S.No. | PROJECT NAME | 1 | CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF CHAKABAMA-ZUNHEBOTO ROAD FROM EXISTING KM 25.760 TO KM 52.370 [DESIGN KM. 25.000 TO KM. 50.000] (DESIGN LENGTH - 25.00 KM) IN THE STATE OF NAGALAND UND
|
2 | CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF CHAKABAMA-ZUNHEBOTO ROAD FROM EXISTING KM 52.370 TO KM 79.040 [DESIGN KM. 50.000 TO KM. 75.000] (DESIGN LENGTH - 25.00 KM) IN THE STATE OF NAGALAND UND
|
3 | CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF PFUTSERO-PHEK ROAD FROM EXISTING KM 40.090 TO KM65.300 [DESIGN KM. 40.000 TO KM. 62.558] (DESIGN LENGTH - 22.558 KM) IN THE STATE OF NAGALAND UNDER SAR
|
4 | 2 LANE + PS ASTHAMODE - TIVATYAL [DESIGN CH. KM 24.300 - 62.00] [KM 134.98-172.95 OF NH-63]
|
5 | 2 LANE + PS PIMPLNER TO SATANA -[DESIGN CHAINAGE KM 21.427 TO 64.00 ] OF NH-752G]
|
6 | 2 LANE WITH PAVED SHOULDER CONFIGURATION FROM SEETHARAMAPURAM TO DUTTALURU SECTION OF NH-167 BG FROM KM. 0/000 TO KM. 36/400 (36.400 KM)
|
7 | 2 LANE WITH PAVED SHOULDERS ON KULLU TO MANALI (KM 272/00 TO 309/345)
|
8 | 2 LANING FROM KANUBARI TO START OF BOGIBEEL BRIDGE APPROACHES OF NH-52B(EXTN) IN ASSAM
|
9 | 2 LANING FROM KM. 40.00 TO KM. 58.27 OF CHANGLANG/ TIRAP DISTRICT BOUNDARY TO CHANGLANG OF NH-52B IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP
|
10 | 2 LANING FROM LONGDING TO KANUBARI OF NH-52B FROM KM 0 TO KM 47.213 IN ARUNACHAL PRADESH
|
11 | 2 LANING FROM PASIGHAT TO PANGIN SECTION OF NH-229 FROM KM 0 TO KM 28
|
12 | 2 LANING FROM PASIGHAT TO PANGIN SECTION OF NH-229 FROM KM 41.3 TO KM 58.42 (EXISTING KM 42 TO KM 59)
|
13 | 2 LANING OF BAMEETHA TO SATNA SECTION OF NH-75 FROM KM. 57+400 TO KM. 155+000 IN THE STATE OF MP
|
14 | 2 LANING OF KOHIMA - JESSAMI SECTION (PACKAGE I)
|
15 | 2 LANING OF KOHIMA - JESSAMI SECTION (PACKAGE III)
|
16 | 2 LANING OF KOHIMA - JESSAMI SECTION (PACKAGE IV)
|
17 | 2 LANING OF SHILLONG NONGSTOIN SECTION OF NH 44 AND NONGSTOIN TURA STATE ROAD UNDER PHASE A OF SARDP NE IN THE STATE OF MEGHALAYA
|
18 | 2 LANING OF SINGER RIVER TO SIZOH NALA IN ARUNACHAL PRADESH ON EPC BASIS
|
19 | 2 LANING WITH PAVED SHOULDER OF AGARTALA-UDAIPUR SECTION OF NH-44 FROM KM 6.800 TO KM 55.00 IN THE STATE OF TRIPURA.
