S.No. | PROJECT NAME | 1 | 2 LANING OF DINDIGUL - PERIGULAM THENI- KUMILI
|
2 | 2 LANING WITH PAVED SHOULDER FROM KM 30.800 TO KM 70.800 AND 2 LANING WITHOUT PAVED SHOULDER FROM KM 70.800 TO KARNATAKA/GOA BORDER (KM 84.120) OF NH-4A IN THE STATE OF KARNATAKA ON EPC MODE (PACKAGE
|
3 | 2- LANE WITH PAVED SHOULDERS OF HINOTIYA TO MEHULWA FROM DESIGN KM 27+000 9OF EXISTING SH-19 KM 26+530) NEAR HINOTIYA VILLAGE TO DESIGN KM 75+700 (OF EXISTING SH-19 KM 74+820) NEAR MEHULWA VILLAGE SEC
|
4 | 2-LANE EXISTING RAMPUR BYPASS OF RAMPUR TO BE DEVELOPED TO 4-LANE ON EPC MODE IN THE STATE OF UTTAR PRADESH (KM 0+000 TO KM 10+190)
|
5 | 2-LANING WITH PS SITARGANJ BAREILY SECTION
|
6 | 2-LANNING WITH PS MOTIHARI-RAXAUL
|
7 | 2L NH-1 FROM KM 8.660 TO KM 33.775 (SUMBAL TO WAYUL) TO 4L DUAL CARRIAGEWAY NH STANDARD AS PART OF SRINAGAR RING ROAD PHASE II (DESIGN CH. 41.907 TO CH. 66.609)
|
8 | 2L PS SRIGANGANAGAR TO RAISINGHNAGAR (DESIGN CHAINAGE -0.500 KM TO DESIGN CHAINAGE 101.000 KM) (PACKAGE-1) ON NH-911
|
9 | 2LPS OF BIJNOR TO KOTAWALI SECTION OF NH-709AD, PKG-IV
|
10 | 3L MAJOR BRIDGE OVER RIVER BRAHMANI AT KM. 401.250 (DUBURI CHANDIKHOLE SECTION) OF NH 200 (NEW NH 53)
|
11 | 4 LANE CONNECTOR FROM DELHI MEERUT EXPRESSWAY KM 50.000 TO KM 8.520 OF NH 235 IN THE STATE OF UTTAR PRADESH ON EPC BASIS
|
12 | 4 LANE OF BILASPUR TO URGA PROJECT (KM 0.00 TO KM 70.2) OF NH-130A
|
13 | 4 LANING FROM EXISTING KM 39.380 (DESIGN CH. 37.000) TO KM 74.450 (DESIGN CH. 69.000) OF MUCHUKOTA – BUGGA SECTION OF NH 544D ON HYBRID ANNUITY MODE UNDER NH(O) IN THE STATE OF ANDHRA PRADESH
|
14 | 4 LANING OF JAGADHRI TAJEWALA ROAD SECTION OF NH 907 (OLD NH 73A) UNDER NH(O) (PKG 1) IN THE STATE OF HARYANA
|
15 | 4 LANING OF KHED SINNAR SECTION OF NH 50
|
16 | 4 LANING OF NAJIBABAD BYPASS OF NH-119 FROM KM. 105.423 TO KM. 118.373 (EXCLUDING 2.45 KM. OF NH-74 BYPASS) IN THE STATE OF UTTAR PRADESH
|
17 | 4 LANING OF NH 544D FROM EXISTING KM 346.300 OF NH 44 (DESIGN CHAINAGE KM 0.000) TO KM 39.380 (DESIGN CHAINAGE KM 37.000) OF ANANTAPUR-MUCHUKOTA SECTION ON HYBRID ANNUITY MODE UNDER NH (O) IN THE STAT
|
18 | 4 LANING OF NH-31D FROM GHOSHPUKUR - SALSALABARI ( KM 0.00 TO KM . 83.785)
|
19 | 4- LANING OF ROHTAK-JIND SECTION FROM KM. 307+000 TO KM. 347+800 OF NH-71 AND CONNECTING LINK FROM KM. 347.800 OF NH-71 TO KM. 9+400 OF NH-71A (BALANCE WORK) ON EPC MODE UNDER BHARATMALA
|
20 | 4-LANING OF GOA/KARNATAKA BORDER-KUNDAPUR SECTION
|
21 | 4-LANING OF GOHANA-SONIPAT (PKG-2) SECTION FROM KM 40.601 TO KM 78.837 (LENGTH = 38.236KM) OF NH-352A IN THE STATE OF HARYANA UNDER BHARATMALA PARIYOJNA UNDER NH (O) TO BE IMPLEMENTED ON HYBRID ANNUIT
|
22 | 4-LANING OF HOSKOTE-DOBBASPET
|
23 | 4-LANING OF KAMALAPURAM - ODDANCHATRAM SECTION OF NH-209
|
24 | 4-LANING OF MADATHUKULAM - POLLACHI SECTION OF NH-209 (NEW NH-83)
|
25 | 4-LANING OF MEERUT NAJIBABAD SECTION FROM KM. 11.500 TO KM 39.250 AND KM 86.590 TO KM. 112.545.IN THE STATE OF UTTAR PRADESH ON HAM MODE.
|
26 | 4-LANING OF MELUR - PILLAYARPATTI - KARAIKUDI SECTION OF NH-338, NH-36, NH-383
|
27 | 4-LANING OF VADIPPATTI - THAMARAIPATTI SECTION OF NH-744A (MADURAI RING ROAD)
|
28 | 4-LANNING OF BODHRE-DHULE SECTION(KM 390.000 TO 452.800)
|
29 | 4-LANNING OF CHAPRA-HAJIPUR
|
30 | 4-LANNING OF HARIDWAR-NAGINA SECTION OF NH 74 FROM (KM 204.300 OF NH 58) TO KM 73.00
|
31 | 4-LANNING OF KODINAR TO VERAVAL SECTION OF NH-8E FROM KM 221.610 TO KM 263.000
|
32 | 4-LANNING OF STHIYATHOPU-CHOLOPURAM
|
33 | 4/6L ACCESS CONTROL EXPRESSWAY FROM DESIGN CHAINAGE KM 515.000 TO 528.300 (KUNJWANI TO SIDHRA SECTION OF NH-44) AND FROM DESIGN CHAINAGE KM 550.900 TO KM 566.520 (DOMEL TO KATRA SECTION) (PHASE II-PAC
|
34 | 4/6L GREENFIELD LUDHIANA RUPNAGAR HIGHWAY FROM JUNCTION WITH NE 05 VILLAGR NEAR TO MANEWAL (LUDHIANA) TO JUNCTION WITH NH 205 NEAR BHEORA VILLAGE (RUPNAGAR) FROM KM 66.000 TO KM 91.000 INCLUDING SPUR
|
35 | 4/6L OF SPUR TO HARIDWAR (GREENFIELD) FROM KM. 0.000 TO KM. 49.000
|
36 | 4/6L OF BANGALORE - PUNE SECTION OF BYPASS CONNECTING DHARWAD - HUBLI FROM KM. 403.80 TO KM. 433.20
|
37 | 4L GREENFIELD ALIGNMENT FROM KALYANAPUR TO TAL DASHRAHA OF NH-119D (PKG-III)
|
38 | 4L AMBALA - KALAAMB FROM KM. -0.800 TO KM. 33.015 OF OLD NH-72
|
39 | 4L BANGALORE-CHENNAI EXPRESSWAY FROM KM. 230.000 TO KM. 261.705 OF KANCHEPURAM TO SRIPERUMBUDUR SECTION (PHASE-III/PACKAGE-IV)
|
40 | 4L FROM GAJU VILLAGE AT KM 32.982 TO DEVINAGAR BYPASS (END) AT KM 208.000 OF NH 530B (PKG 1C)
|
41 | 4L FROM KM 196.87 (SANKHA) TO KM 219.6 (KHAJURI) ON NH-75 [REHLA / GARHWA BYPASS]
|
42 | 4L FROM MATHURA BYPASS (START) AT EXISTING KM. 154.20 OF NH-44 TO GAJU VILLAGE AT KM 32.982 OF NH-530B (PKG-IB)
|
43 | 4L GREENFIELD A. MALOUT BYPASS FROM CH. KM 44.500 TO CH. KM 35.500 ON NH-07 AND CH. KM 0.000 TO KM 6.984 ON NH-09 B. MANDI DABWALI BYPASS FROM CH. 38.450 KM TO KM 27.910 PKG-02
|
44 | 4L GREENFIELD ALIGNMENT OF AMAS TO SHIVRAMPUR FROM 0.000 KM. TO 55.002 KM. OF NH 119 D (PKG-I)
|
45 | 4L GREENFIELD ALIGNMENT OF SHIVRAMPUR TO RAMNAGAR FROM KM. 55.002 TO KM. 109.300 OF NH 119 D (PKG-II)
|
46 | 4L GREENFIELD ROAD CONNECTING NORTH AND SOUTH INDUSTRIAL CLUSTER OF KHANDALERU CREEK NEAR KRISHNAPATNAM PORT AT THAMMINAPATNAM TO MOLLUR FROM KM 0.0 TO KM 16.046, PART I & 6L EXTENSION OF DEDICATED PO
|
47 | 4L GREENFIELD RUDHI TO DESHGAON (PKG V OF BETUL-KHANDWA/DESHGAON) - N/04015/06003/MP
|
48 | 4L GREENFIELD SPUR FROM DELHI-VADODARA GREENFIELD EXPRESSWAY NEAR BANDIKUI TO JAIPUR
|
49 | 4L KODINAR - VERAVAL (PACKAGE VI) FROM KM. 222.400 TO KM. 230.00 (KODINAR BYPASS) OF NH-8E (NH 51 NEW)
|
50 | 4L MEDINIPUR TO BALLUPUR FROM KM. 458.65 TO KM. 487.65 OF NH-07(PKG-2)
|
51 | 4L MISSING LINK (OF REWA BYPASS) FROM JN. WITH NH 30 NEAR BELA TO JN. WITH MPRDC RING ROAD (NEAR SILPARA) ON KM 0.00 TO KM. 13.100 OF SH-9
|
52 | 4L MITIGATION MEASURE STRUCTURES ON CH/MH BORDER TO WAINGANGA BRIDGE SECTION OF NH-53
|
53 | 4L OF CHANDESARA TO KHEDAKHAJURIYA FROM KM. 0.000 TO (-) 750 AND KM 0.000 TO KM 41.400 OF NH-752D (PKG-I)
|
54 | 4L OF ADDAHOLE TO BANTWAL CROSS SECTION
|
55 | 4L OF ADDAHOLE TO BANTWAL CROSS SECTION INCLUDING FLYOVER AT KALLADKA TOWN
|
56 | 4L OF AMRITSAR GHOMAN TANDA UNA SECTION FROM KM 8.270 TO KM 54.000 OF NH 503A PACKAGE I
|
57 | 4L OF BAL WORKS OF MAHUVA TO KAGVADAR FROM 100.450 KM. TO 140.470 KM. OF NH-8E (PKG- III)
|
58 | 4L OF BAL WORKS OF TALAJA - MAHUVA FROM 54.990 KM. TO 100.450 KM. OF OLD NH-8E (PACKAGE-II)
|
59 | 4L OF BARAMATI TO INDAPUR (PKG-II) FROM KM. 41.400 TO KM. 84.550 OF NH-965G (SAINT TUKARAM MARG)
|
60 | 4L OF BEAS-MEHTA-BATALA-DERA BABA NANAK FROM INTERSECTION WITH JALANDHAR-AMRITSAR HIGHWAY (NH-3) NEAR BEAS TILL START OF BATALA BYPASS NEAR VILLAGE ACCHHAL (FROM KM. 0.000 TO KM. 31.300) (PKG-1)
|
61 | 4L OF CHANNARAYAPATNA BYPASS AND HASSAN BYPASS WITH STRUCTURES IN DEVIHALLI -HASSAN SECTION
|
62 | 4L OF END OF PINJORE BYPASS - BADDI - NALAGARH SECTION (KM. 4.200 TO KM. 35.370) OF NH21A
|
63 | 4L OF EXISTING 2/4L STRETCH FROM LONAND TO DIVE GHAT (KM 166.400 TO KM 220.900 ) OF MOHOL – ALANDI SECTION OF NH-965 (PKG - V)
|
64 | 4L OF EXISTING BEAS – BABA BAKALA - DERA BABA NANAK SECTION FROM START OF BATALA BYPASS TILL INTERSECTION WITH AJNALA GURDASPUR HIGHWAY (NH 354) NEAR DERA BABA NANAK ( FROM KM. 31.300 TO KM. 69.100 )
|
65 | 4L OF GREENFIELD ALIGNMENT FROM KM. 47.000 TO KM. 89.210 OF BALBHADARPUR TO BELA NAWDA SECTION OF NH-119D
|
66 | 4L OF HARIDWAR NAGINA SECTION DESIGN CH. LME FROM KM 13.829 TO KM 17.110 AND KM 26.077 TO KM 27.508 AND DESIGN CH. RME FROM KM 13.839 TO KM 17.120 AND KM 26.078 TO KM 27.509 OF EUP MITIGATION MEASURES
|
67 | 4L OF HP/PUNJAB BO4L OF HP/PUNJAB BORDER - MO FROM KM. 11.00 TO KM. 42.00 OF OLD NH-20 (NEW NH-154) (PACKAGE-IA)RDER - MO FROM KM. 11.00 TO KM. 42.00 OF OLD NH-20 (NEW NH-154) (PACKAGE-IA)
|
68 | 4L OF INDAPUR TO TONDLE (PKG-III) FROM KM.84.550 TO KM. 131.00 OF NH-965G (SAINT TUKARAM MARG)
|
69 | 4L OF INDORA CHOWK TO PACHPAOLI AND AGRASEN CHOWK - ASHOKA CHOWK
|
70 | 4L OF INDORE - BOREGAON (PKG-III) [BALWARA TO DHANGAON] FROM KM. 42.260 TO KM. 82.660 OF NH347BG AND 753L
|
71 | 4L OF KARWAR (KM. 281.980 OF NH-62 NAGAUR ROAD) TO DANGIYAVAS OF JODHPUR RING ROAD (PKG-II)
|
72 | 4L OF KM.165.092 TO KM.171.855 (NORTH BOUND) AND FROM KM.166.895 TO KM.173.638 (SOUTH BOUND), EXCL. CERTAIN REACHES OF NORTH BOUND AND SOUTH BOUND OF RAMBAN TO BANIHAL (PKG-III) OF OLD NH-1A (NEW NH-
|
73 | 4L OF KODAD (DESIGN KM 0.00/EXISTING KM 185.00 OF NH-65) TO KHAMMAM (DESIGN KM 31.800/EXISTING KM 29.400) OF NH-365A
|
74 | 4L OF LEFT-OVER WORKS INCLUDING ADDITIONAL STRUCTURES FROM KERALA/TAMIL NADU BORDER TO KANYAKUMARI SECTION FROM KM 43.0 TO KM 96.174 OF NH66 UNDER EPC MODE IN THE STATE OF TAMILNADU.
