SELECT PROJECT


S.No.PROJECT NAME
1(I) CONSTRUCTION OF FOUR/SIX LANING FROM KM 132.375 TO KM 158.058 (TOTAL NEW ALIGNMENT LENGTH OF 20.683 KM) OF DABOKA- DIMAPUR SECTION (DIMAPUR BYPASS) OF NH-36 AND 39
2(II) CONSTRUCTION OF DIMAPUR BYPASS (ASSAM PORTION) OF 4/6 LANE PAVEMENT ON EPC BASIS FROM EXISTING KM 159.400 OF NH-36 TO EXISTING KM 102.500 OF NH-39 AND UPTO END POINT OF ASSAM PORTION [DESIGN KM 1
32 LANE WITH HARD SHOLDER , REHABILITATION AND UP GRADATION OF SECTION FROM KM 242.0 TO KM 298.0 OF NH 223 (NEW NH 4) (PACKAGE II)
42 LANE WITH PAVED SHOULDER FROM KM 16+900 (BOGAPANI) TO KM 27+150 (GOLAI GAON) ON EXISTING DIBRUGARH TO LEDO SECTION WITH PROPOSED DIGBOI BYPASS SECTION-4
52 LANE WITH PAVED SHOULDER FROM KM 399.00 TO KM 430.00 OF KARANPARYAG TO CHAMOLI UNDER CHARDHAM PARIYOJNA
62 LANE WITH PAVED SHOULDER FROM KM 430.00 TO KM 468.00 OF CHAMOLI TO PAINI UNDER CHARDHAM PARIYOJNA
72 LANING FROM MANU-SIMLUNG PKG-2
82 LANING OF DINDIGUL - PERIGULAM THENI- KUMILI
92 LANING OF KOHIMA - JESSAMI SECTION (PACKAGE II)
102 LANING OF KOHIMA - JESSAMI SECTION (PACKAGE V)
112 LANING WITH PAVED SHOULDER FROM KM 30.800 TO KM 70.800 AND 2 LANING WITHOUT PAVED SHOULDER FROM KM 70.800 TO KARNATAKA/GOA BORDER (KM 84.120) OF NH-4A IN THE STATE OF KARNATAKA ON EPC MODE (PACKAGE
122- LANE WITH PAVED SHOULDERS OF HINOTIYA TO MEHULWA FROM DESIGN KM 27+000 9OF EXISTING SH-19 KM 26+530) NEAR HINOTIYA VILLAGE TO DESIGN KM 75+700 (OF EXISTING SH-19 KM 74+820) NEAR MEHULWA VILLAGE SEC
132-LANE EXISTING RAMPUR BYPASS OF RAMPUR TO BE DEVELOPED TO 4-LANE ON EPC MODE IN THE STATE OF UTTAR PRADESH (KM 0+000 TO KM 10+190)
142-LANE WITH PAVED SHOULDER CONFIGURATION OF LAMBASINGI TO PADERU SECTION (KM 205+000 TO KM 253+974) OF NH-516E
15 2-LANE WITH PS OF BEWAR TO NEAR KARRI VILLAGE SECTION OF NH-92 FROM KM.0.00 TO 30.00 UNDER GNHCP
162-LANE WITH PS OF NEAR KARRI VILLAGE TO ETAWAH SECTION OF NH-92 FROM KM.30.000 TO 57.346 UNDER GNHCP
172-LANING FROM JOLAIBARI - BELONIA
182-LANING FROM YAINGANGPOKPI TO FINCH CORNER (PKG-I)
192-LANING FROM YAINGANGPOKPI TO FINCH CORNER (PKG-II)
202-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- 2A)
212-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- 2B)
222-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- IB)
232-LANING WITH PS SITARGANJ BAREILY SECTION
242-LANNING WITH PS MOTIHARI-RAXAUL
252L NH-1 FROM KM 8.660 TO KM 33.775 (SUMBAL TO WAYUL) TO 4L DUAL CARRIAGEWAY NH STANDARD AS PART OF SRINAGAR RING ROAD PHASE II (DESIGN CH. 41.907 TO CH. 66.609)
262L PS SRIGANGANAGAR TO RAISINGHNAGAR (DESIGN CHAINAGE -0.500 KM TO DESIGN CHAINAGE 101.000 KM) (PACKAGE-1) ON NH-911
272L+PS FOR WORK OF NH-325 (BALOTRA TO SANDERAO VIA JALORE) BY CONSTRUCTION OF BYPASSES:(1) ASOTRA- BRAHMDHAM BYPASS (2) SIWANA BYPASS (3) MOKALSAR BYPASS (4) MAJOR REALIGNMENT AT KATHADI (5) MAJOR REAL
282L+PS FROM KM. 0+000 TO KM. 32+000 (MUDIGUBBA TO PUTTAPARTHI) OF NH-342
292LPS FROM GONDIGUDA TO ARAKU BHALLAGUDA KM 27.480 TO KM 51.772 SECTION OF NH 516E
302LPS FROM KM36.400 TO KM. 107.224 OF NH167BG FROM DUTTALUR TO KAVALI SECTION
312LPS OF BIJNOR TO KOTAWALI SECTION OF NH-709AD, PKG-IV
322LPS OF CHAPRATHIPALEM TO LAMBASINGI SECTION OF NH 516E
332LPS OF KOYYURU TO CHAPRATHIPALEM SECTION OF NH 516E
343L MAJOR BRIDGE OVER RIVER BRAHMANI AT KM. 401.250 (DUBURI CHANDIKHOLE SECTION) OF NH 200 (NEW NH 53)
354 LANE CONNECTOR FROM DELHI MEERUT EXPRESSWAY KM 50.000 TO KM 8.520 OF NH 235 IN THE STATE OF UTTAR PRADESH ON EPC BASIS
364 LANE FROM KM 56.400 TO KM 120.300 FROM B.KOTHAPALLI JUNCTION TO GORANTLA OF NH 716G
374 LANE OF BILASPUR TO URGA PROJECT (KM 0.00 TO KM 70.2) OF NH-130A
384 LANE WITH PAVED SHOULDER AGARTALA BYPASS (WESTERN SIDE) CONNECTING NH-8
394 LANE WITH PAVED SHOULDER FROM KM 0.000 TO KM 51.119 OF TADIPATRI TO MUDDANUR OF NH67
404 LANING FROM EXISTING KM 39.380 (DESIGN CH. 37.000) TO KM 74.450 (DESIGN CH. 69.000) OF MUCHUKOTA – BUGGA SECTION OF NH 544D ON HYBRID ANNUITY MODE UNDER NH(O) IN THE STATE OF ANDHRA PRADESH
414 LANING FROM JAMUGURI TO BISWANATH CHARIALI FROM KM 182 TO KM 208 OF NH-52
424 LANING FROM RANGAGARA TO KALIABHOR TINALI FROM KM 297.00 TO KM 315.315 OF NH-37 ON EPC BASIS.
434 LANING OF NH 37 SECTION BETWEEN END OF MORAN BYPASS TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM. 561.700-KM. 580.778) ON EPC MODE.
444 LANING OF ITANAGAR TO BANDARDEWA SECTION OF NH-415 FROM KM 40+430 TO KM 51+735 (PACKAGE B) ON EPC MODE IN THE STATE OF ARUNACHAL PRADES
454 LANING OF JAGADHRI TAJEWALA ROAD SECTION OF NH 907 (OLD NH 73A) UNDER NH(O) (PKG 1) IN THE STATE OF HARYANA
464 LANING OF JORHAT TO JHANJI SECTION FROM KM. 453.00 TO KM. 491.08 (DESIGN KM 403.200 TO KM 454.240)
474 LANING OF KHED SINNAR SECTION OF NH 50
484 LANING OF NAJIBABAD BYPASS OF NH-119 FROM KM. 105.423 TO KM. 118.373 (EXCLUDING 2.45 KM. OF NH-74 BYPASS) IN THE STATE OF UTTAR PRADESH
494 LANING OF NH 544D FROM EXISTING KM 346.300 OF NH 44 (DESIGN CHAINAGE KM 0.000) TO KM 39.380 (DESIGN CHAINAGE KM 37.000) OF ANANTAPUR-MUCHUKOTA SECTION ON HYBRID ANNUITY MODE UNDER NH (O) IN THE STAT
504 LANING OF NH-31D FROM GHOSHPUKUR - SALSALABARI ( KM 0.00 TO KM . 83.785)
514 LANING OF NH-37 SECTION BETWEEN DEMOW TO END OF MORAN BYPASS (FROM KM. 534.800 TO KM. 561.700) ON EPC MODE.
524- LANING OF ROHTAK-JIND SECTION FROM KM. 307+000 TO KM. 347+800 OF NH-71 AND CONNECTING LINK FROM KM. 347.800 OF NH-71 TO KM. 9+400 OF NH-71A (BALANCE WORK) ON EPC MODE UNDER BHARATMALA
534-L DHUBRI PHULBARI BRIDGE WITH APPROACH ROAD
544-LANE WITH PAVED SHOULDERS FROM KM 32/0 TO KM 79/650 (DESIGN CHAINAGE KM 32+000 TO KM 78+760) PUTTAPARTHI KODURU SECTION OF NH-342
554-LANING OF GOA/KARNATAKA BORDER-KUNDAPUR SECTION
564-LANING OF GOHANA-SONIPAT (PKG-2) SECTION FROM KM 40.601 TO KM 78.837 (LENGTH = 38.236KM) OF NH-352A IN THE STATE OF HARYANA UNDER BHARATMALA PARIYOJNA UNDER NH (O) TO BE IMPLEMENTED ON HYBRID ANNUIT
574-LANING OF HAPACHARA - TULUNGIA SECTION
584-LANING OF HOSKOTE-DOBBASPET
594-LANING OF KAMALAPURAM - ODDANCHATRAM SECTION OF NH-209
604-LANING OF KASHIPUR-SITARGANJ SECTION
614-LANING OF MADATHUKULAM - POLLACHI SECTION OF NH-209 (NEW NH-83)
624-LANING OF MEERUT NAJIBABAD SECTION FROM KM. 11.500 TO KM 39.250 AND KM 86.590 TO KM. 112.545.IN THE STATE OF UTTAR PRADESH ON HAM MODE.
634-LANING OF MELUR - PILLAYARPATTI - KARAIKUDI SECTION OF NH-338, NH-36, NH-383
644-LANING OF VADIPPATTI - THAMARAIPATTI SECTION OF NH-744A (MADURAI RING ROAD)
654-LANNING OF BODHRE-DHULE SECTION(KM 390.000 TO 452.800)
664-LANNING OF CHAPRA-HAJIPUR
674-LANNING OF HARIDWAR-NAGINA SECTION OF NH 74 FROM (KM 204.300 OF NH 58) TO KM 73.00
684-LANNING OF KODINAR TO VERAVAL SECTION OF NH-8E FROM KM 221.610 TO KM 263.000
694-LANNING OF NH17 AND NEW NO. NH66 FROM KM 161/600 TO 205/400 UNDER HYBRID ANNUITY MODE
704-LANNING OF NH17 AND NEW NO. NH66 FROM KM 241/300 TO 281/300 UNDER HYBRID ANNUITY MODE
714-LANNING OF STHIYATHOPU-CHOLOPURAM
724/6L ACCESS CONTROL EXPRESSWAY FROM DESIGN CHAINAGE KM 515.000 TO 528.300 (KUNJWANI TO SIDHRA SECTION OF NH-44) AND FROM DESIGN CHAINAGE KM 550.900 TO KM 566.520 (DOMEL TO KATRA SECTION) (PHASE II-PAC
734/6L GREENFIELD LUDHIANA RUPNAGAR HIGHWAY FROM JUNCTION WITH NE 05 VILLAGR NEAR TO MANEWAL (LUDHIANA) TO JUNCTION WITH NH 205 NEAR BHEORA VILLAGE (RUPNAGAR) FROM KM 66.000 TO KM 91.000 INCLUDING SPUR
744/6L OF SPUR TO HARIDWAR (GREENFIELD) FROM KM. 0.000 TO KM. 49.000
754/6L OF BANGALORE - PUNE SECTION OF BYPASS CONNECTING DHARWAD - HUBLI FROM KM. 403.80 TO KM. 433.20
7644 LANE DIVIDED CARRIAGEWAY OF BARMER BYPASS OF NH-15 (NEW NH-68) IN THE STATE OF RAJASTHAN ON EPC MODE.
774L GREENFIELD ALIGNMENT FROM KALYANAPUR TO TAL DASHRAHA OF NH-119D (PKG-III)
784L AMBALA - KALAAMB FROM KM. -0.800 TO KM. 33.015 OF OLD NH-72
794L BANGALORE-CHENNAI EXPRESSWAY FROM KM. 230.000 TO KM. 261.705 OF KANCHEPURAM TO SRIPERUMBUDUR SECTION (PHASE-III/PACKAGE-IV)
804L FROM GAJU VILLAGE AT KM 32.982 TO DEVINAGAR BYPASS (END) AT KM 208.000 OF NH 530B (PKG 1C)
814L FROM KM 196.87 (SANKHA) TO KM 219.6 (KHAJURI) ON NH-75 [REHLA / GARHWA BYPASS]
824L FROM MATHURA BYPASS (START) AT EXISTING KM. 154.20 OF NH-44 TO GAJU VILLAGE AT KM 32.982 OF NH-530B (PKG-IB)
834L GREENFIELD A. MALOUT BYPASS FROM CH. KM 44.500 TO CH. KM 35.500 ON NH-07 AND CH. KM 0.000 TO KM 6.984 ON NH-09 B. MANDI DABWALI BYPASS FROM CH. 38.450 KM TO KM 27.910 PKG-02
844L GREENFIELD ALIGNMENT OF AMAS TO SHIVRAMPUR FROM 0.000 KM. TO 55.002 KM. OF NH 119 D (PKG-I)
854L GREENFIELD ALIGNMENT OF SHIVRAMPUR TO RAMNAGAR FROM KM. 55.002 TO KM. 109.300 OF NH 119 D (PKG-II)
864L GREENFIELD ROAD CONNECTING NORTH AND SOUTH INDUSTRIAL CLUSTER OF KHANDALERU CREEK NEAR KRISHNAPATNAM PORT AT THAMMINAPATNAM TO MOLLUR FROM KM 0.0 TO KM 16.046, PART I & 6L EXTENSION OF DEDICATED PO
874L GREENFIELD RUDHI TO DESHGAON (PKG V OF BETUL-KHANDWA/DESHGAON) - N/04015/06003/MP
884L GREENFIELD SPUR FROM DELHI-VADODARA GREENFIELD EXPRESSWAY NEAR BANDIKUI TO JAIPUR
894L KODINAR - VERAVAL (PACKAGE VI) FROM KM. 222.400 TO KM. 230.00 (KODINAR BYPASS) OF NH-8E (NH 51 NEW)
904L MEDINIPUR TO BALLUPUR FROM KM. 458.65 TO KM. 487.65 OF NH-07(PKG-2)
914L MISSING LINK (OF REWA BYPASS) FROM JN. WITH NH 30 NEAR BELA TO JN. WITH MPRDC RING ROAD (NEAR SILPARA) ON KM 0.00 TO KM. 13.100 OF SH-9
924L MITIGATION MEASURE STRUCTURES ON CH/MH BORDER TO WAINGANGA BRIDGE SECTION OF NH-53
934L OF CHANDESARA TO KHEDAKHAJURIYA FROM KM. 0.000 TO (-) 750 AND KM 0.000 TO KM 41.400 OF NH-752D (PKG-I)
944L OF ADDAHOLE TO BANTWAL CROSS SECTION
954L OF ADDAHOLE TO BANTWAL CROSS SECTION INCLUDING FLYOVER AT KALLADKA TOWN
964L OF AMRITSAR GHOMAN TANDA UNA SECTION FROM KM 8.270 TO KM 54.000 OF NH 503A PACKAGE I
974L OF BAL WORKS OF MAHUVA TO KAGVADAR FROM 100.450 KM. TO 140.470 KM. OF NH-8E (PKG- III)
984L OF BAL WORKS OF TALAJA - MAHUVA FROM 54.990 KM. TO 100.450 KM. OF OLD NH-8E (PACKAGE-II)
994L OF BARAMATI TO INDAPUR (PKG-II) FROM KM. 41.400 TO KM. 84.550 OF NH-965G (SAINT TUKARAM MARG)
1004L OF BEAS-MEHTA-BATALA-DERA BABA NANAK FROM INTERSECTION WITH JALANDHAR-AMRITSAR HIGHWAY (NH-3) NEAR BEAS TILL START OF BATALA BYPASS NEAR VILLAGE ACCHHAL (FROM KM. 0.000 TO KM. 31.300) (PKG-1)
1014L OF CHANNARAYAPATNA BYPASS AND HASSAN BYPASS WITH STRUCTURES IN DEVIHALLI -HASSAN SECTION
1024L OF END OF PINJORE BYPASS - BADDI - NALAGARH SECTION (KM. 4.200 TO KM. 35.370) OF NH21A
1034L OF EXISTING 2/4L STRETCH FROM LONAND TO DIVE GHAT (KM 166.400 TO KM 220.900 ) OF MOHOL – ALANDI SECTION OF NH-965 (PKG - V)
1044L OF EXISTING BEAS – BABA BAKALA - DERA BABA NANAK SECTION FROM START OF BATALA BYPASS TILL INTERSECTION WITH AJNALA GURDASPUR HIGHWAY (NH 354) NEAR DERA BABA NANAK ( FROM KM. 31.300 TO KM. 69.100 )
1054L OF GREENFIELD ALIGNMENT FROM KM. 47.000 TO KM. 89.210 OF BALBHADARPUR TO BELA NAWDA SECTION OF NH-119D
1064L OF HARIDWAR NAGINA SECTION DESIGN CH. LME FROM KM 13.829 TO KM 17.110 AND KM 26.077 TO KM 27.508 AND DESIGN CH. RME FROM KM 13.839 TO KM 17.120 AND KM 26.078 TO KM 27.509 OF EUP MITIGATION MEASURES
1074L OF HP/PUNJAB BO4L OF HP/PUNJAB BORDER - MO FROM KM. 11.00 TO KM. 42.00 OF OLD NH-20 (NEW NH-154) (PACKAGE-IA)RDER - MO FROM KM. 11.00 TO KM. 42.00 OF OLD NH-20 (NEW NH-154) (PACKAGE-IA)
1084L OF INDAPUR TO TONDLE (PKG-III) FROM KM.84.550 TO KM. 131.00 OF NH-965G (SAINT TUKARAM MARG)
1094L OF INDORA CHOWK TO PACHPAOLI AND AGRASEN CHOWK - ASHOKA CHOWK
1104L OF INDORE - BOREGAON (PKG-III) [BALWARA TO DHANGAON] FROM KM. 42.260 TO KM. 82.660 OF NH347BG AND 753L
1114L OF KARWAR (KM. 281.980 OF NH-62 NAGAUR ROAD) TO DANGIYAVAS OF JODHPUR RING ROAD (PKG-II)
1124L OF KM.165.092 TO KM.171.855 (NORTH BOUND) AND FROM KM.166.895 TO KM.173.638 (SOUTH BOUND), EXCL. CERTAIN REACHES OF NORTH BOUND AND SOUTH BOUND OF RAMBAN TO BANIHAL (PKG-III) OF OLD NH-1A (NEW NH-
1134L OF KODAD (DESIGN KM 0.00/EXISTING KM 185.00 OF NH-65) TO KHAMMAM (DESIGN KM 31.800/EXISTING KM 29.400) OF NH-365A
1144L OF LEFT-OVER WORKS INCLUDING ADDITIONAL STRUCTURES FROM KERALA/TAMIL NADU BORDER TO KANYAKUMARI SECTION FROM KM 43.0 TO KM 96.174 OF NH66 UNDER EPC MODE IN THE STATE OF TAMILNADU.
1154L OF MADANAPALLE TO PILERU SECTION FROM KM 0.000 TO KM 55.900 OF NH-71(PACKAGE-I) - N/05060/01002/AP
1164L OF MIRZA CHAUKI TO FARKKA SECTION OF NH80 FROM KM 215.00 TO KM 260.00 ON HAM MODE IN THE STATE OF JHARKHAND PACKAGE I
1174L OF MO - SIHUNI FROM KM. 42.00 TO KM. 51.00 OF OLD NH-20 (NEW NH-154) (PACKAGE-IB)
1184L OF NAGPUR-KATOL SECTION FROM KM. 13.00 TO KM. 62.900 OF NH-353J
1194L OF OBEDULLGANJ - BUDNI SECTION FROM KM. 8.400 TO KM. 20.700 IN RATANPANI WILDLIFE AREA OF NH - 69 (NEW NH-46)
1204L OF PALMA TO GUMLA SECTION OF NH23 FROM KM. 26.00 TO KM. 89.170 ON HAM MODE IN THE STATE OF JHARKHAND.
1214L OF PILERU TO KALUR SECTION FROM KM 55.900 TO KM 92.800 AND KM 94.500 TO KM 95.717
1224L OF RAJURA-KORPANA-ADILABAD ROAD UPTO M.S. BORDER FROM KM 32.910 TO KM 89.090 OF NH-353B
1234L OF RATNAGIRI - KOLHAPUR SECTION FROM KM 112.340 TO KM 145.300 OF NH-166 (PKG–III)
1244L OF RATNAGIRI - KOLHAPUR SECTION FROM KM 67.140 TO KM 112.340 OF NH-166 (PKG – II)
1254L OF RATNAGIRI - KOLHAPUR SECTION OF NH-166 FROM KM 0.000 TO KM 19.769 AND KM 31.000 TO KM 67.140 (PKG – I)
1264L OF SAGAR - MOHARI FROM KM.8 TO KM.50 (PKG-I)
1274L OF SANNUR TO BIKARNAKATTE SECTION FROM KARKALA TO MANGALORE
1284L OF SHAMLI BYAPSS- SAHARANPUR FROM KM 92.2 TO KM 155.025 SECTION OF NH-709B, PKG-II
1294L OF THIRUMANGALAM TO VADUGAPATTI SECTION FROM KM 0.000 TO KM 36.000 OF NH-744
1304L OF TWIN TUBE TUNNEL CONFIGURATION INCLUDING APPROACHES FROM MAROG TO DIGDOL (FROM KM.154.210 TO KM.158.650 (NORTH BOUND) AND FROM KM.155.940 TO KM.160.260 (SOUTH BOUND)) OF RAMBAN TO BANIHAL (PKG-
1314L OF VADUGAPATTI TO THERKUVENGANALLUR (RAJAPALYAM) SECTION FROM KM 36.000 TO KM 71.600 OF NH744 UNDER EPC MODE IN THE STATE OF TAMILNADU.
1324L POANTA SAHEB–MEDNIPUR FROM KM. 435.65 TO KM. 458.65 OF NH-07(PKG-1)
1334L PS FROM KURNOOL (EXISTING KM. 5.400 OF NH-40/DESIGN KM.0.000) TO MANDLEM (EXISTING KM.38.000/DESIGN KM 30.600) OF NH-340C(PACKAGE-1)
1344L PS FROM MANDLEM (EXISTING KM. 38.000/DESIGN KM.30.600) TO ATMAKUR (EXISTING KM.73.000/DESIGN KM 66.115) OF NH-340C (PACKAGE-2)
1354L PS MYDUKUR BADVEL FROM KM 585.820 TO KM 630.960 SECTION OF NH 67
1364L PS OF SAVALI VIHIR TO START OF AHMEDNAGAR BYPASS (KM 88.400 TO KM 163.400) OF NH 160
1374L SPUR OF PANIPAT - SHAMLI CONNECTING NH-709AD (PANIPAT – SHAMLI – MUZAFFARNAGAR) AND NH-709A (KARNAL – MEERUT) BYPASSING SHAMLI DISTRICT (UP)
1384L SPUR OF SHAMLI-MUZZAFARNAGAR CONNECTING NH-709AD (PANIPAT-SHAMLI-MUZAFFARNAGAR) AND NH-58 (MEERUT - ROORKEE) BYPASSING MUFFARNAGAR TOWN
1394L SUNDER NAGAR BYPASS FROM KM173.900 TO KM 179.600 OF NH-21 IN THE STATE OF HP
1404L TWIN TUBE TUNNEL INCLUDING APPROACHES FROM DIGDOL TO KHUNI NALLAH (NORTH BOUND CONNECTING WITH EXISTING MAJOR BRIDGE ON NB) AND SOUTH BOUND CONNECTING WITH TUNNEL T4 ,SINGLE TUBE TUNNEL OF RAMBAN T
1414L+PS OF NH -58 FROM BEAWAR-GOMTI (OLD CH KM 58.245 TO KM. 108.600) PKG-I.