|
20 | 2 LANING WITH PAVED SHOULDER OF SITARGANJ - TANAKUR SECTION OF NH-125
|
21 | 2 LANING WITH PS AGRA ALIGARH
|
22 | 2 LANING WITH PS KANPUR KABRAI
|
23 | 2 LANING WITH PS OF GULABPURA - UNIARA
|
24 | 2 LANNING OF MOKAMA-MUNGER
|
25 | 2 LANNING OF MUZAFFARPUR - SONBARSA
|
26 | 2-LANE WITH PAVED SHOULDER TONK-SAWAIMADHOPUR
|
27 | 2-LANE WITH PAVED SHOULDER WITH PROVISION OF CAPACITY AUGMENTATION OF RAJASTHAN BORDER-FATEHPUR-SALASAR SECTION
|
28 | 2-LANE WITH PAVED SHOULDERS OF GADU-PORBANDER SECTION
|
29 | 2-LANING FROM MANU-SIMLUNG ( PKG I)
|
30 | 2-LANING FROM MANU-SIMLUNG ( PKG III)
|
31 | 2-LANING OF CHANGTONGYA TO LONGLENG ROAD OF NH-702 (PKG-I)
|
32 | 2-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (1A PACKAGES)
|
33 | 2-LANING OF EXISTING AKAJAN LIKABALI BAME ROAD ON EPC BASIS FROM DESIGN KM. 12.000 TO KM. 33.000 (EXISTING 12.000 TO KM. 36.000) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE PROJECT
|
34 | 2-LANING OF KHOWAI -AGARTALA SECTION FROM DESIGN KM 31.300 TO KM 45.300 OF NH-208A PKG-3
|
35 | 2-LANING OF KHOWAI -AGARTALA SECTION FROM DESIGN KM 6.500 TO KM 19.300 OF NH-208A PKG-1
|
36 | 2-LANING WITH PAVED SHOLDERS OF MULTAI CHHINDWARA SEONI SEC
|
37 | 2-LANING WITH PAVED SHOULDER OF MUZAFFARPUR-BARAUNI
|
38 | 2-LANING WITH PAVED SHOULDER OF NH-52 FROM KM 583.450.TO KM 605.600(EXISTING CHAINAGE FROMKM.583.450TOKM.595.00)FROM PASIGHAT TO BOMJUR IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE.
|
39 | 2-LANING WITH PAVED SHOULDER OF RAEBARELI TO JAUNPUR
|
40 | 2-LANING WITH PAVED SHOULDERS OF RAEBARELI - BANDA SECTION OF NH-232
|
41 | 2-LANING WITH PAVED SHOULDERS OF TANDA -RAEBARELI
|
42 | 2-LANING WITH PS BHILWARA-LODPURA SECTION
|
43 | 2-LANING WITH PS LAMBIA-JAITRAN-RAIPUR
|
44 | 2-LANING WITH PS OF JHALAWAR-RAJASTHAN-MP. BORDER
|
45 | 2-LANING WITH PS RAIBAREILI TO ALLAHABAD
|
46 | 2-LANNING OF SHILONG BYPASS
|
47 | 2-LANNING WITH PS KHAGARIA-PURNEA
|
48 | 2L PS OF SATNA - MAIHAR SECTION OF NH-135BG FROM KM 80.800 TO KM 120.125
|
49 | 2L PS OF UJJAIN - JHALAWAR (UPTO RJ BORDER) FROM KM. (-)0.650 TO KM. 132.955 OF NH-552G
|
50 | 2L+PS FROM KM 148/170 TO 211 /100 (DEVAL- DUNGARPUR-HIRATA - VARDA-SAGWARA) SECTION OF NH-927A. PKG-IV
|
51 | 2L+PS OF THIKRI ANJAD SECTION OF NH-347B
|
52 | 2ND FLYOVER (LCW) PARALLEL TO EXISTING FLYOVER IN KISHANGANJ TOWN.
|
53 | 4 - LANING OF RAJSAMAND-GANGAPUR-BHILWARA
|
54 | 4 LAINING WITH PAVED SHOULDERS OF DOGAL KALAN TO PUNJAB/HARYANA BORDER SEC.OF NH-71(NEW NH-52) FROM KM.211.390M TO KM.238.695.
|
55 | 4 LANES WITH PAVED SIDE SHOULDERS OF END OF PATIALA BYPASS TO START OF SANGRUR BYEPASS SEC.OF NH-64(NEW NH-07) FROM EXISTING KM.64/570 TO KM.106/170
|
56 | 4 LANING FROM KALIABOR TINALI TO DOLABARI SECTION FROM KM 0.0 TO KM 17.3 OF NH 37A INCL. ADDITIONAL BRIDGE, REHABILITATION OF EXISTING BRIDGE AND APPROACHES OF BOTH BRIDGES ON EPC BASIS
|
57 | 4 LANING FROM KM. 34.600 TO KM. 79.970 and 2LPS FROM KM. 79.970 TO KM. 82.000 OF NARENPUR - PURNEA SECTION OF NH-131A
|
58 | 4 LANING FROM PHAGWARA TO RUPNAGAR
|
59 | 4 LANING OF AMBALA - KAITHAL - PACKAGE -1
|
60 | 4 LANING OF AMBALA - KAITHAL - PACKAGE -2
|
61 | 4 LANING OF BAHADURGANJ ARARIA SECTION FROM KM 49.000 TO KM 94.000 (PACKAGE-II) OF NH-327E
|
62 | 4 LANING OF BAHARAGORA - SINGHARA
|
63 | 4 LANING OF BATHALAPALLI TO MUDIGUBBA SECTION (DESIGN CHAINAGE KM. 96.300 TO 129.300) INCLUDING BATHALAPALLI BYPASS (DESIGN CH. KM. 96.300 TO 102.300) OF NH-42
|
64 | 4 LANING OF CHAMPA-KORBA-CHHURI-KATGHORA SECTION OF NH 149B FROM KM.0.000 TO KM.38.200
|
65 | 4 LANING OF GALGALIA - BAHADURGANJ SECTION FROM KM 0.000 TO KM 49.000 (PACKAGE-I) OF NH-327E.