|
75 | 4L OF MADANAPALLE TO PILERU SECTION FROM KM 0.000 TO KM 55.900 OF NH-71(PACKAGE-I) - N/05060/01002/AP
|
76 | 4L OF MIRZA CHAUKI TO FARKKA SECTION OF NH80 FROM KM 215.00 TO KM 260.00 ON HAM MODE IN THE STATE OF JHARKHAND PACKAGE I
|
77 | 4L OF MO - SIHUNI FROM KM. 42.00 TO KM. 51.00 OF OLD NH-20 (NEW NH-154) (PACKAGE-IB)
|
78 | 4L OF NAGPUR-KATOL SECTION FROM KM. 13.00 TO KM. 62.900 OF NH-353J
|
79 | 4L OF OBEDULLGANJ - BUDNI SECTION FROM KM. 8.400 TO KM. 20.700 IN RATANPANI WILDLIFE AREA OF NH - 69 (NEW NH-46)
|
80 | 4L OF PALMA TO GUMLA SECTION OF NH23 FROM KM. 26.00 TO KM. 89.170 ON HAM MODE IN THE STATE OF JHARKHAND.
|
81 | 4L OF PILERU TO KALUR SECTION FROM KM 55.900 TO KM 92.800 AND KM 94.500 TO KM 95.717
|
82 | 4L OF RAJURA-KORPANA-ADILABAD ROAD UPTO M.S. BORDER FROM KM 32.910 TO KM 89.090 OF NH-353B
|
83 | 4L OF RATNAGIRI - KOLHAPUR SECTION FROM KM 112.340 TO KM 145.300 OF NH-166 (PKG–III)
|
84 | 4L OF RATNAGIRI - KOLHAPUR SECTION FROM KM 67.140 TO KM 112.340 OF NH-166 (PKG – II)
|
85 | 4L OF RATNAGIRI - KOLHAPUR SECTION OF NH-166 FROM KM 0.000 TO KM 19.769 AND KM 31.000 TO KM 67.140 (PKG – I)
|
86 | 4L OF SAGAR - MOHARI FROM KM.8 TO KM.50 (PKG-I)
|
87 | 4L OF SANNUR TO BIKARNAKATTE SECTION FROM KARKALA TO MANGALORE
|
88 | 4L OF SHAMLI BYAPSS- SAHARANPUR FROM KM 92.2 TO KM 155.025 SECTION OF NH-709B, PKG-II
|
89 | 4L OF THIRUMANGALAM TO VADUGAPATTI SECTION FROM KM 0.000 TO KM 36.000 OF NH-744
|
90 | 4L OF TWIN TUBE TUNNEL CONFIGURATION INCLUDING APPROACHES FROM MAROG TO DIGDOL (FROM KM.154.210 TO KM.158.650 (NORTH BOUND) AND FROM KM.155.940 TO KM.160.260 (SOUTH BOUND)) OF RAMBAN TO BANIHAL (PKG-
|
91 | 4L OF VADUGAPATTI TO THERKUVENGANALLUR (RAJAPALYAM) SECTION FROM KM 36.000 TO KM 71.600 OF NH744 UNDER EPC MODE IN THE STATE OF TAMILNADU.
|
92 | 4L POANTA SAHEB–MEDNIPUR FROM KM. 435.65 TO KM. 458.65 OF NH-07(PKG-1)
|
93 | 4L PS FROM KURNOOL (EXISTING KM. 5.400 OF NH-40/DESIGN KM.0.000) TO MANDLEM (EXISTING KM.38.000/DESIGN KM 30.600) OF NH-340C(PACKAGE-1)
|
94 | 4L PS FROM MANDLEM (EXISTING KM. 38.000/DESIGN KM.30.600) TO ATMAKUR (EXISTING KM.73.000/DESIGN KM 66.115) OF NH-340C (PACKAGE-2)
|
95 | 4L PS MYDUKUR BADVEL FROM KM 585.820 TO KM 630.960 SECTION OF NH 67
|
96 | 4L PS OF SAVALI VIHIR TO START OF AHMEDNAGAR BYPASS (KM 88.400 TO KM 163.400) OF NH 160
|
97 | 4L SPUR OF PANIPAT - SHAMLI CONNECTING NH-709AD (PANIPAT – SHAMLI – MUZAFFARNAGAR) AND NH-709A (KARNAL – MEERUT) BYPASSING SHAMLI DISTRICT (UP)
|
98 | 4L SPUR OF SHAMLI-MUZZAFARNAGAR CONNECTING NH-709AD (PANIPAT-SHAMLI-MUZAFFARNAGAR) AND NH-58 (MEERUT - ROORKEE) BYPASSING MUFFARNAGAR TOWN
|
99 | 4L SUNDER NAGAR BYPASS FROM KM173.900 TO KM 179.600 OF NH-21 IN THE STATE OF HP
|
100 | 4L TWIN TUBE TUNNEL INCLUDING APPROACHES FROM DIGDOL TO KHUNI NALLAH (NORTH BOUND CONNECTING WITH EXISTING MAJOR BRIDGE ON NB) AND SOUTH BOUND CONNECTING WITH TUNNEL T4 ,SINGLE TUBE TUNNEL OF RAMBAN T
|
101 | 4LBERKHEDI TO GODPEHRA NH-44
|
102 | 4LPS OF MUZAFFARNAGAR TO MIRANPUR SECTION OF NH-709AD, PKG-III
|
103 | 6 L OF AURANGABAD TO BIHAR-JHARKHAND BORDER (CHORDAHA) SECTION FROM KM. 180.000 TO KM. 209.827 OF NH-2 (PKG-01).
|
104 | 6 LANING OF EXISTING 4-LANE STRETCH FROM KALKALLU AT KM.454+000 TO GUNDLA POCHAMPALLY AT KM.471+000, ON NAGPUR – HYDERABAD SECTION (DESIGN LENGTH 17.000 KM) OF NH-44 IN THE STATE OF TELANGANA UNDER BH
|
105 | 6-LANE AMRITSAR-BATHINDA GREENFIELD SECTION OF NH-754A FROM JUNCTION WITH MOGA JALANDHAR ROAD (NH-703) NEAR DHARAMKOT TO JUNCTION WITH BHAGTA BHAI KA-BHADAUR ROAD NEAR DYALPURA BHAI KA (FROM KM. 39+00
|
106 | 6-LANING OF KOZHIKODE BYPASS (CALICUT BYPASS) (I.E. VENGALAM JN. TO RAMANATTUKARA JN.) SECTION OF NH-17 (NEW NH-66) IN THE STATE OF KERALA UNDER NHDP PHASE III
|
107 | 6-LANING OF VIJAYAWADA BYPASS FROM GOLLAPUDI (DESIGN CH. 30+000) TO CHINNAKAKANI (DESIGN CH. 47+881) INCLUDING MAJOR BRIDGE ACROSS RIVER KRISHNA IN VIJAYAWADA GUNDUGOLANU SECTION OF NH-16 IN THE STATE
|
108 | 6L ACCESS CONTROL GREENFIELD HIGHWAY OF VILL-KARAUNDA MAHAJAN TO VILL-KHYAWARI FROM KM. 56.500 TO KM. 82.000 (PKG-3)
|
109 | 6L ACCESS CONTROL GREENFIELD HIGHWAY OF VILL-KHYAWARI TO VILL-LATIFPUR AT SAHARANPUR BYPASS FROM KM. 82.000 TO KM. 119.790 (PKG-4)
|
110 | 6L ACCESS CONTROL GREENFIELD HIGHWAY OF VILL-LOHADDA TO VILL-KARAUNDA MAHAJAN FROM KM. 27.000 TO KM. 56.500 (PKG-2)
|
111 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM AUDIREDDIPALLE 160.000 KM. TO MALLAPALLE 176.000 KM. PACKAGE 7
|
112 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM CHANDRASEKHARAPURAM (CH. 228+000) TO POLAVARAM (CH. 260+000)OF [NH-544G] (PACKAGE-11)
|
113 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM KODUR 0.000 KMS TO VANAVOLU 24.300 KMS OF NH 544G PACKAGE 1
|
114 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM MALLAPALLE 176.000 KM. TO KAVULAKUNTLA 196.000 KM. PACKAGE 8
|
115 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM MARRIPUDI (CH. 285+500) TO SOMAVARAPPADU (CH. 314+600) OF [NH-544G] (PACKAGE-13)
|
116 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM NALLACHERUVU PALLI 96.300 KM. TO YERRAGUDIPADU 129.000 KM. OF NH 544G PACKAGE 5
|
117 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM NARAYANMPET (CH. 203+500) TO CHANDRASEKHARPURAM (CH. 228+000)(PACKAGE-10)
|
118 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM ODULAPALLE 72.000 KM. TO NALLACHERUVUPALLI 96.300 KM. OF NH 544G PACKAGE 4
|
119 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM POLAVARAM (CH. 260+000) TO MARRIPUDI (CH. 285+500) OF [NH-544G](PACKAGE-12)
|
120 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM SOMAVARAPPADU (CH.314.600) TO MUPPAVARAM (CH.343+240) OF [NH-544G] (PACKAGE-14)
|
121 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM VANAVOLU 24.300 KM. TO VANKARAKUNTA 45.700 KM. OF NH 544G PACKAGE 2
|
122 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM VANKARAKUNTA 45.700 KM. TO ODULAPALLE 72.000 KM. OF NH 544G PACKAGE 3
|
123 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM YERRAGUDIPADU 129.000 KM. TO AUDIREDDIPALLE 160.000 KM. OF NH 544G PACKAGE 6
|
124 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY OF JULEKAL VILLAGE TO DINNEDEVARAPADU VILLAGE FROM KM 242.200 TO KM 280.400 (PKG-2)
|
125 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY OF JUNCTION OF EPE (VILL.-MAVIKALAN) TO VILL.-LOHADDA FROM KM. 0.000 TO KM. 27.000 (PKG-1)
|