1424LBERKHEDI TO GODPEHRA NH-44
1434LPS OF MUZAFFARNAGAR TO MIRANPUR SECTION OF NH-709AD, PKG-III
1446 L OF AURANGABAD TO BIHAR-JHARKHAND BORDER (CHORDAHA) SECTION FROM KM. 180.000 TO KM. 209.827 OF NH-2 (PKG-01).
1456 LANING FROM KM 9.90 TO KM 19.948 (ARAMGARH-SAMSHABAD SECTION) OF HYDERABAD-SAMSHABAD SECTION OF NH-44 IN THE STATE OF TELANGANA
1466 LANING OF EXISTING 4-LANE STRETCH FROM KALKALLU AT KM.454+000 TO GUNDLA POCHAMPALLY AT KM.471+000, ON NAGPUR – HYDERABAD SECTION (DESIGN LENGTH 17.000 KM) OF NH-44 IN THE STATE OF TELANGANA UNDER BH
1476-LANE AMRITSAR-BATHINDA GREENFIELD SECTION OF NH-754A FROM JUNCTION WITH MOGA JALANDHAR ROAD (NH-703) NEAR DHARAMKOT TO JUNCTION WITH BHAGTA BHAI KA-BHADAUR ROAD NEAR DYALPURA BHAI KA (FROM KM. 39+00
1486-LANING OF KOZHIKODE BYPASS (CALICUT BYPASS) (I.E. VENGALAM JN. TO RAMANATTUKARA JN.) SECTION OF NH-17 (NEW NH-66) IN THE STATE OF KERALA UNDER NHDP PHASE III
1496-LANING OF VIJAYAWADA BYPASS FROM GOLLAPUDI (DESIGN CH. 30+000) TO CHINNAKAKANI (DESIGN CH. 47+881) INCLUDING MAJOR BRIDGE ACROSS RIVER KRISHNA IN VIJAYAWADA GUNDUGOLANU SECTION OF NH-16 IN THE STATE
1506L ACCESS CONTROL GREENFIELD HIGHWAY OF VILL-KARAUNDA MAHAJAN TO VILL-KHYAWARI FROM KM. 56.500 TO KM. 82.000 (PKG-3)
1516L ACCESS CONTROL GREENFIELD HIGHWAY OF VILL-KHYAWARI TO VILL-LATIFPUR AT SAHARANPUR BYPASS FROM KM. 82.000 TO KM. 119.790 (PKG-4)
1526L ACCESS CONTROL GREENFIELD HIGHWAY OF VILL-LOHADDA TO VILL-KARAUNDA MAHAJAN FROM KM. 27.000 TO KM. 56.500 (PKG-2)
1536L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM AUDIREDDIPALLE 160.000 KM. TO MALLAPALLE 176.000 KM. PACKAGE 7
1546L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM CHANDRASEKHARAPURAM (CH. 228+000) TO POLAVARAM (CH. 260+000)OF [NH-544G] (PACKAGE-11)
1556L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM KODUR 0.000 KMS TO VANAVOLU 24.300 KMS OF NH 544G PACKAGE 1
1566L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM MALLAPALLE 176.000 KM. TO KAVULAKUNTLA 196.000 KM. PACKAGE 8
1576L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM MARRIPUDI (CH. 285+500) TO SOMAVARAPPADU (CH. 314+600) OF [NH-544G] (PACKAGE-13)
1586L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM NALLACHERUVU PALLI 96.300 KM. TO YERRAGUDIPADU 129.000 KM. OF NH 544G PACKAGE 5
1596L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM NARAYANMPET (CH. 203+500) TO CHANDRASEKHARPURAM (CH. 228+000)(PACKAGE-10)
1606L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM ODULAPALLE 72.000 KM. TO NALLACHERUVUPALLI 96.300 KM. OF NH 544G PACKAGE 4
1616L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM POLAVARAM (CH. 260+000) TO MARRIPUDI (CH. 285+500) OF [NH-544G](PACKAGE-12)
1626L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM SOMAVARAPPADU (CH.314.600) TO MUPPAVARAM (CH.343+240) OF [NH-544G] (PACKAGE-14)
1636L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM VANAVOLU 24.300 KM. TO VANKARAKUNTA 45.700 KM. OF NH 544G PACKAGE 2
1646L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM VANKARAKUNTA 45.700 KM. TO ODULAPALLE 72.000 KM. OF NH 544G PACKAGE 3
1656L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM YERRAGUDIPADU 129.000 KM. TO AUDIREDDIPALLE 160.000 KM. OF NH 544G PACKAGE 6
1666L ACCESS CONTROLLED GREENFIELD HIGHWAY OF JULEKAL VILLAGE TO DINNEDEVARAPADU VILLAGE FROM KM 242.200 TO KM 280.400 (PKG-2)
1676L ACCESS CONTROLLED GREENFIELD HIGHWAY OF JUNCTION OF EPE (VILL.-MAVIKALAN) TO VILL.-LOHADDA FROM KM. 0.000 TO KM. 27.000 (PKG-1)
1686L ACCESS CONTROLLED GREENFIELD HIGHWAY OF NANDINNE VILLAGE TO JULEKAL VILLAGE FROM KM 202.900 TO KM 242.200 (PKG-1)
1696L ACCESS CONTROLLED HIGHWAY FROM DND MAHARANI BAGH JN. WITH JAITPUR PUSHTA ROAD OF NH 148NA FROM KM. 0.00 TO KM. 9.00 IN NCR
1706L ACCESS CONTROLLED LUDHIANA-BATHINDA GREENFIELD HIGHWAY FROM JN. WITH AMRITSAR-BATHANDA GREENFIELD ROAD (NH-754A) NEAR RAMPURA PHUL TO JN. WITH MOGA-BARNALA ROAD (NH-703) NEAR VILLAGE TALLEWAL FROM
1716L ACCESS-CONTROLLED HIGHWAY FROM (GANESHPUR) TO(NEAR MOHAND) OF GANESHPUR – DEHRADUN SECTION FROM KM.0 TO KM.8.3 OF NH-72A (PACKAGE-1)
1726L ACCESS-CONTROLLED HIGHWAY OF DAAT KALI TUNNEL - DEHRADUN OF GANESHPUR – DEHRADUN SECTION FROM KM.16.380 TO KM.19.785 OF NH-72A (PACKAGE-3)
1736L ALURU - JAKKUVA SECTION OF NH-130CD ROAD FROM KM 365.033 TO KM 396.800 (PKG. 1)
1746L AMRITSAR BATHINDA GREENFIELD SECTION FROM VILLAGE TIBA ON NE 5A TO JN. WITH MOGA JALANDHAR ROAD NH 703 NEAR DHARAMKOT FROM KM 0.000 TO KM 39.000 OF NH-754A PKG-1
1756L AMRITSAR-BATHINDA GREENFIELD SECTION FROM JN. WITH BHAGTA BHAI KA-BHADAUR ROAD NEAR DYALPURA BHAI KA TO JN. WITH MANDI DABWALI BATHINDA ROAD ON NH-54 NEAR SANGAT KALAN FROM KM 93.000 TO KM 154.866
1766L FROM BELGAUM TO SANKESHWAR BYPASS FROM KM 515.000 TO KM 555.017 OF NH 48
1776L FROM SANKESHWAR BYPASS TO MH KNT BORDER FROM KM. 555.017 TO KM. 592.853 OF NH-48 (PKG II)
1786L GREENFIELD BARAJA - KANDILI SECTION OF NH- 130-CD ROAD FROM KM 338+500 TO KM 342+500 (PACKAGE-OD-7)
1796L GREENFIELD KANDILI - ALURU SECTION OF NH-130-CD ROAD FROM KM 342+500 TO KM 365+033 (PACKAGE-OD-8)
1806L GREENFIELD BAUNSAGUAR - BARAJA SECTION OF NH-130-CD ROAD FROM KM 293+000 TO KM 338+500 (PACKAGE – OD-6)
1816L GREENFIELD KALIAGURA – BAUNSAGUAR SECTION OF NH-130-CD ROAD FROM KM 249+000 TO KM 293+000 (PACKAGE – OD-5)
1826L GREENFIELD KANPUR - LUCKNOW (EXPRESSWAY) PKG II FROM KM. 28.500 TO KM. 73.744
1836L JAKKUVA – KORLAM SECTION OF NH-130CD ROAD FROM KM 396.800 TO KM 421.100 (PKG 2)
1846L KANTAKAPALLE – SABBAVARAM SECTION OF NH-130CD ROAD FROM KM 445.100 TO KM 464.662 (PKG-4)
1856L MINOR BRIDGE (PALOLI PALAM) AT KM. 203.160 and MAJOR BRIDGE (MORAD) AT KM. 204.895 AND ALLIED WORKS
1866L OF ACCESS-CONTROLLED HIGHWAY FROM MOHAND TO DAAT KALI TUNNEL OF GANESHPUR – DEHRADUN SECTION FROM KM.8.30 TO KM.16.380 OF NH-72A (PACKAGE-2)
1876L OF AGRA BYPASS (NORTHERN) CONNECTING KM. 174.500 OF NH-2 (NEW NH-19) TO KM. 141.000 OF YAMUNA EXPRESSWAYS
1886L OF AMBALA-CHANDIGARH GREENFIELD SECTION FROM KM. 0.000 TO KM. 25.000 WITH 4L SPUR TO LALRU FROM KM. 0.000 TO KM. 5.828 AND SPUR TO PR-7 ROAD FROM KM. 0.000 TO KM. 11.157
1896L OF AZHIYUR-VENGALAM FROM KM. 189.200 TO KM. 230.400 OF NH-66
1906L OF BADAKUMARI - KARKI SECTION FROM KM 179.000 TO KM 226.500 OF NH-130-CD (PACKAGE – OD-3)
1916L OF CHILKARARUPET BYPASS FROM KM. 357.400 TO KM. 371.920 OF NH-16
1926L OF CHITTOOR TO THATCHUR FROM KUMARAJAPET TO VEERA KAVERI RAJA PURAM FROM KM 43.800 TO KM 61.380 OF NH-716B (PKG-II)
1936L OF DHANARA - HATIBENA SECTION FROM KM 124.611 TO KM 146.50 OF NH-130-CD (PACKAGE – OD-1)
1946L OF EXISTING 4L FROM GUNDLAPOCHAMPALLY TO BOWENPALLY FROM KM 471.300 TO KM 481.331 OF NH-44
1956L OF HATIBENA - BADAKUMARI SECTION FROM KM 146.50 TO KM 179.00 OF NH-130-CD (PACKAGE – OD-2)
1966L OF IT CITY CHOWK TO KURALI CHANDIGARH ROAD
1976L OF JODHPUR ROMANA (BATHINDA) - MANDI DABWALI (PUNJAB HARYANA BORDER) SECTION OF NH-54 FROM KM. 0.000 TO KM. 27.400 OF NH-54
1986L OF KAGAL-SATARA SECTION FROM KM 592.240 TO KM 658.000 OF NH-48 (PKG-I)
1996L OF KAGAL-SATARA SECTION FROM KM 658.000 TO KM 725.000 OF NH-48 (PKG-II)
2006L OF KARKI – KALIAGURA SECTION FROM KM 226.500 TO KM 249.000 OF NH-130-CD (PACKAGE – OD-4)
2016L OF MADURAVOYAL TO SRIPERUMBUDUR SECTION FROM KM. 13.800 TO KM. 37.000 OF NH-4 THROUGH STATE HIGHWAYS DEPARTMENT
2026L OF MH/KN BORDER (NIMBAL VILLAGE) TO KN/TS BORDER (SINGNODI VILLAGE) FROM KM. 26.000 TO KM. 97.000 IN GULBARGA OF NH-150C (PKG-II)
2036L OF PONDAVAKKAM TO KANNIGAIPAIR FROM KM 96.040 TO KM 116.100 OF NH 716B (PKG-IV)
2046L OF SRIPERUMBUDUR TO KARAIPETTAI FROM KM 37.000 TO KM 71.015 OF NH 48
2056L OF VARADHARAJULA TO KUMARAJAPET FROM KM 0.000 TO KM 43.800 OF NH-716B (PKG-I)
2066L OF VEERA KAVERI RAJA PURAM TO PONDAVAKKAM FROM KM 61.380 TO KM 96.040 OF NH 716B (PKG-III)
2076L OF WAINGANGA BRIDGE - BHANDARA (INCLUDING BHANDARA BYPASS) SECTION FROM KM 485.000 TO KM 499.800 OF NH-53
2086L STANDALONE FLYOVERS AT BONGAIGAON, CHAPAGURI, PATHSALA, SIMLAGURI CHOWK AND BAIHATA BYPASS JUNCTIONS ON STRETCHES OF NH-31 AND NH-27
2096L STANDALONE FLYOVERS AT RAHA, DEMOW, BORGHAT, KATHIATALI JUNCTIONS AND ROB AT JAGIROAD ON STRETCHES OF NH 36 AND NH 27
2106L WITH ACCESS CONTROL PROVISION SAHARANPUR BYPASS TO GANESHPUR SECTION FROM 13.89 KM TO 41.820 KM OF DELHI- DEHRADUN ECONOMIC CORRIDOR (PACKAGE-2)
2118L OF DWARKA EXPRESSWAY PKG-II (RUB NEAR DWARKA SECTOR 21-DL/HR BORDER) FROM 5.300 KM.TO 9.500 KM. OF NH-248BB
212ACCESS CONTROLLED HIGHWAY OF 4 LANE WITH PAVED SHOULDERS FROM TIRUVALLUR (DESIGN CHAINAGE KM 17+56) TO TN/AP BRODER (DESIGN CHAINAGE KM 61+51) OF NH-716 (CHENNAI-TIRUPATI PACKAGE-1)
213ACCESS CONTROLLED HIGHWAY OF 4 LANE WITH PAVED SHOULDERS FROM TN/AP BORDER (DESIGN CHAINAGE KM 61+51) TO PUTTUR (DESIGN CHAINAGE KM 81+540) OF NH-716 & 6 LANE WITH PAVED SHOULDERS FROM MALLAVARAM TO R
214 ACCESS ROAD/BRIDGE CONNECTIVITY FROM NH-09 AT KM.40 NEAR JAGBUDA BRIDGE (INDIA) TO BOUNDARY PILLAR NO. 802/11 OF INDO-NEPAL BORDER
215ADDITIONAL STRUCTURES ON 6LGURGAON-JAIPUR SECTION OF NH-48 BETWEEN KM 42.700 TO KM 273.00
216AKASH BRIDGE - JESSAMI SECTION PKG-2
217AMRITSAR AIRPORT JUNCTION RAMDAS FROM KM. 100.835 TO KM. 139.813 PKG IV
218AURANGABAD TO SILLOD
219BADARPUR – CHURAIBARI PKG-6
220BAKHTIYARPUR RAJAULI PKG-II FROM KM 54.405 TO KM 101.630 NH20
221BAL. WORKS OF FAGNE (KM. 510.000) TO MAHARASHTRA/GUJARAT BORDER (KM. 650.794)
222BALANCE WORK - WB-10 (GANDAK BRIDGE) KM 402.00 TO KM 440.00 (DEVANPUR - KOTWA)
223BALANCE WORK OF 2L PS FROM KM 30.800 TO 70.800 AND 2L WITH RIGID CARRIAGEWAY FROM 70.800 TO KM 84.120 OF KHANAPUR KA/GOA BORDER SECTION OF NH 4A
224BALANCE WORK OF 4 LANING OF PANVEL TO INDAPUR SECTION OF NH-66(OLD NH- 17) FROM KM 0.000 (PANVEL) TO KM 42.300 (KASU) UNDER BHARATMALA PARIYOJNA ON EPC MODE IN THE STATE OF MAHARASHTRA.
225BALANCE WORK OF 4- L ANING OF PATNA-GAYA-DOBHI SECTION (KM.83.00 TO KM. 127.217) OF NH-83 IN THE STATE OF BIHAR- PKG-III
226BALANCE WORK OF 4- LANING OF PATNA-GAYA-DOBHI SECTION (KM. 0.00 TO KM. 127.217) OF NH-83 IN THE STATE OF BIHAR TO BE EXECUTED UNDER JICA ODA LOAN ASSISTANCE -PKG-I
227BALANCE WORK OF 4- LANING OF PATNA-GAYA-DOBHI SECTION (KM. 39.00 TO KM. 83.00) OF NH-83 IN THE STATE OF BIHAR- PKG-II
228BALANCE WORK OF 4L OF NARIMBANGLO–JATINGA JUNCTION- HARANGAJO ROAD SECTION FROM KM 0.000 TO KM 49.230 OF NH-27
229BALANCE WORK OF 4L OF NAURADEHI SANCTUARY DE-SCOPED STRETCH OF HIRAN RIVER TO SINDOOR RIVER FROM KM. 66.00 TO 130.00 NH-12 (NEW NH-45)
230BALANCE WORK OF CONSTRUCTION OF TWO/FOUR LANE WITH PAVED SHOULDER FROM KM 422.000 TO 523.600 ( CHITRADURGA TO SHIVAMOGGA ) OF NH-13 IN THE STATE OF KANATAKA ON EPC MODE.
231BALANCE WORK OF CONTSRUCTION OF TWO/FOUR LANE WITH PAVED SHOULDER FROM KM. 54.370 TO KM. 101.400 (BIDAR TO HUMNABAD SECTION) OF NH50 IN THE STATE OF KARNATAKA ON EPC MODE
232BALANCE WORK OF PANIKOILI RIMULI SECTION OF NEW NH-20 FROM KM 0.00 TO KM. 163.000
233BALANCE WORK OF REHABILITATION AND UP-GRADATION TO NH-166F FROM MAHAD JUNCTION (AT KM 123/400 ON NH-66) TO RAIGAD FORT UP TO CHITTAA DARWAZA, PACHAD TO TOMB OF JIJAUMATA AND HIRKANIWADI CONNECTOR [LEN
234BALANCE WORK OF REHABILITATION AND UPGRADING TO 2LANE/2LANE WITH PAVED SHOULDER CONFIGURATION AND STRENGTHENING FROM FROM KM 343.80 TO 400.33 OF GOWRIBIDANUR CHIK BALLAPUR SECTION IN THE STATE OF KARN
235BALANCE WORK OF TWO LANING WITH PAVED SHOULDER OF PIPRAKOTHI–MOTIHARI- RAXAUL SECTION OF NH-28A FROM
236BALANCE WORKS OF 4 LANE DIVIDED CARRIAGEWAY OF MISSING LINK SECTION OF NH-39 (REWA BYPASS) FROM JUNCTION WITH NH 30 NEAR BELA TO JUNCTION WITH MPRDC RING ROAD NEAR SILPARA ON SH 9 (DESIGN LENGTH 13.10
237BALANCE WORKS OF 4-LANNING OF RAMPUR-KATHGODAM SECTION OF NH-87 (NEW NH NO. 09) FROM KM. 0.000 (KM 190.000 OF NH-24) TO KM 42.791 (DESIGN CHAINAGE KM 43.446) (PACKAGE-I)
238BALANCE WORKS OF 4L PANVEL-INDAPUR SECTION OF NH-66 (OLD NH-17) FROM KM 42.300 (KASU) TO KM 84.600 (INDAPUR)
239BALANCE WORKS OF FOUR LANE FROM KM 43+950 (THIRUVALLUR BYPASS) TO KM 61+470 (VEPPAMPATTU BYPASS) PASSING THROUGH THANNERKULAM THOZUR AND SEVAPET BYPASS (17.520 KMS) OF TIRUPATI-TIRUTTANI-CHENNAI SECTI
240BALANCE WORKS OF FOUR LANING FROM RAMBAN KM 151.00 TO BANIHAL KM 187.00 OF NH-1A (NOW NH-44) WITH VALUE ADDITION AT CRITICAL LOCATION ON ENGINEERING PROCUREMENT AND CONSTRUCTION MODE (EPC MODE) IN THE
241BANGALORE CHENNAI EXPRESSWAY (PHASE-II PKG-I) FROM KM.71.000 TO KM 96.000 (BETHAMANGALA IN THE STATE OF KARNATAKA TO BYREDDYPALLI)
242BANGALORE CHENNAI EXPRESSWAY (PHASE-II PKG-II) FROM KM.96.000 TO KM 127.000 (BAIREDDYPALLE TO BANGARUPALEM SECTION)
243BANGALORE CHENNAI EXPRESSWAY (PHASE-II PKG-III) FROM KM.127.000 TO KM 156.000 (BANGARUPALEM TO GUDIPALA SECTION)
244BANGALORE CHENNAI EXPRESSWAY PHASE-III PACKAGE II (WALAJAHPET TO ARAKKONAM) FROM KM 180.000 TO KM 204.500
245BANGALORE CHENNAI EXPRESSWAY PHASE-III PACKAGE III (ARAKKONAM TO KANCHEEPURAM) FROM KM 204.500 TO KM 230.000
246BANGALORE CHENNAI EXPRESSWAY PHASE-III – PACKAGE I (GUDIPALA TO WALAJAJHPET) FROM KM 156.000 TO KM 180.000
247BANGALORE/TN BORDER TO HOSKOTE
248BANIHAL BYPASS (DELINKED FROM SRINAGAR - BANIHAL) FROM KM. 187.00 TO KM. 189.350
249BAREILY-SITAPUR (NH-24)
250BARELA-MANDLA SECTION OF NH-12A IN MADHYA PRADESH KM 22/8 TO KM 89/6 OF NH-12A
251BELAKERI PORT TO KUMTA - SIRSI ROAD FROM KM 0.00 - KM 4.265 OF BELEKERI PORT ROAD LINK RD. AND KM 4.965 - KM 60.00 OF SH-69
252BHARATMALA PARIYOJANA OF BOKARO JAINA MORE - GOLA SECTION OF NH-320 FROM KM. 21.110 TO KM. 53.600 IN THE STATE OF JHARKHAND PKG1
253BHOGAN KHURD TO KASHEDI
254BILASIPURA- GUWAHATI ROAD PKG-1
255BILASIPURA- GUWAHATI ROAD PKG-2
256BILASIPURA-GUWAHATI ROAD PKG-10
257BILASIPURA-GUWAHATI ROAD PKG-8
258BILASIPURA-GUWAHATI ROAD PKG-9
259BYPASS ROAD TO ADONI TOWN CONNECTING NH-167 (HAGARI - JADCHARLA ROAD) FROM KM.62/700 TO 71/400 IN KURNOOL
260CAPACITY AUGMENTATION OF THE EXISTING 4 LANE STRETCH FROM ICHHAPURAM TO NARASANNAPETA IN THE STATE OF ANDHRA PRADSEH
261CHAMPAK NAGAR TO KHAYERPUR SECTION (DESIGN KM 242+500 TO KM 261+610)
262CHOITHAR TO MARREM KHULLEN SECTION IMPHAL- UKHRUL - JESSAMI PKG-5
263CHURACHANPUR TUIVAI PKG-3
264COMPLETION OF BALANCE WORKS PENDING IN BIT AND PIECES (INCOMPLETE STRETCH AT 7 LOCATIONS) AND LISTED BALANCE WORKS FROM KM. 274.800 TO 338.030 IN AP PORTION AND OTHER LISTED BALANCE WORKS FROM KM. 0.0
265CONSTRUCTION OF FOUR LANING OF UP/HARYANA BORDER-YAMUNANGAR-SAHA-BARWALA-PANCHKULA SECTION OF NH-73 FROM KM 160357 TO KM 179.249 (DESIGN KM 157.192 TO KM 176.400) THE STATE OF
266CONSTRUCTION AND UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER FROM KM27.200 (END OF RONGLI BYPASS) TO KM37.600(NEW ROLEP BRIDGE) OF RHENOK-MENLA SPUR ( II B)
267CONSTRUCTION AND UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER FROM NEW ROLEP BRIDGE AT KM 37.600 TO CHOCHENPHERI AT KM 52.00 OF RONGLI TO CHOCHENPHERI (PKG-II C)
268CONSTRUCTION AND UPGRADATION OFEXISTINGROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT OF KAFER- LAVA MORE SECTION FROM KM 40.00 TO KM 61.100 (PKG-VA)
269CONSTRUCTION AND UPGRADATION OFEXISTINGROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT OF SECT. FROM PEDONG BYPASS TO RESHI BORDER KM 79.700 TO KM96.254 (LAVA MORE-RISHI BORDER )PKG
270CONSTRUCTION FOR MITIGATION MEASURES KM 368.00-UTTARAKHAND-TO KM 433.00 ON NH-07-PKG-1
271CONSTRUCTION FOR MITIGATION MEASURES KM 450.00-UTTARAKHAND-TO KM 468.00 ON NH-07-PKG-3
272CONSTRUCTION FOR MITIGATION MEASURES PKG-2
273CONSTRUCTION OF (I) 4-LANE HIGHWAY FROM VIDISHA TO HINOTIYA FROM KM. 0.000 TO KM. 27.000 (LENGTH=27 KM) (VIDISHA-MEHULWA-TALBEHAT PKG.-I) SECTION OF NH-346 AND (II) 4-LANING OF VIDISHA TO MORIKORI FRO
274CONSTRUCTION OF (I) CONNECTING ROAD FROM Z-MORH TUNNEL TO ZOJILA TUNNEL AND (II) 14.150 KM LONG BI-DIRECTIONAL TUNNEL ACROSS ZOJI LA PASS ON SONAMARG-KARGIL SECTION OF NH-01 ON EPC MODE IN THE UNION T
275CONSTRUCTION OF 1 NOS ROB, 2 NOS VUPS, SERVICE ROADS, PROVISION OF LIGHTING AND CONSTRUCTION OF OTHER MISCELLANEOUS WORKS AT VARIOUS STRETCHES INCLUDING MAINTENANCE OF EXISTING SECTION OF NH-4 FROM AP