|
66 | 4 LANING OF GOMTI CHAURAHA - UDAIPUR
|
67 | 4 LANING OF KASHIPUR-SITARGANJ SECTION KM. 175.000 TO KM. 252.20
|
68 | 4 LANING OF KAZHAKKOTTAM TO MUKKOLA SECTION OF NH-47
|
69 | 4 LANING OF KUTCHERY CHOWK TO BIJU PARA SECTION (FROM KM 0.00 TO KM.34.00)
|
70 | 4 LANING OF NAGPUR-BETUL
|
71 | 4 LANING OF NH 415 FROM DESIGN CHAINAGE 29/500 TO 40/400 (ITANAGAR TO BANDARDEWA SECTION) IN THE STATE OF ARUNACHAL PRADESH UNDER ANNUAL PLAN 2016-17 ON EPC MODE PACKAGE-A
|
72 | 4 LANING OF PATHRAPALI TO KATGHORA FROM KM.53.300 TO KM.92.600
|
73 | 4 LANING OF PISKA MORE TO PALMA SECTION(FROM KM 2.9 TO KM 26.00)
|
74 | 4 LANING OF SOLAPUR YEDISHI SECTION OF NH-211
|
75 | 4 LANNING OF AHMEDABAD TO GODHARA
|
76 | 4 LANNING OF GODHARA TO GUJARAT/MP BORDER
|
77 | 4 LANNING OF LUCKNOW-SULTANPUR SECTION OF NH-56 FROM KM 11.500
|
78 | 4 LANNING OF MH-KNT BORDER SANGAREDDY SECTION OF NH-9
|
79 | 4 LANNING OF MUKKOLA JUNCTION TO KERALA/ TAMIL NADU BORDER FROM KM 26.500 TO KM 43.000 OF NH-47 IN THE STATE OF KERALA ON EPC MODE
|
80 | 4-LAINING WITH PAVED SHOULDERS OF SANGRUR TO DOGAL KALAN SEC.OF NH-71(NEW NH-52) FROM KM.181.805 TO 211.390.
|
81 | 4-LANE WITH PAVED SHOULDER CONFIGURATION OF BILASPUR-PATHRAPALI (KM.0+000 TO KM. 53+300) SECTION OF NH-111 (NEW HN-130)
|
82 | 4-LANES WITH PAVED SIDE SHOULDERS OF END OF SANGRUR BYPASS TO TAPA SEC,IF NH-64(NEW NH-07) FROM EXISTING KM.116/950 TO KM.138/030 AND EXISTING KM.142/950 TO KM.168/0
|
83 | 4-LANES WITH PAVED SIDE SHOULDERS OF TAPA TO BATHINDA SEC.OF NH-64(NEW NH-07) FROM EXISING KM.168/0 TO 209/500
|
84 | 4-LANING AND STRENGTHENING OF NH-I FROM KARNAL TO HARYANA/PU
|
85 | 4-LANING FROM AURANGABAD TO KARODI (KM 290.200 TO 320.104)
|
86 | 4-LANING FROM KARODI TO TELWADI (KM 320.104 TO 375.000)
|
87 | 4-LANING OF LAMBRA-SHAHKOT SECTION OF NH-71 FROM KM 12.00 TO 44.600
|
88 | 4-LANING OF ALIGARH-KANPUR SECTION FROM KM 229.000 (DESIGN CHAINAGE 240.897) TO KM 289.000 (DESIGN CHAINAGE 302.108) (PACKAGE-III FORM KALYANPUR-NAVIGANJ) OF NH-91
|
89 | 4-LANING OF BRAHAMPORE-FARAKA