126 | 6L ACCESS CONTROLLED GREENFIELD HIGHWAY OF NANDINNE VILLAGE TO JULEKAL VILLAGE FROM KM 202.900 TO KM 242.200 (PKG-1)
|
127 | 6L ACCESS CONTROLLED HIGHWAY FROM DND MAHARANI BAGH JN. WITH JAITPUR PUSHTA ROAD OF NH 148NA FROM KM. 0.00 TO KM. 9.00 IN NCR
|
128 | 6L ACCESS CONTROLLED LUDHIANA-BATHINDA GREENFIELD HIGHWAY FROM JN. WITH AMRITSAR-BATHANDA GREENFIELD ROAD (NH-754A) NEAR RAMPURA PHUL TO JN. WITH MOGA-BARNALA ROAD (NH-703) NEAR VILLAGE TALLEWAL FROM
|
129 | 6L ACCESS-CONTROLLED HIGHWAY FROM (GANESHPUR) TO(NEAR MOHAND) OF GANESHPUR – DEHRADUN SECTION FROM KM.0 TO KM.8.3 OF NH-72A (PACKAGE-1)
|
130 | 6L ACCESS-CONTROLLED HIGHWAY OF DAAT KALI TUNNEL - DEHRADUN OF GANESHPUR – DEHRADUN SECTION FROM KM.16.380 TO KM.19.785 OF NH-72A (PACKAGE-3)
|
131 | 6L ALURU - JAKKUVA SECTION OF NH-130CD ROAD FROM KM 365.033 TO KM 396.800 (PKG. 1)
|
132 | 6L AMRITSAR BATHINDA GREENFIELD SECTION FROM VILLAGE TIBA ON NE 5A TO JN. WITH MOGA JALANDHAR ROAD NH 703 NEAR DHARAMKOT FROM KM 0.000 TO KM 39.000 OF NH-754A PKG-1
|
133 | 6L AMRITSAR-BATHINDA GREENFIELD SECTION FROM JN. WITH BHAGTA BHAI KA-BHADAUR ROAD NEAR DYALPURA BHAI KA TO JN. WITH MANDI DABWALI BATHINDA ROAD ON NH-54 NEAR SANGAT KALAN FROM KM 93.000 TO KM 154.866
|
134 | 6L FROM BELGAUM TO SANKESHWAR BYPASS FROM KM 515.000 TO KM 555.017 OF NH 48
|
135 | 6L FROM SANKESHWAR BYPASS TO MH KNT BORDER FROM KM. 555.017 TO KM. 592.853 OF NH-48 (PKG II)
|
136 | 6L GREENFIELD BARAJA - KANDILI SECTION OF NH- 130-CD ROAD FROM KM 338+500 TO KM 342+500 (PACKAGE-OD-7)
|
137 | 6L GREENFIELD KANDILI - ALURU SECTION OF NH-130-CD ROAD FROM KM 342+500 TO KM 365+033 (PACKAGE-OD-8)
|
138 | 6L GREENFIELD BAUNSAGUAR - BARAJA SECTION OF NH-130-CD ROAD FROM KM 293+000 TO KM 338+500 (PACKAGE – OD-6)
|
139 | 6L GREENFIELD KALIAGURA – BAUNSAGUAR SECTION OF NH-130-CD ROAD FROM KM 249+000 TO KM 293+000 (PACKAGE – OD-5)
|
140 | 6L GREENFIELD KANPUR - LUCKNOW (EXPRESSWAY) PKG II FROM KM. 28.500 TO KM. 73.744
|
141 | 6L JAKKUVA – KORLAM SECTION OF NH-130CD ROAD FROM KM 396.800 TO KM 421.100 (PKG 2)
|
142 | 6L KANTAKAPALLE – SABBAVARAM SECTION OF NH-130CD ROAD FROM KM 445.100 TO KM 464.662 (PKG-4)
|
143 | 6L MINOR BRIDGE (PALOLI PALAM) AT KM. 203.160 and MAJOR BRIDGE (MORAD) AT KM. 204.895 AND ALLIED WORKS
|
144 | 6L OF ACCESS-CONTROLLED HIGHWAY FROM MOHAND TO DAAT KALI TUNNEL OF GANESHPUR – DEHRADUN SECTION FROM KM.8.30 TO KM.16.380 OF NH-72A (PACKAGE-2)
|
145 | 6L OF AGRA BYPASS (NORTHERN) CONNECTING KM. 174.500 OF NH-2 (NEW NH-19) TO KM. 141.000 OF YAMUNA EXPRESSWAYS
|
146 | 6L OF AMBALA-CHANDIGARH GREENFIELD SECTION FROM KM. 0.000 TO KM. 25.000 WITH 4L SPUR TO LALRU FROM KM. 0.000 TO KM. 5.828 AND SPUR TO PR-7 ROAD FROM KM. 0.000 TO KM. 11.157
|
147 | 6L OF AZHIYUR-VENGALAM FROM KM. 189.200 TO KM. 230.400 OF NH-66
|
148 | 6L OF BADAKUMARI - KARKI SECTION FROM KM 179.000 TO KM 226.500 OF NH-130-CD (PACKAGE – OD-3)
|
149 | 6L OF CHILKARARUPET BYPASS FROM KM. 357.400 TO KM. 371.920 OF NH-16
|
150 | 6L OF CHITTOOR TO THATCHUR FROM KUMARAJAPET TO VEERA KAVERI RAJA PURAM FROM KM 43.800 TO KM 61.380 OF NH-716B (PKG-II)
|
151 | 6L OF DHANARA - HATIBENA SECTION FROM KM 124.611 TO KM 146.50 OF NH-130-CD (PACKAGE – OD-1)
|
152 | 6L OF EXISTING 4L FROM GUNDLAPOCHAMPALLY TO BOWENPALLY FROM KM 471.300 TO KM 481.331 OF NH-44
|
153 | 6L OF HATIBENA - BADAKUMARI SECTION FROM KM 146.50 TO KM 179.00 OF NH-130-CD (PACKAGE – OD-2)
|
154 | 6L OF IT CITY CHOWK TO KURALI CHANDIGARH ROAD
|
155 | 6L OF JODHPUR ROMANA (BATHINDA) - MANDI DABWALI (PUNJAB HARYANA BORDER) SECTION OF NH-54 FROM KM. 0.000 TO KM. 27.400 OF NH-54
|
156 | 6L OF KAGAL-SATARA SECTION FROM KM 592.240 TO KM 658.000 OF NH-48 (PKG-I)
|
157 | 6L OF KAGAL-SATARA SECTION FROM KM 658.000 TO KM 725.000 OF NH-48 (PKG-II)
|
158 | 6L OF KARKI – KALIAGURA SECTION FROM KM 226.500 TO KM 249.000 OF NH-130-CD (PACKAGE – OD-4)
|
159 | 6L OF MADURAVOYAL TO SRIPERUMBUDUR SECTION FROM KM. 13.800 TO KM. 37.000 OF NH-4 THROUGH STATE HIGHWAYS DEPARTMENT
|
160 | 6L OF MH/KN BORDER (NIMBAL VILLAGE) TO KN/TS BORDER (SINGNODI VILLAGE) FROM KM. 26.000 TO KM. 97.000 IN GULBARGA OF NH-150C (PKG-II)
|
161 | 6L OF PONDAVAKKAM TO KANNIGAIPAIR FROM KM 96.040 TO KM 116.100 OF NH 716B (PKG-IV)
|
162 | 6L OF SRIPERUMBUDUR TO KARAIPETTAI FROM KM 37.000 TO KM 71.015 OF NH 48
|
163 | 6L OF VARADHARAJULA TO KUMARAJAPET FROM KM 0.000 TO KM 43.800 OF NH-716B (PKG-I)
|
164 | 6L OF VEERA KAVERI RAJA PURAM TO PONDAVAKKAM FROM KM 61.380 TO KM 96.040 OF NH 716B (PKG-III)
|
165 | 6L OF WAINGANGA BRIDGE - BHANDARA (INCLUDING BHANDARA BYPASS) SECTION FROM KM 485.000 TO KM 499.800 OF NH-53
|
166 | 6L STANDALONE FLYOVERS AT BONGAIGAON, CHAPAGURI, PATHSALA, SIMLAGURI CHOWK AND BAIHATA BYPASS JUNCTIONS ON STRETCHES OF NH-31 AND NH-27
|
167 | 6L STANDALONE FLYOVERS AT RAHA, DEMOW, BORGHAT, KATHIATALI JUNCTIONS AND ROB AT JAGIROAD ON STRETCHES OF NH 36 AND NH 27
|
168 | 6L WITH ACCESS CONTROL PROVISION SAHARANPUR BYPASS TO GANESHPUR SECTION FROM 13.89 KM TO 41.820 KM OF DELHI- DEHRADUN ECONOMIC CORRIDOR (PACKAGE-2)
|
169 | 8L OF DWARKA EXPRESSWAY PKG-II (RUB NEAR DWARKA SECTOR 21-DL/HR BORDER) FROM 5.300 KM.TO 9.500 KM. OF NH-248BB
|
170 | ACCESS CONTROLLED HIGHWAY OF 4 LANE WITH PAVED SHOULDERS FROM TIRUVALLUR (DESIGN CHAINAGE KM 17+56) TO TN/AP BRODER (DESIGN CHAINAGE KM 61+51) OF NH-716 (CHENNAI-TIRUPATI PACKAGE-1)
|
171 | ACCESS CONTROLLED HIGHWAY OF 4 LANE WITH PAVED SHOULDERS FROM TN/AP BORDER (DESIGN CHAINAGE KM 61+51) TO PUTTUR (DESIGN CHAINAGE KM 81+540) OF NH-716 & 6 LANE WITH PAVED SHOULDERS FROM MALLAVARAM TO R
|
172 | ACCESS ROAD/BRIDGE CONNECTIVITY FROM NH-09 AT KM.40 NEAR JAGBUDA BRIDGE (INDIA) TO BOUNDARY PILLAR NO. 802/11 OF INDO-NEPAL BORDER
|
173 | ADDITIONAL STRUCTURES ON 6LGURGAON-JAIPUR SECTION OF NH-48 BETWEEN KM 42.700 TO KM 273.00
|
174 | AMRITSAR AIRPORT JUNCTION RAMDAS FROM KM. 100.835 TO KM. 139.813 PKG IV
|
175 | BAKHTIYARPUR RAJAULI PKG-II FROM KM 54.405 TO KM 101.630 NH20
|
176 | BAL. WORKS OF FAGNE (KM. 510.000) TO MAHARASHTRA/GUJARAT BORDER (KM. 650.794)
|
177 | BALANCE WORK - WB-10 (GANDAK BRIDGE) KM 402.00 TO KM 440.00 (DEVANPUR - KOTWA)
|
178 | BALANCE WORK OF 2L PS FROM KM 30.800 TO 70.800 AND 2L WITH RIGID CARRIAGEWAY FROM 70.800 TO KM 84.120 OF KHANAPUR KA/GOA BORDER SECTION OF NH 4A
|
179 | BALANCE WORK OF 4 LANING OF PANVEL TO INDAPUR SECTION OF NH-66(OLD NH- 17) FROM KM 0.000 (PANVEL) TO KM 42.300 (KASU) UNDER BHARATMALA PARIYOJNA ON EPC MODE IN THE STATE OF MAHARASHTRA.
