SELECT PROJECT
S.No.
PROJECT NAME
1
4TH LINE BETWEEN BAREJADI NANDEJ (GERATPUR)- SANAND (38.20 KM) (AHMEDABAD BYPASS).
2
ADRAJ MOTI-VIAJAPUR (39.75 KM)
3
ANAND GODHRA DOUBLING PROJECT 79 KMS
4
BHUJ-NALIYA(GC) WITH EXTENSION FROM NALIYA TO VAYOR (WR)
5
CHOTTAUDEPUR-DHAR(NL)
6
DAHOD-INDORE VIA SARDARPUR, JHABUA AND DHAR (NL)
7
GODRA-INDOREDEWAS-MAKSI
8
HIMMATNAGAR-KHEDBRAHMA (54.83 KM)
9
KALOL-KADI-KATOSAN ROAD (37.23 KM)
10
MEHSANA PALANPUR DOUBLING PROJECT 65.10 KMS
11
MEHSANA-PALANPUR (65.1 KM)
12
MIYAGAM-KARJAN-DABHOI-SAMLAYA (GC)
13
MODASA- SHAMLAJI NEW LINE ( MM OF AHMEDABAD-HIMMATNAGAR-UDAIPUR (299.2 KM))
14
MUMBAI CENTRAL VIRAR VADODARA AHMEDABAAD TRAIN PROTECTION SYSTEM 500 RKM
15
NADIAD-PETLAD (37.26 KM)
16
NATHDWARA-NEW NATHDWARA NEW LINE ( MM OF AJMER-CHITTAURGARH-UDAIPUR)
17
NEW BG LINE BETWEEN NALIYA-JAKHAU PORT
18
NEW BG LINE INTERSECTION (5 NOS) BETWEEN GERATPUR-SANAND & BOTAD-AHMEDABAD (16.51 KM) (PB#29/NR/2022-23)
19
NIMACH BADI SADRI NEW LINE PROJECT
20
NIMACH-RATLAM (133 KM)
21
PETLAD-BHADRAN (22.5 KM)
22
QUADRUPLING BETWEEN GANDHIDHAM - ADIPUR WITH Y CONNECTION AT ADIPUR FOR PROVIDING DIRECT ENTRY TOWARDS MUNDRA PORT AND BHUJ AND HIGH LEVEL PLATFORM AT GOPALPUR (10.69 KM)
23
RAJKOT-KANALUS (111.20 KM)
24
RATLAM-MHOW-KHANDWA-AKOLA (GC)
25
SAMLAYA-TIMBA ROAD (53.53 KM)
26
SAMNI-JAMBUSAR (24.08 KM)
27
VIJAPUR-AMBLIYASAN (41.53 KM)
28
VIRAR SURAT ROAD OVER BRIDGE IN LIEU OF LEVEL CROSSING NOS 42 46A 48 52 55 102 106 108 130 AND 137 ALONG DEDICATED FRIEGHT CORRIDOR ROUTE
29
VIRAR SURAT ROAD OVER BRIDGE IN LIEU OF LEVEL CROSSING NOS 60 64 66 68 69 71 74 75 77 81 AND 82 ALONG DEDICATED FRIEGHT CORRIDOR ROUTE