276CONSTRUCTION OF 2 LANE BARPETA BYPASS FROM KM 77+900(BARADI) TO KM 86+150( DEURIKUCHI) (LENGTH=8.25KM) ON NH-427 IN THE STATE OF ASSAM UNDER EPC MODE(JOB NO.427/AS/2022-23/245)
277CONSTRUCTION OF 2 LANE BRIDGE ACROSS RIVER KOSI WITH APPROACH ROAD FROM BHEJA TO BAKAUR SECTION OF NH 527A DESIGN CHAINAGE KM 0.000 TO KM 13.300 UNDER BRT SCHEME OF BHARATMATA PARIYOJANA PHASE I IN TH
278CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 163.59 TO KM 206.66 (PACKAGE 5) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHW
279CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER FROM KM 55.6 TO KM 90.7 (EXISTING CHAINAGES) OF NH-766C (COMPLETE REALIGNMENT OF 13.76 KM) WITH 2 MAJOR BRIDGES ACROSS SHARAVATHI BACKWATERS IN THE STATE OF
280CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER NORTHERN BYPASS PHASE-II OF KOTA CITY FROM DESIGN CHAINAGE KM.0/0 (KM. 178+300 OF SH-33) TO KM 12/915 (KM. 236+800 OF NH-52) ON EPC MODE IN THE STATE OF RAJA
281CONSTRUCTION OF 2 LANE WITH PAVED SHOULDERS (BARAMULLA BYPASS) GREENFIELD BYPASS FROM EXISTING CH. KM 47+020 TO KM 56+720 AND DESIGN CH. FROM 48+500 TO 62+600 (TOTAL LENGTH= 14.100 KM) ON ROAD SRINAGA
282CONSTRUCTION OF 2-LANE MAJOR BRIDGE INCLUDING APPROACHESOVER BRAHMAPUTRA BETWEEN MAJULI ON NORTH BANK AND JORHAT ON SOUTH BANK, LENGTH OF BRIDGE 6812.5 METRE (PACKAGE II) ON NH-715 K IN THE STATE OF A
283CONSTRUCTION OF 2-LANE ROAD FROM KM 33 TO KM 65.00 OF AKAJAN-LIKABALI-BAME ROAD IN ARUNACHAL PRADESH
284CONSTRUCTION OF 2-LANE ROAD WITH PAVED SHOULDER (GREENFIELD ALIGNMENT) OF EXISTING STRETCH BETWEEN LEGSHIP - GYALSHING FROM KM75.00 TO KM 90.210 (PKG-6I)
285CONSTRUCTION OF 2-LANE ROAD WITH PAVED SHOULDERS FROM KM16.00 OF ROING-HUNLI SECTION TO KM 21.500 OF HUNLI-ANINI ROAD (GREENFIELD ALIGNMENT) (NH-313)(TOTAL LENGTH= 74.863 KM) IN ARUNACHAL PRADESH UNDE
286CONSTRUCTION OF 2-LANE SPECIFICATION ROAD WITH PAVED SHOULDER AS REALIGNMENT (GREENFIELD ALIGNMENT) OF EXISTING STRETCH BETWEEN LEGSHIP - GYALSHING FROM KM58.840-KM75.00 (PKG- V)
287CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER GANGTOK BYPASS ROAD FROM RANIPOOL TO BURTUK (L=23.316KM) IN THE STATE OF SIKKIM
288CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM KM 0.000 TO KM 16.000 OF STRETCH SINGTAM – TARKU OF NH-510 ON EPC BASIS UNDER SARDP –NE PHASE ‘A’ IN THE STATE OF SIKKIM
289CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF KOHIMA-BYPASS ROAD FROM DSIGN KM32.0 TO KM43.454 [DESIGN LENGTH=11.454] (PKG.- 4)
290CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF KOHIMA-BYPASS ROAD FROM DESIGN KM 0.00 TO KM 10.500 [DESIGN LENGTH- 10.500 KM] PACKAGE- I
291CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF KOHIMA-BYPASS ROAD FROM DESIGN KM10.500 TO 21.00KM [DESIGN LENGTH- 10.500 KM] PACKAGE- 2
292CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF KOHIMA-BYPASS ROAD FROM DESIGN KM21.0 TO KM32.0 [DESIGN LENGTH=11.0 KM] (PKG.- 3)
293CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF NEW GREEN FIELD ALIGNMENT FROM CHOCHENPHERI AT KM 52.000 TO HELIPAD NEAR MENLA AT KM82.00 OF RHENOK-MENLA SPUR (PKG-3A)
294CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF SHILLONG WESTERN BYPASS STARTING FROM NH-06 NEAR LADUMSAW (EXISTING KM 60.900 OF OLD NH-40) TO NH106 (OLD NH-44E), KM 0+000 TO KM 12+800 PACKAGE-1
295CONSTRUCTION OF 2-LANE WITH PAVED SHOULDERS OF SHILLONG WESTERN BYPASS STARTING FROM NH-06 NEAR LADUMSAW (EXISTING KM 60.900 OF OLD NH40) TO NH106 (OLD NH 44E) (PACKAGE-III), FROM KM 24+700 TO KM 38+2
296CONSTRUCTION OF 2-LANING WITH HARD SHOULDER ROAD OF UKHRUL - TOLOI - TADUBI SECTION OF NH-102A FROM DESIGN CHAINAGE 50.850 KM TO 81.870 KM (PACKAGE -3)
297CONSTRUCTION OF 2-LANING WITH HARD SHOULDER ROAD OF UKHRUL - TOLOI - TADUBI SECTION OF NH-102A FROM DESIGN CHAINAGE 81.870 KM TO 105.825 KM PACKAGE -4
298CONSTRUCTION OF 2-LANING WITH HARD SHOULDERS OF ARROWA-KHUPA-HAYULIANG SECTION OF NH-113 FROM CH.68.550 TO CH.91.633
299CONSTRUCTION OF 2-LANING WITH HARD SHOULDERS OF DEMWE-BRAHMAKUND SECTION OF NH-13 FROM CH.0.00 KM TO 18.464KM ON EPC
300CONSTRUCTION OF 2L+PS FROM PASARLAPUDI-DHINDI (105/700 TO 127.500 OF NH-214) OF NH-216
301CONSTRUCTION OF 4 LANE ACCESS CONTROLLED HIGHWAY FROM CHILLAKURU CROSS ROAD TO TURPUKANUPUR KM 0+000 TO KM 23+770 INCLUDING 6 LANE FLYOVER ON NH-16 (LENGTH KM 1.050) AND 6 LANE FROM TURPUKANUPUR TO PO
302CONSTRUCTION OF 4 LANE ACCESS CONTROLLED NEW GREENFIELD HIGHWAY SECTION OF NH 365BG FROM RECHARLA VILLAGE TO GURVAYGUDEM VILLAGE (DESIGN CHAINAGE 105.236 TO 132.664) UNDER HAM MODE UNDER BHARATMALA PA
303CONSTRUCTION OF 4 LANE ACCESS CONTROLLED NEW GREENFIELD HIGHWAY SECTION OF NH-365BG (KHAMMAM-DEVARAPALLE) FROM GURVAYGUDEM TO DEVARAPALLE (DESIGN CHAINAGE 132+664 TO 162+126 ) UNDER BHARATMALA PARIYOJ
304CONSTRUCTION OF 4 LANE ELEVATED HIGHWAY AND AT-GRADE IMPROVEMENTS AT GOPALGANJ TOWN FROM DESIGN CH: 384+000 (EXISTING CH: 384+000)TO DESIGN CH: 386+750 (EXISTING CH: 386+410) ON NH-28 (NEW NH-27) ON E
305CONSTRUCTION OF 4 LANE ELEVATED SECTION AND AT- GRADE IMPROVEMENTS AT BEGUSARAI TOWN SECTION OF NH-31 FROM DESIGN CHAINAGE 221+047 TO 225+302 IN THE STATE OF BIHAR ON EPC MODE
306CONSTRUCTION OF 4 LANE FLYOVER AT NAGPUR RTO CHOWK TO NAGPUR UNIVERSITY CAMPUS FROM CH 2/250 TO 5/100 AND 4 LANE FLYOVER AT WADI/MIDC JUNCTION FROM KM 8/360 TO KM, 10/300 ON NH 53 IN STATE OF MAHARASH
307CONSTRUCTION OF 4 LANE GAURIPUR BYPASS ON NH-17 IN THE STATE OF ASSAM
308CONSTRUCTION OF 4 LANE GREEN FIELD NORTHERN EAST SIDE GORAKHPUR BYPASS (26.616 KMS) STARTING FROM NH 29E (CHAINAGE 83.308) AND END AT NH 28 (CHAINAGE 285.100) IN THE STATE OF UTTAR PRADESH UNDER BHARA
309CONSTRUCTION OF 4 LANE ROB AND ITS APPROACHES AT THE LEVEL OF CROSSING (L C NO. 29-B) OF KM 29 (EKANGANSARAI) AT NH-110(NEW NH-33) & RAILWAY KM 32.63 OF FATWA(FUT) - ISLAMPUR (IPR) SECTION IN THE STAT
310CONSTRUCTION OF 4 LANE ROB WITH APPROACHES IN LIEU OF LC NO. RV-172 AT KM 176.00 OF NH-201 (PRESENT NH-26) AT KESINGA INCLUDING LAND ACQUISITION IN THE STATE OF ODISHA ON EPC MODE UNDER ANNUAL PLAN 20
311CONSTRUCTION OF 4 LANE WITH PAVED SHOULDER (PATTAN BYPASS) GREENFIELD BYPASS FROM EXISTING CH. KM 24+320 TO KM 33+760 AND DESIGN CH. FROM KM 24+400 TO KM 35+300, TOTAL LENGTH= 10.900 KM ON ROAD SRINAG
312CONSTRUCTION OF 4 LANE WITH PAVED SHOULDER FROM (DESIGN CH. 14+200 TO 24+400), (DESIGN CH. 35+300 TO 44+294) AND (DESIGN CH. 44+958 TO 48+500) OF TOTAL LENGTH 22.736 KMS (NH-01) IN THE UT OF JAMMU
313CONSTRUCTION OF 4 LANE WITH PAVED SHOULDERS THIRUVAYARU BYPASS IN BETWEEN EXISTING KM.55/926 TO 62/680 IN NH 226EXTN. (NEW NH 136)
314CONSTRUCTION OF 4 NOS GRADE SEPARATOR BETWEEN KM. 281.000 TO KM 307.600 KM. 286.400 KUMHARI KM. 299.000 TRANSPORT NAGAR KM. 302.000 POWER HOUSE KM. 304.000 CHANDRA MOURA CHOWK TO KM. 305.00 SUPELA OF
315CONSTRUCTION OF 4-LANE ACCESS CONTROLLED GREENFIELD HIGHWAY SECTION ON NH-163G (KHAMMAM - VIJAYAWADA) FROM BRAHMANAPALLI (K) VILLAGE AT DESIGN CH 250.400 KM TO REMIDICHERLA VILLAGE AT DESIGN CH. 280.2
316CONSTRUCTION OF 4-LANE ACCESS CONTROLLED GREENFIELD HIGHWAY SECTION ON NH-163G (KHAMMAM-VIJAYAWADA) FROM V. VENKATAYAPALEM VILLAGE AT DESIGN CH. 220.480 KM TO BRAHMANAPALLI (K) VILLAGE AT DESIGN CH. 2
317CONSTRUCTION OF 4-LANE FLYOVER AT AMBERPET-X ROAD, HYDERABAD ON NH-202 (NEW NH-163) IN THE STATE OF TELANGANA
318CONSTRUCTION OF 4-LANE FROM BARELA TO MANEGAON SECTION OF NH-30 FROM DESIGN CH. 2.900 TO DESIGN CH. 19.050 (JABALPUIR RING ROAD) UNDER BHARATMALA PARIYOJANA IN THE STATE OF MADHYA PRADESH EPC MODE (PA
319CONSTRUCTION OF 4-LANE GREEN FIELD HIGHWAY FROM KM. 35.000 TO KM. 49.155 OF NH-731A WITH PAVED SHOULDERS ON HYBRID ANNUITY MODE IN THE STATE OF UTTAR PRADESH
320CONSTRUCTION OF 4-LANE GREENFIELD JALBEHRA - SHAHBAD SECTION OF NH – 152G FROM KM 0+000 TO KM 22+850 (PART OF SHAHBAD - THOL FEEDER ROUTE) IN THE STATE OF HARYANA ON HYBRID ANNUITY MODE UNDER BHARATMA
321CONSTRUCTION OF 4-LANE HIGHWAY FROM SAMARLAKOTA TO ACHAMPETA JUNCTION (FROM KM. 0.000 TO KM. 12.250) AS PART OF KAKINADA PORT TO NH-16 CONNECTIVITY IN THE STATE OF ANDHRA PRADESH UNDER BHARATMALA PAR
322CONSTRUCTION OF 4-LANE HIGHWAY WITH PAVED SHOULDERS FROM KM 49.155 TO KM 74.700 OF NH-731A ON HYBRID ANNUITY MODE IN THE STATE OF UTTAR PRADESH
323CONSTRUCTION OF 4-LANE PANCHGRAM BYPASS FROM DESIGN CHAINAGE KM 15+500 ON NH-37 (OLD NH-53) AT KALINAGAR PT.-II VILLAGE TO DESIGN CHAINAGE KM 27+300 AT CROSSING WITH NH-6 (OLD NH-44) NEAR SIDDESWAR PT
324CONSTRUCTION OF 4-LANING OF BHIWANI HANSI ROAD SECTION OF NH 148B (DESIGN LENGTH 42.934 KM) UNDER BHARATMALA PARIYOJANA IN THE STATE OF HARYANA ON HYBRID ANNUITY MODE
325CONSTRUCTION OF 4.5 KM LONG SILKYARA TUNNEL BETWEEN KM 25.40 TO 50.25 KM (TUNNEL WORK)
326CONSTRUCTION OF 5 HL BRIDGES AT KM 379/000 (PANGAM), KM 439/400 (POTTERU), KM 444/237 (KONGURUKONDA), KM 457/075 (MV-90) AND KM 468/150 (MV-96) OF NH-326 (MALKANGIRI-MOTU ROAD) IN THE STATE OF ODISHA.
327CONSTRUCTION OF 6 LANE BRIDGE ON GANGA ON NH-96 AND ITS APPROACHES IN PHAPHAMAU ALLAHABAD ON EPC MODE
328CONSTRUCTION OF 6 LANE DURG RAIPUR ARANG BYPASS PKG 1 SECTION OF NH 53 FROM CH 0.000 TO CH 44.500 IN THE STATE OF CHHATTISGARH
329CONSTRUCTION OF 6 LANE DURG RAIPUR ARANG BYPASS PKG 2 SECTION OF NH 53 FROM CH 44+500 TO CH.92+230 IN THE STATE OF CHHATTISGARH
330CONSTRUCTION OF 6 LANE ELEVATED CORRIDOR ALONG WITH DEVELOPMENT OF EXISTING 4 LANE ROAD AT GROUND LEVEL FROM AROOR TO THURAVOOR THEKKU SECTION OF NH-66 FROM KM. 366.330 TO KM. 379.082 OF NH-66 (LENGT
331CONSTRUCTION OF 6- LANE BRIDGE AND ITS APPROACHES ACROSS RIVER GANGA AS PART OF PATNA RING ROAD (NH-131G) STARTING FROM DESIGN KM. 8+480 NEAR SHERPUR TO KM. 23+000 NEAR DIGHWARA UNDER BHARATMALA PARIY
332CONSTRUCTION OF 6-LANE ELEVATED / EXTRA DOSE CABLE BRIDGE ON RIVER GANGA PARALLEL TO AND WESTERN SIDE OF DIGHA-SONEPUR RAIL CUM-ROAD BRIDGE OF NH 139W IN THE STATE OF BIHAR
333CONSTRUCTION OF 6-LANE GREENFIELD AMBALA RING ROAD STARTING FROM JUNCTION WITH SHAMLI-AMBALA SECTION OF NH-344GM NEAR VILLAGE KAPURI (DESIGN KM 18+226) AND TERMINATING AT ISMAILABAD - AMBALA SECTION O
334CONSTRUCTION OF 6-LANE GREENFIELD KARNAL RING ROAD STARTING FROM NH-44 NEAR VILLAGE SHAMGARH (DESIGN KM 0+000 ) AND TERMINATING AT KARNAL - MUNAK ROAD (MDR -115) NEAR VILLAGE SAMALAKHA (DESIGN KM 34+5
335CONSTRUCTION OF 8 LANING OF EXISTING 4 LANE VADAPE TO THANE FROM KM 539.202 TO KM 563.000 SECTION OF NH-3 (NEW NH-848)
336CONSTRUCTION OF A NEW 4 LANE BRIDGE PARALLEL TO EXISTING MG SETU WITH ITS APPROACHES FROM KM 0.00 TO KM 14.500 ACROSS RIVER GANGA ON NH 19 AT PATNA IN THE STATE OF BIHAR
337CONSTRUCTION OF A NEW 4 LANE MAJOR BRIDGE ACROSS RIVER KOSI AT PHULAUT INCLUDING RHABILITATION AND UPGRADATION OF EXISTING BIRPUR-BIHPUR SECTION OF NH-106 FROM KM 106 TO 136 TO 2- LANE PAVED SHOULDER
338CONSTRUCTION OF ADDITIONAL 3 LANE WITH PAVED SHOULDER (DESIGN LENGTH 8.87 KM) AS REALIGNMENT OF BAKANER GHAT (BETWEEN INDORE TO KHALAGHAT SECTION FROM EXISTING KM 59+190 TO KM 66+120) OF NH 52 (OLD NH
339CONSTRUCTION OF AMETHI BYPASS (PART-II) AT KM.30.050 OF NH-931 UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
340CONSTRUCTION OF BALRAMPUR BYPASS WITH 2L FLEXIBLE PAVEMENT CONFIGURATION FROM KM.223.000 OF NH-330 TO KM.328.300 OF NH-730 UNDER EPC MODE
341CONSTRUCTION OF BASTI RING ROAD (PHASE-I) WITH 4L CONFIGURATION FOR BASTI CITY IN THE STATE OF UTTAR PRADESH ON HAM MODE
342CONSTRUCTION OF BHABHUA BYPASS FROM CH. 10+800(DESIGN CH. 10+800) TO CH. 19+860 (DESIGN CH. 18+150) AND CHAND BYPASS FROM CH. 38+060 (DESIGN CH. 36+250) TO CH. 40+460 (DESIGN CH. 38+650) AND WIDENING
343CONSTRUCTION OF BYPASS FOR PROVIDING INTER CONNECTIVITY AMONG (NHS) AROUND THE PRATAPGARH CITY (PRATAPGARH BYPASS) ON EPC MODE
344CONSTRUCTION OF BYPASS ON NH-59 FROM KM 336/350 TO 349/910 (13.56 KM) NEAR BERHAMPUR TOWN INCLUDING 4-LANE ROB IN THE STATE OF ODISHA.
345CONSTRUCTION OF BYPASS ROAD TO BALANGIR TOWN FROM KM 72/400 (DESING KM 0/0) TO KM 79/800 (DESIGN KM 11/670) OF NH-26 IN THE STATE OF ODISHA.
346CONSTRUCTION OF BYPASS TO GUDIYATHAM TOWN IN KM 23/100 – 29/250 INCLUDING LA AND SHIFTING OF NH-234 (MANGALORE -VILLUPURAM ROAD) (NEW NH-75)
347CONSTRUCTION OF BYPASS TO KHORDHA TOWN FROM KM 294/000 TO 300/300 ON NH-57 INCLUDING LA IN THE STATE OF ODISHA ON EPC MODE.
348CONSTRUCTION OF BYPASS TO MADURAI - ACHAMBATHU - VIRATIPATHU IN KM 6/850 - 10/382 OF NH 49 EXTN. (NEW NH 85) INCLUDING LA & SHIFTING OF UTILITIES
349CONSTRUCTION OF BYPASS TO NAYAGARH TOWN FROM KM 235.469 TO 252.482 OF NH-57 INCLUDING LAND ACQUISITION IN THE STATE OF ODISHA.
350CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY FROM KM 103.400 TO KM 128.000 OF VADODARA MUMBAI EXPRESSWAY TALASARI TO KARVAD SECTION IN THE STATE OF GUJARAT AND MAHARASHTRA ON HAM MODE UNDER
351CONSTRUCTION OF EIGHT LANE EXPRESSWAY FROM KM 190.000 TO KM 217.500 GANDEVA TO ENA SECTION OF VADODARA MUMBAI EXPRESSWAY IN THE STATE OF GUJARAT ON HAM MODE UNDER BHARATMALA PARIYOJANA PHASE I PACKAGE
352CONSTRUCTION OF EIGHT LANE VADODARA KIM EXPRESSWAY FROM KM 254.430 TO KM 279.000 (KIM TO ANKLESHWAR SECTION OF VADODARMUMBAI EXPRESSWAY) PACKAGE V
353CONSTRUCTION OF ELEVATED CORRIDOR FROM KM. 135.650 TO 136.300 ON 63, FROM KM. 249 TO KM. 250.050 ON OLD NH4 AND FROM KM. 192.910 TO KM. 193.350 ON NH218 FROM DECONGESTION OF TRAFFIC IN RANICHENNAMMA C
354CONSTRUCTION OF EMERGENCY LANDING FACILITY FROM KM. 246.60 TO KM. 249.70 ON SRINAGAR - BANIHAL SECTION
355CONSTRUCTION OF FLYOVER AT KM.544.650 INCLUDING ROB ,SERVICE ROADS ,FOOTPATH FOR RCC DRAINS ON URBAN LINK TO NAGPUR -RAIPUR ROAD
356CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF DSIR ZONE OF AHMEDABAD DISTRICT TO ADHELAI VILLAGE OF BHAVNAGAR DISTRICT (CH 71.00 TO CH109.019) SECTION OF AHMEDABAD DHOLERA GREENFILD ALIGNMENT (NH
357CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF SARDAR PATEL RING ROAD TO SINDHREJ VILLAGE (CH. 0.00 TO CH. 22.00) SECTION OF AHMEDABAD DHOLERA GREENFILD ALIGNMENT (NH 751) UNDER BHARATMALA PARIYOJ
358CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF SINDHREJ VILLAGE (CH. 22.00 TO CH. 48.52) SECTION OF AHMEDABAD DHOLERA GREENFILD ALIGNMENT (NH 751) UNDER BHARATMALA PARIYOJANA IN THE STATE OF GUJAR
359CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF VEJALLKA VILLAGE TO START OF DSIR ZONE OF AHMEDABAD DISTRICT (CH. 48.52 TO CH. 71.06) SECTION OF AHMEDABAD DHOLERA GREENFILD ALIGNMENT (NH 751) IN TH
360CONSTRUCTION OF FOUR LANE GREENFIELD PROJECT OF DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-III) FROM JUNCTION WITH JIND-PANIPAT ROAD (NH-352A) NEAR GANGANA VILLAGE TO JUNCTION WITH JIND-KARNAL ROAD
361CONSTRUCTION OF FOUR LANE GREENFIELD PROJECT OF DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-IV) FROM JUNCTION WITH JIND-KARNAL ROAD (NH-709A) NEAR ALEWA VILLAGE TO JUNCTION WITH AMBALA-KAITHAL-HISSAR
362CONSTRUCTION OF FOUR LANE GREENFIELD PROJECT OF DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-V) FROM JUNCTION WITH AMBALA-KAITHAL-HISSAR ROAD (NH-152) NEAR KHARAK PANDWA VILLAGE TO JUNCTION WITH PATIA
363CONSTRUCTION OF FOUR LANE HIGHWAY FORM GHAZIPUR BALLIA UP BIHAR STATE BORDER (GREENFIELD) SECTION OF NH31 PACKAGE I FROM HRIDAIPUR KM 0.000 TO SHAHAPUR KM 42.500 ON EPC MODE IN THE STATE OF UTTAR PRAD
364CONSTRUCTION OF FOUR LANE HIGHWAY FROM GHAZIPUR BALLIA UP BIHAR STATE BORDER (GREENFIELD) SECTION OF NH31 PACKAGE II FROM SHAHAPUR (KM 42.500) TO PINDARI (KM 78.150) ON EPC MODE IN THE STATE OF UTTAR
365CONSTRUCTION OF FOUR LANE HIGHWAY FROM GHAZIPUR BALLIA UP BIHAR STATE BORDER (GREENFIELD) SECTION OF NH31 PACKAGE III FROM PINDARI KM 78.150 TO RAWALGANJ BYPASS KM 117.120 ON EPC MODE IN THE STATE OF
366CONSTRUCTION OF FOUR LANE HIGHWAY FROM GHAZIPUR BALLIA UP BIHAR STATE BORDER GREENFIELD SECTION OF NH31 PACKAGE IV FROM BUXUR SPUR OF LENGTH KM 17.270 ON EPC MODE IN THE STATE OF UTTAR PRADESH
367CONSTRUCTION OF FOUR LANE HIGHWAY WITH PAVED SHOULDER FROM KM.74.700 TO KM.112.950 OF NH-731A (I/C YAMUNA BRIDGE) ON HAM IN THE STATE OF UTTAR PRADESH.