|
180 | BALANCE WORK OF 4- L ANING OF PATNA-GAYA-DOBHI SECTION (KM.83.00 TO KM. 127.217) OF NH-83 IN THE STATE OF BIHAR- PKG-III
|
181 | BALANCE WORK OF 4- LANING OF PATNA-GAYA-DOBHI SECTION (KM. 0.00 TO KM. 127.217) OF NH-83 IN THE STATE OF BIHAR TO BE EXECUTED UNDER JICA ODA LOAN ASSISTANCE -PKG-I
|
182 | BALANCE WORK OF 4- LANING OF PATNA-GAYA-DOBHI SECTION (KM. 39.00 TO KM. 83.00) OF NH-83 IN THE STATE OF BIHAR- PKG-II
|
183 | BALANCE WORK OF 4L OF NARIMBANGLO–JATINGA JUNCTION- HARANGAJO ROAD SECTION FROM KM 0.000 TO KM 49.230 OF NH-27
|
184 | BALANCE WORK OF 4L OF NAURADEHI SANCTUARY DE-SCOPED STRETCH OF HIRAN RIVER TO SINDOOR RIVER FROM KM. 66.00 TO 130.00 NH-12 (NEW NH-45)
|
185 | BALANCE WORK OF PANIKOILI RIMULI SECTION OF NEW NH-20 FROM KM 0.00 TO KM. 163.000
|
186 | BALANCE WORK OF TWO LANING WITH PAVED SHOULDER OF PIPRAKOTHI–MOTIHARI- RAXAUL SECTION OF NH-28A FROM
|
187 | BALANCE WORKS OF 4 LANE DIVIDED CARRIAGEWAY OF MISSING LINK SECTION OF NH-39 (REWA BYPASS) FROM JUNCTION WITH NH 30 NEAR BELA TO JUNCTION WITH MPRDC RING ROAD NEAR SILPARA ON SH 9 (DESIGN LENGTH 13.10
|
188 | BALANCE WORKS OF 4-LANNING OF RAMPUR-KATHGODAM SECTION OF NH-87 (NEW NH NO. 09) FROM KM. 0.000 (KM 190.000 OF NH-24) TO KM 42.791 (DESIGN CHAINAGE KM 43.446) (PACKAGE-I)
|
189 | BALANCE WORKS OF 4L PANVEL-INDAPUR SECTION OF NH-66 (OLD NH-17) FROM KM 42.300 (KASU) TO KM 84.600 (INDAPUR)
|
190 | BALANCE WORKS OF FOUR LANE FROM KM 43+950 (THIRUVALLUR BYPASS) TO KM 61+470 (VEPPAMPATTU BYPASS) PASSING THROUGH THANNERKULAM THOZUR AND SEVAPET BYPASS (17.520 KMS) OF TIRUPATI-TIRUTTANI-CHENNAI SECTI
|
191 | BALANCE WORKS OF FOUR LANING FROM RAMBAN KM 151.00 TO BANIHAL KM 187.00 OF NH-1A (NOW NH-44) WITH VALUE ADDITION AT CRITICAL LOCATION ON ENGINEERING PROCUREMENT AND CONSTRUCTION MODE (EPC MODE) IN THE
|
192 | BANGALORE CHENNAI EXPRESSWAY (PHASE-II PKG-I) FROM KM.71.000 TO KM 96.000 (BETHAMANGALA IN THE STATE OF KARNATAKA TO BYREDDYPALLI)
|
193 | BANGALORE CHENNAI EXPRESSWAY (PHASE-II PKG-II) FROM KM.96.000 TO KM 127.000 (BAIREDDYPALLE TO BANGARUPALEM SECTION)
|
194 | BANGALORE CHENNAI EXPRESSWAY (PHASE-II PKG-III) FROM KM.127.000 TO KM 156.000 (BANGARUPALEM TO GUDIPALA SECTION)
|
195 | BANGALORE CHENNAI EXPRESSWAY PHASE-III PACKAGE II (WALAJAHPET TO ARAKKONAM) FROM KM 180.000 TO KM 204.500
|
196 | BANGALORE CHENNAI EXPRESSWAY PHASE-III PACKAGE III (ARAKKONAM TO KANCHEEPURAM) FROM KM 204.500 TO KM 230.000
|
197 | BANGALORE CHENNAI EXPRESSWAY PHASE-III – PACKAGE I (GUDIPALA TO WALAJAJHPET) FROM KM 156.000 TO KM 180.000
|
198 | BANGALORE/TN BORDER TO HOSKOTE
|
199 | BANIHAL BYPASS (DELINKED FROM SRINAGAR - BANIHAL) FROM KM. 187.00 TO KM. 189.350
|
200 | BAREILY-SITAPUR (NH-24)
|
201 | BELAKERI PORT TO KUMTA - SIRSI ROAD FROM KM 0.00 - KM 4.265 OF BELEKERI PORT ROAD LINK RD. AND KM 4.965 - KM 60.00 OF SH-69
|
202 | BHARATMALA PARIYOJANA OF BOKARO JAINA MORE - GOLA SECTION OF NH-320 FROM KM. 21.110 TO KM. 53.600 IN THE STATE OF JHARKHAND PKG1
|
203 | CAPACITY AUGMENTATION OF THE EXISTING 4 LANE STRETCH FROM ICHHAPURAM TO NARASANNAPETA IN THE STATE OF ANDHRA PRADSEH
|
204 | COMPLETION OF BALANCE WORKS PENDING IN BIT AND PIECES (INCOMPLETE STRETCH AT 7 LOCATIONS) AND LISTED BALANCE WORKS FROM KM. 274.800 TO 338.030 IN AP PORTION AND OTHER LISTED BALANCE WORKS FROM KM. 0.0
|
205 | CONSTRUCTION OF FOUR LANING OF UP/HARYANA BORDER-YAMUNANGAR-SAHA-BARWALA-PANCHKULA
SECTION OF NH-73 FROM KM 160357 TO KM 179.249 (DESIGN KM 157.192 TO KM 176.400)
THE STATE OF
|
206 | CONSTRUCTION OF (I) 4-LANE HIGHWAY FROM VIDISHA TO HINOTIYA FROM KM. 0.000 TO KM. 27.000 (LENGTH=27 KM) (VIDISHA-MEHULWA-TALBEHAT PKG.-I) SECTION OF NH-346 AND (II) 4-LANING OF VIDISHA TO MORIKORI FRO
|
207 | CONSTRUCTION OF 1 NOS ROB, 2 NOS VUPS, SERVICE ROADS, PROVISION OF LIGHTING AND CONSTRUCTION OF OTHER MISCELLANEOUS WORKS AT VARIOUS STRETCHES INCLUDING MAINTENANCE OF EXISTING SECTION OF NH-4 FROM AP
|
208 | CONSTRUCTION OF 2 LANE BRIDGE ACROSS RIVER KOSI WITH APPROACH ROAD FROM BHEJA TO BAKAUR SECTION OF NH 527A DESIGN CHAINAGE KM 0.000 TO KM 13.300 UNDER BRT SCHEME OF BHARATMATA PARIYOJANA PHASE I IN TH
|
209 | CONSTRUCTION OF 4 LANE ACCESS CONTROLLED HIGHWAY FROM CHILLAKURU CROSS ROAD TO TURPUKANUPUR KM 0+000 TO KM 23+770 INCLUDING 6 LANE FLYOVER ON NH-16 (LENGTH KM 1.050) AND 6 LANE FROM TURPUKANUPUR TO PO
|
210 | CONSTRUCTION OF 4 LANE ACCESS CONTROLLED NEW GREENFIELD HIGHWAY SECTION OF NH 365BG FROM RECHARLA VILLAGE TO GURVAYGUDEM VILLAGE (DESIGN CHAINAGE 105.236 TO 132.664) UNDER HAM MODE UNDER BHARATMALA PA
|
211 | CONSTRUCTION OF 4 LANE ACCESS CONTROLLED NEW GREENFIELD HIGHWAY SECTION OF NH-365BG (KHAMMAM-DEVARAPALLE) FROM GURVAYGUDEM TO DEVARAPALLE (DESIGN CHAINAGE 132+664 TO 162+126 ) UNDER BHARATMALA PARIYOJ
|
212 | CONSTRUCTION OF 4 LANE ELEVATED HIGHWAY AND AT-GRADE IMPROVEMENTS AT GOPALGANJ TOWN FROM DESIGN CH: 384+000 (EXISTING CH: 384+000)TO DESIGN CH: 386+750 (EXISTING CH: 386+410) ON NH-28 (NEW NH-27) ON E
|
213 | CONSTRUCTION OF 4 LANE ELEVATED SECTION AND AT- GRADE IMPROVEMENTS AT BEGUSARAI TOWN SECTION OF NH-31 FROM DESIGN CHAINAGE 221+047 TO 225+302 IN THE STATE OF BIHAR ON EPC MODE
|
214 | CONSTRUCTION OF 4 LANE GREEN FIELD NORTHERN EAST SIDE GORAKHPUR BYPASS (26.616 KMS) STARTING FROM NH 29E (CHAINAGE 83.308) AND END AT NH 28 (CHAINAGE 285.100) IN THE STATE OF UTTAR PRADESH UNDER BHARA
|
215 | CONSTRUCTION OF 4-LANE ACCESS CONTROLLED GREENFIELD HIGHWAY SECTION ON NH-163G (KHAMMAM - VIJAYAWADA) FROM BRAHMANAPALLI (K) VILLAGE AT DESIGN CH 250.400 KM TO REMIDICHERLA VILLAGE AT DESIGN CH. 280.2
|
216 | CONSTRUCTION OF 4-LANE ACCESS CONTROLLED GREENFIELD HIGHWAY SECTION ON NH-163G (KHAMMAM-VIJAYAWADA) FROM V. VENKATAYAPALEM VILLAGE AT DESIGN CH. 220.480 KM TO BRAHMANAPALLI (K) VILLAGE AT DESIGN CH. 2
|
217 | CONSTRUCTION OF 4-LANE FROM BARELA TO MANEGAON SECTION OF NH-30 FROM DESIGN CH. 2.900 TO DESIGN CH. 19.050 (JABALPUIR RING ROAD) UNDER BHARATMALA PARIYOJANA IN THE STATE OF MADHYA PRADESH EPC MODE (PA
|
218 | CONSTRUCTION OF 4-LANE GREENFIELD JALBEHRA - SHAHBAD SECTION OF NH – 152G FROM KM 0+000 TO KM 22+850 (PART OF SHAHBAD - THOL FEEDER ROUTE) IN THE STATE OF HARYANA ON HYBRID ANNUITY MODE UNDER BHARATMA
|
219 | CONSTRUCTION OF 4-LANE HIGHWAY FROM SAMARLAKOTA TO ACHAMPETA JUNCTION (FROM KM. 0.000 TO KM. 12.250) AS PART OF KAKINADA PORT TO NH-16 CONNECTIVITY IN THE STATE OF ANDHRA PRADESH UNDER BHARATMALA PAR
|
220 | CONSTRUCTION OF 4-LANING OF BHIWANI HANSI ROAD SECTION OF NH 148B (DESIGN LENGTH 42.934 KM) UNDER BHARATMALA PARIYOJANA IN THE STATE OF HARYANA ON HYBRID ANNUITY MODE
|
221 | CONSTRUCTION OF 6 LANE DURG RAIPUR ARANG BYPASS PKG 1 SECTION OF NH 53 FROM CH 0.000 TO CH 44.500 IN THE STATE OF CHHATTISGARH
|
222 | CONSTRUCTION OF 6 LANE DURG RAIPUR ARANG BYPASS PKG 2 SECTION OF NH 53 FROM CH 44+500 TO CH.92+230 IN THE STATE OF CHHATTISGARH
|
223 | CONSTRUCTION OF 6 LANE ELEVATED CORRIDOR ALONG WITH DEVELOPMENT OF EXISTING 4 LANE ROAD AT GROUND LEVEL FROM AROOR TO THURAVOOR THEKKU SECTION OF NH-66 FROM KM. 366.330 TO KM. 379.082 OF NH-66 (LENGT
|
224 | CONSTRUCTION OF 6- LANE BRIDGE AND ITS APPROACHES ACROSS RIVER GANGA AS PART OF PATNA RING ROAD (NH-131G) STARTING FROM DESIGN KM. 8+480 NEAR SHERPUR TO KM. 23+000 NEAR DIGHWARA UNDER BHARATMALA PARIY
|
225 | CONSTRUCTION OF 6-LANE GREENFIELD AMBALA RING ROAD STARTING FROM JUNCTION WITH SHAMLI-AMBALA SECTION OF NH-344GM NEAR VILLAGE KAPURI (DESIGN KM 18+226) AND TERMINATING AT ISMAILABAD - AMBALA SECTION O
|
226 | CONSTRUCTION OF 6-LANE GREENFIELD KARNAL RING ROAD STARTING FROM NH-44 NEAR VILLAGE SHAMGARH (DESIGN KM 0+000 ) AND TERMINATING AT KARNAL - MUNAK ROAD (MDR -115) NEAR VILLAGE SAMALAKHA (DESIGN KM 34+5
|
227 | CONSTRUCTION OF 8 LANING OF EXISTING 4 LANE VADAPE TO THANE FROM KM 539.202 TO KM 563.000 SECTION OF NH-3 (NEW NH-848)
|
228 | CONSTRUCTION OF ADDITIONAL 3 LANE WITH PAVED SHOULDER (DESIGN LENGTH 8.87 KM) AS REALIGNMENT OF BAKANER GHAT (BETWEEN INDORE TO KHALAGHAT SECTION FROM EXISTING KM 59+190 TO KM 66+120) OF NH 52 (OLD NH
|
229 | CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY FROM KM 103.400 TO KM 128.000 OF VADODARA MUMBAI EXPRESSWAY TALASARI TO KARVAD SECTION IN THE STATE OF GUJARAT AND MAHARASHTRA ON HAM MODE UNDER
|
230 | CONSTRUCTION OF EIGHT LANE EXPRESSWAY FROM KM 190.000 TO KM 217.500 GANDEVA TO ENA SECTION OF VADODARA MUMBAI EXPRESSWAY IN THE STATE OF GUJARAT ON HAM MODE UNDER BHARATMALA PARIYOJANA PHASE I PACKAGE
|