|
90 | 4-LANING OF DERGAON TOWN
|
91 | 4-LANING OF DEWAS-UJJAIN OF SECTION NH-148 NG FROM KM 0+000 TO KM 41.42 IN MP ON HAM MODE
|
92 | 4-LANING OF FARAKA-RAIGANJ
|
93 | 4-LANING OF GAGALHERI- SAHARANPUR- YAMUNANAGAR (UP/HARYANA BORDER) SECTION OF NH-73 FROM KM 33.000 ( DESIGN CHAINAGE KM 35.400)
|
94 | 4-LANING OF GHAGHRA BRIDGE TO VARANSI ( PACKAGE -I)
|
95 | 4-LANING OF ITANAGAR TO BANDARDEWA SECTION OF NH-415 FROM KM 51+700 TO KM 59+199 (PACKAGE-C) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH [JOB NO. 415/AR. P/2020-21/030]
|
96 | 4-LANING OF LOHA - WARANGA SECTION OF NH-361 FROM KM. 187.800 TO KM. 244.369 (DESIGN LENGTH 56.569 KM)
|
97 | 4-LANING OF MOGA -TALLEWAL SECTION OF NH-71 FROM KM 77.200 TO 114.00
|
98 | 4-LANING OF ODDANCHATRAM - MADATHUKULAM SECTION OF NH-209 (NEW NH-83)
|
99 | 4-LANING OF ROHTAK - HISSAR SECTION
|
100 | 4-LANING OF SOLAPUR - MAHARASHTRA/ KARNATKA SECTION
|
101 | 4-LANNING EXISTING KM 189.700 TO 237.00] HASSAN TO MARANAHALLY
|
102 | 4-LANNING EXISTING KM 263.00 TO 328.00] ADDAHOLE TO BANTAWAL
|
103 | 4-LANNING OF CHIKHLI TO TARSOD (FROM KM 360-422.700)
|
104 | 4-LANNING OF CHUTMALPUR-GANESHPUR SECTION OF NH-72A FROM KM 0.000 (KM 22.825 OF MH-73) TO KM 17.900 (KM 16.00 OF NH-72A) PKG-I
|
105 | 4-LANNING OF END OF PANDOH BYPASS TAKOLI IN H.P
|
106 | 4-LANNING OF KODEBAD-DHAMTARI SECTION OF NH-43 (FROM KM. 43.400 TO KM. 82.209) IN THE STATE OF CHHATTISGARH EPC MODE
|
107 | 4-LANNING OF MAHAGAON-YAVATMAL SECTION(KM 320.580 TO 400.575)
|
108 | 4-LANNING OF MAHULIA BAHARAGORA-JH/WB BORDER SECTION
|
109 | 4-LANNING OF NAGINA-KASHIPUR SECTION OF NH-74 FROM KM 73.00 TO KM 175.00
|
110 | 4-LANNING OF OTTANCHATRAM BYPASS
|
111 | 4-LANNING OF PORBANDAR DWARKA SECTION IN THE STATE OF GUJARAT
|
112 | 4-LANNING OF PUNJAB HARYANA BORDER-JIND SECTION OF NH-71 FROM KM 238.695 TO KM 307.00 ON DBFOT TOLL MODE UNDER NHDP-IV-B IN THE STATE OF HARYANA
|
113 | 4-LANNING OF RAIPUR-KODEBAD SECTION OF NH-43 (FROM KM. 10.200 TO KM. 43.400) IN THE STATE OF CHHATTISGARH ON EPC MODE.
