SELECT PROJECT
S.No.
PROJECT NAME
1
300 MW SOLAR POWER PROJECT UNDER CPSU SCHEME
2
600 MW SOLAR POWER PROJECT UNDER CPSU SCHEME
3
ADDITIONAL TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM BHADLA-III PS AS PART OF RAJASTHAN REZ PHASE III SCHEME [20 GW] [SPV NAME POWERGRID BHADLA-III POWER TRANSMISSION LIMITED]
4
AUGMENTATION AT FATEHGARH-II PS, FATEHGARH-IV PS (SECTION-II) AND BARMER-I
5
AUGMENTATION OF 1500MVA 3RD 765/400KV TRANSFORMATION CAPACITY AT KURNOOL NEW SUBSTATION
6
AUGMENTATION OF BANASKANTHA (RAGHANESDA) PS (GIS)
7
AUGMENTATION OF TRANSFORMATION CAPACITY AT BIDAR PS
8
AUGMENTATION OF TRANSFORMATION CAPACITY AT JAM KHAMBHALIYA PS [GIS] [SPV NAME POWERGRID JAM KHAMBHALIYA TRANSMISSION LIMITED]
9
AUGMENTATION OF TRANSFORMATION CAPACITY AT KPS2 AND KPS2
10
BADAM COAL MINING PROJECT
11
BHADLA-II 500MW SOLAR PV PROJECT
12
BHUJ SOLAR 300MW (TRANCHE-IV WIND SOLAR HYBRID)
13
BIKANER SOLAR POWER PROJECT
14
BUXAR THERMAL POWER PLANT (1320 MW)
15
Bagodara Solar Power Project
16
COMPREHENSIVE SCHEME FOR THE STRENGHTENING OF THE TRANSMISSION AND DISTRIBUTION SYSTEM IN A P
17
DAYAPAR WIND ENERGY PROJECT 150MW
18
DAYAPAR WIND ENERGY PROJECT 200MW
19
DAYAPAR WIND- III (HYBRID TRANCHE-V)
20
DHAULASIDH HYDROELECTRIC PROJECT (66 MW)
21
DIBANG MULTIPURPOSE PROJECT 2880 MW ARUNACHAL PRADESH
22
EASTERN REGION EXPANSION SCHEME XXIX
23
EASTERN REGION EXPANSION SCHEME: 43 [ERES: 43]
24
EASTERN REGION EXPANSION SCHEME: 44 [ERES: 44]
25
ESTABLISHMENT OF KHAVDA POOLING STATION 3 (KPS3) IN KHAVDA RE PARK
26
GUJARAT 200 MW (GUVNL TENDER)
27
IMPLEMENTATION OF LILO OF BOTH CIRCUITS OF 400KV VIDHYACHAL PS TO SASAN D/C LINE AT HINDALCO SWITCHYARD
28
KHAVDA 1200MW (4X300MW) IN KHAVDA RE PARK
29
KHAVDA PHASE-II-PART B, GUJARAT- TRANSMISSION SCHEME FOR EVACUATION OF 4.5 GW RE INJECTION AT KHAVDA P.S. UNDER PHASE-II –PART B
30
KHAVDA PHASE-II-PART C, GUJARAT- TRANSMISSION SCHEME FOR EVACUATION OF 4.5 GW RE INJECTION AT KHAVDA P.S. UNDER PHASE-II – PART C
31
KHAVDA-2, GUJARAT- ESTABLISHMENT OF KHAVDA POOLING STATION-2 (KPS2) IN KHAVDA RE PARK
32
KHAWDA 1255MW SOLAR PROJECT (KHAWDA SOLAR PARK)
33
KHURJA SUPER THERMAL POWER PROJECT
34
KIRU HYDRO ELECTRIC PROJECT
35
KWAR HE PROJECT
36
LARA SUPER THERMAL POWER PROJECT, STAGE-II (2X800 MW)
37
LATA-TAPOVAN HYDRO ELECTRIC POWER PROJECT 3X57 MW
38
LUHRI HYDROELECTRIC PROJECT (STAGE1)
39
NOKH SOLAR PV PROJECT 735 MW
40
NORTH EASTERN REGION POWER SYSTEM IMPROVEMENT PROJECT (NERPSIP) FOR SIX (6) STATES
41
PAKAL DUL HYDRO ELECTRIC PROJECT (1000 MW)
42
PATRATU STPP-I (3X800MW)
43