231 | CONSTRUCTION OF EIGHT LANE VADODARA KIM EXPRESSWAY FROM KM 254.430 TO KM 279.000 (KIM TO ANKLESHWAR SECTION OF VADODARMUMBAI EXPRESSWAY) PACKAGE V
|
232 | CONSTRUCTION OF EMERGENCY LANDING FACILITY FROM KM. 246.60 TO KM. 249.70 ON SRINAGAR - BANIHAL SECTION
|
233 | CONSTRUCTION OF FLYOVER AT KM.544.650 INCLUDING ROB ,SERVICE ROADS ,FOOTPATH FOR RCC DRAINS ON URBAN LINK TO NAGPUR -RAIPUR ROAD
|
234 | CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF DSIR ZONE OF AHMEDABAD DISTRICT TO ADHELAI VILLAGE OF BHAVNAGAR DISTRICT (CH 71.00 TO CH109.019) SECTION OF AHMEDABAD DHOLERA GREENFILD ALIGNMENT (NH
|
235 | CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF SARDAR PATEL RING ROAD TO SINDHREJ VILLAGE (CH. 0.00 TO CH. 22.00) SECTION OF AHMEDABAD DHOLERA GREENFILD ALIGNMENT (NH 751) UNDER BHARATMALA PARIYOJ
|
236 | CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF SINDHREJ VILLAGE (CH. 22.00 TO CH. 48.52) SECTION OF AHMEDABAD DHOLERA GREENFILD ALIGNMENT (NH 751) UNDER BHARATMALA PARIYOJANA IN THE STATE OF GUJAR
|
237 | CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF VEJALLKA VILLAGE TO START OF DSIR ZONE OF AHMEDABAD DISTRICT (CH. 48.52 TO CH. 71.06) SECTION OF AHMEDABAD DHOLERA GREENFILD ALIGNMENT (NH 751) IN TH
|
238 | CONSTRUCTION OF FOUR LANE GREENFIELD PROJECT OF DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-III) FROM JUNCTION WITH JIND-PANIPAT ROAD (NH-352A) NEAR GANGANA VILLAGE TO JUNCTION WITH JIND-KARNAL ROAD
|
239 | CONSTRUCTION OF FOUR LANE GREENFIELD PROJECT OF DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-IV) FROM JUNCTION WITH JIND-KARNAL ROAD (NH-709A) NEAR ALEWA VILLAGE TO JUNCTION WITH AMBALA-KAITHAL-HISSAR
|
240 | CONSTRUCTION OF FOUR LANE GREENFIELD PROJECT OF DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-V) FROM JUNCTION WITH AMBALA-KAITHAL-HISSAR ROAD (NH-152) NEAR KHARAK PANDWA VILLAGE TO JUNCTION WITH PATIA
|
241 | CONSTRUCTION OF FOUR LANE HIGHWAY FORM GHAZIPUR BALLIA UP BIHAR STATE BORDER (GREENFIELD) SECTION OF NH31 PACKAGE I FROM HRIDAIPUR KM 0.000 TO SHAHAPUR KM 42.500 ON EPC MODE IN THE STATE OF UTTAR PRAD
|
242 | CONSTRUCTION OF FOUR LANE HIGHWAY FROM GHAZIPUR BALLIA UP BIHAR STATE BORDER (GREENFIELD) SECTION OF NH31 PACKAGE II FROM SHAHAPUR (KM 42.500) TO PINDARI (KM 78.150) ON EPC MODE IN THE STATE OF UTTAR
|
243 | CONSTRUCTION OF FOUR LANE HIGHWAY FROM GHAZIPUR BALLIA UP BIHAR STATE BORDER (GREENFIELD) SECTION OF NH31 PACKAGE III FROM PINDARI KM 78.150 TO RAWALGANJ BYPASS KM 117.120 ON EPC MODE IN THE STATE OF
|
244 | CONSTRUCTION OF FOUR LANE HIGHWAY FROM GHAZIPUR BALLIA UP BIHAR STATE BORDER GREENFIELD SECTION OF NH31 PACKAGE IV FROM BUXUR SPUR OF LENGTH KM 17.270 ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
245 | CONSTRUCTION OF FOUR LANE RINGROAD BYPASS SRINAGAR CITY
|
246 | CONSTRUCTION OF FOUR-LANE “WESTERN SIDE SPUR OF RAMPUR-RUDRAPUR SECTION CONNECTING NH-24 TO NH-87 BYPASSING RAMPUR TOWN” (DESIGN KM 00+000 TO KM DESIGN KM 13+700(LENGTH= 13.70 KM) ON EPC MODE IN THE S
|
247 | CONSTRUCTION OF FOUR/SIX LANE GREENFIELD LUDHIANA – RUPNAGAR NATIONAL HIGHWAY NO. NH-205K UNDER BHARATMALA PARIYOJANA IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE, PACKAGE-1 (DESIGN CH. 0.000 TO DESI
|
248 | CONSTRUCTION OF GREENFIELD CONNECTIVITY TO JEWAR INTERNATIONAL AIRPORT FROM DND FARIDABAD BALLABHGARH BYPASS KMP LINK SPUR TO DELHI MUMBAI EXPRESSWAY
|
249 | CONSTRUCTION OF GURGAON - PATAUDI - REWARI SECTION OF NH-352W (DESIGN LENGTH 46.11 KM) AS FEEDER ROUTE IN THE STATE OF HARYANA ON HYBRID ANNUITY MODE.
|
250 | CONSTRUCTION OF LEFT OUT PORTION OF AGRA INNER RING ROAD CONNECTING VILLAGE DEORI TO NH-44 VILLAGE BAD FROM KM. 0.000 TO KM. 7.772
|
251 | CONSTRUCTION OF NEW 2 LANE WITH PAVED SHOULDER OF HAMIRPUR BYPASS (PACKAGE IVA) OF NH-88 (NEW NH-103) (DESIGN CHAINAGE-KM 121+175 TO KM. 138+295, DESIGN LENGTH- 17.120) IN THE STATE OF HIMACHAL PRADES
|
252 | CONSTRUCTION OF NEW 4 LANE BRIDGE OVER RIVER GANGA AT DOWNSTREAM OF FARAKKA BARRAGE INCLUDING APPROACHES CONNECTING FARAKKA RAIGANJ SECTION OF NH34 IN THE STATE OF WEST BENGAL ON EPC MODE
|
253 | CONSTRUCTION OF NEW 4 LANE PRAYAGRAJ SOUTHERN BYPASS (PHASE-I) FROM DESIGN KM 43+200 (AT MAHUWARI VILLAGE) TO DESIGN KM 50+860 ON NH-19 (AT NABABA URF NIBI KALA UPARHAR VILLAGE) INCLUDING MAJOR BRIDGE
|
254 | CONSTRUCTION OF NEW 4 LANE PRAYAGRAJ SOUTHERN BYPASS FROM DESIGN KM 50.860 (NABABA URF NIBI KALA UPARHAR) TO DESIGN KM 64.763 ON NH-19 (NEAR KHODAYAPUR KASGAON) INCLUDING INTERCHANGE LOOP AT NH-19 (DE
|
255 | CONSTRUCTION OF NEW DOUBLE TIER 4 LANE ELEVATED CORRIDOR FROM CHENNAI PORT TO MADURAVOYAL IN CHENNAI DISTRICT FROM KM 0.342 TO KM 20.593 PACKAGE 1 FROM KM 0.342 TO KM 4.604
|
256 | CONSTRUCTION OF NEW DOUBLE TIER 4L ELEVATED CORRIDOR FROM CHENNAI PORT TO MADURAVOYAL IN CHENNAI DISTRICT FROM KM -0.342 TO KM 20.593 AND PACKAGE II FROM (KM 4.604 TO KM 9.700)
|
257 | CONSTRUCTION OF NEW DOUBLE TIER 4L ELEVATED CORRIDOR FROM CHENNAI PORT TO MADURAVOYAL IN CHENNAI DISTRICT FROM KM -0.342 TO KM 20.593 AND PACKAGE III FROM (KM 9.700 TO KM 14.185)
|
258 | CONSTRUCTION OF NEW DOUBLE TIER 4L ELEVATED CORRIDOR FROM CHENNAI PORT TO MADURAVOYAL IN CHENNAI DISTRICT FROM KM -0.342 TO KM 20.593 AND PACKAGE IV FROM (KM 14.185 TO KM 20.593)
|
259 | CONSTRUCTION OF NEW LINK (NH-133B) FROM KM 0/00 (KM 200/87 OF SAHIBANJ BYPASS) IN JHARKHAND TO KM 15/885 (JUNCTION OF NH-133B AND 131 A ON MANIHARI BYPASS) AND CONSTRUCTION OF MANIHARI BYPASS FROM KM
|
260 | CONSTRUCTION OF PROPOSED REWARI BYPASS (DESIGN LENGTH 14.4 KM) NH-11 AS A FEEDER ROUTE IN THE STATE OF HARYANA ON HYBRID ANNUITY MODE
|
261 | CONSTRUCTION OF PROPOSED SRINAGAR BYPASS FROM KM.0.000 TO KM.42,100 ( CROSSING OF SUMBEL ROAD ) IN SRINAGAR IN THE STATE OF JAMMU AND KASHMIR ON EPC MODE
|
262 | CONSTRUCTION OF RING ROAD AROUND KANPUR FROM KM.000 TO KM. 23.325 (CHACHENDI SACHENDI I TO MAHARAJPUR) (PACKAGE-I)
|
263 | CONSTRUCTION OF SIX LANING OF DEDICATED PORT ROAD TO KRISHNAPATNAM PORT (PACKAGE-I) KM 0+000 TO KM 18+000 ON ENGINEERING PROCUREMENT AND CONSTRUCTION
|
264 | CONSTRUCTION OF SIX LANING OF NAIDUPETA JUNCTION - TURPUKANUPUR SECTION FROM KM.57+046 TO KM.91+927 IN THE STATE OF ANDHRA PRADESH ON HAM UNDER BHARATMALA PARIYOJANA, PHASE-I.
|
265 | CONSTRUCTION OF STAND ALONE RING ROAD/ BYPASS AROUND JAMMU CITY IN THE STATE OF J AND K ON EPC MODE
|
266 | CONSTRUCTION OF STRR (WEST SIDE)-NH948A-BALAGONDAPALLI (TAMIL NADU) TO KARNATAKA/TAMIL NADU BORDER FROM KM 144.170 TO KM 179.936 (35.766 KM) IN THE STATE OF TAMIL NADU ON HYBRID ANNUITY MODE UNDER BHA
|
267 | CONSTRUCTION OF TUNNELS/VIADUCTS AT IDENTIFIED SLIDING/SLIP ZONES AT KM 130.550 TO KM.130.750; KM. 131.170 TO KM. 131.763; KM. 132.560 TO KM. 133.168; KM. 133.590 TO KM. 133.743 AND KM. 147.877 TO KM
|
268 | CONSTRUCTION OF TWIN TUBE TUNNELS ON JAMMU KASHMIR RING ROAD (NH-244A) BETWEEN DESIGN CH. 50+600 TO 51+700 AND DESIGN CH. 53+535 TO 55+700 ON EPC MODE UNDER RESIDUAL NHDP COMPONENT OF BHARATMALA PARIY
|
269 | CONSTRUCTION/ UP-GRATION OF FOUR/TWO LANE WITH PAVED SHOULDER OF NH68 FROM TANOT-RAMGARH BHADASAR-JAISALMER(DESIGN CH.0.000-125.573) AND FROM BHADASAR(MOKAL)-SARKARITALA UPTO PAKISTAN BORDER(DESIGN CH
|
270 | CONVERSION OF PARTIALLY EXCAVATED ESCAPE TUNNEL TO UNIDIRECTIONAL TWO LANE TUNNEL (INCLUDING CONSTRUCTION OF CROSS PASSAGES & APPROACH ROAD ON EITHER SIDE OF TUNNEL) FROM KM 12.732 TO KM 14.568 OF KIR
|
271 | CORRIDOR EFFICIENCY IMPROVEMENT INCLUDING REMOVAL OF BLACK SPOTS IN LAKHANPUR - SAMBA SECTION OF NH-44 FROM CHAINAGE KM. 16.300 TO KM. 74.100 - N/02007/03002/JK
|
272 | DELHI AMRITSAR KATRA EXPRESSWAY (PHASE-II PKG XVIII) DEVELOPMENT AND UPGRADATION OF FOUR LANE ACCESS CONTROL EXPRESSWAY FROM DESIGN CHAINAGE KM 530.00 TO KM 545.300 (SIDHRA TO DOMEL SECTION OF NH-44)
|
273 | DELHI AMRITSAR KATRA EXPRESSWAY PHASE I SPUR III FROM JUNCTION WITH AMRITSAR JALANDHAR ROAD NH3 NEAR BHISHAMBARPURA TO JUNCTION WITH AMRITSAR ANJALA ROAD NH354 NEAR AMRITSAR AIRPORT KM 71+000 TO KM 99
|
274 | DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 26
|
275 | DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 27
|
276 | DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 28
|
277 | DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 30
|
278 | DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 31
|
279 | DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-XI) FROM JUNCTION WITH JALANDHAR - KAPURTHALA ROAD (NH-703A) NEAR KHOJEWAL VILLAGE TO JUNCTION WITH AMRITSAR-MEHTA-SRIHARGOBINDPUR-TANDA ROAD (NH-503A) NEA