|
114 | 4-LANNING OF TARSOD-FAGNE(FROM KM 422.700-510.00)
|
115 | 4-LANNING OF THALSERRY -MAHE BYPASS
|
116 | 4-LANNING OF VARANASI GORAKHPUR SECTION OF NH-29 FROM 12.00 TO 88.00 KM [PACKAGE-II] (GORAKPUR)
|
117 | 4-LANNING OF VARANASI GORAKHPUR SECTION OF NH-29 FROM 148.00 208.300 KM [PACKAGE-IV]
|
118 | 4-LANNING OF VARANASI GORAKHPUR SECTION OF NH-29 FROM 88.00 148.00 KM 4-LANNING OF VARANASI GORAKHPUR SECTION OF NH-29 FROM 88.00 148.00 KM [PACKAGE-III]
|
119 | 4-LANNING OF WARANGA-MAHAGAON SECTION(KM 253.7000 TO 320.580)
|
120 | 4-LANNING OF WARDHA- BUTIBORI SECTION(KM 465.500 TO 524.690)
|
121 | 4-LANNING OF YAVATMAL-WARDHA SECTION(KM 400.575 TO 465.500)
|
122 | 4/2 LANNING WITH PS DAUSA-LALSOT-KAUTHUN SECTION OF NH-11A
|
123 | 4/6 LANING FROM KHARAR TO LUDHIYANA FROM KM 10.185 (DESIGN CHAINAGE) TO KM 86.199(DESIGN CHAINAGE)
|
124 | 4L BYPASSES FOR JAGATPUR, B4ABUGANJ, UNCHAHAR, ALAPUR BYPASS, AND SAI RIVER BRIDGE OF RAEBARELI- PRAYAGRAJ SECTION OF NH-30
|
125 | 4L FROM KM 42.000 TO KM 80.00 OF DODABALLAPUR BYPASS TO HOSKOTE SECTION OF NH-648 (OLD NH- 207) ON HYBRID ANNUITY MODE UNDER BHARATMALPARIYOJNA , IN THE STATE OF KARNATAKA ( PACKAGE-2)
|
126 | 4L OF AHMEDNAGAR - MIRAJGAON - KARMALA - TEMBHURNI (PKG-I) [AHMEDNAGAR TO GHOGARGAON] FROM KM. 0.00 TO KM. 38.775 OF NH-516A
|
127 | 4L OF AHMEDNAGAR - MIRAJGAON - KARMALA - TEMBHURNI (PKG-II) [GHOGARGAON TO AHMEDNAGAR- SOLPAUR DISTRICT BORDER] FROM KM. 38.775 TO KM. 80.390 OF NH-516A
|
128 | 4L OF AKOLA - MEDSHI FROM KM. 0.00 TO KM. 47.70 OF NH-161 INCLUDING BYPASSES AT PATUR AND MEDSHI
|
129 | 4L OF AUSA-CHAKUR SECTION FROM KM 55.835 TO KM 114.345 OF NH-361
|
130 | 4L OF DHROL-BHADRA-PATIYA SECTION FROM 0.000 TO KM 13.600 AND BHADRA PATIYA - PIPALIYA SECTION FROM 73.00 TO KM 24.00 OF NH-151A
|
131 | 4L OF DUDHADHARI ELEVATED FLYOVER (MUZAFFARNAGAR –HARIDWAR SECTION) FROM KM 356.450 TO KM 353.800 OF NH-34
|
132 | 4L OF HARDA - BETUL (PKG-I) FROM KM.0 TO KM.30 [HARDA - TEMAGAON]
|
133 | 4L OF HARDA - BETUL (PKG-II) FROM KM. 30.00 TO KM.81.00 [TEMAGAON TO CHICHOLI]
|
134 | 4L OF HARDA - BETUL (PKG-III) FROM KM. 81.00 TO KM.121.248 [CHICHOLI - BETUL]
|
135 | 4L OF KHEDAKHAJURIYA TO SUHAGADI FROM KM. 41.400 TO KM. 89.200 OF NH-148NG (PKG-II)
|
136 | 4L OF KM 0.00 TO KM 42.00 OF OFDOBBASPET TO DODDABALLAPURA BYPASS SECTION NH 648 OLD NH 207 BANGALORE RING ROAD PKG 1
|
137 | 4L OF MALOUT-MANDI DABWALI SECTION PKG-01 DANEWALA AT KM 7.000 TO MANDI DABWALI AT KM 29.500 OF NH-09
|
138 | 4L OF SHAMLI TO MUZAFFARNAGAR SECTION OF NH-709AD, PKG-II
|
139 | 4L OF SUHAGADI TO BARDIYA AMRA FROM KM. 89.200 TO KM. 135.351 OF NH-752D (PKG-III)
|
140 | 4L OF UJJAIN TO BADNAWAR FROM KM 26.900 TO KM 96.00 OF NH-752D
|
141 | 4L PS OF MEERUT TO AFTER BRIDGE OVER RIVER YAMUNA, HARYANA VIA SHAMLI-FROM KM. 0.00 TO KM. 88.476 OF NH-709A
|
142 | 4L+PS OF BEAWAR-ASIND SECTION (KM 30.00 TO KM 74.00) OF NH-158 (GNHCP) WORLD BANK. PKG-II
|
143 | 4L+PS OF NH -58 FROM BEAWAR-GOMTI (OLD CH KM 108.600 TO KM 144 KM 158.419 TO KM 173.300 PKG-II.
|
144 | 4L+PS OF RAS-BEAWAR SECTION (KM 0.00 TO KM 30.00) OF NH-158 (GNHCP) WORLD BANK. PKG-I.
