4 LANE WITH PAVED SHOULDER WITH CC PAVEMENT FROM KM 256/550 TO KM 289/500 ON KOTA-DARAH SECTION OF NH-12 (KOTA-JHALAWAR ROAD) IN THE STATE OF RAJASTHAN ON EPC MODE
|
348 | WIDENING TO 4/6 LANES OF EXISTING NH-17 FROM KM 531/934 (AFTER ZUARI BR.) TO KM 536/250 JN. WITH VERNA INDUSTRIAL ONE OF GOA (PACKAGE-III)
|
349 | WIDENING TO 4/6/8 LANES OF EXISTING NH-17 FROM KM 522/615 (NEAR GMC) TO KM 530/850 JOINING NEW ZUIARI BRIDGE IN PANJIM MANGLORE SECTION IN THE STATE OF GOA (PACKAGE-I) ON EPC MODE.
|
350 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM.125.626 TO 155 OF NH -167 HAGARI JADECHERLA SECTION IN THE STATE OF KARNATAKA ON EPC MODE (PAAKAGE-I)(JOB NO. NH-167-KNT- 2016-17-814)
|
351 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 59.500 TO KM 132.033 OF MANNEGUDA-RAVULAPALLY SECTTION OF NH-163 ON EPC MODE IN THE STATE OF TELANGANA
|
352 | WIDENING, STRENGTHENING AND RECONSTRUCTION OF NH-552- EXTN FROM KM 76/600 TO 112/00 (SAWAI MADHOPUR TO SHEOPUR SECTION).
|
353 | WIDNG WITH PS AND STRNG FROM KM.0.00 TO 50.675 OF NH-730A EPC MODE
|