|
280 | DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-XII) FROM JUNCTION WITH AMRITSAR-MEHTA-SRIHARGOBINDPUR-TANDA ROAD (NH-503A) NEAR SRIHARGOBINDPUR TO JUNCTION WITH PATHANKOT-GURDASPUR ROAD (NH-54) NEAR GUR
|
281 | DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I SPUR-I) FROM JN. WITH KAPURTHALA - SULTANPUR LODHI ROAD (NH-703A) NEAR ISHARWAL VILLAGE TO JN. WITH KAPURTHALA - TARN TARAN ROAD (NH-703AA) NEAR GOINWAL SAHIB
|
282 | DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-II PKG-XIV) FROM JUNCTION WITH PATHANKOT-GURDASPUR ROAD (NH-54) NEAR BALSUA TO JUNCTION WITH HIRANAGAR ROAD NEAR VILLAGE GURHA BAILDARAN (KM 423+500 TO KM 468+10
|
283 | DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-II PKG-XV) [JUNCTION WITH HIRANAGAR ROAD NEAR VILLAGE GURHA BAILDARAN TO JUNCTION WITH JAMMU RING ROAD (NH-244A) NEAR JAKH VILLAGE FROM KM 468+100 TO KM 503+250]
|
284 | DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-II PKG-XVI) EXISTING JAKH (VIJAYPUR)-KUNJWANI SECTION OF NH-44 INCLUDING SPUR CONNECTIVITY TO JAMMU AIRPORT ( NH-144A) [KM 503+500 TO KM 514+500] - N/01004/01022
|
285 | DELHI-AMRITSAR-KATRA EXPRESSWAY FROM CH.KM 303+900 TO KM 319+400 OF MAIN EXPRESSWAY) AND AMRITSAR CONNECTIVITY CH.KM 0+000 TO KM 24+000. – PKG X
|
286 | DELHI-AMRITSAR-KATRA EXPRESSWAY FROM JUNCTION WITH LUDHIANA-MALERKOTLA ROAD (SH-11) NEAR BHOGIWAL VILL. TO JUNCTION WITH LUDHIANA-MOGA ROAD (NH-5) NEAR MULLANPUR DAKHA (KM 225+770 TO KM 260+860)ON EPC
|
287 | DELHI-AMRITSAR-KATRA EXPRESSWAY FROM JUNCTION WITH LUDHIANA-MOGA ROAD (NH-5) NEAR MULLANPUR DAKHA TO JUNCTION WITH JALANDHAR-MOGA ROAD (NH-703) NEAR KANG SAHIBU VILLAGE (KM 260+860 TO KM 303+900) ON E
|
288 | DELHI-AMRITSAR-KATRA EXPRESSWAY FROM JUNCTION WITH PATIALA-BATHINDA ROAD (NH-7) NEAR BHAWANIGARH TO JUNCTION WITH LUDHIANA-MALERKOTLA ROAD (SH-11) NEAR BHOGIWAL VILL. (KM 188+830 TO KM 225+770) ON EPC
|
289 | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-09) (CH. 247.310 TO CH. 292.950) [JUNCTION WITH MDR-1 (BAONLI-JHALAI ROAD) TO END OF INTERCHANGE ON NH-166 NEAR VILLAGE MUI]
|
290 | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-10) (CH. 292.950 TO CH. 319.400) [END OF INTERCHANGE ON NH-166 NEAR VILLAGE MUI TO HARDEOGANJ VILLAGE NEAR INDERGARH]
|
291 | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-14) (CH. 388.420 TO CH. 419.000) [JUNCTION WITH NH- 76 TO JUNCTION WITH NH-12 NEAR VILLAGE UMMEDPURA]
|
292 | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-15) (CH. 419.000 TO CH.427.300) [JUNCTION WITH NH-12 NEAR VILLAGE UMMEDPURA TO MAJOR BRIDGE OVER TAKLI RIVER NEAR NAYAGAON JAGEER VILLAGE]
|
293 | DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-6)
|
294 | DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-7)
|
295 | DEVELOPMENT OF 6 LANE ACCESS CONTROLLED GREENFIELD HIGHWAY FROM KM. 97.000 TO KM. 162.500 MARADGI S ANDOLA TO BASWANTHPUR SECTION OF NH-150C (PACKAGE-III OF AKKALKOT-KNT/TS BORDER) ON HYBRID ANNUITY M
|
296 | DEVELOPMENT OF 6 LANE JALANDHAR BYPASS FROM KAHLWAN NATIONAL HIGHWAY 03 DESIGN KM 0.00 ENDING AT KANG SAHBU NATIONAL HIGHWAY 703 DESIGN KM. 46.500 VIA SARMASTPUR NATIONAL HIGHWAY 44 MADARA NH03 KHA
|
297 | DEVELOPMENT OF 6L UER II [PACKAGE - II] (KARALA KANJHAWALA ROAD TILL NANGLOI - NAJAFGARH ROAD) FROM KM. 15.00 TO KM.28.45
|
298 | DEVELOPMENT OF 6L UER-II (PACKAGE-I) (NH-1 NEAR BAKOLI TILL KARALA KANJHAWALA ROAD) FROM KM. (-)0.70 TO KM. 15.07
|
299 | DEVELOPMENT OF FOUR LANNING OF ANGUL-SAMBALPUR SECTION OF NATIONAL HIGHWAY NH-42 (NEW NH-55 IN THE STATE OF ODISHA UNDER NATIONAL HIGHWAY DEVELOPMENT PROJECT (NHDP) PHASE-IV ON ENGINEERING PROCUREMEN
|
300 | DEVELOPMENT OF MULTIMODAL LOGISTICS PARK AT BANGALORE AND EXTERNAL CONNECTIVITY TO THE MULTI MODEL LOGISTIC PARK
|
301 | DEVELOPMENT OF NEWLY DECLARED NH-527C FROM MAJHAULI TO CHAROUT SECTION TO 2 LANE WITH PAVED SHOULDERS NATIONAL HIGHWAY STANDARD IN THE STATE OF BIHAR (KM 0.000 TO KM 63.655)
|
302 | DEVELOPMENT OF SIX LANE ACCESS CONTROLLED GREEN FIELD HIGHWAY FROM KAVULAKUNTLA (KM.196+000) TO NARAYANAMPET (KM 203+500) OF NH 544G BENGALURU-VIJAYAWADA ECONOMIC CORRIDOR ON HAM MODE IN THE STATE OF
|
303 | DEVELOPMENT OF SIX LANE BASANWAHI-MARANGPURI OF NH 130 CD FROM KM.99+500 TO 124+661 UNDER RAIPUR VISAKHAPATTNAM EC
|
304 | DEVELOPMENT OF SIX LANE JHANKI SARGI OF NH 130 CD FROM KM.0+000 TO 42+800 UNDER RAIPUR VISAKHAPATTNAM EC
|
305 | DEVELOPMENT OF SIX LANE SARGI-BASANWAHI OF NH 130 CD FROM KM.42+800 TO 99+500 UNDER RAIPUR VISAKHAPATTNAM EC
|
306 | DEVELOPMENT OF SIX-LANE ACCESS CONTROLLED HIGHWAY FROM ADHOYA MUSALMANA (AMBALA DISTRICT) TO SADOPUR (AMBALA DISTRICT) (FROM CH. 84+400 TO 121+786) OF SHAMLI - AMBALA SECTION OF BAREILLY - LUDHIANA EC
|
307 | DEVELOPMENT OF SIX-LANE ACCESS CONTROLLED HIGHWAY FROM GOGWAN JALALPUR (SHAMLI DISTRICT) TO RANIPUR BARSI (SAHARANPUR DISTRICT) (FROM CH. -(000+600) TO 45+500) OF SHAMLI - AMBALA SECTION OF BAREILLY -
|
308 | DEVELOPMENT OF SIX-LANE ACCESS CONTROLLED HIGHWAY FROM RANIPUR BARSI (SAHARANPUR DISTRICT) TO ADHOYA MUSALMANA (AMBALA DISTRICT) (FROM CH. 45+500 TO 84+400) OF SHAMLI - AMBALA SECTION OF BAREILLY - LU
|
309 | DHARAMPURI-LONAND FROM KM. 117.00 TO 166.40 (PKG-IV) ON MOHOL-ALANDI SECTION
|
310 | DWARKA EXPRESSWAY FROM KM -0.600 TO KM 5.300 - PKG-I (SHIVMURTI CHOWK-RUB NEAR DWARKA SECTOR 21)
|
311 | ELEVATED CORRIDOR IN RANCHI CITY FROM KM 0.00 TO KM 3.260 OF NH-75 INCLUDING DOWN RAMP ON NH-23 FROM KM 0.100 TO KM 0.600
|
312 | FOUR LANING OF AMRITSAR BYPASS FROM NEW TARN TARAN ROAD TO AJNALA ROAD FROM DESIGN KM. 0.750 TO DESIGN KM. 43.750 AND UPGRADATION OF EXISTING AMRITSAR KHEMKARAN ROAD NH354 TO FOUR LANE CONFIGURATION
|
313 | FOUR LANING OF AURANGABAD-PAITHAN SECTION OF NH-752E ON EPC MODE IN THE STATE OF MAHARASHTRA .
|
314 | FOUR LANING OF BAKHTIYARPUR - MOKAMA SECTION OF NH-31
|
315 | FOUR LANING OF BASUKINATH-DEOGHAR SECTION OF NH-114A FROM KM 85.081 TO KM 130.240 UNDER NHDP PHASE-IV IN THE STATE OF JHARKHAND ON HAM
|
316 | FOUR LANING OF BETTADAHALLI TO SRIRAMPURA SECTION FROM KM. 166+100 (DESIGN KM. 170+415) TO KM. 217+000 (DESIGN KM. 226+750) OF NH-206 ON HAM UNDER BHARATHMALA PARIYOJANA, IN THE STATE OF KARNATAKA. (P
|
317 | FOUR LANING OF BHOGU TO SANKHA FROM KM 147.450 TO KM 196.870 ON NH-75 PKG SEC-III
|
318 | FOUR LANING OF JITTANDAHALLI TO DHARMAPURI SECTION OF NH-844 (PKG-III) FROM KM.60+100 TO KM.94+460
|
319 | FOUR LANING OF KAGAVADAR - UNA SECTION OF NH-8E FROM KM 139.915 TO KM 180.478 (PACKAGE-IV) IN THE STATE OF GUJARAT
|
320 | FOUR LANING OF KARIMNAGAR-WARANGAL SECTION OF NH-563 FROM DESIGN CH.48.860 KM NEAR SH-1 CH.170.400 KM AT MANAKONDUR BYPASS TO DESIGN CH.116.875 KM EXISTING CH. 144.050 KM AT PALVELPULA NEAR HANAMKONDA
|
321 | FOUR LANING OF KHAJURI TO WYNDHAMGANJ FROM KM 219.600 TO KM 260.483 ON NH-75 PKG SEC-V ON HAM
|
322 | FOUR LANING OF KIRATPUR NEAR CHOUK SECTION (73.20 KM TO186.50 KM)
|
323 | FOUR LANING OF LEFT OVER WORKS OF HOSPET BELLARY KARNATAKA/ AP BORDER FROM KM.280.080 TO KM. 375.450 OF NH-63 (NEW NH-67) IN THE STATE OF KARNATAKA
|
324 | FOUR LANING OF MAMALLAPURAM TO MUGAIYUR SECTION OF NH332A FROM KM 0.000 TO KM 31.000
|
325 | FOUR LANING OF MEHGAMA HANSDIHA SECTION OF NH-33 FROM EXISTING KM 41.900 TO 93.000 IN THE STATE OF JHARKHAND ON HAM
|
326 | FOUR LANING OF MOGA TO BAJAKHANA LAMBWALI SECTION OF 105B GREENFIELD ALIGNMENT FROM DESIGN CHAINAGE FROM KM 0.000 TO KM 43.319 UNDER BHARATMALA PARIYOJNA IN THE STATE OF PUNJAB
|
327 | FOUR LANING OF MUGAIYUR TO MARAKKANAM SECTION OF NH-332A FROM KM 31.000 TO KM 62.000
|
328 | FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM KHARIA VILLAGE JUNCTION TO START OF EXISTING BHAGALPUR BYPASS DESIGN CHAINAGE KM KM 95+580 TO KM 125+000 (PACKAGE 02) ON HYBRID ANNUITY MODE I
|
329 | FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM MUNGER TO KHARIA VILLAGE JUNCTION DESIGN CHAINAGE KM 69+520 TO KM 95+580 (PACKAGE 01) ON HYBRID ANNUITY MODE IN THE STATE OF BIHAR
|
330 | FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM NEAR RASULPUR TO MIRZACHAUKI (DESIGN CHAINAGE KM 157+350 TO KM 193+931) (PACKAGE 04) ON HYBRID ANNUITY MODE IN THE STATE OF BIHAR
|
331 | FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM START OF EXISTING BHAGALPUR BYPASS TO RASULPUR (DESIGN CHAINAGE KM 125+000 TO KM 157+350)(PACKAGE 03)ON HYBRID ANNUITY MODE IN THE STATE OF BI
|
332 | FOUR LANING OF NERALURU TO THORAPALLI AGRAHARAM SECTION OF NH-844 (PKG-I) FROM KM.0+000 TO KM.23+350