|
145 | 6-LANING OF DHANKUNI-KHARAGPUR SECTION
|
146 | 6-LANING OF EXISTING 2-LANE (I) NANDIGAMA BYPASS FROM KM 220.700 TO KM 226.600 (DESIGN CHAINAGE FROM KM 220.700 TO KM 227.480) AND (II) KANCHIKACHERLA BYPASS FROM KM 238.200 KM 245.400 (DESIGN CHAINAG
|
147 | 6-LANING OF VIJAYAWADA BYPASS FROM CHINNA AVUTUPALLI (DESIGN CH.0+000) TO GOLLAPUDI (DESIGN CH. 30+000) IN VIJAYAWADA – GUNDUGOLANU SECTION OF NH-16 IN THE STATE OF ANDHRA PRADESH UNDER BHARATMALA PAR
|
148 | 6-LANNING OF HANDIA-VARANASI SECTION OF NH-2 FROM KM 713.146 TO KM 785.544 IN THE STATE OF UTTAR PRADESH UNDER NHDP PHASE-V ON HYBRID ANNUITY MODE
|
149 | 6-LANNING OF KISHANGARH TO GULABPURA SECTION OF NH-79A AND NH-79 IN THE STATE OF RAJASATHAN(PACKAGE-1)
|
150 | 6/8 LANING OF ROAD PORT CONNECTIVITY JNPT PHASE II -CONSTRUCTION OF NH-348 - PKG3
|
151 | 6L ACCESS CONTROLLED HIGHWAY FROM JN WITH JAITPUR PUSHTA ROAD TO JN WITH SECTOR 62/65 DIVIDING ROAD ON FARIDABAD BALLABHGARH BYPASS OF NH148NA FROM KM 9 TO KM 33 INCLUDING SPUR UPTO BADARPUR BORDER
|
152 | 6L FLYOVER AT BORAGAON, GORCHUK, LOKHRA AND BASISTHA JUNCTION ON GUWAHATI BYPASS SECTION FROM KM 146.172 TO KM 162.620 OF NH-27 - N/02027/01003/AS
|
153 | 6L KORLAM-KANTAKAPALLE SECTION OF NH-130CD ROAD FROM KM 421.100 TO KM 445.100 (PKG-3)
|
154 | 6L OF KANHAULI RAMNAGAR PATNA RING ROAD PKG I FROM KM 0.000 TO KM 39.160 OF SH78 NEW NH131G
|
155 | 6L OF MH/KN BORDER (NIMBAL VILLAGE) TO KN/TS BORDER (SINGNODI VILLAGE) FROM KM. 162.5 TO KM. 203.100 IN RAICHUR OF NH-150C (PKG-IV)
|
156 | 8 LANING OF MUKARBA CHOWK TO PANIPAT
|
157 | 8L OF GUDUVANCHERY (KM 38.00) - MARAIMALAI NAGAR (KM 42.00) - SINGAPERUMAL KOIL (47.00) - CHETTIPUNIYAM MAHINDRA CITY (51.300) SECTION OF NH 45
|
158 | A'DHYA-L'NOW(LMNHP3)NH28
|
159 | A'PALLI-TUNI GQ
|
160 | A'PALLI-TUNI GQ
|
161 | ACQ. 2 BULK CARR.RESALE
|
162 | ACQ.2 PRODU-CT CARRIER
|
163 | ACQ.IND.LR- II TANKER
|
164 | ACQ.OF OIL CARRIERS,SCI
|
165 | ACQ.OF TEU CONTAINER
|
166 | ACQ.OF2-146,860 DWT OIL
|
167 | ADDITIONAL FACILITY FOR 4-LANE DIVIDED HIGHWAY OF KM 52.250 TO KM 130.560 OF NH-58 (MEERUT-MUZAFFARNAGAR SECTION) IN THE STATE OF UTTAR PRADESH ON EPC MODE
|
168 | ADDITIONAL WORKS (2VUPS, MR-10 JUNCTION FLYOVER AND UNDERPASS) IN SIX LANE INDORE-DEWAS SECTION OF NH-52 IN THE STATE OF MADHYA PRADESH ON EPC MODE
|
169 | AGRA-BHARATPUR
|
170 | AGRA-BYPASS(NS-1/UP-1), NH-2,3
|
171 | AGRA-S'HABAD GQ
|
172 | AGRA-SHIKOHABAD (GQ) KM.199.66-KM.250.50 (NH-2)
|
173 | AHMADPUR TO PIMPLA
|
174 | AHMEDABAD TO VADODARA SECTION
|
175 | AHMEDNAGAR BYPASS
|
176 | AHMEDNAGAR TO BARAMATI
|
177 | AJANTHA TO BULDHANA
|
178 | AKKALKOT TO DHUDHNI
|
179 | AKOLA TO AKOT
|
180 | AKOT TO ANJANGAON
|
181 | ALIGARH MORADABAD SECTION OF NH-93 FROM KM 85.650 TO KM 232.020
|
182 | ALIGARH-KANPUR SECTION PACKAGEV FROM MITRASEN-KANPUR
|
183 | ALLAHABAD BYPASS (KM.158-KM.198) GQ, NH-2
|
184 | ALLAHABAD BYPASS (KM.198-KM.242.708) GQ, NH-2
|
185 | ALLAHABAD TO UP/MP BORDER SECTION OF NH-27 IN UTTAR PRADESH
|
186 | ALLAHGANJ TO MIRANPUR KATRA SECTION OF NH-730C FROM KM.52.770 TO 114.00
|
187 | ALWAR NUH SECTION ON EPC MODE IN THE STATE OF RAJASTHAN.