PROVISION OF DYNAMIC REACTIVE COMPENSATION AT KHAVDA POOLING STATION 1 [KPS1] AND KHAVDA POOLING STATION 3 [KPS3]
44
RAJASTHAN REZ PH-V (PART-1: 4 GW) [SIROHI/NAGAUR] COMPLEX
45
RAMMAM-III HEPP (3X40 MW)
46
RANGIT IV HE PROJECT
47
RATLE HE PROJECT
48
SHAJAPUR 325MW SOLAR PV PROJECT
49
SINGRAULI SUPER THERMAL POWER PROJECT, STAGE-III (2X800 MW)
50
SUBANSIRI LOWER H.E.P (8X250 MW) (NHPC)
51
SUNNI DAM HYDRO ELECTRIC PROJECT
52
SYSTEM STRENGTHENING AT KOPPAL-II AND GADAG-II FOR INTEGRATION OF RE GENERATION PROJECTS
53
TALCHER THERMAL POWER PROJECT STAGE III(2X660 MW)
54
TAPOVAN-VISHNUGAD HEP (4X130MW)
55
TEESTA VI HE PROJECT
56
TEHRI PUMPED STORAGE PLANT(1000MW)
57
TRANSMISSION NETWORK EXPANSION IN GUJARAT TO INCREASE ATC FROM ISTS: PART B
58
TRANSMISSION SCHEME FOR EVACUATION OF POWER FROM RATLE HEP (850 MW) AND KIRU (624 MW): PART B
59
TRANSMISSION SCHEME FOR INTEGRATION OF DAVANAGERE / CHITRADURGA AND BELLARY REZ IN KARNATAKA
60
TRANSMISSION SCHEME FOR SOLAR ENERGY ZONE IN ANANTHPURAM (2500MW) AND KURNOOL (1000MW)
61
TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM POTENTIAL RENEWABLE ENERGY ZONE IN KHAVDA AREA OF GUJARAT UNDER PHASE-IV [7GW] PART B [SPV NAME POWERGRID SOUTH OLPAD TRANSMISSION LIMITED]
62
TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM POTENTIAL RENEWABLE ENERGY ZONE IN KHAVDA AREA OF GUJARAT UNDER PHASE-V [8 GW] PART A [SPV NAME POWERGRID KHAVDA V-A POWER TRANSMISSION LIMITED]
63
TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH -IV [PART-2 5.5 GW] [JAISALMER/BARMER COMPLE] PART F [SPV NAME POWERGRID BARMER I TRANSMISSION LIMITED]
64
TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV (PART-4: 3.5 GW): PART A
65
TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV [PART-2 5.5GW] [JAISALMER/BARMER COMPLEX] PART H1
66
TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV [PART-3 (6 GW)] [BIKANER COMPLEX] PART B [SPV NAME POWERGRID BIKANER B POWER TRANSMISSION LIMITED]
67
TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV [PART-3 (6GW)] [BIKANER COMPLEX] PART A [SPV NAME POWERGRID BIKANER A POWER TRANSMISSION LIMITED]
68
TRANSMISSION SYSTEM FOR INTEGRATION OF KURNOOL-IV REZ PHASE-I (FOR 4.5 GW)
69
TRANSMISSION SYSTEM FOR KURNOOL WIND ENERGY ZONE SOLAR ENERGY ZONE (AP) PART-A PART B
70
TRANSMISSION SYSTEM FOR STRENGTHENING TO FACILITATE EVACUATION OF POWER FROM BHADLA/BIKANER COMPLEX
71
TRANSMISSION SYSTEM SCHEME FOR EVACUATION OF POWER FROM REZ RAJASTHAN (8.1 GW) UNDER PHASE-II PART E
72
TRANSMISSION SYSTEM STRENGTHENING AT KURNOOL- III PS FOR INTEGRATION OF ADDITIONAL RE GENERATION PROJECTS
