SELECT PROJECT


S.No.PROJECT NAME
1102 MW WIND POWER PROJECT
24TH PHASE DEVELOPMENT OF NBP FIELD
3ADDITIONAL DEV. OF D-1 FIELD
4ADDITIONAL DEVELOPMENT HEERA, PART-II
5ADDITIONAL DEVELOPMENT OF VASAI EAST FIELD
6ADDITIONAL GAS PROCESSING FACILITY AT HAZIRA
7ADDITIONAL GAS PROCESSING UNITS AT URAN
8ADDL DEV. OF BASIN FIELD AND INST. OF IIND BOSTER COMP. ONGC
9ADDL.DEVELOPMENT OF A-1 LAYER,L-III RESERVOIR MHN
10ASSAM RENEWAL PROJECT FOR GROUP A
11BARGE BUMPER-BOAT LANDING-RISER PROTECTOR PROJECT PH-II
12C2-C3 AND LPG RECOVERY FROM LNG, DAHEJ (ONGC)
13CONSTRUCTION OF 12 OFFSHORE SUPPLY VESSELS(OSV)
14CONSTRUCTION OF 23 IMMEDIATE SUPPLY VESSELS (ISV)
15CONSTRUCTION OF 6 ETPS
16CONSTRUCTION OF NEW PROCESS COMPLEX MHN
17CONSTRUCTION OF ONE ETP AND THREE ETPS CUM WATER INJECTION PLANTS(WIP)
18CONSTRUCTION OF ONE ETP AT GGS-NADA, ANKLESHWAR
19CONSTRUCTION OF THREE ETPS, MEHSANA
20CONSTRUCTION OF TWO PRODUCED WATER TREATMENT PLANTS (PWTP) AT BECHARAJI AND SOBHASAN INSTALLATION OF MEHSANA ASSET (2PWTP-MHN)
21CONVERSION OF RIG SAGAR SAMRAT TO MOBILE OFFSHORE PRODUCTION UNIT(MOPS)
22DAMAN DEVELOPMENT PROJECT
23DEV.OF BASIN AND2ND BOSTER
24DEVELOPMENT OF B-147 FIELD
25DEVELOPMENT OF B-193 CLUSTER FIELDS
26DEVELOPMENT OF B-22 CLUSTER FIELDS
27DEVELOPMENT OF B-46 CLUSTER FIELD
28DEVELOPMENT OF BHE AND BH-35 AREA.
29DEVELOPMENT OF BSE-11 BLOCK
30DEVELOPMENT OF C-26 CLUSTER FIELDS
31DEVELOPMENT OF C-SERIES FIELDS
32DEVELOPMENT OF CLUSTER-7 FIELDS
33DEVELOPMENT OF G1 AND GS-15 (ONGCL)
34DEVELOPMENT OF NELP BLOCK KG-ONN-2003/1 NAGAYALANKA FIELD-PH II
35DEVELOPMENT OF NEW MARGINAL FIELD WO 24-3, D30 AND B192 ALONG WITH FACILITY FOR CO2 MITIGATION
36DEVELOPMENT OF R-SERIES FIELDS INCLUDING REVIVAL OF R 12 (RATNA)
37DEVELOPMENT OF R-SERIES FIELDS INCLUDING REVIVAL OF R-12 (RATNA)
38DEVELOPMENT OF SB-11,BASSEIN FIELD
39DEVELOPMENT OF SB-14 FIELD
40DEVELOPMENT OF WESTERN PERIPHERY OF MH SOUTH FIELD
41DEVELOPMENT OF WO-16 CLUSTER FIELDS
42DEVELOPMENT PLAN FOR LOWER PAYS IN NBP-14 BLOCK OF NBP FIELD (D-1)
43DEVELOPMENT PLAN OF CBM - BOKARO BLOCK
44ENHANCED RECOVERY FROM BASSEIN FIELD THROUGH INTEGRATED DEVELOPMENT OF MUKTA, BASSEIN AND PANNA
45FIELD DEVELOPMENT OF NELP BLOCK KG-ONN-2003, NAGAYALANKA-KG
46FIRE WATER NETWORK AT URAN
47GAMJI REDEVELOPMENT PROJECT
48GAS ASSISTED GRAVITY DRAINAGE SCHEME, KASOMARIGAON
49GAS COMPRESSOR PROJECT AT ANKLESHWAR ASSET (GCP-ANK)
50HEERA AND SOUTH HEERA RE-DEVELOPMENT PROJECT
51HEERA AND SOUTH HEERA REDEVELOPMENT PH-II
52HEERA RECONSTRUCTION
53HEERA REDEVELOPMENT - PHASE III
54HIGH-URAN TRUNK P.LINE
55INTEGRATED DEVELOPMENT OF B-127 FIELDS
56INTEGRATED DEVELOPMENT OF VASHISTA AND S-1 FIELDS
57IOR GELEKI (ONGCL)
58IOR LAKWA - LAKHMANI (ONGCL)
59IOR OF B-173A FIELD
60MH NORTH REDEVELOPMENT PHASE III
61MNW-NF BRIDGE PROJECT
62MUMBAI HIGH NORTH DEVELOPMENT PHASE-II
63MUMBAI HIGH NORTH REDEVELOPMENT PHASE-IV
64MUMBAI HIGH SOUTH (MHS) REDEVELOPMENT PHASE-III
65MUMBAI HIGH SOUTH REDEVELOPMENT PH-2
66MUMBAI HIGH SOUTH REDEVELOPMENT PHASE-IV
67MUMBAI HIGH-URAN TRUNK PIPELINE (ONGC)
68NAWAGAM-KOYALI PIPELINE PROJECT
69NEELAM RECONSTRUCTION
70NEELAM REDEVELOPMENT PLAN FOR EXPLOITATION OF BASSEIN AND MUKTA PAY
71NORTH TAPTI GAS FIELD DEVELOPMENT
72NW B-173A DEVELOPMENT PLAN FOR EXPLOITATION OF MUKTA PAY
73OFFSHORE GRID INTERCONNECTIVITY PROJECT IN MUMBAI HIGH
74PIPELINE NETWORK PROJECT GELEKI, ASSAM
75PIPELINE REPLACEMENT PROJECT (PRP-VI)
76PIPELINE REPLACEMENT PROJECT - VII
77PIPELINE REPLACEMENT PROJECT -4
78PIPELINE REPLACEMENT PROJECT, AHMEDABAD
79PIPELINE REPLACEMENT PROJECT-2
80PIPELINE REPLACEMENT PROJECT-3
81PIPELINE REPLACEMENT PROJECT-V (OFFSHORE)
82RECONSTRUCTION OF BPA AND BPB PLATFORMS
83REDEVELOPMENT OF NANDASAN FIELD
84REVAMPING OF WIN PLATFORM AT MH ASSET
85SIX PIPELINE REPLACEMENT PROJECT
86SONAMURA GGS AND PIPIPELINE PROJECT ( PART OF OVERALL SCHEME TO PRODUCE 5.1 MMMCMD GAS AT TRIPURA ASSET)
87UP-GRADATION OF KONABAN GGS AND PIPELINE GRID PROJECT, TRIPURA
88UPGRADING IPSHEM TO WORLD CLASS FACILITY OF ONGC, GOA

Back