|
188 | AMBALA-CHD. NH-21AND22
|
189 | AMBALA-ZIRAKPUR, NH-21AND22, KM.5/735 TO KM.39/961 OF NH-22
|
190 | AMDI TO SAONER
|
191 | AMRITSAR-PATHANKOT
|
192 | AMRITSAR-WAGHA BORDER
|
193 | ANJANGAON TO MAH/MP BORDER
|
194 | ANKAPALLI-TUNI (GQ) KM.28.-KM.49 (NH-5)
|
195 | AP/KARNATKA BORDER-NANDI HILL CROSSING AND DEVANHALLI TO MEENU KUNLE VILLAGE,NH-7
|
196 | ARDHAPUR TO HIMAYATNAGAR
|
197 | ARMUR TO KADLOOR YELLAREDDY
|
198 | ARNI TO NAIGAINBANDI
|
199 | ASSAM/WB BORDER TO GAIRKATTA (WB-1)
|
200 | ATUL-KAIJALI (GQ) KMS.343-KMS.381.6 (NH-8)
|
201 | ATUL-KAIJALI GQ
|
202 | ATUL-KAIJALI GQ
|
203 | AU'BAD-B'CHATTI GQ
|
204 | AURAD - BIDAR KM 0.00 TO KM 45.878
|
205 | AURANG - RAIPUR,NH-6
|
206 | AURANG-RAIPUR, NH-6, KM.232 TO KM.281
|
207 | AURANGABAD-BARACHATTI (GQ) KM.180-KM.240 (NH-2)
|
208 | AYODHYA - LUK.:LMNHP-2
|
209 | AYODHYA - LUK.:LMNHP-I
|
210 | AYODHYA - LUCKNOW (LMNHP-I) NH-28, KM.45 TO KM.8.250, NH-28
|
211 | AYODHYA - LUCKNOW (LMNHP-II) KM.93.075 TO KM.45, NH-28
|
212 | AYODHYA-LUCKNOW (LMNHP-3),NH-28, KM.135.000 TO KM.93.075
|
213 | B'GAUM-D'WAD GQ
|
214 | B'RIA-G'NDA (RJ-2),NH-76
|
215 | B'SORE-BHDRK GQ
|
216 | B'WARA-CHI'GARH GQ
|
217 | B'WARA-CHI'GARH GQ
|
218 | BAHRAICH BYPASS TO RUPAIDHA SECTION NH-28C IN UTTAR PRADESH KM 99 TO150
|
219 | BAKARIA TO GOGUNDA(RJ-2) NH-76 PHASE-II KM.74-KM.30
|
220 | BAKHTIYARPUR RAJAULI PKG-III FROM KM 101.630 TO KM 152.520 NH20
|
221 | BALANCE 4 LANING WORK OF RAIGANJ DALKHOLA SECTION OF NH34 FROM KM 398.000 TO KM 452.750 (PACKAGE V) IN THE STATE OF WEST BENGAL ON EPC MODE
|
222 | BALANCE WORK 2-LANE WITH PAVED SHOULDERS OF NAGAPATTINAM - THANJAVUR SECTION OF NH-67 (NEW NH-83)
|
223 | BALANCE WORK 2-LANING OF LALPUL MANMAO CHANGLANG ROAD (NH-215) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH
|
224 | BALANCE WORK FOR "IMPROVEMENT OF EXISTING SINGLE INTERMEDIATE LANE ROAD OF NH-44 TO BE 2-LANE ROAD WITH PAVED SHOULDER FROM KM 230/200 TO KM 247/000, KM 261.504 TOTAL LENGTH 30.28KM OF NH-44 IN THE ST
|
225 | BALANCE WORK FOR FOUR LANING OF ITARSI TO BETUL SECTION OF NH69 FROM KM 63.000 TO KM 137.00 (DESIGN LENGTH 73.955 KM) IN THE STATE OF MADHYA PRADESH (PACKAGE-II/NH-69) ON EPC MODE
|
226 | BALANCE WORK FOR REHABILITATION AND UPGRADATION OF SATNA-BELA SECTION OF NH-75 FROM KM. 155.0 TO KM. 202.040 TO FOUR LANE WITH PS ON ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) MODE