368CONSTRUCTION OF FOUR LANE PINJORE BYPASS FROM KM 0.00 TO 7.70 ON EPC MODE.
369CONSTRUCTION OF FOUR LANE RINGROAD BYPASS SRINAGAR CITY
370CONSTRUCTION OF FOUR LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LEVEL CROSSING NO. RV-71 AT KM 435 ON NH-217 (NEW NH-353) AT KHARIAR INCLUDING LAND ACQUISITION UNDER NH(O) IN ANNUAL PLAN 2021-22
371CONSTRUCTION OF FOUR-LANE CONCRETE ROAD FROM POLICE HEADQUARTER GONDIA CITY TO RAWANWADI VILLAGE (BIRSI AIRPORT JUNCTION) FROM DESIGN KM 0.000 TO KM 15.781  (EXISTING KM 39/720 OF NH-753 TO EXISTING K
372CONSTRUCTION OF FOUR-LANE ELEVATED VIADUCT FROM KM.4+634 TO KM.6+345 ON NH-24A INCLUDING RETAINING WALL, SERVICE LANE, AT GRADE ROAD AND IMPROVEMENT OF JUNCTIONS, ON EPC MODE
373CONSTRUCTION OF FOUR-LANE “WESTERN SIDE SPUR OF RAMPUR-RUDRAPUR SECTION CONNECTING NH-24 TO NH-87 BYPASSING RAMPUR TOWN” (DESIGN KM 00+000 TO KM DESIGN KM 13+700(LENGTH= 13.70 KM) ON EPC MODE IN THE S
374CONSTRUCTION OF FOUR/SIX LANE GREENFIELD LUDHIANA – RUPNAGAR NATIONAL HIGHWAY NO. NH-205K UNDER BHARATMALA PARIYOJANA IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE, PACKAGE-1 (DESIGN CH. 0.000 TO DESI
375CONSTRUCTION OF GREENFIELD CONNECTIVITY TO JEWAR INTERNATIONAL AIRPORT FROM DND FARIDABAD BALLABHGARH BYPASS KMP LINK SPUR TO DELHI MUMBAI EXPRESSWAY
376CONSTRUCTION OF GURGAON - PATAUDI - REWARI SECTION OF NH-352W (DESIGN LENGTH 46.11 KM) AS FEEDER ROUTE IN THE STATE OF HARYANA ON HYBRID ANNUITY MODE.
377CONSTRUCTION OF JASRA BYPASS WITH FOUR LANE PAVED SHOULDER CONFIGURATION FROM KM. 379.670 ON NH-76 (NEW NH-35) TO KM. 18.000 ON NH-27 (NEW NH-30) ON EPC MODE
378CONSTRUCTION OF KAITHI-PADARIA KALA BYPASS, PATNA-TAMOLI BYPASS, JASO BYPASS , NAGOD BYPASS (TOTAL LENGTH 15.44 KM) TO 2-LANE WITH PAVED SHOULDERS FLEXIBLE PAVEMENT ON NH-943 IN THE STATE OF MADHYA PR
379CONSTRUCTION OF KUND BYPASS FROM EXISTING KM 33+130 TO KM 41+260 (EXISTING LENGTH: 8.130 KM); DESIGN CHAINAGE: KM 35+130 TO KM 47+700 (DESIGN LENGTH: 12.570 KM) FOR NH-109
380CONSTRUCTION OF LEFT OUT PORTION OF AGRA INNER RING ROAD CONNECTING VILLAGE DEORI TO NH-44 VILLAGE BAD FROM KM. 0.000 TO KM. 7.772
381CONSTRUCTION OF MAJOR BRIDGE ACROSS SHARAVATHI BACKWATERS AND APPROCHES BETWEEN AMBARGODU AND KALASAVALLI NEAR SIGANDHUR IN SAGAR TALUK ON NH 369E IN THE STATE OF KARNATAKA ON EPC MODE.(JOB NO. NH-369
382CONSTRUCTION OF MAJOR BRIDGE AT KM 180.865 ACROSS RIVER KRISHNA ON NH-167 HAGARI – JADERCELA SECTION IN THE STATE OF KARNATAKA [JOB NO. NH-167/KNT (13)/2016-17-009-S&R (B)]
383CONSTRUCTION OF MAJOR BRIDGE OVER MIDDLE STRAIT CREEK BETWEEN KM. 106.590 TO KM. 107.762 OF NH 223 (NEW NO. NH 4)
384CONSTRUCTION OF MANGALDOI BYPASS (NH-15) STARTING AT CH 26+400 AND TERMINATING AT CH 41+505 UNDER RANGIA NH DIVISION ( L= 15.105 KM) IN THE STATE OF ASSAM. JOB NO. 15/AS/2021-22/234
385CONSTRUCTION OF MARIAHU BYPASS WITH FOUR LANE PAVED SHOULDER CONFIGURATION (KM.53.540 TO KM.59.200) OF NH-135A ON EPC MODE IN THE STATE OF UTTAR PRADESH
386CONSTRUCTION OF MIHONA BYPASS, LAHAR BYPASS, DABOH BYPASS and BHANDER BYPASS (TOTAL LENGTH 20.60 KM) TO 2-LANE WITH PAVED SHOULDER FROM ON MIHONA-BHANDER-MP/UP BORDER SECTION OF NH 552E IN THE STATE O
387CONSTRUCTION OF MISSING LINKS (SINGLE LANE) IN LAKHPAT GADULI HAJIPIR ODMA KHAVDA DHOLAVIRA MAUVANA GADKABET SANTALPUR ROAD ALONG THE INDO PAKISTAN BOARDER IN THE STATE OF GUJARAT (NEWLY DECLARED NATI
388CONSTRUCTION OF NEW 2 LANE WITH PAVED SHOULDER OF HAMIRPUR BYPASS (PACKAGE IVA) OF NH-88 (NEW NH-103) (DESIGN CHAINAGE-KM 121+175 TO KM. 138+295, DESIGN LENGTH- 17.120) IN THE STATE OF HIMACHAL PRADES
389CONSTRUCTION OF NEW 4 LANE BRIDGE OVER RIVER GANGA AT DOWNSTREAM OF FARAKKA BARRAGE INCLUDING APPROACHES CONNECTING FARAKKA RAIGANJ SECTION OF NH34 IN THE STATE OF WEST BENGAL ON EPC MODE
390CONSTRUCTION OF NEW 4 LANE PRAYAGRAJ SOUTHERN BYPASS (PHASE-I) FROM DESIGN KM 43+200 (AT MAHUWARI VILLAGE) TO DESIGN KM 50+860 ON NH-19 (AT NABABA URF NIBI KALA UPARHAR VILLAGE) INCLUDING MAJOR BRIDGE
391CONSTRUCTION OF NEW 4 LANE PRAYAGRAJ SOUTHERN BYPASS FROM DESIGN KM 50.860 (NABABA URF NIBI KALA UPARHAR) TO DESIGN KM 64.763 ON NH-19 (NEAR KHODAYAPUR KASGAON) INCLUDING INTERCHANGE LOOP AT NH-19 (DE
392CONSTRUCTION OF NEW 4-LANE BRIDGE (PARALLEL TO EXISTING VIKRAMASHILA SETU)FROM KM 8+920 TO KM 13+375(INCLUDING APPROACH ROAD 35M NAUGACHHIA SIDE &53 M BHAGALPUR SIDE)ACROSS RIVER GANGA ON NEWLY DECLAR
393CONSTRUCTION OF NEW DOUBLE TIER 4 LANE ELEVATED CORRIDOR FROM CHENNAI PORT TO MADURAVOYAL IN CHENNAI DISTRICT FROM KM 0.342 TO KM 20.593 PACKAGE 1 FROM KM 0.342 TO KM 4.604
394CONSTRUCTION OF NEW DOUBLE TIER 4L ELEVATED CORRIDOR FROM CHENNAI PORT TO MADURAVOYAL IN CHENNAI DISTRICT FROM KM -0.342 TO KM 20.593 AND PACKAGE II FROM (KM 4.604 TO KM 9.700)
395CONSTRUCTION OF NEW DOUBLE TIER 4L ELEVATED CORRIDOR FROM CHENNAI PORT TO MADURAVOYAL IN CHENNAI DISTRICT FROM KM -0.342 TO KM 20.593 AND PACKAGE III FROM (KM 9.700 TO KM 14.185)
396CONSTRUCTION OF NEW DOUBLE TIER 4L ELEVATED CORRIDOR FROM CHENNAI PORT TO MADURAVOYAL IN CHENNAI DISTRICT FROM KM -0.342 TO KM 20.593 AND PACKAGE IV FROM (KM 14.185 TO KM 20.593)
397CONSTRUCTION OF NEW FOUR LANE BYPASS TO PARBHANI CITY (PARWA TO ASOLA) KM 463/265 TO KM 481/180 (DESIGN CH. 19+220 TO CH. 34+434) (LENGTH-15.214 KM) SECTION OF NH-61 ON EPC MODE IN THE STATE OF MAHARA
398CONSTRUCTION OF NEW LINK (NH-133B) FROM KM 0/00 (KM 200/87 OF SAHIBANJ BYPASS) IN JHARKHAND TO KM 15/885 (JUNCTION OF NH-133B AND 131 A ON MANIHARI BYPASS) AND CONSTRUCTION OF MANIHARI BYPASS FROM KM
399CONSTRUCTION OF NEW ROAD AT THE MISSING LINK PORTION OF NH-81 ALONG THE APPROVED ALIGNMENT BETWEEN HARISHCHANDRAPUR EASTER APPROACH OF KALINDRI-BRIDGE, IN THE DISTRICT OF MALDA. (JOB NO. 081-WB-2015
400CONSTRUCTION OF PRATAPGARH BYPASS (EXTENSION) CONNECTING NH-31 TO NH-330
401CONSTRUCTION OF PROPOSED 4_LANE REVELGUNJ BYPASS NH-19 IN THE STATE OF BIHAR ON EPC MODE CONNECTING NH 19 TO 85 ORIGIN
402CONSTRUCTION OF PROPOSED REWARI BYPASS (DESIGN LENGTH 14.4 KM) NH-11 AS A FEEDER ROUTE IN THE STATE OF HARYANA ON HYBRID ANNUITY MODE
403CONSTRUCTION OF PROPOSED SRINAGAR BYPASS FROM KM.0.000 TO KM.42,100 ( CROSSING OF SUMBEL ROAD ) IN SRINAGAR IN THE STATE OF JAMMU AND KASHMIR ON EPC MODE
404CONSTRUCTION OF RAEBARELI RING ROAD (PHASE-2) WITH FOUR LANE CONFIGURATION FOR RAEBARELI CITY IN THE STATE OF UTTAR PRADESH ON HYBRID ANNUITY MODEL (HAM) BASIS
405CONSTRUCTION OF REALIGNMENT BETWEEN PANDRASS- PASHKYUN (TOTAL LENGTH 27.10 KM) ON ROAD ZOZILA-KARGIL -LEH (NH-1) I.E. DRASS ALIGNMENT (9.30 KM) KHARBOO REALIGNMENT (6.30 KM) AND KARGIL ALIGNMENT (11
406CONSTRUCTION OF REHABILITATION AND UPGRADING TO 2 LANES/2 LANE(FOR LOT-I-KM 40.00 TO KM 65.400 AND KM 76.300 TO KM 79.400) WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF SITAMARHI-JAYNAGAR-NA
407CONSTRUCTION OF RING ROAD AROUND KANPUR FROM KM.000 TO KM. 23.325 (CHACHENDI SACHENDI I TO MAHARAJPUR) (PACKAGE-I)
408CONSTRUCTION OF RING ROAD FOR RAEBARELI CITY (PHASE -I) ON EASTERN SIDE OF NH 24B
409CONSTRUCTION OF ROAD FROM KM 0/0 TO 72/0 OF NH-26 SUCH AS 4 LANE FROM KM 0/0 TO 21/0 (BARGARH TO BARPALI) AND 2L+PS FROM KM 21/0 TO 72/0 (BARPALI TO BOLANGIR)
410CONSTRUCTION OF ROB AND ITS APPROACHES IN LIEU OF LEVEL CROSSING NO 10 B T AT KM 307 050 OF NH 60 BHIMGARH
411CONSTRUCTION OF ROB WITH APPROACHES IN LIEU OF L C NO 165 OF AHMEDABAD PALANPUR BETWEEN RAILWAY STATION KARJODA AND PALANPUR NH 58 IN THE STATE OF GUJARAT
412CONSTRUCTION OF SHOHRATGARH BYPASS ON NH-730 UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
413CONSTRUCTION OF SIX LANE ELEVATED CORRIDOR FROM KM. 508.000 TO KM. 513.150 INCLUDING APPROACHES ON NH-66
414CONSTRUCTION OF SIX LANE ELEVATED CORRIDOR FROM KM.7.950 (UPPAL) TO KM.14.200 OF NH-163 TO DE-CONGEST THE URBAN LIMITS OF HYDERABAD-BHOOPALAPATNAM SECTION ON EPC MODE IN THE STATE OF TELANGANA
415CONSTRUCTION OF SIX LANE FLYOVER AT KATRAJ JUNCTION AT KM, 3/880 OF NH 548-DD (VADGAON - KATRAJ - KONDHWA - MANTARWADI CHOWK - LONI KALBHOR - THEUR PHATA - LONIKAND ROAD) IN PUNE DIST; OF THE STATE OF
416CONSTRUCTION OF SIX LANING OF DEDICATED PORT ROAD TO KRISHNAPATNAM PORT (PACKAGE-I) KM 0+000 TO KM 18+000 ON ENGINEERING PROCUREMENT AND CONSTRUCTION
417CONSTRUCTION OF SIX LANING OF NAIDUPETA JUNCTION - TURPUKANUPUR SECTION FROM KM.57+046 TO KM.91+927 IN THE STATE OF ANDHRA PRADESH ON HAM UNDER BHARATMALA PARIYOJANA, PHASE-I.
418CONSTRUCTION OF STAND ALONE RING ROAD/ BYPASS AROUND JAMMU CITY IN THE STATE OF J AND K ON EPC MODE
419CONSTRUCTION OF STRR (WEST SIDE)-NH948A-BALAGONDAPALLI (TAMIL NADU) TO KARNATAKA/TAMIL NADU BORDER FROM KM 144.170 TO KM 179.936 (35.766 KM) IN THE STATE OF TAMIL NADU ON HYBRID ANNUITY MODE UNDER BHA
420CONSTRUCTION OF TIMMAPURAM TO GURJANAPALLE SECTION FROM KM 26.150 TO 41.161 OF NH-214(NH216)(KAKINADA BYPASS) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
421CONSTRUCTION OF TUNNELS/VIADUCTS AT IDENTIFIED SLIDING/SLIP ZONES AT KM 130.550 TO KM.130.750; KM. 131.170 TO KM. 131.763; KM. 132.560 TO KM. 133.168; KM. 133.590 TO KM. 133.743 AND KM. 147.877 TO KM
422CONSTRUCTION OF TWIN TUBE TUNNELS ON JAMMU KASHMIR RING ROAD (NH-244A) BETWEEN DESIGN CH. 50+600 TO 51+700 AND DESIGN CH. 53+535 TO 55+700 ON EPC MODE UNDER RESIDUAL NHDP COMPONENT OF BHARATMALA PARIY
423CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD FROM EXISTING KM 20.456 TO KM 41.065 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH - 20.00 KM) IN THE STATE OF NAGALAND UND
424CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD FROM EXISTING KM 60.345 TO KM 98.065 [DESIGN KM. 59.000 TO KM. 86.835] (DESIGN LENGTH - 27.835 KM) IN THE STATE OF NAGALAND UN
425CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FOR FATEHPUR BYPASS, MANDAWA BYPASS AND JHUNJHUNU BYPASS OF NH-11 IN THE STATE OF RAJASTHAN.
426CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM.0.000 TO KM.55.610 (DESIGN KM. 0.000 TO KM. 54.048) OF NH-124D
427CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM KM.0 TO KM. 80 ON NH 548B (VIJAYAPURA-SANKESWAR SECTION) IN THE STATE OF KARNATAKA ON HYBRID ANNUITY MODE (HAM) BASIS CONTRACT
428CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER HIGHWAY FROM DESIGN CH.0.000 TO CH.49.2OO OF NH-731B ON EPC MODE
429CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF SELLING-DULTE SECTION OF NH-06 (PKG-I)
430CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF SELLING-DULTE SECTION OF NH-06 (PKG-III)
431CONSTRUCTION OR 4 LANE RANIGANJ BYPASS OF LENGTH 5 261 KM ON NH 60 NEW NH 14 FROM KM 273 00 OF NH TO KM 478 18 OF NH 2 NEW NH 16 IN PASCHIM BARDHAMAN WEST BENGAL IN EPC MODE REG JOB NO 014 WB
432CONSTRUCTION/ UP-GRATION OF FOUR/TWO LANE WITH PAVED SHOULDER OF NH68 FROM TANOT-RAMGARH BHADASAR-JAISALMER(DESIGN CH.0.000-125.573) AND FROM BHADASAR(MOKAL)-SARKARITALA UPTO PAKISTAN BORDER(DESIGN CH
433CONSTRUCTION/UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM RANIPOOL TO PAKYONG FROM KM 0.000 TO KM 16.167 OF NH-717A ON EPC BASIS UNDER SARDP-NE PHASE
434CONSTUCTION/UPGRADATION OF EXISTING HIGHWAY TO 2 LANE WITH PAVED SHOULDER FROM KM 0.00 TO KM 13.00 NH-717A BAGRAKOT-KAFER IV A.
435CONSTUCTION/UPGRADATION OF EXISTING HIGHWAY TO 2 LANE WITH PAVED SHOULDER FROM KM 13.00 TO KM 25.600 NH-717A BAGRAKOT-KAFER IV B.
436CONVERSION OF PARTIALLY EXCAVATED ESCAPE TUNNEL TO UNIDIRECTIONAL TWO LANE TUNNEL (INCLUDING CONSTRUCTION OF CROSS PASSAGES & APPROACH ROAD ON EITHER SIDE OF TUNNEL) FROM KM 12.732 TO KM 14.568 OF KIR
437CORRIDOR EFFICIENCY IMPROVEMENT INCLUDING REMOVAL OF BLACK SPOTS IN LAKHANPUR - SAMBA SECTION OF NH-44 FROM CHAINAGE KM. 16.300 TO KM. 74.100 - N/02007/03002/JK
438DABOKA BYPASS OF DABOKA - PAROKHAOWA PKG -1
439DABOKA KATHKATI PACKAGE-5
440DABOKA KATHKATI PACKAGE-6
441DABOKA KATHKATI PACKAGE-7
442DAHEGAON TO KUHI
443DAINADUBI-DARUGIRI PKG-1B
444DAVUALAPALLY TO MALLAPALEM SECTION {DESIGN CH. KM 133+922 TO KM 154+216 (EXISTING CH. KM 133+922 TO KM 154+900)} OF NH-565
445DELHI AMRITSAR KATRA EXPRESSWAY (PHASE-II PKG XVIII) DEVELOPMENT AND UPGRADATION OF FOUR LANE ACCESS CONTROL EXPRESSWAY FROM DESIGN CHAINAGE KM 530.00 TO KM 545.300 (SIDHRA TO DOMEL SECTION OF NH-44)
446DELHI AMRITSAR KATRA EXPRESSWAY PHASE I SPUR III FROM JUNCTION WITH AMRITSAR JALANDHAR ROAD NH3 NEAR BHISHAMBARPURA TO JUNCTION WITH AMRITSAR ANJALA ROAD NH354 NEAR AMRITSAR AIRPORT KM 71+000 TO KM 99
447DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 26
448DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 27
449DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 28
450DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 30
451DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 31
452DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-XI) FROM JUNCTION WITH JALANDHAR - KAPURTHALA ROAD (NH-703A) NEAR KHOJEWAL VILLAGE TO JUNCTION WITH AMRITSAR-MEHTA-SRIHARGOBINDPUR-TANDA ROAD (NH-503A) NEA
453DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-XII) FROM JUNCTION WITH AMRITSAR-MEHTA-SRIHARGOBINDPUR-TANDA ROAD (NH-503A) NEAR SRIHARGOBINDPUR TO JUNCTION WITH PATHANKOT-GURDASPUR ROAD (NH-54) NEAR GUR
454DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I SPUR-I) FROM JN. WITH KAPURTHALA - SULTANPUR LODHI ROAD (NH-703A) NEAR ISHARWAL VILLAGE TO JN. WITH KAPURTHALA - TARN TARAN ROAD (NH-703AA) NEAR GOINWAL SAHIB
455DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-II PKG-XIV) FROM JUNCTION WITH PATHANKOT-GURDASPUR ROAD (NH-54) NEAR BALSUA TO JUNCTION WITH HIRANAGAR ROAD NEAR VILLAGE GURHA BAILDARAN (KM 423+500 TO KM 468+10
456DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-II PKG-XV) [JUNCTION WITH HIRANAGAR ROAD NEAR VILLAGE GURHA BAILDARAN TO JUNCTION WITH JAMMU RING ROAD (NH-244A) NEAR JAKH VILLAGE FROM KM 468+100 TO KM 503+250]
457DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-II PKG-XVI) EXISTING JAKH (VIJAYPUR)-KUNJWANI SECTION OF NH-44 INCLUDING SPUR CONNECTIVITY TO JAMMU AIRPORT ( NH-144A) [KM 503+500 TO KM 514+500] - N/01004/01022
458DELHI-AMRITSAR-KATRA EXPRESSWAY FROM CH.KM 303+900 TO KM 319+400 OF MAIN EXPRESSWAY) AND AMRITSAR CONNECTIVITY CH.KM 0+000 TO KM 24+000. – PKG X
459DELHI-AMRITSAR-KATRA EXPRESSWAY FROM JUNCTION WITH LUDHIANA-MALERKOTLA ROAD (SH-11) NEAR BHOGIWAL VILL. TO JUNCTION WITH LUDHIANA-MOGA ROAD (NH-5) NEAR MULLANPUR DAKHA (KM 225+770 TO KM 260+860)ON EPC
460DELHI-AMRITSAR-KATRA EXPRESSWAY FROM JUNCTION WITH LUDHIANA-MOGA ROAD (NH-5) NEAR MULLANPUR DAKHA TO JUNCTION WITH JALANDHAR-MOGA ROAD (NH-703) NEAR KANG SAHIBU VILLAGE (KM 260+860 TO KM 303+900) ON E
461DELHI-AMRITSAR-KATRA EXPRESSWAY FROM JUNCTION WITH PATIALA-BATHINDA ROAD (NH-7) NEAR BHAWANIGARH TO JUNCTION WITH LUDHIANA-MALERKOTLA ROAD (SH-11) NEAR BHOGIWAL VILL. (KM 188+830 TO KM 225+770) ON EPC
462DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-09) (CH. 247.310 TO CH. 292.950) [JUNCTION WITH MDR-1 (BAONLI-JHALAI ROAD) TO END OF INTERCHANGE ON NH-166 NEAR VILLAGE MUI]
463DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-10) (CH. 292.950 TO CH. 319.400) [END OF INTERCHANGE ON NH-166 NEAR VILLAGE MUI TO HARDEOGANJ VILLAGE NEAR INDERGARH]
464DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-14) (CH. 388.420 TO CH. 419.000) [JUNCTION WITH NH- 76 TO JUNCTION WITH NH-12 NEAR VILLAGE UMMEDPURA]
465DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-15) (CH. 419.000 TO CH.427.300) [JUNCTION WITH NH-12 NEAR VILLAGE UMMEDPURA TO MAJOR BRIDGE OVER TAKLI RIVER NEAR NAYAGAON JAGEER VILLAGE]
466DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-6)
467DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-7)
468DEVELOPMENT OF 6 LANE ACCESS CONTROLLED GREENFIELD HIGHWAY FROM KM. 97.000 TO KM. 162.500 MARADGI S ANDOLA TO BASWANTHPUR SECTION OF NH-150C (PACKAGE-III OF AKKALKOT-KNT/TS BORDER) ON HYBRID ANNUITY M
469DEVELOPMENT OF 6 LANE JALANDHAR BYPASS FROM KAHLWAN NATIONAL HIGHWAY 03 DESIGN KM 0.00 ENDING AT KANG SAHBU NATIONAL HIGHWAY 703 DESIGN KM. 46.500 VIA SARMASTPUR NATIONAL HIGHWAY 44 MADARA NH03 KHA
470DEVELOPMENT OF 6L UER II [PACKAGE - II] (KARALA KANJHAWALA ROAD TILL NANGLOI - NAJAFGARH ROAD) FROM KM. 15.00 TO KM.28.45
471DEVELOPMENT OF 6L UER-II (PACKAGE-I) (NH-1 NEAR BAKOLI TILL KARALA KANJHAWALA ROAD) FROM KM. (-)0.70 TO KM. 15.07
472DEVELOPMENT OF EXTERNAL TRUNK CONNECTIVITY AND INTERNAL INFRASTRUCTURE WORKS AT MULTI MODEL LOGISTICS PARK AT JOGIGHOPA IN THE STATE OF ASSAM
473DEVELOPMENT OF FOUR LANNING OF ANGUL-SAMBALPUR SECTION OF NATIONAL HIGHWAY NH-42 (NEW NH-55 IN THE STATE OF ODISHA UNDER NATIONAL HIGHWAY DEVELOPMENT PROJECT (NHDP) PHASE-IV ON ENGINEERING PROCUREMEN
474DEVELOPMENT OF MULTIMODAL LOGISTICS PARK AT BANGALORE AND EXTERNAL CONNECTIVITY TO THE MULTI MODEL LOGISTIC PARK
475DEVELOPMENT OF NEWLY DECLARED NH-527C FROM MAJHAULI TO CHAROUT SECTION TO 2 LANE WITH PAVED SHOULDERS NATIONAL HIGHWAY STANDARD IN THE STATE OF BIHAR (KM 0.000 TO KM 63.655)
476DEVELOPMENT OF SIX LANE ACCESS CONTROLLED GREEN FIELD HIGHWAY FROM KAVULAKUNTLA (KM.196+000) TO NARAYANAMPET (KM 203+500) OF NH 544G BENGALURU-VIJAYAWADA ECONOMIC CORRIDOR ON HAM MODE IN THE STATE OF
477DEVELOPMENT OF SIX LANE BASANWAHI-MARANGPURI OF NH 130 CD FROM KM.99+500 TO 124+661 UNDER RAIPUR VISAKHAPATTNAM EC
478DEVELOPMENT OF SIX LANE JHANKI SARGI OF NH 130 CD FROM KM.0+000 TO 42+800 UNDER RAIPUR VISAKHAPATTNAM EC
479DEVELOPMENT OF SIX LANE SARGI-BASANWAHI OF NH 130 CD FROM KM.42+800 TO 99+500 UNDER RAIPUR VISAKHAPATTNAM EC
480DEVELOPMENT OF SIX-LANE ACCESS CONTROLLED HIGHWAY FROM ADHOYA MUSALMANA (AMBALA DISTRICT) TO SADOPUR (AMBALA DISTRICT) (FROM CH. 84+400 TO 121+786) OF SHAMLI - AMBALA SECTION OF BAREILLY - LUDHIANA EC
481DEVELOPMENT OF SIX-LANE ACCESS CONTROLLED HIGHWAY FROM GOGWAN JALALPUR (SHAMLI DISTRICT) TO RANIPUR BARSI (SAHARANPUR DISTRICT) (FROM CH. -(000+600) TO 45+500) OF SHAMLI - AMBALA SECTION OF BAREILLY -
482DEVELOPMENT OF SIX-LANE ACCESS CONTROLLED HIGHWAY FROM RANIPUR BARSI (SAHARANPUR DISTRICT) TO ADHOYA MUSALMANA (AMBALA DISTRICT) (FROM CH. 45+500 TO 84+400) OF SHAMLI - AMBALA SECTION OF BAREILLY - LU
483DEVELOPMENT TO 4/6-LANNING OF NH-31 (NEW NH-10) WITH BOTH SIDE SERVICE ROADS FROM KM 569.258 TO KM 581.030 (END OF AH-02 PROJECT ON NH- 31 NEAR SHIVMANDIR TO SEVOKE ARMY CANTONMENT) IN DISTRICTS OF DA
484DEVELOPMENT/WIDENING OF TALEGAON – CHAKAN – SHIKRAPUR – NHAVARA SECTION OF NH 548DG (NHAVARA TO CHOUFULA SECTION) OF STATE HIGHWAY IN THE STATE OF MAHARASHTRA” ON EPC MODE (LENGTH 24.037 KM).