|
333 | FOUR LANING OF PARARIA TO MOHANIA SECTION OF NH 319 (OLD NH 30) FROM KM. 54+530 (DESIGN CHAINAGE) TO KM. 115+330 (DESIGN CHAINAGE) ON EPC MODE IN THE STATE OF BIHAR (PACKAGE II)
|
334 | FOUR LANING OF PATNA TO KOILWAR
|
335 | FOUR LANING OF POONDIYANKUPPAM TO SATTANATHAPURAM (DESIGN CH KM. 67.000 TO KM. 123+800) SECTION OF NH-45A
|
336 | FOUR LANING OF PUDUCHERRY - POONDIYANKUPPAM SECTION OF NH 45 A (NEW NH 332) FROM KM 29.000 TO KM 67.000 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA PHASE I (RESIDUAL NHDP IV WORKS)
|
337 | FOUR LANING OF PURULIYA BYPASS SECTION OF NH 32 IN THE STATE OF WEST BENGAL ON EPC MODE
|
338 | FOUR LANING OF RAGHOGARH (DESIGN CH.29.300/EXISTING CH. 29.555) TO NANASA (DESIGN CH.92.971/EXISTING CH. 95.000) OF NH-47 (OLD NH-59A) (INDORE-HARDA, PACKAGE-II)
|
339 | FOUR LANING OF RAMBAN - BANIHAL SECTION OF NH-1A
|
340 | FOUR LANING OF SATTANATHAPURAM (KM.123/800) TO NAGAPATTINAM (KM.179/555) SECTION OF NH-45A ON HAM UNDER BHARATMALA PARIYOJANA PHASE -1 (RESIDUAL WORKS UNDER NHDP) OF TAMIL NADU
|
341 | FOUR LANING OF SOLAN-KAITHLIGHAT SECTION OF NH-22 (NOW NH-5) FROM KM 106.139 TO KM 129.050, ON EPC MODE
|
342 | FOUR LANING OF SONAULI GORAKHPUR SECTION OF NH 29E (NEW NH 24) FROM DESIGN CH. 0.000 TO DESIGN CH. 79.540 (FROM EXISTING CH. 0.000 TO EXISTING CH. 80.295) ON HYBRID ANNUITY MODE IN THE STATE OF UTTAR
|
343 | FOUR LANING OF THORAPALLI AGRAHARAM TO JITTANDAHALLI SECTION OF NH-844 (PKG-II) FROM KM.23+350 TO KM.60+100
|
344 | FOUR LANING OF UDHAMBUR - RAMBAN SECTION OF NH-1A
|
345 | FOUR LANING OF VILLUKURI KANNIYAKUMAR ROAD OF KM 70.250 TO 96.700 AND NAGERCOIL TO KAVALKINARU OF NH 47 B KM 0.00 TO 16.314
|
346 | FOUR LANING OF VILUPPURAM - PUDUCHERRY SECTION OF NH 45 A (NEW NH 32) FROM KM 0.000 TO KM 29.000 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA PHASE I (RESIDUAL NHDP IV WORKS)
|
347 | FOUR LANING WITH PAVED SHOULDER OF SECTION FROM KM 53.600 (GOLA ON NH-320) TO KM 81.446 (ORMANJHI ON NH-320B) IN THE STATE OF JHARKHAND ON HYBRID ANNUITY MODE
|
348 | FOUR LANINIG OF CHETTIKULAM TO NATHAM SECTION OF NH-785 FROM CHETTIKULUM (KM 7.300) TO NATHAM (KM. 36.690)
|
349 | FOUR LANNING OF CHOLOPURAM-THANJAVUR
|
350 | FOUR LANNING OF NERCHOWK-PANDOH BYPASS SECTION OF NH-21(PACKAGE-I KM 190.000 TO KM 221.305) UNDER NHDP-IVB ON EPC MODE IN THE STATE OF HIMACHAL PRADESH
|
351 | FOUR LANNING OF TAMIL NADU KERALA BORDER TO VILLUKURI FROM KM. 43.00 TO 70.25 OF NH-47 UNDER NHDP-PH III ON EPC MODE IN STATE OF TAMIL NADU
|
352 | FOUR LANNING OF VIKRAVANDI-SETHIYAHOPU FROM KM 0.000 TO KM 60.250(DESIGN CHAINAGE KM 0.000 TO KM 65.960) SECTION OF NH-45C IN THE STATE OF TAMIL NADU UNDER NHDP –IV ON EPC MODE
|
353 | FOUR LANNING OF VILLUKURI TO KANYAKUMARI SECTION FROM KM 70.25 TO 96.714 OF NH-47 AND NAGERCOIL TO KAVALKINARU SECTION FROM 0.00KM TO 16.736 KM
|
354 | FOUR LANÌNG OF PUDUCHERRY (KM.29/000) TO POONDIYANKUPPAM (KM.67/000) SECTION OF NH-45A ON HAM UNDER BHARATMALA PARIYOJANA PHASE -1 (RESIDUAL WORKS UNDER NHDP) OF TAMIL NADU
|
355 | FOUR OF SIMARIA - KHAGARIA SECTION OF NH-31
|
356 | FOUR SIX LANING OF PIMPALGAON NASHIK GONDE FROM KM 380.00 TO KM 440.00 SECTION OF NH-3
|
357 | GARHMUKTESHWAR (KM. 83.200 OF NH-24) TO MEERUT (KM. 9.860 OF NH-235) INCLUDING CONNECTOR TO NH-119
|
358 | HARIDWAR DEHRADUN APPROVED LENGTH 69
|
359 | HARIHARGANJ TO PARWA MODE SECTION FROM KM 23.284 TO KM 57.049 OF NH-98
|
360 | HYDERABAD-BANGALORE SEC.(NS COR.PH.-II)[KM.418-463.16],NH-7
|
361 | IMPROVEMENT , UP-GRADATION OF NH-734 SECTION OF MORADABAD - THAKURDWARA - KASHIPUR: “PACKAGE-I: MORADABAD BYPASS” (LENGTH= 33.724 KM), START FROM CH. 0+00 (KM. 144+381 OF NH-24) AND ENDS AT CH. 33+724
|
362 | IMPROVEMENT AND UP-GRADATION OF EXISTING ROAD TO 2/4L PS FROM KM 40.000 TO 88.750, START OF KHUTAR BYPASS TO START OF SHAHJAHANPUR BYPASS OF NH 731(PKG-I)
|
363 | IMPROVEMENT AND UP-GRADATION OF EXISTING ROAD TO 4L PS FROM KM 123.650 TO 175.080, FROM START OF SHAHABAD BYPASS TO END OF HARDOI BYPASS OF NH 731 (PKG-2B)
|
364 | IMPROVEMENT AND UP-GRADATION OF EXISTING ROAD TO 4L PS FROM KM 229.070 TO 260.800, END OF HARDOI DISTRICT TO LUCKNOW RING ROAD OF NH 731 (PKG-4)
|
365 | IMPROVEMENT OF EXISTING ALIGNMENT OF PANDHARPUR TOWN PART BYPASSED SECTION FROM WAKHARI TO LORD VITTHAL TEMPLE LENGTH 8 KM UNDER BHARATMALA PARIYOJANA ON EPC MODE
|
366 | IMPROVEMENT OF GEOMETRICS OF THONDUPALLY TO KOTHUR FROM KM 22.300 TO KM 34.14 OF NH-44-RCW
|
367 | INDORE - EDLABAD (PKG-II) [TEJAJINAGAR TO BALWARA]
|
368 | INDORE - HARDA (PKG-I) [INDORE TO RAGHAV GARH FROM KM. 0.25 TO KM. 26.903]
|
369 | INDORE - HARDA (PKG-III) [NANASA TO PIDGAON SECTION FROM KM 95.000 TO KM 142.445]
|
370 | KANPUR LUCKNOW EXPRESSWAY PKG-1 CONSTRUCTION OF 6-LANE TO EIGHT LANE OF KANPUR LUCKNOW EXPRESSWAY (NE-6), INCLUDING SPUR FROM KM. 10.980 TO KM. 28.500 IN THE STATE OF UTTAR PRADESH ON HAM MODE UNDER B
|
371 | KARAIPETTAI TO WALAJAPET FROM KM 71.015 TO 107.091
|
372 | KATNI BYPASS FROM KM. 359.50 TO KM. 378.50
|
373 | KHAMMAM DEVARAPALLE PKG II 4L ACCESS CONTROLLED (GREENFIELD) FROM SOMAVARAM VILLAGE TO CHINTAGUDEM VILLAGE (DESIGN CHAINAGE 33+604 TO 63+117) N/05011/02003/TS
|
374 | KHAMMAM-DEVARAPALLE PKG I [4L ACCESS CONTROLLED (GREENFIELD) FROM THALLAMPADU VILLAGE TO SOMAVARAM VILLAGE (DESIGN CHAINAGE 0+000 TO 33+604)] - N/05011/02002/TS
|
375 | KHAMMAM-DEVARAPALLE PKG III [4L ACCESS CONTROLLED (GREENFIELD) FROM CHINTAGUDEM VILLAGE TO RECHERLA VILLAGE (DESIGN CHAINAGE 63+117 TO 105+236)] - N/05011/02004/TS
|
376 | LUCKNOW-BYPASS (EW) (NS AND EW-PH-I) NH-25 AND NH-28 VIA NH-56
|
377 | NAGPUR RING ROAD PACKAGE-2
|
378 | PANIKHOLI-RIMOLI
|
379 | PANVEL-INDAPUR
|
380 | PATNA-MUZZAFFARPUR
|
381 | PERMANENT RECTIFICATION OF 3 NOS. OF BLACK SPOTS IN PROJECT HIGHWAY NH-27 OF U.P BORDER - DEWAPUR - KOTWA SECTION, PERMANENT RECTIFICATION OF 5 NOS. OF BLACK SPOTS OF PROJECT HIGHWAY NH-27 OF KOTWA -
|
382 | PERMANENT RECTIFICATION OF 4 NOS. OF BLACKSPOTS ON NH 27 OF KOTWA MEHSI MUZAFFARPUR SECTION FROM 4 NOS. OF BLACKSPOT ON NH-27 OF MUZAFFARPUR DARBHANGA PURNIA SECTION 1 NO OF AT GRADE JUNCTION REM
|
383 | PKG NAME: 4L OF KATHLIGHAT TO SHAKRAL VILLAGE FROM KM 128.835 TO KM 146.300 OF NH- 5 (SHIMLA BYPASS - PKG I)
|
384 | PREPATION OF FEASIBILITY/DPR OF CONSTRUCTION OF NEW 4-LANE ELEVATED ROAD FROM CHENNAI PORT TO MADURAVOYAL IN THE STATE OF TAMIL NADU
|
385 | REHABILITATION AND UP GRADATION FROM 4 TO 8 LANING OF CHANDIKHOLE PARADIP SECTION OF NH 53 FROM KM.39.000 TO KM.60.00 (PACKAGE 3)
|
386 | REHABILITATION AND UP GRADATION FROM 4 TO 8 LANING OF CHANDIKHOLE PARADIP SECTION OF NH 53 FROM KM 18.00 TO KM 39.00 IN THE STATE OF ODISHA ON HAM MODE (PACKAGE 2)
|
387 | REHABILITATION AND UP GRADATION FROM 4 TO 8 LANING OF CHANDIKHOLE PARADIP SECTION OF NH 53 FROM KM.0.00 TO KM.18.00 (PACKAGE 1)
|
388 | REHABILITATION AND UP GRADATION FROM 4 TO 8 LANING OF CHANDIKHOLE – PARADIP SECTION OF NH-53 (OLD NH – 5A) FROM KM.60.000 TO KM.76.646 (PACKAGE-4)
|
389 | REHABILITATION AND UP GRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER CONFIGURATION IN PURULIA (JH/WB BORDER) TO KM. 84.400 (NEAR SIMULIA JUNCTION, PURULIA) TO KM. 153.705 (NEAR CHANDIL, JUNC
|
390 | REHABILITATION AND UP-GRADATION OF EXISTING 2-LANE TO 4 LANE OF DUBURI (KM 388.376) TO CHANDIKHOLE (KM 428.074) PKG-III ON EPC MODE
|
391 | REHABILITATION AND UP-GRADATION OF EXISTING 2-LANE TO FOUR LANE FROM TALCHAR TO END OF KAMAKHYANAGAR BYPASS SECTION OF (KM. 8.844 – KM. 15.725) OF NH 23 (NEW NH – 149) AND (KM. 301.875 – KM. 335.946
|
392 | REHABILITATION AND UP-GRADATION OF EXISTING ROAD TO 2L PS FROM END OF HAMIRPUR BYPASS (NEAR CHILBAHAL) TO BHANGBAR SECTION FROM KM. 138.295 TO KM.175.270 OF NH-88 (PKG-IV)
|
393 | REHABILITATION AND UP-GRADATION TO 4-LANING OF RAJAMUNDA-BARKOTE SECTION OF NH-23 (NEW NH NO. 143) (KM. 287.200 TO KM. 337.185) IN THE STATE OF ODISHA UNDER NHDP-IV
|
394 | REHABILITATION AND UP-GRADATION TO 4L CONFIGURATION AND STRENGTHENING OF THANPURI TO PAROR SECTION FROM KM 85.135 TO KM 100.840 OF NH-154 (PKG IIC)
|
395 | REHABILITATION AND UPGRADATION OF CUTTACK ANGUL SECTION OF NH-42 (NEW NH-55) TO 4 LANE (KM. 0+400 TO KM. 60+200) IN THE STATE OF ODISHA UNDER NHDP PHASE-III ON EPC MODE, PKG-1
|
396 | REHABILITATION AND UPGRADATION OF CUTTACK-ANGUL SECTION TO 4 LANE (KM 60.20) TO (KM 112.0) PKG II ON EPC MODE
|
397 | REHABILITATION AND UPGRADATION OF SIX LANING OF BHADRAK BALESHWAR SECTION (KM 136.50) TO (KM 199.141) ON HAM.