73
TRANSMISSION SYSTEM STRENGTHENING FOR INTERCONNECTIONS OF BHADLA-III AND BIKANER III COMPLEX [SPV NAME POWERGRID BHADLA III AND BIKANER III TRANSMISSION LIMITED]
74
TRANSMISSION SYSTEM STRENGTHENING FOR SRINAGAR-LEH TRANSMISSION SYSTEM
75
TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHAN (8.1 GW) UNDER PHASE-II PART G1
76
TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHAN (8.1 GW) UNDER PHASE-II- PART G
77
TRANSMISSION SYSTEM UNDER ISTS FOR EVACUATION OF POWER FROM KUDANKULAM UNIT - 3 AND 4 (2X1000 MW)
78
TS FOR EVACUATION OF 7GW RE INJECTION AT KHAVDA PS UNDER PHASE-IV PART E4
79
TS FOR EVACUATION OF ADDITIONAL 7GW RE POWER FROM KHAVDA RE PARK UNDER PHASE-III PART B [VATAMAN TRANSMISSION LIMITED]
80
TS FOR EVACUATION OF POWER FROM 7GW REZ IN KHAVDA AREA UNDER PHASE-IV PART E2
81
TS FOR EVACUATION OF POWER FROM PAKALDUL HEP IN CHENAB VALLEY HEPS - LTA SYSTEM
82
TS FOR EVACUATION OF POWER FROM POTENTIAL RE ZONE IN KHAVDA AREA OF GUJARAT UNDER PH-IV PART E3
83
TS FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV (PART-1) [BIKANER COMPLEX] PART A [BIKANER III NEEMRANA TRANSMISSION LTD]
84
TS FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV (PART-1) [BIKANER COMPLEX] PART D [NEEMRANA II BAREILLY TRANSMISSION LTD]
85
TS FOR EVACUATION OF POWER FROM REZ IN RAJASTHAN (20GW) UNDER PH-III PART D [SIKAR KHETRI TRANSMISSION LTD]
86
TS FOR EVACUATION OF POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III, PART E1
87
TS FOR EVACUATION POWER FROM RAJASTHAN REZ PH-IV (PART-2:5.5GW) (JAISALMER/BARMER COMPLEX) PART-C
88
TS FOR EVACUATION POWER FROM RAJASTHAN REZ PH-IV (PART-2:5.5GW) (JAISALMER/BARMER COMPLEX) PART-E
89
TS FOR EVACUATION POWER FROM RAJASTHAN REZ PH-IV (PART-2:5.5GW) PART-B (JAISALMER/BARMER COMPLEX)
90
TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART B1
91
TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART C1
92
TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART E2
93
TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART H
94
TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART J
95
TS FOR EVACUATION POWER RAJASTHAN REZ PH-IV (PART-2:5.5GW) (JAISALMER/BARMER COMPLEX): PART-C
96
TS FOR INTRGRATION OF RE ZONE (PHASE II) IN KOPPAL II (PHASE A and B) AND GADAG II (PHASE A) IN KARNATAKA [KOPPAL II GADAG II TRANSMISSSION LIMITED]
97
TS FOR SOLAR ENERGY ZONE IN BIDAR (2500MW), KARNATAKA [BIDAR TRANSMISSION LTD]
98
VISHNUGAD PIPALKOTI HYDRO ELECTRIC PROJECT
99
WESTERN REGION EXPANSION SCHEME XXV