485DHARAMPURI-LONAND FROM KM. 117.00 TO 166.40 (PKG-IV) ON MOHOL-ALANDI SECTION
486DIBRUGARH-LAHOAL-CHABUA BYPASS PACKAGE-3
487DIGRAS DARWAH KARANJA
488DORNALA TO KUNTA JUNCTION FROM DESIGN CHAINAGE KM 244+000 TO 267+990 SECTION OF NH-765 (PACKAGE-2)
489DULTE- KWALKULH - CHAMPAI PKG.2
490DWARKA EXPRESSWAY FROM KM -0.600 TO KM 5.300 - PKG-I (SHIVMURTI CHOWK-RUB NEAR DWARKA SECTOR 21)
491ELEVATED CORRIDOR IN RANCHI CITY FROM KM 0.00 TO KM 3.260 OF NH-75 INCLUDING DOWN RAMP ON NH-23 FROM KM 0.100 TO KM 0.600
492EPC- CORRIDOR APPROACH WORKS - NH (O): WIDENING EXISTING 2 LANE TO 2 LANE WITH PAVED SHOULDERS IN KM 67/2 TO 109/0 INCLUDING INTERMEDIATE LANES OF NH 363 (WARANGAL)
493ESTIMATE FOR IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER FROM RAMNAGAR TO ROSEDA FROM (KM 3.500 TO 43.000) OF NH 527 E ON EPC MODE IN STATE OF BIHAR. (JOB NO. NH-527E/2021-22/BR/50)
494ESTIMATE FOR WIDENING TWO LANE TO FOUR LANE FROM FROM KM.129.00 TO 144.00 OF NH-63 ANKOLA-GOOTY SECTION PASSING THROUGH HUBBALLI CITY LIMITS (JOB NO:NH-63-KNT-2016-17-838)
495FOUR LANING OF AMRITSAR BYPASS FROM NEW TARN TARAN ROAD TO AJNALA ROAD FROM DESIGN KM. 0.750 TO DESIGN KM. 43.750 AND UPGRADATION OF EXISTING AMRITSAR KHEMKARAN ROAD NH354 TO FOUR LANE CONFIGURATION
496FOUR LANING OF AURANGABAD-PAITHAN SECTION OF NH-752E ON EPC MODE IN THE STATE OF MAHARASHTRA .
497FOUR LANING OF BAKHTIYARPUR - MOKAMA SECTION OF NH-31
498FOUR LANING OF BASUKINATH-DEOGHAR SECTION OF NH-114A FROM KM 85.081 TO KM 130.240 UNDER NHDP PHASE-IV IN THE STATE OF JHARKHAND ON HAM
499FOUR LANING OF BETTADAHALLI TO SRIRAMPURA SECTION FROM KM. 166+100 (DESIGN KM. 170+415) TO KM. 217+000 (DESIGN KM. 226+750) OF NH-206 ON HAM UNDER BHARATHMALA PARIYOJANA, IN THE STATE OF KARNATAKA. (P
500FOUR LANING OF BHOGU TO SANKHA FROM KM 147.450 TO KM 196.870 ON NH-75 PKG SEC-III
501FOUR LANING OF EXISTING DIMAPUR KOHIMA ROAD FROM DESIGN KM 152.490 TO KM 166.700 (EXISTING KM 156.000 TO KM 172.900) EXCLUDING DIMAPUR AND KOHIMA BYPASS IN THE STATE OF NAGALAND
502FOUR LANING OF GAYA-HISUA-RAJGIRI-NALANDA-BIHARSHARIF SECTION (KM0.00 TO 92.935) ON NH-82 IN BIHAR
503FOUR LANING OF JAMMU-AKHNOOR PKG-1
504FOUR LANING OF JHANJHI JN TO DEMOW SECTION FROM KM. 491.050 TO KM. 535.250(DESIGN KM 490.800 TO KM 534.800) (WITH TOLL PLAZA)
505FOUR LANING OF JITTANDAHALLI TO DHARMAPURI SECTION OF NH-844 (PKG-III) FROM KM.60+100 TO KM.94+460
506FOUR LANING OF KAGAVADAR - UNA SECTION OF NH-8E FROM KM 139.915 TO KM 180.478 (PACKAGE-IV) IN THE STATE OF GUJARAT
507FOUR LANING OF KARIMNAGAR-WARANGAL SECTION OF NH-563 FROM DESIGN CH.48.860 KM NEAR SH-1 CH.170.400 KM AT MANAKONDUR BYPASS TO DESIGN CH.116.875 KM EXISTING CH. 144.050 KM AT PALVELPULA NEAR HANAMKONDA
508FOUR LANING OF KHAJURI TO WYNDHAMGANJ FROM KM 219.600 TO KM 260.483 ON NH-75 PKG SEC-V ON HAM
509FOUR LANING OF KIRATPUR NEAR CHOUK SECTION (73.20 KM TO186.50 KM)
510FOUR LANING OF LEFT OVER WORKS OF HOSPET BELLARY KARNATAKA/ AP BORDER FROM KM.280.080 TO KM. 375.450 OF NH-63 (NEW NH-67) IN THE STATE OF KARNATAKA
511FOUR LANING OF MAMALLAPURAM TO MUGAIYUR SECTION OF NH332A FROM KM 0.000 TO KM 31.000
512FOUR LANING OF MEHGAMA HANSDIHA SECTION OF NH-33 FROM EXISTING KM 41.900 TO 93.000 IN THE STATE OF JHARKHAND ON HAM
513FOUR LANING OF MOGA TO BAJAKHANA LAMBWALI SECTION OF 105B GREENFIELD ALIGNMENT FROM DESIGN CHAINAGE FROM KM 0.000 TO KM 43.319 UNDER BHARATMALA PARIYOJNA IN THE STATE OF PUNJAB
514FOUR LANING OF MUGAIYUR TO MARAKKANAM SECTION OF NH-332A FROM KM 31.000 TO KM 62.000
515FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM KHARIA VILLAGE JUNCTION TO START OF EXISTING BHAGALPUR BYPASS DESIGN CHAINAGE KM KM 95+580 TO KM 125+000 (PACKAGE 02) ON HYBRID ANNUITY MODE I
516FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM MUNGER TO KHARIA VILLAGE JUNCTION DESIGN CHAINAGE KM 69+520 TO KM 95+580 (PACKAGE 01) ON HYBRID ANNUITY MODE IN THE STATE OF BIHAR
517FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM NEAR RASULPUR TO MIRZACHAUKI (DESIGN CHAINAGE KM 157+350 TO KM 193+931) (PACKAGE 04) ON HYBRID ANNUITY MODE IN THE STATE OF BIHAR
518FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM START OF EXISTING BHAGALPUR BYPASS TO RASULPUR (DESIGN CHAINAGE KM 125+000 TO KM 157+350)(PACKAGE 03)ON HYBRID ANNUITY MODE IN THE STATE OF BI
519FOUR LANING OF NERALURU TO THORAPALLI AGRAHARAM SECTION OF NH-844 (PKG-I) FROM KM.0+000 TO KM.23+350
520FOUR LANING OF OTTANCHATRAM TO PALANI SECTION FROM KM 30/700 TO KM 55/000 OF NH 209(NEW NH-83) INCLUDING FOOTPATH FOR PEDESTRIAN AND WAY SIDE AMENITIES EXCEPT FROM KM 37/870 TO 38/130,KM 39/2 TO KM 41
521FOUR LANING OF PARARIA TO MOHANIA SECTION OF NH 319 (OLD NH 30) FROM KM. 54+530 (DESIGN CHAINAGE) TO KM. 115+330 (DESIGN CHAINAGE) ON EPC MODE IN THE STATE OF BIHAR (PACKAGE II)
522FOUR LANING OF PATNA TO KOILWAR
523FOUR LANING OF POONDIYANKUPPAM TO SATTANATHAPURAM (DESIGN CH KM. 67.000 TO KM. 123+800) SECTION OF NH-45A
524FOUR LANING OF PUDUCHERRY - POONDIYANKUPPAM SECTION OF NH 45 A (NEW NH 332) FROM KM 29.000 TO KM 67.000 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA PHASE I (RESIDUAL NHDP IV WORKS)
525FOUR LANING OF PURULIYA BYPASS SECTION OF NH 32 IN THE STATE OF WEST BENGAL ON EPC MODE
526FOUR LANING OF RAGHOGARH (DESIGN CH.29.300/EXISTING CH. 29.555) TO NANASA (DESIGN CH.92.971/EXISTING CH. 95.000) OF NH-47 (OLD NH-59A) (INDORE-HARDA, PACKAGE-II)
527FOUR LANING OF RAMBAN - BANIHAL SECTION OF NH-1A
528FOUR LANING OF SATTANATHAPURAM (KM.123/800) TO NAGAPATTINAM (KM.179/555) SECTION OF NH-45A ON HAM UNDER BHARATMALA PARIYOJANA PHASE -1 (RESIDUAL WORKS UNDER NHDP) OF TAMIL NADU
529FOUR LANING OF SOLAN-KAITHLIGHAT SECTION OF NH-22 (NOW NH-5) FROM KM 106.139 TO KM 129.050, ON EPC MODE
530FOUR LANING OF SONAULI GORAKHPUR SECTION OF NH 29E (NEW NH 24) FROM DESIGN CH. 0.000 TO DESIGN CH. 79.540 (FROM EXISTING CH. 0.000 TO EXISTING CH. 80.295) ON HYBRID ANNUITY MODE IN THE STATE OF UTTAR
531FOUR LANING OF SRIRAMPUR-DHUBRI PKG-2
532FOUR LANING OF THORAPALLI AGRAHARAM TO JITTANDAHALLI SECTION OF NH-844 (PKG-II) FROM KM.23+350 TO KM.60+100
533FOUR LANING OF UDHAMBUR - RAMBAN SECTION OF NH-1A
534FOUR LANING OF VILLUKURI KANNIYAKUMAR ROAD OF KM 70.250 TO 96.700 AND NAGERCOIL TO KAVALKINARU OF NH 47 B KM 0.00 TO 16.314
535FOUR LANING OF VILUPPURAM - PUDUCHERRY SECTION OF NH 45 A (NEW NH 32) FROM KM 0.000 TO KM 29.000 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA PHASE I (RESIDUAL NHDP IV WORKS)
536FOUR LANING WITH PAVED SHOULDER OF SECTION FROM KM 53.600 (GOLA ON NH-320) TO KM 81.446 (ORMANJHI ON NH-320B) IN THE STATE OF JHARKHAND ON HYBRID ANNUITY MODE
537FOUR LANINIG OF CHETTIKULAM TO NATHAM SECTION OF NH-785 FROM CHETTIKULUM (KM 7.300) TO NATHAM (KM. 36.690)
538FOUR LANNING OF BADARPUR BYPASS FROM DESIGN CHAINAGE KM 27+300 AT CROSSING WITH NH-6
539FOUR LANNING OF CHOLOPURAM-THANJAVUR
540FOUR LANNING OF NERCHOWK-PANDOH BYPASS SECTION OF NH-21(PACKAGE-I KM 190.000 TO KM 221.305) UNDER NHDP-IVB ON EPC MODE IN THE STATE OF HIMACHAL PRADESH
541FOUR LANNING OF TAMIL NADU KERALA BORDER TO VILLUKURI FROM KM. 43.00 TO 70.25 OF NH-47 UNDER NHDP-PH III ON EPC MODE IN STATE OF TAMIL NADU
542FOUR LANNING OF VIKRAVANDI-SETHIYAHOPU FROM KM 0.000 TO KM 60.250(DESIGN CHAINAGE KM 0.000 TO KM 65.960) SECTION OF NH-45C IN THE STATE OF TAMIL NADU UNDER NHDP –IV ON EPC MODE
543FOUR LANNING OF VILLUKURI TO KANYAKUMARI SECTION FROM KM 70.25 TO 96.714 OF NH-47 AND NAGERCOIL TO KAVALKINARU SECTION FROM 0.00KM TO 16.736 KM
544FOUR LANÌNG OF PUDUCHERRY (KM.29/000) TO POONDIYANKUPPAM (KM.67/000) SECTION OF NH-45A ON HAM UNDER BHARATMALA PARIYOJANA PHASE -1 (RESIDUAL WORKS UNDER NHDP) OF TAMIL NADU
545FOUR OF SIMARIA - KHAGARIA SECTION OF NH-31
546FOUR SIX LANING OF PIMPALGAON NASHIK GONDE FROM KM 380.00 TO KM 440.00 SECTION OF NH-3
547GARHMUKTESHWAR (KM. 83.200 OF NH-24) TO MEERUT (KM. 9.860 OF NH-235) INCLUDING CONNECTOR TO NH-119
548GOHA-KHELLANI PKG-3
549GUDIWADA TOWN 2 LANE ROB AND ROAD IMPROVEMENT OF NH165 IN REPLACEMENT OF LC NO 3ESPL3 AT KM 231.700 OF NH165 AND CONSTRUCTION OF 2 LANE ROB IN REPLACEMENT OF LC NO. 52 ON AT KM 230.600 OF NH165
550HARIDWAR DEHRADUN APPROVED LENGTH 69
551HARIHARGANJ TO PARWA MODE SECTION FROM KM 23.284 TO KM 57.049 OF NH-98
552HUNLI TO HAYULIANG PKG-1
553HUNLI TO ITHUN BRIDGE SECTION
554HYDERABAD-BANGALORE SEC.(NS COR.PH.-II)[KM.418-463.16],NH-7
555IMPHAL - KHONGSANG - JIRIBAM PKG-2
556IMPHAL - KHONGSANG PKG-3
557IMPHAL - KHONGSANG PKG-4
558IMPHAL - KHONGSANG PKG-5
559IMPHAL - KHONGSANG PKG-6
560IMPHAL-KOHIMA ROAD PKG-4B
561IMPHAL-KOHIMA ROAD PKG-5A
562IMPROVEMENT , UP-GRADATION OF NH-734 SECTION OF MORADABAD - THAKURDWARA - KASHIPUR: “PACKAGE-I: MORADABAD BYPASS” (LENGTH= 33.724 KM), START FROM CH. 0+00 (KM. 144+381 OF NH-24) AND ENDS AT CH. 33+724
563IMPROVEMENT AND RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS FROM KM 489.845 (NEW KM.58.125) AND KM. 537.500 (NEW KM 105.780) OF CHIKKAMAGALURU TO BILIKRE SECTION OF NH-373 IN THE STATE OF KARNAT
564IMPROVEMENT AND UP-GRADATION OF EXISTING ROAD TO 2/4L PS FROM KM 40.000 TO 88.750, START OF KHUTAR BYPASS TO START OF SHAHJAHANPUR BYPASS OF NH 731(PKG-I)
565IMPROVEMENT AND UP-GRADATION OF EXISTING ROAD TO 4L PS FROM KM 123.650 TO 175.080, FROM START OF SHAHABAD BYPASS TO END OF HARDOI BYPASS OF NH 731 (PKG-2B)
566IMPROVEMENT AND UP-GRADATION OF EXISTING ROAD TO 4L PS FROM KM 229.070 TO 260.800, END OF HARDOI DISTRICT TO LUCKNOW RING ROAD OF NH 731 (PKG-4)
567IMPROVEMENT AND UP-GRADATION OF NH-227B (84 KOSI PARIKRAMA MARG) PACKAGE –I, FROM KM 228.920 (JAGARNATHPUR) TO KM 235.960/0.000 (MAKHAUDADHAM) TO KM 29.000 (SARPUR) IN THE STATE OF UTTAR PRADESH ON EP
568IMPROVEMENT AND UP-GRADATION OF NH-227B (84 KOSI PARIKRAMA MARG) PACKAGE –III, FROM KM.47.800 (GOSAIGANJ) TO KM.73.300 (BIKAPUR) IN THE STATE OF UTTAR PRADESH ON EPC BASIS.