|
398 | REHABILITATION AND UPGRADATION OF TWO LANING OF MAHESHKHUNT - SAHARSA - PURNEA SECTION PKG - I
|
399 | REHABILITATION AND UPGRADATION TO 4L CONFIGURATION and STRENGTHENING OF SIHUNI TO RAJOL FROM KM 51.000 TO KM 72.000 OF NH-154
|
400 | REHABILITATION AND UPGRADING FROM 2 L TO 4 L FROM BHANGBAR(NEAR RANITAL) TO KANGRA BYPASS SECTION OF NH-88 (NEW NH-303, 503) UP TO INTERSECTION WITH NH-154 (DESIGN CH. KM. 175.270 TO CH. KM. 193.400)
|
401 | REHABILITATION and UPGRADATION FROM 2 LANE TO 4 LANE OF NH STRETCH UNDER BHARATMALA PARIYOJANA FOR UNNAO-LALGANJ SECTION OF NEW NH-31 (OLD NH-232A) ON HYBRID ANNUITY MODE IN THE STATE OF UTTAR PRADESH
|
402 | RENIGUNTA - POYYA - NAIDUPETA KM 124.60 TO KM 183.4 OF NH 71 - N/04027/06001/AP
|
403 | SANCHORE - SANTALPUR FROM KM 67.000- KM 99.000 OF NH-754K (AJ-RGBS-PACKAGE-3)
|
404 | SANCHORE - SANTALPUR FROM KM 99.000- KM 130.073 OF NH-754K (AJ-RGBS-PACKAGE-4)
|
405 | SIX LANE ACCESS CONTROLLED OF DELHI SAHARANPUR HIGHWAY FROM AKSHARDHAM NH 9 JUNCTION TO DELHI UP BORDER CH.0.00 TO CH. 14.750 IN THE STATE OF DELHI ON EPC MODE UNDER ECONOMIC CORRIDOR IN PHASE 1 OF BH
|
406 | SIX LANE ACCESS CONTROLLED OF DELHI SAHARANPUR HIGHWAY FROM DELHI UP BORDER TO EPE JUNCTION CH.14.750 TO CH. 31.200 IN THE STATE OF UTTAR PRADESH ON EPC MODE UNDER ECONOMIC CORRIDOR IN PHASE 1 OF BHAR
|
407 | SIX LANE OF PALSIT TO DANKUNI SECTION FROM 588.870 TO KM. 652.700
|
408 | SIX LANING FROM KAPPIRIKKAD TO THALIKULAM SECTION OF NH – 66 (OLD NH-17) FROM DESIGN CH. 335+850 (EX. KM 349.260) TO DESIGN CHAINAGE 369+015 (EX. KM 382.300) IN THE STATE OF KERALA ON HYBRID ANNUITY M
|
409 | SIX LANING FROM KODUNGALLUR TO EDAPALLY SECTION OF NH –66 (OLD NH-17) FROM DESIGN CHAINAGE 397+750 (EX. KM 411.850) TO DESIGN CHAINAGE 423+780 (EX. KM 343.330 OF NH 47: NEAR 438.600 OF NH- 17) IN THE
|
410 | SIX LANING FROM START OF VALANCHERY BYPASS TO KAPPIRIKKAD-SECTION OF NH-66(OLD NH-17) FROM DESIGN CH-298+500 FEX.KM 304.250) TO DESIGN CH.335+850(EX.KM 349.260) IN THE STATE OF KERALA ON HYBRID ANNUIT
|
411 | SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF NH – 66 (OLD NH-17) FROM DESIGN CH.369+015 (EX. KM 382.300) TO DESIGN CH. 397+750 (EX. KM 411.850) IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UN
|
412 | SIX LANING OF AURANGABAD TO BIHAR - JHARKHAND BORDER (CHORDAHA) SECTION
|
413 | SIX LANING OF BIHAR - JHARKHAND BORDER (CHORDAHA) TO GORHAR SECTION
|
414 | SIX LANING OF CHENGALA TO NEELESHWARAM SECTION OF NH-17 (NEW NH-66) FROM CH. 56+200 (EXISTING KM 57+200) TO CH. 93+468 (EXISTING KM 95+650) TOTAL LENGTH 37.268 KM IN THE STATE OF KERALA ON HYBRID ANNU
|
415 | SIX LANING OF HAPUR BYPASS TO MORADABAD SECTION INCLUDING HAPUR BYPASS FROM KM 50.000 (DESIGN CHAINAGE 50.000) TO KM 148.277 (DESIGN CHAINAGE 149.867) OF NH-24 (NEW NH-9)
|
416 | SIX LANING OF KADAMBATTUKONAM TO KAZHAKKOOTTAM SECTION OF NH-66(OLD NH-47) FROM KM. 517+250 TO KM.547+080 IN THE STATE OF KERALA ON EPC MODE UNDER BHARATMALA PARIYOJANA
|
417 | SIX LANING OF KOTTUKULANGARA (DESIGN KM. 454+500) TO START OF KOLLAM BYPASS (DESIGN KM. 486+000) SECTION OF NEW NH-66 (OLD NH-47) IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJ
|
418 | SIX LANING OF KT/KL BORDER (THALAPPDY) TO CHENGALA SECTION OF NH17 (NEW NH-66) FROM CH. 17.200 TO CH. 57+200 IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJNA
|
419 | SIX LANING OF NATIONAL CORRIDOR NH19 FROM PANAGARH TO PALSIT IN THE STATE OF WEST BENGAL UNDER BHARATMALA PARIYOJANA TO BE EXECUTED ON BOT TOLL BASIS
|
420 | SIX LANING OF NEELESHWARAM TO THALIPARAMBHA SECTION FROM CH. 94+540 (EXISTING KM 96+450) TO CH. 134+650 (EXISTING KM 137+900) (TOTAL LENGTH 40.11 KM) IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UND
|
421 | SIX LANING OF PARAVOOR(DESIGN KM. 417+000) TO KOTTUKULANGARA(DESIGN KM. 454+500) SECTION OF NEW NH-66 (OLD NH-47) IN THE STATE OF KERALA ON EPC MODE UNDER BHARATMALA PARIYOJANA
|
422 | SIX LANING OF RAMANATTUKARA JUNCTION TO START OF VALANCHERY BYPASS SECTION OF NH-66 (OLD NH-17) FROM DESIGN CH.258+818 (EX.KM 27.840 OF KOZHIKODE BYPASS) TO DESIGN CH.298+500 (EX.KM 304.250) IN THE ST
|
423 | SIX LANING OF START OF KOLLAM BYPASS (KM.486+000) KADAMBATTUKONAM (KM.517+250) SECTION OF NEW NH-66 (OLD NH-47) IN THE STATE OF KERALA ON HAM UNDER BHARATMALA PARIYOJANA
|
424 | SIX LANING OF THALIPARAMBHA- MUZHAPILANGAD SECTION FROM KM 137.900 TO KM. 170.600 OF NH-17 (NEW NH-66) (PROJECT LENGTH 29.948 KM) IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIY
|
425 | SIX LANING OF THURAVOOR (DESIGN KM. 378+612) TO PARAVOOR (DESIGN KM.417+000) SECTION OF NEW NH-66 (OLD NH-47) IN THE STATE OF KERALA ON EPC MODE UNDER BHARATMALA PARIYOJANA
|
426 | SIX LANING OF TUTICORIN PORT ROAD SECTION OF NH-7A (NEW NH-138) FROM KM 0.000 TO KM 6.140 [EFFECTIVE LENGTH – 5.16 KM] ON EPC MODE IN THE STATE OF TAMIL NADU ON EPC MODE
|
427 | SIX LANNING FROM KM. 401.200 TO 494.410 OF NH-8 ON HYBRID ANNUITY MODE UNDER NHDP-V(PKG VI)REG.
|
428 | SIX LANNING OF AUNTA-SIMARIA(GANGA BRIDGE WITH APPROACH ROADS) SECTION OF NH-31
|
429 | SIX LANNING OF AURANGABAD TO BIHAR/JHARKHAND BORDER SECTION OF NH-19 (OLD NH-2) FROM KM. 209.827 TO 249.525 (PKG-II) IN THE STATE OF BIHAR ON EPC MODE.
|
430 | SIX-LANING OF BARWA ADDA-PANAGARH
|
431 | SPUR OF MEERUT-GARH-MUKTESHWAR SECTION(NH-709A) CONNECTING NH-119 AND NH-58 BYPASSING MEERUT TOWN
|
432 | STRENGTHENING OF EXISTING 4L AYODHYA BYPASS SECTION FROM DESIGN KM.121.600 TO KM. 144.020 OF NH 28 (NEW NH 27) (PKG-3)
|
433 | THOPPUR METTUR BHAVANI ERODE SECTION OF NH 544H FOR A LENGTH OF 85 KM
|
434 | TUMKUR - NELAMANGALA(6L)
|
435 | TUNNEL AT KHAMBATAKI GHAT SECTION AND ITS APPROACHES FROM EXISTING KM. 771.730 TO EXISTING KM. 782.000
|
436 | TWO / FOUR LANING OF RAEBARELI - JAGDISHPUR SECTION OF NH-330A FROM KM. 0.000 TO KM. 47.800 (DESIGN LENGTH – 46.020 KM) INCLUDING JAGDISHPUR BYPASS (3.52 KM.) IN THE STATE OF UTTAR PRADESH UNDER NH(O)
|
437 | TWO LANING WITH PS OF NAGAPATTINAM - THANJAVUR
|
438 | TWO LANNING WITH FORMATION OF FOUR LANE OF PROPOSED SHIMLA BYPASS
|
439 | TWO-LANNING WITH PAVED SHOULDER OF MAHSHKUNT-SAHARSA-PURNEA SECTION FROM EXISTING KM.89.020 (DESIGN CHAINAGE 90.000) TO EXISTING KM 179.470 ) PKG-II
|
440 | UP-GRADATION TO 4-LANE WITH PAVED SHOULDER OF BHIMASAR JUNCTION OF NH-41 TO ANJAR BHUJ UPTO AIRPORT JUNCTION FROM KM. 0.000 TO KM. 65.478 OF NH-341 TO BE EXECUTED ON HYBRID ANNUITY MODE IN THE STATE O
|
441 | UPGRADATION 2/4 LANE NH CONNECTIVITY UNDER SAGARMALA SCHEME SH 2 HAVERI YEKAMBI SH 69 YEKAMBI KUMTA BELEKERE UNDER STATE OF KARNATAKA
|
442 | UPGRADATION AND 4L OF HARIDWAR BYPASS FROM KM 0.000 (KM 188.100 OF NH-58) TO KM. 15.100 (KM 5.100 OF NH 74) (PKG-1)
|
443 | UPGRADATION OF EXISTING 4 LANE ISMAILABAD-AMBALA SECTION (KM. 0+000 TO KM 42+500) (PART OF AMBALA-KOTPUTLI CORRIDOR) TO 4-LANE ACCESS CONTROLLED STRETCH BY PROVIDING GRADE SEPARATED STRUCTURES AND SER
|
444 | UPGRADATION TO 4L PS DIVIDED CARRIAGEWAY FROM PATAN (NEAR RAJPUR) TO GOJARIYA FROM KM 52.000 TO KM 128.940 OF NH-68
|
445 | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XI) [KM. 77.000 TO KM. 103.400] (GANJAD - TALSARI)
|
446 | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XII) [KM. 50.700 TO KM. 77.000] (MASVAN - GANJAD)
|
447 | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XIII) [KM. 26.582 TO KM. 50.700] (SHIRSAD - MASVAN)
|
448 | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XIV) [KM. 3.000 TO KM. 20.200 OF SPUR] (SHIRSAD - AKLOLI)
|
449 | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XV) [KM. 20.200 TO KM. 43.000 OF SPUR] (AKLOLI - AMNE)
|
450 | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XVI) [KM. 43.000 TO KM. 69.800 OF SPUR] (AMNE - BHOJ)
|
451 | VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XVII) [KM. 69.800 TO KM. 79.783 OF SPUR] (BHOJ - MORBE)
|
452 | VARANASI RING ROAD (PKG-II) CONNECTING SANDAHA VILLAGE (KM 11.70 / NH-29) WITH REVASA VILLAGE (KM 818.80 / NH-2)
|
453 | VARANASI-AURANGABAD KM.786 TO KM.978.40
|
454 | WIDENING TO 6L OF EXISTING 4L JETPUR - GONDAL - RAJKOT SECTION FROM KM. 117.600 TO KM. 185.00 ON NH-27
|
455 | WIDENING/DEVELOPMENT OF EXISTING NH-85 FROM KM 0.000 TO KM 124.636 SECTION TO 2L/@L+PS SECTION IN THE STATE OF KERALA ON EPC MODE UNDER BHARATMALA PARIYOJANA
|