569IMPROVEMENT AND UP-GRADATION TO TWO LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM. 420.00 (SHOHRATHGARH) TO KM. 454.00 (USKA BAZAR) OF NH-730 IN THE STATE OF UTTAR PRADESH (EPC) BASIS
570IMPROVEMENT AND UP-GRADATION TO TWO LANE WITH PAVED SHOULDER/FOUR LANE CONFIGURATION FROM EXISTING KM 130.000 TO KM 191.000 (DESIGN KM 131.500 TO KM 188.735, DESIGN LENGTH 57.235 KM) OF NH-227A (NEAR
571IMPROVEMENT AND UPGRADATION TO TWO LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM 55.00 TO KM 90.00 (DESIGN LENGTH 34.76) OF NH-227A (NEAR CHHAPIA VILLAGE TO NEAR SIKRIGANJ) IN THE STATE OF U
572IMPROVEMENT AND UPGRADATION TO TWO LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM 90.00 TO 130.00 (DESIGN LENGTH 39.15) OF NH-227A ( NEAR SIKRIGANJ TO BARHALGANJ) IN THE STATE OF UP ON EPC MO
573IMPROVEMENT AND WIDENING TO 2-LANE WITH EARTHEN PAVED SHOULDER FROM UDAIPUR TO SRIMANTAPUR
574IMPROVEMENT AND WIDENING TO 2-LANE WITH PAVED SHOULDER OF ROAD FROM KM 101.300 TO KM 127.319 (TOTAL LENGTH 26.019 KM) I.E. THE KHOWAI –TELIAMURA-AMARPUR-HARINA-SABROOM
575IMPROVEMENT AND WIDENING TWO LANNIG WITH PAVED SHOULDER OF NATIONAL HIGHWAY 127B FROM KM 31.500 (GOERAGRE) TO KM 63.224 PACKAGE-II IN STATE OF MEGHALAYA
576IMPROVEMENT OF 2 LANE WITH PAVED SHOULDER OF STRETCH FROM BIKRAMGANJ DAWATH MELAYABAGH NAWANAGR -DUMROW OF NH-120(CH-201.665 TO KM 240.200) EXCLUDING DAWATH BYPASS UNDER EPC MODE IN THE STATE OF BIHAR
577IMPROVEMENT OF EXISTING ALIGNMENT OF PANDHARPUR TOWN PART BYPASSED SECTION FROM WAKHARI TO LORD VITTHAL TEMPLE LENGTH 8 KM UNDER BHARATMALA PARIYOJANA ON EPC MODE
578IMPROVEMENT OF GEOMETRICS OF THONDUPALLY TO KOTHUR FROM KM 22.300 TO KM 34.14 OF NH-44-RCW
579IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER FROM JUNCTION OF NH-22 NEAR HAJIPUR TO JUNCTION OF NH-122 AT BACHHWARA VIA MAHNAR AND MOHIUDDIN NAGAR FROM KM 0.00 TO 29+730 OF NH 122B IN THE STATE OF BIHA
580IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF BH/WBBORDER-AMDABAD-MANIHARI SECTION FROM DESIGN KM 0+000 TO KM23+945 OF NH-131 A (TOTAL LENGTH-23.945 KM) ON EPC MODE INTHE STATE OF BIHAR. (JOB NO. NH
581 IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF NH 122B FROM KM 29.730 TO KM 72.348 IN STATE OF BIHAR UNDER EPC MODE
582 IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF NH-319A FROM KM 0 TO KM 45 IN STATE OF BIHAR UNDER EPC MODE
583IMPROVEMENT/CONSTRUCTION OF EXISTING CLASS 5 ROAD TO NH INTERMEDIATE LANE SPECIFICATION WITH HARD SHOULDER FROM EXISTING KM 76+340 TO KM 134+940 (DESIGN CHAINAGE FROM KM 76+300 TO KM 133+000) OF NH-50
584IMPROVEMENT/CONSTRUCTION OF EXISTING CLASS-5 ROAD TO NH INTERMEDIATE LANE SPECIFICATION WITH HARD SHOULDER FROM EXISTING KM 134+940 TO KM 169+970 (DESIGN CHAINAGE FROM KM 133+000 TO KM 166.000) OF NH
585IMPROVEMENT/UPGRADATION OF EXISTING 2-LANE TO 4-LANE DIVIDED HIGHWAY FROM DAILI TO KURAOPOKPI SECTION OF IMPHAL-KOHIMA ROAD (DESIGN CH.: KM 274.610 TO 287.00 ) (PKG-4B)
586IMPROVEMENT/UPGRADATION OF EXISTING 2-LANE TO 4-LANE DIVIDED HIGHWAY FROM KURAOPOKPI TO SEKMAI SECTION OF IMPHAL-KOHIMA ROAD (DESIGN CH.: KM 287.00 TO 297.700) (PKG-5A)
587IMPROVEMENT/UPGRADATION OF EXISTING 2-LANE TO 4-LANE DIVIDED HIGHWAY FROM TAPHOU KUKI TO DAILI SECTION OF IMPHAL-KOHIMA ROAD (DESIGN CH.: KM 262.175 TO 274.610) (PKG-4A)
588IMPROVEMENT/WIDENING TO 2-L WITH PAVED SHOULDER FROM (DESIGN KM 0.00 TO KM 10.670) / 4-LANING FROM (DESIGN KM 0.00 TO KM 0.930) BETWEEN SHILLONG-DAWKI (PKG-1)
589IMPROVEMENT/WIDENING TO 2-LANE WITH PAVED SHOULDER / 4-LANING FROM (DESIGN KM 63.530 TO KM 71.520) BETWEEN SHILLONG-DAWKI (PKG-5)
590IMPROVEMENT/WIDENING TO 2-LANE WITH PAVED SHOULDER FROM (DESIGN KM 10.670 TO KM 37.550) BETWEEN SHILLONG-DAWKI (PKG-2)
591IMPROVEMENT/WIDENING TO 2-LANE WITH PAVED SHOULDER FROM (DESIGN KM 45.760 TO KM 63.530) BETWEEN SHILLONG-DAWKI (PKG-4)
592IMPROVEMENTS AND RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS FROM KM 243.20 TO KM 290.20 OF NH-234 IN THE STATE OF KARNATAKA THROUGH EPC MODE ( JOB NO NH234/KNT/2016-17/815)
593INDAPUR TO VADPALE
594INDORE - EDLABAD (PKG-II) [TEJAJINAGAR TO BALWARA]
595INDORE - HARDA (PKG-I) [INDORE TO RAGHAV GARH FROM KM. 0.25 TO KM. 26.903]
596INDORE - HARDA (PKG-III) [NANASA TO PIDGAON SECTION FROM KM 95.000 TO KM 142.445]
597JALANDHAR-HOSHIARPUR SECTION OF NH-70 [NEW NH NO. 3] FROM EXISTING KM 11.400 TO KM 49.200
598JAMMU - AKHNOOR SECTION OF NH 144A PKG-3B
599JESSAMI TO LAYNEN BRIDGE UKHRUL - JESSAMI PKG-7
600JOGIGHOPA BRIDGE
601JORAM – KOLORIANG ROAD FROM EXISTING KM 50.050 TO KM 70.00 (PKG-3)
602JORAM – KOLORIANG ROAD FROM EXISTING KM122.600 TO KM138.00 (PKG-7)
603KAILASHAHAR TO KHOWAI PKG-4
604KANPUR LUCKNOW EXPRESSWAY PKG-1 CONSTRUCTION OF 6-LANE TO EIGHT LANE OF KANPUR LUCKNOW EXPRESSWAY (NE-6), INCLUDING SPUR FROM KM. 10.980 TO KM. 28.500 IN THE STATE OF UTTAR PRADESH ON HAM MODE UNDER B
605KANTE TO WAKED
606KARAD PATAN CHIPLUN GUHAGAR
607KARAIPETTAI TO WALAJAPET FROM KM 71.015 TO 107.091
608KARGIL-ZANSKR PACKAGE-1
609KARGIL-ZANSKR PACKAGE-2
610KARGIL-ZANSKR PACKAGE-3
611KARGIL-ZANSKR PACKAGE-8
612KARIMGANI - SUTARKANDI SECTION ON SILCHAR-CHURAIBARI PKG-7
613KARWANDI TO RAJURI
614KATNI BYPASS FROM KM. 359.50 TO KM. 378.50
615KEIFANG - TUVAI PKG-3
616KHAMMAM DEVARAPALLE PKG II 4L ACCESS CONTROLLED (GREENFIELD) FROM SOMAVARAM VILLAGE TO CHINTAGUDEM VILLAGE (DESIGN CHAINAGE 33+604 TO 63+117) N/05011/02003/TS
617KHAMMAM-DEVARAPALLE PKG I [4L ACCESS CONTROLLED (GREENFIELD) FROM THALLAMPADU VILLAGE TO SOMAVARAM VILLAGE (DESIGN CHAINAGE 0+000 TO 33+604)] - N/05011/02002/TS
618KHAMMAM-DEVARAPALLE PKG III [4L ACCESS CONTROLLED (GREENFIELD) FROM CHINTAGUDEM VILLAGE TO RECHERLA VILLAGE (DESIGN CHAINAGE 63+117 TO 105+236)] - N/05011/02004/TS
619KHELLANI-KHANABAL PKG-1
620KHELLANI-KHANABAL PKG-2
621KHELLANI-KHANABAL PKG-3
622KHELLANI-KHANABAL PKG-4
623KHELLANI-KHANABAL PKG-5
624KHOWAI –TELIAMURA-AMARPUR-HARINA-SABROOM PACKAGE-2
625KHOWAI –TELIAMURA-AMARPUR-HARINA-SABROOM PACKAGE-3
626KHOWAI –TELIAMURA-AMARPUR-HARINA-SABROOM SECTION PKG-4
627KOPARGAON TO SAVALI VIHIR SECTION
628KURNOOL/KADAPA BORDER-JAMMALAMADUGU SECTION OF NH-167K I.E. DESIGN CH. KM 248+010 TO KM 269+900
629LMPHAL TO JIRIBAM PKG-7
630LUCKNOW-BYPASS (EW) (NS AND EW-PH-I) NH-25 AND NH-28 VIA NH-56
631MAJOR BRIDGE OVER MIDDLE STRAIT CREEK
632MANU-SIMLUNG ( PKG 4)
633MARAM - PEREN PKG-3
634MARIAM - PEREN (PKG 1B)
635MARIAM - PEREN PKG-1A
636MARREM KHULLEN TO JESSAMI SECTION IMPHAL- UKHRUL - JESSAMI PKG-6 (DESIGN CHAINAGE KM 95.700 TO KM 140.180)
637MERANGKONG-TAMLU-MON (MTM) PKG-5
638MHASWAD TO TEMBHURNI
639NAGPUR RING ROAD PACKAGE-2
640NANDED TO JALKOT
641NASRATPUR TO BARASGAON
642NH 167 B KADAPA NELLORE BORDER TO CSPURAM I.E. FROM KM 58.635 TO KM 99.409
643NH-30-BHADRACHALAM TO KONTA SECTION 2LPS
644NH165 FROM KM 0.000 TO KM 64.020 PAMARRU TO AKIVEEDU SECTION TO TWO LANE WITH PAVED SHOULDERS
645NH167AD FROM MACHERLA TO DACHEPALLI FROM KM.0.000 TO 43.659 TO 2LPS
646NH440 RAYACHOTY TOVEMPALLI 2LPS
647ONSTRUCTION OF 4-LANE FLYOVER AT AMBERPET-X ROAD, HYDERABAD ON NH-202 IN THE STATE OF TELANGANA
648PACKAGE-3A
649PACKAGE-3B
650PADERU BYPASS (KM 0+000 TO KM 13+000) OF 2- LANE WITH PAVED SHOULDER ON NH-516E
651PAITHAN TO SHIRUR
652PALPHATA TO PHULAMBARI
653PANCHARAL TO MANDANGHAR
654PANGAON TO DHARMAPURI AND PARALI TO INJEGAON 2L+PS
655PANGO TO JORGING ROAD PKG-1
656PANIKHOLI-RIMOLI
657PANVEL-INDAPUR
658PATNA-MUZZAFFARPUR
659PEN TO KHOPOLI
660PEREN-DIMAPUR PKG-5
661PEREN-DIMAPUR PKG-3
662PEREN-DIMAPUR SECTION PKG-2
663PERMANENT RECTIFICATION OF 3 NOS. OF BLACK SPOTS IN PROJECT HIGHWAY NH-27 OF U.P BORDER - DEWAPUR - KOTWA SECTION, PERMANENT RECTIFICATION OF 5 NOS. OF BLACK SPOTS OF PROJECT HIGHWAY NH-27 OF KOTWA -
664PERMANENT RECTIFICATION OF 4 NOS. OF BLACKSPOTS ON NH 27 OF KOTWA MEHSI MUZAFFARPUR SECTION FROM 4 NOS. OF BLACKSPOT ON NH-27 OF MUZAFFARPUR DARBHANGA PURNIA SECTION 1 NO OF AT GRADE JUNCTION REM
665PKG NAME: 4L OF KATHLIGHAT TO SHAKRAL VILLAGE FROM KM 128.835 TO KM 146.300 OF NH- 5 (SHIMLA BYPASS - PKG I)
666PREPATION OF FEASIBILITY/DPR OF CONSTRUCTION OF NEW 4-LANE ELEVATED ROAD FROM CHENNAI PORT TO MADURAVOYAL IN THE STATE OF TAMIL NADU
667PROCUREMENT, AND CONSTRUCTION OF REHABILITATION AND UPGRADING TO 2 LANES/2 LANE(FOR LOT-III-KM 156.500 TO KM 219.945) WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF SITAMARHI-JAYNAGAR-NARAHIA
668PROJECTS- REHABILITATION AND UPGRADATION OF NH-731A FROM KM 0.00 TO KM.35.00
669PUNE RAIGARH DISTRICT BORDER TO MANGAON
670R/U TO 2-LANE WITH PS OF BEWAR TO ALLAHGANJ SECTION OF NH-730C FROM KM.0.00 TO 52.770 UNDER GNHCP
671RANIKOR- MAHESHKHOLA- BAGHMARA PKG-2
672RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS FROM DS. CH. 442+180 (EX. KM 448.00) TO DS. CH.485+240 (EX. KM 494.000) OF HULIYAR TO KB CROSS SECTION AND FROM KM DS. CH. 532+100 (EX.KM 533.150) TO DS
673RECONSTRUCTION WITH GEOMETIC IMPROVEMENT OF EXISTING TWO LANE TO 2- LANE WITH PAVED SHOULDERS CONFIGURATION FROM EXISTING KM. 126.73 TO 135.075 KM.143.75 TO 163.00(PITHORAGARH-TANAKPUR PROJECT ROAD)
674RECONSTRUCTION WITH GEOMETIC IMPROVEMENT OF SINGLE LANE TO 2- LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM. 163.00 TO KM 194.800(DESIGN CHAINAGE 160.88 TO 192.320) OF NH-125 IN THE STATE OF
675RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM. 52.200 TO KM 92.880 OF NH-125 IN THE STATE OF UTTARAKHAND UN
676RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM KM. 268.00 TO 300.00 OF NH-58 IN THE STATE OF UTTARAKHAND UNDER EPC MODE
677RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM KM. 300 TO 338 OF NH-58
678RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM KM. 300 TO 338 OF NH-58 IN THE STATE OF UTTARAKHAND UNDER EPC MODE
679RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING SINGLE/INTERMEDIATE LANE TO 2 LANE WITH EARTHEN SHOULDER CONFIGURATION FROM EXISTING KM 16.545 TO KM 33.130 KM 41.260 TO KM 57.975 (DESIGN CH
680RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING SINGLE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM. 92.880 TO KM 121.550 (DESIGN CHAINAGE KM 91.550 TO KM 120.45
681RECONSTRUCTION WITH GEOMETRIC IMPROVMENT OF EXISTING INTERMEDIATE LANE TO 2 LANE WITH PAVED SHOULDER CONFIGURATION FROM KM. 1.95 TO 28.600N (EXCLUDING THE STRTC H FROM KM 13.800 TO KM 18.550 OF NH-94
682REHABILITATION / UPGRADATION TO 4 LANE WITH PAVED SHOULDER OF EXISTING SECTION IN SILLOD TOWN WITH DESIGN CH. (KM54+500 TO KM 60+679) [LENGTH=6.179 KM] SECTION OF NH 753F (AURANGABAD-JALGAON ROAD) ON
683REHABILITATION AND UP GRADATION FROM 4 TO 8 LANING OF CHANDIKHOLE PARADIP SECTION OF NH 53 FROM KM.39.000 TO KM.60.00 (PACKAGE 3)
684REHABILITATION AND UP GRADATION FROM 4 TO 8 LANING OF CHANDIKHOLE PARADIP SECTION OF NH 53 FROM KM 18.00 TO KM 39.00 IN THE STATE OF ODISHA ON HAM MODE (PACKAGE 2)
685REHABILITATION AND UP GRADATION FROM 4 TO 8 LANING OF CHANDIKHOLE PARADIP SECTION OF NH 53 FROM KM.0.00 TO KM.18.00 (PACKAGE 1)
686REHABILITATION AND UP GRADATION FROM 4 TO 8 LANING OF CHANDIKHOLE – PARADIP SECTION OF NH-53 (OLD NH – 5A) FROM KM.60.000 TO KM.76.646 (PACKAGE-4)
687REHABILITATION AND UP GRADATION FROM KM. 121/0 TO 154/0 OF NAKAREKAL – MALLAMPALLY SECTION OF NH-365 TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF TELANGANA
688REHABILITATION AND UP GRADATION OF 2 LANE/ 2 LANE WITH PAVED SHOULDER FROM EXISTING KM. 172.900 TO KM. 194.150 (DESIGN CHAINAGE KM. 49.300 TO KM. 70.300) ON DHARASU TO YAMUNOTRI ROAD OF NH- 134 (OLD N
689REHABILITATION AND UP GRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER CONFIGURATION IN PURULIA (JH/WB BORDER) TO KM. 84.400 (NEAR SIMULIA JUNCTION, PURULIA) TO KM. 153.705 (NEAR CHANDIL, JUNC
690REHABILITATION AND UP GRADATION OF SECTION FROM KM 206.00 TO KM 242.00 (NIMBUTALA TO AUSTIN CREEK) OF NH 223 (NEW NH 4) (PACKAGE IV)
691REHABILITATION AND UP GRADATION TO 2 LANE WITH PAVED SHOULDER OF NH-703A FROM MAKHU (DESIGN CH 0 000)
692REHABILITATION AND UP-GRADATION FOR TALERE A?? GAGANBAWDAA?? KOLHAPUR ROAD (NH-166G) STRETCHES START FROM DESIGN CH. 6.00 KM TO DESIGN CH. 11.00 KM AND DESIGN CH.19.300 KM (START OF KARUL GHAT) TO DES
693REHABILITATION AND UP-GRADATION FROM KM. 0.000 TO KM. 40.390 OF NH-730S (MAHARAJGANJ – NICHLOUL – THUTHIBARI) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
694REHABILITATION AND UP-GRADATION OF EXISTING 2-LANE TO 4 LANE OF DUBURI (KM 388.376) TO CHANDIKHOLE (KM 428.074) PKG-III ON EPC MODE
695REHABILITATION AND UP-GRADATION OF EXISTING 2-LANE TO FOUR LANE FROM TALCHAR TO END OF KAMAKHYANAGAR BYPASS SECTION OF (KM. 8.844 – KM. 15.725) OF NH 23 (NEW NH – 149) AND (KM. 301.875 – KM. 335.946
696REHABILITATION AND UP-GRADATION OF EXISTING ROAD TO 2L PS FROM END OF HAMIRPUR BYPASS (NEAR CHILBAHAL) TO BHANGBAR SECTION FROM KM. 138.295 TO KM.175.270 OF NH-88 (PKG-IV)
697REHABILITATION AND UP-GRADATION OF JINTUR- SHIRAD SHAHAPUR SECTION KM 258.300 TO KM 306.300 [DESIGN CHAINAGE KM 0/00 (JINTUR) TO KM 48/00 (SHIRAD SHAHPUR) (LENGTH - 48.00 KM)] OF NH-752 I TO TWO LANES
698REHABILITATION AND UP-GRADATION OF MUDKHED TO NANDED SECTION FROM KM. 372+000 TO KM 388+400 OF NH 161A I.E. NANDED-BHOKAR-HIMAYATNAGAR-KINWAT-MAHUR-ARANI ROAD (DESIGN CHAINAGE FROM KM 372+000 (MUDKHED
699REHABILITATION AND UP-GRADATION OF ROAD FROM DESIGN KM 25.250 TO KM 36.460 (TOTAL LENGH: 11.210 KM) OF KAILASHAHAR-KURTI BRIDGE SECTION ON NH-208A TO 2-LANE WITH PAVED SHOULDER (PACKAGE-III)
700REHABILITATION AND UP-GRADATION OF SABALKHED TO ASHTI SECTION FROM KM 37+900 TO KM 55+100 AND CHINCHPUR TO JAMKHED SECTION FROM KM 70+000 TO KM 72+922 OF NH-561 TO TWO LANE WITH PAVED SHOULDER/ FOUR L
701REHABILITATION AND UP-GRADATION OF VALIGONDA TO THORRUR SECTION TO TWO LANE WITH PAVED SHOULDERS FROM KM 39.180 TO KM 108.300 OF NH-930P IN THE STATE OF TELANGANA ON ENGINEERING, PROCUREMENT AND CONST
702REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION OF MAHUD SANGOLA ROAD NH 965 G 159+400 TO 161+900AND 162+400 TO 183+960 (DESIGN CHAINAGE FROM KM. 32/300 TO KM. 34/800 AND K
703REHABILITATION AND UP-GRADATION TO 4 LANE ROAD WITH PAVED SHOULDER CONFIGURATION OF SECTION FROM UNDEWADI KADE PATHAR (CH. 102+050)- DESHMUKH CHOWK (CH. 113+400) AND DHAWAN PATIL CHOWK (BARAMATI) (CH.
704REHABILITATION AND UP-GRADATION TO 4-LANING OF RAJAMUNDA-BARKOTE SECTION OF NH-23 (NEW NH NO. 143) (KM. 287.200 TO KM. 337.185) IN THE STATE OF ODISHA UNDER NHDP-IV
705REHABILITATION AND UP-GRADATION TO 4L CONFIGURATION AND STRENGTHENING OF THANPURI TO PAROR SECTION FROM KM 85.135 TO KM 100.840 OF NH-154 (PKG IIC)
706REHABILITATION AND UP-GRADATION TO TWO LANE WITH PAVED SHOULDERS FROM KM 0/0 TO 72/6 OF NH-365 (NAKREKAL TO THANAMCHERLA SECTION) IN THE STATE OF TELANGANA
707REHABILITATION AND UPGRADATION FROM KM 51.600 TO KM 75.700 OF NH-321G (NUHKHAS TO ETAH SECTION) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
708REHABILITATION AND UPGRADATION OF 2 LANE WITH PAVED SHOULDER FROM EXISTING KM. 195.175 TO KM. 220.000 (DESIGN CHAINAGE KM71.300 TO KM. 95.947) EXCLUDING EXISTING CHAINAGE KM 200.300 TO KM 202.400 (DES
709REHABILITATION AND UPGRADATION OF CUTTACK ANGUL SECTION OF NH-42 (NEW NH-55) TO 4 LANE (KM. 0+400 TO KM. 60+200) IN THE STATE OF ODISHA UNDER NHDP PHASE-III ON EPC MODE, PKG-1
710REHABILITATION AND UPGRADATION OF CUTTACK-ANGUL SECTION TO 4 LANE (KM 60.20) TO (KM 112.0) PKG II ON EPC MODE
711REHABILITATION AND UPGRADATION OF EXISTING NH-167 FROM KM 14.900 TO KM 70.00 (DESIGN CH.14.900 TO 69.700) CHINTAKUNTA TO ADONI SECTION TO TWO LANE WITH PAVED SHOULDERS EPC MODE
712REHABILITATION AND UPGRADATION OF EXISTING NH-565 FROM KM 425.400 TO KM 509.400 (PENCHALAKONA TO ERPEDU) TO TWO LANE WITH PAVED SHOULDER IN THE STATE OF ANDHRA PRADESH UNDER NHDP –IV THROUGH ENGINEERI
713REHABILITATION AND UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT OF SECTION FROM START OF RABANGLA KM33.600 TO KM58.540 (PKG- IV)
714REHABILITATION AND UPGRADATION OF JAMKHED TO SAUTADA SECTION OF NH548 D (FROM KM 195.375 TO KM 208.774, LENGTH – 13.399 KM) TO 2L +PS /4L CONFIGURATION WITH RIGID PAVEMENT IN THE STATE OF MAHARASHTRA
715REHABILITATION AND UPGRADATION OF KARNATATKA/AP BORDER-GOOTY SECTION FROM KM 368.920 TO KM 424.225 OF NH-63(NEW NH-67) TO FOUR LANE WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS
716REHABILITATION AND UPGRADATION OF KURWAI–MUNGAOLI–CHANDERI ROAD SECTION OF NH-346, FROM DESIGN CHAINGE 0.000 TO 81.300 KM
717REHABILITATION AND UPGRADATION OF LB-NAGAR TO MALKAPUR SECTION TO 6-LANE MAIN CARRIAGEWAY WITH SERVICE ROADS, DRAINS CUM FOOTPATH, INCLUDING VUPS AND WIDENING OF MINOR BRIDGE & ROAD SAFETY PROVISIONS
718REHABILITATION AND UPGRADATION OF NEW NH-544DD FROM DESIGN CHAINAGE KM 56.00 TO 102.20 OF KALYANDURG-MOLAKALMURU SECTION TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
719REHABILITATION AND UPGRADATION OF NH -565 FROM KM 1.00 TO 86.057 (NAKREKAL TO NAGARJUNSAGAR DAM SECTION) TO TWO-LANES WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS.(HYDERABAD)
720REHABILITATION AND UPGRADATION OF NH 216 FROM KM 3.800 TO 90.460 RAIGARH TO SARAIPALLI SECTION
721REHABILITATION AND UPGRADATION OF NH 43 KANKER TO BEDMA SECTION KM. 130 TO 180
722REHABILITATION AND UPGRADATION OF NH 78 FROM KM 373.505 TO 469.300 AMBIKAPUR TO PATHALGAON SECTION
723REHABILITATION AND UPGRADATION OF NH 78 FROM KM 469.000 TO 531.000 PATTHALGAON TO KUNKURI
724REHABILITATION AND UPGRADATION OF NH-167 FROM DESIGN KM.113.900 TO 154.479 (MALLEPALLY - HALIYA SECTION) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF TELANGANA
725REHABILITATION AND UPGRADATION OF NH-167 FROM DESIGN KM.187.723 TO 234.434 (MIRYALAGUDA TO KODAD SECTION) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF TELANGANA
726REHABILITATION AND UPGRADATION OF NH-221 FROM KM 121/0 TO 165/00 (OF VIJAYAWADA-JAGDALPUR RUDRAMPUR TO SARAPAKA) (WARANGAL)
727REHABILITATION AND UPGRADATION OF NONGSTOIN TO WAHKAJI SECTION OF PROJECT ROAD KM 0.000 TO KM 43.060 TO INTERMEDIATE LANE WITH EARTHERN SHOULDER UNDER SARDP NE PHASE A IN THE STATE OF MEGHALAYA ON EP
728REHABILITATION AND UPGRADATION OF PARLI TO SIRSALA SECTION OF NH-361F (KM 136+700 TO 115+000) (LENGTH=21.70 KM) TO TWO LANES WITH PAVED SHOULDER /FOUR LANE CONFIGURATIONS ON EPC MODE IN THE STATE OF M
729REHABILITATION AND UPGRADATION OF ROAD FROM KM 0.00 TO KM 18.600 OF KUMARGHAT-KAILASHAHAR SECTION
730REHABILITATION AND UPGRADATION OF SATANA TO MANGRUL (CHANDWAD) SECTION OF NH752 G DESIGN CH: KM 64.000 TO CH: KM 101.140 TWO LANE WITH PAVED SHOULDER/FOUR LANE CONFIGURATION IN THE STATE OF MAHARASHTR
731REHABILITATION AND UPGRADATION OF SHIRAPUR JUNCTION TO SHIVAJI CHOWK (DESIGN CHAINAGE KM. 130+00 TO KM.144+500) SECTION OF NH-561 AND BARSHI NAKA TO JARUD PHATA (DESIGN CHAINAGE KM. 49+500 TO 59+500)
732REHABILITATION AND UPGRADATION OF SIX LANING OF BHADRAK BALESHWAR SECTION (KM 136.50) TO (KM 199.141) ON HAM.
733REHABILITATION AND UPGRADATION OF TWO LANING OF MAHESHKHUNT - SAHARSA - PURNEA SECTION PKG - I
734REHABILITATION AND UPGRADATION TO 2 LANE WITH PS OF RADHAITA TO PILIBHIT SECTION OF 46.130 KM
735REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM DESIGN CHAINAGE KM 162.800 TO KM 198.18 UNDER 31 BRTF ON AKHNOOR POONCH ROAD NH 144A IN THE UT OF JAMMU AND KASHMIR UNDER PROJECT SA
736REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 102 TO KM 134 DESIGN CHAINAGE KM 90 TO KM 116 UNDER 31 BRTF ON AKHNOOR POONCH ROAD NH 144A UNDER PROJECT SAMPA
737REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 134.95 TO KM 166.100 (DESIGN CHAINAGE KM 116.98 TO KM 146.700) (PACKAGE-VI) UNDER 31 BRTF ON AKHNOOR-POONCH ROA
738REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 30.000 TO KM 49.150 DESIGN CHAINAGE KM 30.000 TO KM 46.450 INCLUDING KANDI TUNNEL UNDER 31 BRTF ON AKHNOOR PO
739REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 64.535 TO KM 85.385 (DESIGN CHAINAGE KM 55.800 TO KM 74.350) (PACKAGE-III) UNDER 31 BRTF ON AKHNOOR-POONCH ROA
740REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 166.100 TO KM 192.98 (DESIGN CHAINAGE KM 146.700 TO KM 162.800) INCLUDING CONSTRUCTION OF BHIMBER GALI TUNNEL (TO
741REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 49.150 TO KM 64.535 (DESIGN CHAINAGE KM 46.450 TO KM 55.800) INCLUDING CONSTRUCTION OF SUNGAL TUNNEL (TOTAL LENG
742 REHABILITATION AND UPGRADATION TO 2 LANE WITH PS OF MIRANPUR KATRA TO RADHAITA SECTION OF NH-730C FROM KM
743REHABILITATION AND UPGRADATION TO 2-LANE CONFIGURATION OF ASHYARI-SHRI KYARI SECTION (KM 50.000 TO KM 75.000) OF NH-707 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
744REHABILITATION AND UPGRADATION TO 2-LANE CONFIGURATION OF HAMIRPUR-KARNOHAL SECTION (KM 141.000 TO KM 181.000) OF NH-70 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
745REHABILITATION AND UPGRADATION TO 2-LANE CONFIGURATION OF HEWNA-ASHYARI SECTION (KM 25.000 TO KM 50.000) OF NH-707 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHC
746REHABILITATION AND UPGRADATION TO 2-LANE CONFIGURATION OF KALWAHAN-MANDI SECTION (KM 208.950 TO KM 250.592) OF NH-70 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT WIT
747REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION OF JIRAPUR-SUSNER-MP-RJ BORDER ROAD (FROM KM 0+000 TO KM 40+400, EXCLUDING 1.1KM LENGTH FROM KM 26.400 TO KM 27.500) AND INCL
748REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS CONFIGURATION OF PADERU-GONDIGUDA SECTION (KM 2.400 TO KM 27.480) OF NH-516E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
749REHABILITATION AND UPGRADATION TO 2-LANE/2-LANE WITH PAVED SHOULDERS/4-LANE CONFIGURATION OF PAONTA SAHIB-HEWNA SECTION (KM 000.000 TO KM 25.000) OF NH-707 IN THE STATE OF HIMACHAL PRADESH UNDER GN
750REHABILITATION AND UPGRADATION TO 4L CONFIGURATION and STRENGTHENING OF SIHUNI TO RAJOL FROM KM 51.000 TO KM 72.000 OF NH-154
751REHABILITATION AND UPGRADATION TO FOUR LANE ROAD FROM KM 70.500 TO KM 78.600 OF NH-92 UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
752REHABILITATION AND UPGRADATION TO INTERMEDIATE LANE CONFIGURATION OF SHRI KYARI-GUMMA SECTION (KM 75.000 TO KM 94.900) OF NH-707 IN THE STATE OF HIMACHAL PRADESH UNDER GNHCP WITH THE LOAN ASSISTANCE
753REHABILITATION AND UPGRADING FROM 2 L TO 4 L FROM BHANGBAR(NEAR RANITAL) TO KANGRA BYPASS SECTION OF NH-88 (NEW NH-303, 503) UP TO INTERSECTION WITH NH-154 (DESIGN CH. KM. 175.270 TO CH. KM. 193.400)
754REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS (KM 40 TO KM 219.945) OF NH-104
755REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHING OF MADHUGIRI- CHIKKABALLAPUR- MULUBAGAL SECTION (KM 343.80 TO 483.151) OF NH-234 IN THE STATE OF KARNA
756REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF BIRPUR - BIHPUR SECTION ( KM 0 TO KM 106) OF NH-106 IN THE STATE OF BIHAR
757REHABILITATION OF SECTION FROM KM 298.00 TO KM 330.662 PKG-8
758REHABILITATION and UP-GRADATION TO 2L+PS FROM KM. 0.0 TO KM. 7.80 AND KM. 35.400 TO KM. 52.345 (DESIGN LENGTH 24.745 KM. EXCEPT BIHAR PORTION) OF NH-727B (TAMKUHIRAJ TO BIHAR BORDER and BIHAR BORDER TO M
759REHABILITATION and UPGRADATION FROM 2 LANE TO 4 LANE OF NH STRETCH UNDER BHARATMALA PARIYOJANA FOR UNNAO-LALGANJ SECTION OF NEW NH-31 (OLD NH-232A) ON HYBRID ANNUITY MODE IN THE STATE OF UTTAR PRADESH
760REHABILITATION, UPGRADATION AND WIDENING OF EXISTING HIGHWAY TO RIGID PAVEMENT 2 LANE WITH PAVED SHOULDER OF NH 965DD FROM LONAND A??SHIRVAL-BHOR A??MANDANGAD-PCHRAL SECTION SHINDEWADIPHATA TO VARANDAH
761REHABILITATION/ UPGRADATION OF EXISTING HIGHWAY TO FOUR LANE STANDARDS IN KURKHEDA TOWN FROM (KM.413+257 TO KM 410+775), TWO LANE IN SHANKARPUR €“GURNULI (KM 424+00 TO KM 431+00) SECTION AND RECONSTR
762REHABILITATION/UP GRADATION OF KARANJA “ KHERDA - MURTIZAPUR SECTION TO  4LANE+PAVED SHOULDER STANDARDS FROM DESIGN KM 74+351 TO KM 102+331 (EXCLUDING OVERLAPPING PORTION WITH SAMARUDDHI MAHAMARG FROM
763REHABILITATION/UPGRADATION OF EXISTING HIGHWAY TO 2L+PS/4 LANE OF DHAWALI TO RAJOLI FROM DESIGN KM.149+476 TO 163+476 (EXISTING KM.150+000 TO 164+000), PANDHASALA TO MOHADONGRI FROM DESIGN KM.170+476
764REHABITITATION AND UP GRADATION OF NONGSTOIN-RAMBRAI-KYRSHAI ROAD UP TO MEGHALAYA-ASSAM BORDER FROM KM 0.335 TO KM 34.039 TO 2-LANE UNDER NH(O) - NE IN THE STATE OF MEGHALAYA PACKAGE-1
765RENIGUNTA - POYYA - NAIDUPETA KM 124.60 TO KM 183.4 OF NH 71 - N/04027/06001/AP
766REPANPALLI TO SIRONCHA
767RISHI BORDER- ROLEP- MENLA PKG- 3B
768RRM FOR IMP.OFDRAUGHT
769Rehabilitation and up gradation to 2 lane with paved shoulder configuration from existing km. 122.00 to km 147.230 NH-94
770SANCHORE - SANTALPUR FROM KM 67.000- KM 99.000 OF NH-754K (AJ-RGBS-PACKAGE-3)
771SANCHORE - SANTALPUR FROM KM 99.000- KM 130.073 OF NH-754K (AJ-RGBS-PACKAGE-4)
772SARSAM TO KOTHARI
773SATARA TO MHASWAD
774SENAPATI- IMPHAL PKG-5B
775SHILLONG WESTERN BYPASS PACKAGE-2
776SHIRUR TO KHARDA
777SILCHAR VAIRENGTE SAIRANG ROAD PKG-1
778SILCHAR VAIRENGTE SAIRANG ROAD PKG-2
779SILCHAR- CHURAIBARI PKG-5
780SILCHAR-JIRIBAM PKG-1
781SILLOD TO FARDAPUR
782SIX LANE ACCESS CONTROLLED OF DELHI SAHARANPUR HIGHWAY FROM AKSHARDHAM NH 9 JUNCTION TO DELHI UP BORDER CH.0.00 TO CH. 14.750 IN THE STATE OF DELHI ON EPC MODE UNDER ECONOMIC CORRIDOR IN PHASE 1 OF BH
783SIX LANE ACCESS CONTROLLED OF DELHI SAHARANPUR HIGHWAY FROM DELHI UP BORDER TO EPE JUNCTION CH.14.750 TO CH. 31.200 IN THE STATE OF UTTAR PRADESH ON EPC MODE UNDER ECONOMIC CORRIDOR IN PHASE 1 OF BHAR
784SIX LANE OF PALSIT TO DANKUNI SECTION FROM 588.870 TO KM. 652.700
785SIX LANING FROM KAPPIRIKKAD TO THALIKULAM SECTION OF NH – 66 (OLD NH-17) FROM DESIGN CH. 335+850 (EX. KM 349.260) TO DESIGN CHAINAGE 369+015 (EX. KM 382.300) IN THE STATE OF KERALA ON HYBRID ANNUITY M
786SIX LANING FROM KODUNGALLUR TO EDAPALLY SECTION OF NH –66 (OLD NH-17) FROM DESIGN CHAINAGE 397+750 (EX. KM 411.850) TO DESIGN CHAINAGE 423+780 (EX. KM 343.330 OF NH 47: NEAR 438.600 OF NH- 17) IN THE
787SIX LANING FROM START OF VALANCHERY BYPASS TO KAPPIRIKKAD-SECTION OF NH-66(OLD NH-17) FROM DESIGN CH-298+500 FEX.KM 304.250) TO DESIGN CH.335+850(EX.KM 349.260) IN THE STATE OF KERALA ON HYBRID ANNUIT
788SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF NH – 66 (OLD NH-17) FROM DESIGN CH.369+015 (EX. KM 382.300) TO DESIGN CH. 397+750 (EX. KM 411.850) IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UN
789SIX LANING OF AURANGABAD TO BIHAR - JHARKHAND BORDER (CHORDAHA) SECTION
790SIX LANING OF BIHAR - JHARKHAND BORDER (CHORDAHA) TO GORHAR SECTION
791SIX LANING OF CHENGALA TO NEELESHWARAM SECTION OF NH-17 (NEW NH-66) FROM CH. 56+200 (EXISTING KM 57+200) TO CH. 93+468 (EXISTING KM 95+650) TOTAL LENGTH 37.268 KM IN THE STATE OF KERALA ON HYBRID ANNU
792SIX LANING OF HAPUR BYPASS TO MORADABAD SECTION INCLUDING HAPUR BYPASS FROM KM 50.000 (DESIGN CHAINAGE 50.000) TO KM 148.277 (DESIGN CHAINAGE 149.867) OF NH-24 (NEW NH-9)
793SIX LANING OF KADAMBATTUKONAM TO KAZHAKKOOTTAM SECTION OF NH-66(OLD NH-47) FROM KM. 517+250 TO KM.547+080 IN THE STATE OF KERALA ON EPC MODE UNDER BHARATMALA PARIYOJANA
794SIX LANING OF KOTTUKULANGARA (DESIGN KM. 454+500) TO START OF KOLLAM BYPASS (DESIGN KM. 486+000) SECTION OF NEW NH-66 (OLD NH-47) IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJ
795SIX LANING OF KT/KL BORDER (THALAPPDY) TO CHENGALA SECTION OF NH17 (NEW NH-66) FROM CH. 17.200 TO CH. 57+200 IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJNA
796SIX LANING OF NATIONAL CORRIDOR NH19 FROM PANAGARH TO PALSIT IN THE STATE OF WEST BENGAL UNDER BHARATMALA PARIYOJANA TO BE EXECUTED ON BOT TOLL BASIS
797SIX LANING OF NEELESHWARAM TO THALIPARAMBHA SECTION FROM CH. 94+540 (EXISTING KM 96+450) TO CH. 134+650 (EXISTING KM 137+900) (TOTAL LENGTH 40.11 KM) IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UND
798SIX LANING OF PARAVOOR(DESIGN KM. 417+000) TO KOTTUKULANGARA(DESIGN KM. 454+500) SECTION OF NEW NH-66 (OLD NH-47) IN THE STATE OF KERALA ON EPC MODE UNDER BHARATMALA PARIYOJANA
799SIX LANING OF RAMANATTUKARA JUNCTION TO START OF VALANCHERY BYPASS SECTION OF NH-66 (OLD NH-17) FROM DESIGN CH.258+818 (EX.KM 27.840 OF KOZHIKODE BYPASS) TO DESIGN CH.298+500 (EX.KM 304.250) IN THE ST
800SIX LANING OF START OF KOLLAM BYPASS (KM.486+000) KADAMBATTUKONAM (KM.517+250) SECTION OF NEW NH-66 (OLD NH-47) IN THE STATE OF KERALA ON HAM UNDER BHARATMALA PARIYOJANA
801SIX LANING OF THALIPARAMBHA- MUZHAPILANGAD SECTION FROM KM 137.900 TO KM. 170.600 OF NH-17 (NEW NH-66) (PROJECT LENGTH 29.948 KM) IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIY
802SIX LANING OF THURAVOOR (DESIGN KM. 378+612) TO PARAVOOR (DESIGN KM.417+000) SECTION OF NEW NH-66 (OLD NH-47) IN THE STATE OF KERALA ON EPC MODE UNDER BHARATMALA PARIYOJANA
803SIX LANING OF TUTICORIN PORT ROAD SECTION OF NH-7A (NEW NH-138) FROM KM 0.000 TO KM 6.140 [EFFECTIVE LENGTH – 5.16 KM] ON EPC MODE IN THE STATE OF TAMIL NADU ON EPC MODE
804SIX LANNING FROM KM. 401.200 TO 494.410 OF NH-8 ON HYBRID ANNUITY MODE UNDER NHDP-V(PKG VI)REG.
805SIX LANNING OF AUNTA-SIMARIA(GANGA BRIDGE WITH APPROACH ROADS) SECTION OF NH-31
806SIX LANNING OF AURANGABAD TO BIHAR/JHARKHAND BORDER SECTION OF NH-19 (OLD NH-2) FROM KM. 209.827 TO 249.525 (PKG-II) IN THE STATE OF BIHAR ON EPC MODE.
807SIX-LANING OF BARWA ADDA-PANAGARH
808SOMAYAJULAPALLI – DHONE SECTION OF NH – 340B FROM KM.0/0 TO 56/200 [DESIGN CH. KM 0/00 TO KM 53/33]
809SPECIAL PROTECTION WORK ON REHABILITATION AND RESTORATION OF SLIDING AND SINKING ZONE FROM RANGPO TO RANIPOOL SECTION
810SPUR OF MEERUT-GARH-MUKTESHWAR SECTION(NH-709A) CONNECTING NH-119 AND NH-58 BYPASSING MEERUT TOWN
811SRIRAMPUR - DHUBRI PKG-1
812STRENGTHENING AND WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM.106.00 TO 153.00 OF NH-218 BIJAPUR HUBLI SECTION IN THE STATE OF KARNATAKA
813STRENGTHENING OF 2L+PS FROM KM 17/8 – 18/2, CONSTRUCTION OF 2L+PS FROM KM 18/2 TO KM 20/0 AND CONSTRUCTION OF 4L+PS FROM KM 20/0 TO KM 35/6 OF SALEM- THIRUPATHUR – VANIYAMBADI ROAD (NH 179A)
814STRENGTHENING OF EXISTING 4L AYODHYA BYPASS SECTION FROM DESIGN KM.121.600 TO KM. 144.020 OF NH 28 (NEW NH 27) (PKG-3)
815Sagwara Bypass and Garhi- Partapur Bypass of NH-927A in the State of Rajasthan.
816TADIPATRI BYPASS (KM 0+000 TO KM 6+285) OF 4-LANE ON NH-67 IN ANANTAPURAMU
817TAMENGLONG - MAHUR PKG-1
818TAMENGLONG - MAHUR PKG-2
819TAMENGLONG - MAHUR PKG-3
820TAMENGLONG - MAHUR PKG-4
821TAMENGLONG - MAHUR PKG-5
822TAMENGLONG - MAHUR PKG-6
823TAMENGLONG- MAHUR ROAD PKG-7
824THOPPUR METTUR BHAVANI ERODE SECTION OF NH 544H FOR A LENGTH OF 85 KM
825TLABUNG - LUNGLEI PKG-A
826TLABUNG - LUNGLEI PKG-B
827TULUNGIA-JOGIGHOPA-PAIKAN ROAD PKG-7
828TUMKUR - NELAMANGALA(6L)
829TUNNEL AT KHAMBATAKI GHAT SECTION AND ITS APPROACHES FROM EXISTING KM. 771.730 TO EXISTING KM. 782.000
830TWO / FOUR LANING OF RAEBARELI - JAGDISHPUR SECTION OF NH-330A FROM KM. 0.000 TO KM. 47.800 (DESIGN LENGTH – 46.020 KM) INCLUDING JAGDISHPUR BYPASS (3.52 KM.) IN THE STATE OF UTTAR PRADESH UNDER NH(O)
831TWO LANING OF JORAM KOLORIANG ROAD (NH 713) ON EPC BASIS FROM DESIGN KM. 138+000 TO KM. 154+036 [EXISTING KM 138.00 TO KM 158.00] IN THE STATE OF ARUNACHAL PRADESH
832TWO LANING WITH PS OF NAGAPATTINAM - THANJAVUR
833TWO LANNING WITH FORMATION OF FOUR LANE OF PROPOSED SHIMLA BYPASS
834TWO-LANING OF HAYULIANG– HAWAI BYPASS ROAD ON EPC BASIS FROM DESIGN KM. 51.825 TO KM. 63.131 EXISTING KM 45.050 OF HAYULIANG – HAWAI ROAD TO HAWAI TOWN IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-
835TWO-LANNING WITH PAVED SHOULDER OF MAHSHKUNT-SAHARSA-PURNEA SECTION FROM EXISTING KM.89.020 (DESIGN CHAINAGE 90.000) TO EXISTING KM 179.470 ) PKG-II
836UKHRUL TOLOI TADUBI PKG-2
837UMARIYA TO SHAHDOL SECTION OF NH-78 IN MADYA PRADESH KM 68/4 TO 142/200
838UP GRADATION OF NH 130C ABHANPUR TO PAUND FROM NK KM 0.000 TO KM. 40.380 TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF CHHATTISGARH ON EPC
839UP GRADATION OF NH 930 SHERPAR TO KOHKA FROM KM 67.880 TO KM 114.860 TO TWO LANE WITH PAVED SHOULDER IN THE STATE OF CHHATTISGARH CONFIGURATION UNDER ENGINEER PROCUREMENT CONSTRUCTION EPC MODE.
840UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FROM CHARBHUJA AT DESIGN KM 0.00 (EXISTING KM 150.00) TO NEECHLI ODEN (NATHDWARA) AT DESIGN CH. KM 88.800 (EXISTING KM 55.950) OF NH-162E ON EPC MODE.
841UP-GRADATION TO 2-LANE WITH PAVED SHOULDER FROM KM 12.850 TO KM20.300 OF 7.450KM LENGTH ON GOHA-KHELLANI SECTION AND A LINK ROAD TO GOHA VILLAGE OF 2.016 KM ON NH-244 (PACKAGE I)
842UP-GRADATION TO 2-LANE WITH PAVED SHOULDER FROM KM 20.300 TO KM 29.030 OF 8.730 KM LENGTH ON GOHA-KHELLANI SECTION ON NH-244 (PACKAGE II)
843UP-GRADATION TO 2-LANE WITH PAVED SHOULDERS OF NGOPA - PAWLRANG SECTION OF NH 102B OF AIZAWL - IMPHAL ECONOMIC CORRIDOR FROM EXISTING CHAINAGE KM 32.796 TO KM 72.030 [DESIGN CHAINAGE KM 31.280 TO KM 6
844UP-GRADATION TO 4 LANE CONFIGURATION FOR THE WORK OF PETH NAKA TO SANGLI ROAD, NH-166H, FROM KM 0+000 TO KM 41+250 (DESIGN LENGTH = 41.25 KM) IN THE STATE OF MAHARASHTRA ON EPC MODE.
845UP-GRADATION TO 4 LANING OF DAULTABAD T-POINT TO MALIWADA [FROM DESIGN KM.0.000 TO KM 4.000] AND UPGRADATION TO 2 LANE WITH PAVED SHOULDERS CONFIGURATION OF DEVGAON RANGARI TO SHIVOOR [FROM DESIGN KM
846UP-GRADATION TO 4-LANE WITH PAVED SHOULDER OF BHIMASAR JUNCTION OF NH-41 TO ANJAR BHUJ UPTO AIRPORT JUNCTION FROM KM. 0.000 TO KM. 65.478 OF NH-341 TO BE EXECUTED ON HYBRID ANNUITY MODE IN THE STATE O
847UP-GRADATION TO 4-LANE WITH PAVED SHOULDER OF JAMMU-AKHNOOR ROAD SECTION OF NH-144A FROM GANESH VIHAR (KM 6.000) TO KHATI CHOWK (KM 26.350) OF 20.35 KM LENGTH IN THE STATE OF JAMMU AND KASHMIR TO BE E
848UP-GRADATION TO FOUR LANE/ TWO LANE WITH PAVED SHOULDERS CONFIGURATION OF KALYAN - MURBAD - MALSHEJ GHAT - NIRMAL ROAD NH- 61 KM 15/200 TO KM 38/00 AND FROM KM. 58/00 TO KM 84/00 (DESIGN LENGTH = 48.5
849UP-GRADATION TO TWO LANE WITH PAVED SHOULDER CONFIGURATION OF NH-354 SECTION ARIFKES-FEROZEPUR-MUKTSAR-MALAUT FROM KM 201.500 TO KM 212.500 & KM 229.690 TO KM 269.960 AND STRENGTHENING OF EXISTING PAV
850UPGRADATIOBN AND REHABILITATION OF SECTION OF NH 361 F FROM PARLI (00/000) TO GANGAKHED (30/400) TO TWO LANES WITH PAVED SHOULDER / FOUR LANE CONFIGURATIONS ON EPC MODE IN THE STATE OF MAHARASHTRA.
851UPGRADATION 2/4 LANE NH CONNECTIVITY UNDER SAGARMALA SCHEME SH 2 HAVERI YEKAMBI SH 69 YEKAMBI KUMTA BELEKERE UNDER STATE OF KARNATAKA
852UPGRADATION AND 4L OF HARIDWAR BYPASS FROM KM 0.000 (KM 188.100 OF NH-58) TO KM. 15.100 (KM 5.100 OF NH 74) (PKG-1)
853UPGRADATION AND STRENGTHENING TO 2 LANE PS FROM KM 95/500 TO KM 129/775 OF NH 168 G IDAR BHILODA SAMLAJI IN THE STATE OF GUJARAT
854UPGRADATION AND WIDENING OF BILASPUR TO MUNGELI SECTION NH-130A
855UPGRADATION OF ADHALGAON-JAMKHED SECTION OF NH-548 D FROM KM 132/600 TO KM 195/375 TO TWO LANE WITH PAVED SHOULDER/FOUR LANE STANDARDS ON EPC MODE IN THE STATE OF MAHARASHTRA.
856UPGRADATION OF DHORAJI JAMKANDORNA KALAVAD SECTION OF NH 927D FROM DESIGN CHAINAGE KM 00 TO KM 58.115 TO TWO LANE WITH PS CONFIGURATION IN THE STATE OF GUJARAT ON EPC
857UPGRADATION OF DINDORI-SAGARTOLA-KABICHABUTRA (MP-CG BORDER) SECTION OF NH -45 FROM KM 0+00(DESIGN) TO KM 77.00 (DESIGN) TO TWO LANE WITH PAVED SHOULDER CONFIGRATION ALONG WITH ONE TIME IMPROVEMENT IN
858UPGRADATION OF EXHISTING 2 LANE FLEXIBLE PAVEMENT TO 2 LANE PAVED SHOULDERS RIGID PAVEMENT FROM DESIGN CHAINAGE KM 66.00 TO DESIGN KM 82.440 (START OF KOLHAPUR MUNICIPAL CORPORATION NEAR PHULEWADI TO
859UPGRADATION OF EXISTING 4 LANE ISMAILABAD-AMBALA SECTION (KM. 0+000 TO KM 42+500) (PART OF AMBALA-KOTPUTLI CORRIDOR) TO 4-LANE ACCESS CONTROLLED STRETCH BY PROVIDING GRADE SEPARATED STRUCTURES AND SER
860UPGRADATION OF NASRULLAGANI-REHTI-BUDHNI SCCTION TO 2-LANE WITH PAVED SHOULDER FROM KM 0+150 TO KM 50+500 OF NH-146B IN THE STATE OF MADHYA PRADESH ON EPC MODE.
861UPGRADATION OF NH 130A MUNGELI TO PONDI FROM NH KM. 51.600 TO KM. 77.870 KM. 80.970 TO 96.970 TO 2 LANE WITH PAVED SHOULDERS IN THE STATE OF CHHATTISGARH ON EPC MODE
862UPGRADATION OF NH-81 WITH A MINIMUM OF 2-LANE WITH PAVED SHOULDER CONFIGURATION STARTING FROM KM 19.205 TO KM 46.550 IN THE DISTRICT OF MALDA INCLUDING COST OF LAND ACQUISITION, ON EPC MODE IN THE STA
863UPGRADATION OF TWO LANE PAVED SHOULDER FROM SHAHPURA TO THANAGAZI OF NH-248A ON EPC MODE IN THE STATE OF RAJASTHAN.
864UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM NEECHLI ODEN (NATHDWARA) AT DESIGN KM 88.800 TO BHATEWAR AT DESIGN KM 142.028 OF NH 162E IN THE STATE OF RAJASTHAN ON EPC MODE
865UPGRADATION TO 2 LANE WITH PAVED SHOULDER OF HANUMANGARH TO KENCHIYAN OF NH 54 ON EPC MODE IN THE STATE OF RAJASTHAN
866UPGRADATION TO 4L PS DIVIDED CARRIAGEWAY FROM PATAN (NEAR RAJPUR) TO GOJARIYA FROM KM 52.000 TO KM 128.940 OF NH-68
867UPGRADATION TO TWO LANE PAVED SHOULDER OF KOTHUN-LALSOT-KAROLI-DHOLPUR ROAD NH-23 (OLD NH-11B) IN THE STATE OF RAJASTHAN.
868UPGRADATION TO TWO LANE WITH PAVED SHULDER CONFIGUARATION FROM KM 00 TO 47 OF NH 351 MAHUVA TO BADHADA SECTION IN THE STATE OF GUJARAT
869UPGRADATION and WIDENING OF JHARKHEDA- BERASIA - DHOLKHEDI FROM DESIGN KM 0+000 TO KM 87+900 (DESIGN LENGTH 87.90KM) OF NH-346 (INCLUDING 3 NOS. BYPASSES OF 13.10 KM) IN THE STATE OF MADHYA PRADESH UN
870VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XI) [KM. 77.000 TO KM. 103.400] (GANJAD - TALSARI)
871VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XII) [KM. 50.700 TO KM. 77.000] (MASVAN - GANJAD)
872VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XIII) [KM. 26.582 TO KM. 50.700] (SHIRSAD - MASVAN)
873VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XIV) [KM. 3.000 TO KM. 20.200 OF SPUR] (SHIRSAD - AKLOLI)
874VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XV) [KM. 20.200 TO KM. 43.000 OF SPUR] (AKLOLI - AMNE)
875VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XVI) [KM. 43.000 TO KM. 69.800 OF SPUR] (AMNE - BHOJ)
876VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XVII) [KM. 69.800 TO KM. 79.783 OF SPUR] (BHOJ - MORBE)
877VARANASI RING ROAD (PKG-II) CONNECTING SANDAHA VILLAGE (KM 11.70 / NH-29) WITH REVASA VILLAGE (KM 818.80 / NH-2)
878VARANASI-AURANGABAD KM.786 TO KM.978.40
879VITA TO NAGAJ
880VODAREVU-CHILAKALURIPET SECTION (DESIGN CHAINAGE 0+00 TO 47+000) OF NH-167A (PACKAGE-I)
881WADI TO ASOLA
882WIDEINING TO TWO/FOUR LANE WITH PAVED SHOULDERS FROM EXISTING KM 180.60 TO KM 223.00 OF NH-63 ON NIZAMABAD-JAGADALPUR ROAD IN THE STATE OF TELANGANA
883WIDEINING TO TWO/FOUR LANE WITH PAVED SHOULDERS FROM EXISTING KM 182.120 TO KM 227.600 OF NH-167 ON HAGGIRI-JADCHERLA ROAD IN THE STATE OF TELANGANA
884WIDENING FROM 2L+PS TO 4L/4L+PS AND IMPROVEMENTS THE SELECTED STRETHCES FROM KM 26/5 - 81/2 INCLUDING CD WORKS OF NH 81 (COIMBATORE – CHIDAMBARAM)(OLD NH-67) (NAGAPATTINAM-TRICHY-COIMBATORE-GUDALUR
885WIDENING 2 LANE TO 4-LANE FROM KM 92/320 TO KM 115/320 (VAV CHOKDI-SATLASANA TO TO VRUNDAVAN CHOKDI, KHERALU) ON NH-58 IN THE STATE OF GUJARAT.
886WIDENING AND IMPROVEMENT OF EXISTING CARRIAGE WAY TO 2 LANE WITH PAVED SHOULDERS FROM KM. 86/160 TO 131/730 OF JANGAON-DUDDEDA SECTION OF NH-365B IN THE STATE OF TELANGANA ON EPC MODE
887WIDENING AND PAVED SHOULDER OF TOHANA (IN HARYANA) PUNJAB/HARYANA BORDER TO MOONAK-JAKHAL-BUDHLADA-BHIKHI FROM KM 236.600 TO 287.710 OF NH-148B
888WIDENING AND STRENGTHENING FROM DESIGN KM. 67.280 TO KM. 88.622 OF NH-727A (SALEMPUR-MAIRWA ROAD) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
889WIDENING AND STRENGTHENING FROM KM 0.00 TO KM 15.089 OF NH-334A (PURKAJI-LAKSAR-HARIDWAR ROAD) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UP.
890WIDENING AND STRENGTHENING OF EXISTING 2 LANE WITH PAVED SHOULDER TO 4 LANE WITH PAVED SHOULDER FROM KM 150/0 TO 159/0 AND KM 165/4 TO 186/0 OF NH-163 (OLD NH-202) UNDER NH(O)-TSP FOR THE YEAR 2020
891WIDENING AND STRENGTHENING OF EXISTING 2-LANE TO 2-LANE WITH PAVED SHOULDERS FROM KM.159/0 TO 165/4 AND 186/0 TO 215/0 OF NH-163 ON EPC MODE IN THE STATE OF TELANGANA
892WIDENING AND STRENGTHENING OF EXISTING CARRIAGEWAY IN 2 LANE WITH PAVED SHOULDERS FROM KM.25/0 TO 59/2 (DESIGN CH. KM.25.467 TO 59.200) OF NH-353C ON EPC MODE IN THE STATE OF TELANGANA
893WIDENING AND STRENGTHENING OF EXISTING PAVEEMNT TO TWO LANE WITH PAVED SHOULDERS FROM KM 116.00 TO KM 176.355 OF NH-75E IN THE STATE OF JHARKHAND ON EPC MODE.
894WIDENING AND STRENGTHENING OF RAFIABAD-KUPWARA-CHOWKIBAL-TANGDHAR-CHAMKOT (NH-701) ROAD FROM DESIGN CH. FROM 0+000 TO 51+000 TO TWO LANES WITH PAVED SHOULDERS UNDER PROJECT BEACON IN THE UT OF JAMMU &
895WIDENING AND STRENGTHENING OF SECTION FROM BHARTHANA CHOWK TO KODARKOOT (KM. 0.00 TO KM. 40.00) OF NH-91A ON EPC MODE
896WIDENING AND STRENGTHENING TO 2/4 LANE WITH PAVED SHOULDERS OF MAHABUBNAGAR – CHINCHOLI SECTION FROM KM 0/0 TO KM 60/255 OF NH-167N IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE(PACK
897WIDENING AND STRENGTHENING TO 2L+PS INCLUDING LA OF KANDARPUR-BALIKUDA FROM KM 277/500 TO 318/970 OF NH-55 IN THE STATE OF ODISHA UNDER ANNUAL PLAN 2021-22.
898WIDENING AND STRENGTHENING TO 4 LANE / 2-LANE WITH PAVED SHOULDERS OF MAHABUBNAGAR-CHINCHOLI SECTION FROM KM 60/255 TO KM 102/834 OF NH-167N IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC
899WIDENING AND STRENGTHENING TO 4L+PS/2L+PS FROM KM 0.000 TO 35.800 (KUAKHIA - MANGALPUR SECTION) OF NH 20 IN THE STATE OF ODISHA ON ANNUAL PLAN 2021-22."
900WIDENING AND STRENGTHENING TO TWO LANE WITH PAVED SHOULDER/TWO LANE+ PAVED SHOULDER WITH SERVICE ROAD FROM KM 98+000 TO KM 176+310 OF NH-320G IN THE STATE OF JHARKHAND UNDER EPC MODE
901WIDENING AND STRENGTHENING/ RECONSTRUCTION OF EXISTING PAVEMENT TO FOUR ALNE WITH PAVED SHOULDERS FROM KM 266.348 TO KM 283.000 OF MAHABUBNAGAR-JADCHERLA SECTION OF NH-167 ON EPC MODE IN THE STATE OF
902WIDENING AND STRENGTHENING/RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDER/ TWO LANE WITH PAVED SHOULDERS WITH SERVICE ROAD FROM KM 0+000 TO KM 42+250 (EXCLUDING DESIGN CH. 03+220 TO 04+200 & 28+350 TO
903WIDENING AND STRENGTHENLNG TO 2L+PS FROM KM 0.000 TO 40.000 (DHAUGAON- PODAMARI SECTION) OF NH 326 IN THE STATE OF ODISHA UNDER ANNUAL PLAN 2021.22.
904WIDENING AND STRENTHENING FROM KM 70.15 TO KM 121.025 OF NH-80
905WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 125.00 TO KM 166.00 (PACKAGE-3) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
906WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 166.00 TO KM 208.00 (PACKAGE-4) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON
907WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 208.00 TO KM 250.00 (PACKAGE-5) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
908WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 250.00 TO KM 298.00 (PACKAGE-6) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
909WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 298.00 TO KM 339.00 (PACKAGE-7) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
910WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 339.00 TO KM 380.00 (PACKAGE-8) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
911WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 8.00 TO KM 65.00 (PACKAGE-1) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON EPC
912WIDENING AND UPGRADATION TO FOUR LANE CONFIGURATION FROM KM.34.900 (BHADOHI) TO KM.73.134 (JAUNPUR) OF NH-135A ON EPC MODE
913WIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN THE STATE OF ASSAM STARTING FROM KM 116.480 NEAR HANGRUM TO KM 136.500 NEAR HEJAICHAK (PACKAGE-8)
914WIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN THE STATE OF ASSAM STARTING FROM KM 136.500 NEAR HEJAICHAK TO KM 156.489 NEAR P. LEIKUL (PACKAGE-9)
915WIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN THE STATE OF ASSAM STARTING FROM KM 156.489 NEAR P. LEIKUL TO KM 176.410 NEAR BOROWAPU (PACKAGE-10)
916WIDENING OF EXISTING SINGLE LANE / INTERMEDIATE LANE ROAD TO 2 LANE FROM KM 101 TO KM 125 OF NH 61 IN THE STATE OF NAGALAND
917WIDENING OF EXISTING SINGLE LANE ROAD TO INTERMEDIATE LANE ROAD FROM MOKOKCHUNG TO CHARE VIA DIKHU IN THE STATE OF NAGALAND
918WIDENING OF EXISTING SINGLE LANE ROAD TO TWO LANE WITH PAVED SHOULDERS CONFIGURATION FROM KM. 235.000 TO KM. 268.000 OF NH-58 INCLUDING 600M MARINE DRIVE VIADUCT PORTION NEAR BYASI
919WIDENING OF PACHPADRA-BAGUNDI SECTION TO 4 LANE FROM KM 73/60 TO 95/70 OF NH-25 ON EPC MODE IN THE STATE OF RAJASTHAN.
920WIDENING TO 2 LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-I (DESIGN CHAINAGE 0+000 KM TO 34+795 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE
921WIDENING TO 2 LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-II (DESIGN CHAINAGE 34+795 KM TO 69+875 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (0)-NE
922WIDENING TO 2 LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-III (DESIGN CHAINAGE 69+875 KM TO 106+816 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE
923WIDENING TO 2 LANE WITH PAVED SHOULDERS AND GEOMETRIC IMPROVEMENT OF NH-114A FROM KM 141 TO KM 184 IN THE STATE OF JHARKHAND UNDER EPC MODE
924WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM DESIGN KM 103.200 (EXISTING KM 103.200) TO DESIGN KM 116.700 (EXISTING KM 118.470) ON AP/KNT BORDER TO SIRA SECTION OF NH 544E IN THE STATE OF KARNATAKAON
925WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM DESIGN KM 103.200 (EXISTING KM 103.200) TO DESIGN KM 116.700 (EXISTING KM 118.470) ON AP/KNT BORDER TO SIRA SECTION OF NH544E IN THE STATE OF KARNATAKA ON
926WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM KM 0 TO 54 OF NH-50 UNDER EPC MODE IN THE STATE OF KARNATAKA
927WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM KM 116.800 TO 149.070(DESIGN CHANGES) ON HOSADURGA HOLALKERE SECTION OF NH173 IN THE STATE OF KARNATAKA ON EPC MODE UNDER ANNUAL PLAN 2021-22 (JOB NO. NH1
928WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM KM 34.00 TO 70.900 OF NH-150 UNDER EPC MODE IN THE STATE OF KARNATAKA
929WIDENING TO 2 LANE WITH PAVED SHOULDERS OF SIDDIPET-ELKATHURTHY SECTION FROM KM 69/978 TO KM 133/619 OF NH-765DG IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE
930WIDENING TO 2 LANE WITH PAVED SHOULDERS OF MEDAK - SIDDIPET SECTION FROM KM 0/0 TO KM 69/978 OF NH-765DG IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE
931WIDENING TO 2 LANE, RE-ALIGNMENT AND GEOMETRIC IMPROVEMENT FROM KM 11/00 TO KM 114/618 OF NH-44A IN MIZORAM UNDER PHASE A OF SARDP-NE
932WIDENING TO 2 LANES WITH PAVED SHOULDERS FROM KM 24.400 TO 27.270, 40.500 TO 41.900, 84.300 TO 88.200, 105.250 TO 112.710, 161.550 TO 166.350, 174.120 TO 176.120 AND 186.550 TO 191.900 OF NH 766C IN T
933WIDENING TO 2 LANES WITH PAVED SHOULDERS FROM KM.87/000 TO 133/720 (NATTUKAL TO THANAU JN. IN PALAKKAD) OF NH-966 (OLD NH-213) ON EPC MODE BASIS UNDER NH(O) ANNUAL PLAN 2016-17 IN THE STATE OF KERALA
934WIDENING TO 2-LANE WIH PAVED SHOULDER FROM KM. 544.20 TO 594.00 (HOSAMANE CROSS TO PANDAVAPURA) SECTION OF NH 150A
935WIDENING TO 2-LANE WITH GEOMETRIC IMPROVEMENTS OF TURA DALU ROAD UNDER JICA FUNDING FROM KM 85.000 TO 95.000 101.000 TO 145.000 TO 2-LANES WITH PAVED SHOULDER OF TURA–DALU SECTION OF NH-51 IN THE ST
936WIDENING TO 2-LANE WITH PAVED SHOULDER FROM KM 0.00 TO 44.00 (KURU-GHAGHRA SECTION) OF NH-143A INCLUDING RE-CONSTRUCTION OF CULVERTS AND BRIDGES.
937WIDENING TO 2-LANE WITH PAVED SHOULDERS FROM KM 119/017 TO KM 161/300 ON NH 85 (OLD NH 49)
938WIDENING TO 2L+PS FROM KM 71.00 TO 104.00 (EXISTING CHAINAGES) (SARJAPUR TO PATTADKALLU) ON BHANAPUR TO GADDANAKERI SECTION NH-367 IN THE STATE OF KARNATAKA
939WIDENING TO 2LPS FROM 0/0 TO 119/0 OF NH-157 IN THE STATE OF ODISHA.
940WIDENING TO 2LPS FROM 239/9 TO 294/3 OF NH-57 (NAYAGARH TO KHURDA) IN THE STATE OF ODISHA
941WIDENING TO 2LPS FROM 269/30 TO 328/20 OF NH-49 IN THE STATE OF ODISHA
942WIDENING TO 2LPS OF RAMPACHODAVARAM - KOYYURU SECTION OF NH516E FROM KM.43.700 TO KM 113.820
943WIDENING TO 4 LANE FROM KM 51.60 TO 76.20 (HEBRI TO PARKALA) AND FROM KM 85.20 TO 88.90 (KARAVALI JUNCTION TO MALPE) OF THIRTHAHALLI UDUPI-MALPE SECTION OF NH169A IN THE STATE OF KARNATAKA ON EPC MODE
944WIDENING TO 4 LANE FROM KM. 133.00 TO 158.04 (DESIGN CHAINAGE KM. 130.88 TO 155.145) (SHIRUR CROSS TO GADDANKERI) OF NH367 IN THE STATE OF KARNATAKA ON EPC MODE. (JOB NO. NH367 KNT 2021 22 930)
945WIDENING TO 4L FROM KM.108.50 TO 139.00 OF NH-135A PKG-II (JAUNPUR TO AKBARPUR SECTION) ON HAM IN THE STATE OF UTTAR PRADESH
946WIDENING TO 4L RIGID PAVEMENT CONFIGURATION FROM KM 90.00 TO KM 100.800 OF NH-96 (KM 42.O TO KM 53.300 AS PER NEW NH-330), UNDER EPC MODE
947WIDENING TO 4L/4L+PS AND STRENGTHENING IN SELECTED STRETCHES FROM KM 0/8 TO 50/570 OF NH 532 INCLUDING CENTRE MEDIAN IN SELECTED STRETCHES, CONSTRUCTION OF CD WORKS, WIDENING AND RECONSTRUCTION OF CD
948WIDENING TO 6L OF EXISTING 4L JETPUR - GONDAL - RAJKOT SECTION FROM KM. 117.600 TO KM. 185.00 ON NH-27
949WIDENING TO EXISTING 2 LANE WITH PAVED SHOULDER TO 4 LANE WITH PAVED SHOULDER FROM DESIGN KM 153.00 TO 168.27 (MALA GATE TO KARKALA) OF NH 169 ON SHIMOGA - MANGALORE SECTION IN THE STATE OF KARNATAKA
950WIDENING TO EXISTING SINGLE LANE /INTERMEDIATE LANE TO 2 LANE FROM KM185.00 TO KM 220.00 OF NH-61 (NEW NH-02) IN THE STATE OF NAGALAND.
951WIDENING TO EXISTING SINGRE/INTERMEDIATE RANE TO 2 LANE FROM KM 135 TO KM 147 AND FROM KM 156.00 TO KM 168 OF NH-61 (NEW NH-2) IN THE STATE OF NAGALAND
952WIDENING TO FOUR LANE WITH PAVED SHOULDER FROM DESIGN KM.49.200 TO KM.89.285 OF NH-731B ON EPC MODE IN THE STATE OF UTTAR PRADESH
953WIDENING TO INTERMEDIATE/TWO LANE TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHANAGES KM 112.750 TO 142.00 (LIINGASUR TO MUDABAL CROSS) & FROM KM. 147.070 TO KM. 149.070 (MASKI CITY LIMIT) OF JEWARGI
954WIDENING TO TWO LANE WITH PAVED SHOULDER FROM KM 194.900 TO KM 243.200 OF NH-234 BANAVARA-HULIYAR SECTION IN KARNATAKA STATE UNDER EPC MODE’’.(JOB NO. NH-234-KNT-2017-18-870)
955WIDENING TO TWO LANE WITH PAVED SHOULDER FROM KM 4.40 TO KM 56.00 OF NH-218 BIJAPURA-HUBLI SECTION UNDER EPC MODE IN THE STATE OF KARNATAKA (JOB NO.NH-218-KNT-2016-17-836)
956WIDENING TO TWO LANE WITH PAVED SHOULDER FROM KM 544.200 TO KM 594.000 OF NH-150A HOSMANE CROSS – PANDAVAPURASECTION ON EPC MODE IN THE STATE OF KARNATAKA(JOB NO.NH-150A-KNT-2016-17-835).
957WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM 24.600 TO 70.063 OF MUDIGERE TO KADUR SECTION OF NH-173” ON EPC MODE IN THE STATE OF KARNATAKA (JOB.NO.NH-173-KNT-2017-18-873)
958WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 0.00 (DESIGN CHAINAGE 0.00) TO KM 23.338 (DESIGN CHAINAGE 23+310) OF NH-166E (MH/KNT BORDER- KANAMADI- BIJJARGI- TIKOTA SECTION) IN THE STATE OF KARNA
959WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 0/000 TO KM 79/300 OF KALWAKURTHY - KOLLAPUR SECTION OF NH-167K IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE UNDER NH(O)
960WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 0/970 TO KM 40/410 OF JANAGAON-THIRUMALAGIRI OF NH-365B (ERSTWHILE SECTION OF SH-16) IN THE STATE OF TELANGANA
961WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 15.525 TO KM 62.880 OF JADCHERLA-KALWAKURTHY SECTION OF NH-167 (ERSTWHILE SH-18) IN THE STATE OF TELANGANA
962WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 20.150 TO KM 40.00 OF BC ROAD KOTTIGEHARA SECTION OF NH-234 ON EPC MODE IN THE STATE OF KARNATAKA (JOB.NO.NH-234-KNT-2017-18-875)
963WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 40.00 TO KM 75.00 (EXISTING CHAINAGES) OF MANGALORE - TUMKUR SECTION OF NH-73 IN THE STATE OF KARNATAKA ON EPC MODE UNDER ANNUAL PLAN 2021-22 (JOB NO
964WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 40/410 TO KM 84/037OF THIRUMALAGIRI TO SURYAPET SECTION OF NH-365B (ERSTWHILE SECTION OF SH-16) IN THE STATE OF TELANGANA
965WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 67.00 TO 114.425 OF KALWAKURTHY-MALLEPALLY SECTION OF NH-167 (ERSTWHILE SH-18) IN THE STATE OF TELANGANA
966WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM. 33.13 TO KM. 40.23 AND KM. 52.00 TO KM. 71.00 (EXISTING CHAINAGES) OF BHANAPUR GADDANKERI SECTION OF NH367
967WIDENING TO TWO LANE WITH PAVED SHOULDERS OF 'BODHAN BASAR BHAINSA ' SECTION FROM KM 38/900 TO 95/300 OF NH-161BB IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE UNDER NH ( O).
968WIDENING TWO LANE WITH PAVED SHOULDERS FROM FROM KM.56.00 TO 106.00 OF NH-218 (218-KNT-2014-15-775) EPC
969WIDENING and STRENTHENING FROM KM132.895 TO KM 190.15 NH-80
970WIDENING/DEVELOPMENT OF EXISTING NH-85 FROM KM 0.000 TO KM 124.636 SECTION TO 2L/@L+PS SECTION IN THE STATE OF KERALA ON EPC MODE UNDER BHARATMALA PARIYOJANA
971WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 0+800 (KANDULIJAN GAON) TO KM 27+701 (SIMEN CHAPORI) OF NH-515 IN THE STATE OF ASSAM ON EPC MODE UNDER BMP (DIBRUGARH-OYAN, PACKAGE-1)
972WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 27+701 (SIMEN CHAPORI) TO KM 55+000 (NAGABANG GAMSUK) IN DHEMAJI DISTRICT IN THE STATE OF ASSAM ON EPC MODE UNDER BHARATMALA (PACKAGE-2)
973WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 55+000 (NAGABANG GAMSUK) TO KM 82+514 (OYAN) (PACKAGE-3)
974WORK OF DEVELOPMENT AND CONSTRUCTION OF ELEVATED CORRIDORFROM KM 38/660 TO KM 42/690 (ISCON JUNCTION TO START POINT OF APPROACH OF SANAND FLYOVER) OF NH-147 IN THE SATE OF GUJARAT
975WORK OF WIDENING/UPGRADATION OF 2-LANE WITH PAVED SHOULDER OF SRI MUKTSAR SAHIB TO MALOUT ROAD FROM KM 279.400 TO KM 307.060 SECTION OF NH-354 IN THE STATE OF PUNJAB ON EPC MODE. (JOB NO. NH-354-PB-20
976ZORINPUI- HMAWNGBU-LONGMASU (NH-502A)

Back