|
227 | BALANCE WORK OF 2-LANE WITH PAVED SHOULDER OF BHOPAL-SANCHI SECTION
|
228 | BALANCE WORK OF 2-LANING OF LONGDING– TISSA- KHONSA ROAD (NH-215) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH [JOB NO. 215/AR. P/2019-20/028]
|
229 | BALANCE WORK OF 2L PS OF TINDIVANAM KRISHNAGIRI FROM KM 37.600 TO 219.782
|
230 | BALANCE WORK OF 4 LANING OF GORAKPUR -GOPALGANJ
|
231 | BALANCE WORK OF 4-LANNING FROM KM 153.000 TO KM 175.000 OF NAGPUR- HYDERABAD SECTION NS-62
|
232 | BALANCE WORK OF 4-LANNING FROM KM 94.000 TO KM 123.000 OF NAGPUR- HYDERABAD SECTION NS-60
|
233 | BALANCE WORK OF 4-LANNING OF LALGHATI TO MUBARAKPUR OF NH-12
|
234 | BALANCE WORK OF 4-LANNING OF OBEDULLAGANJ TO ITARSI SECTION OF NH-69
|
235 | BALANCE WORK OF 4L OF INDORE-GUJARAT/MP BORDER FROM KM 106.210 TO KM 115.250 (START AND END POINT OF BIRD SANCTUARY), KM 121.740 TO KM 127.140 (MACHILYA GHAT SECTION) AND FOREST PORTION KM 149.800 TO
|
236 | BALANCE WORK OF RANCHI-MAHULIA SECTION OF NH-33 FROM KM 113.730 (VIKAS) TO KM 140.000 (RAMPUR) (PKG-I)
|
237 | BALANCE WORK UNDER PHASE-I FOR 4L OF KHED SINNER SECTION COMPRISING OF THE STRETCHES (I) KHED BYPASS (KM 42.000 TO KM 46.981), (II) PETH (KM 56.100 TO KM 56.780), (III) MANCHAR BYPASS AND (IV) LINEAR
|
238 | BALANCE WORKS OF 4L AMRAVATI - CHIKHLI (PKG I) [AMRAVATI TO KURANKHED FROM KM. 166.00 TO KM. 220.00]
|
239 | BALANCE WORKS OF 4L AMRAVATI - CHIKHLI (PKG II) [KURANKHED TO SHELAD FROM KM. 220.00 TO KM. 270.00]
|
240 | BALANCE WORKS OF 4L AMRAVATI CHIKHLI (PKG IV) [NANDURA TO CHIKHLI FROM KM. 315.00 TO KM. 360.00]
|
241 | BALASORE BHADRAK (REVIVED) KM 136.5 - 199.14 NH-5
|
242 | BALASORE-BHADRAK (GQ) KM.136.5-199.14 (NH-5)
|
243 | BAMNI TO NAVAEGAON
|
244 | BANGALORE-NEELAMANGLALA NH-4
|
245 | BANGLORE - HOSKOTE MUDBOGAL SECTION NH-4
|
246 | BARA TO ORAI, NH-2, 25
|
247 | BARABANKI TO JUNCTION WITH MDR 13 NEAR JARWAL SECTION OF NH-28C IN UTTAR PRADESH KM 0 TO 43
|
248 | BARACHATTI-GORHAR (GQ) KM.240-KM.320, NH-2
|
249 | BARASGAON TO RAHATEE
|
250 | BEAWAR PALI PINDWARA
|
251 | BELA(RIWA)-MP/UP BORDER (4L) OF NH-7 IN MP
|
252 | BELGAUM-DHARWAD (GQ) KM.495-KM.433 (NH-4)
|
253 | BELGAUM-DHARWAD(NH-4)
|
254 | BHADGAON TO CHALISGAON
|
255 | BHADRAK-CHANDIKHOLE (GQ) KM.61-KM.136 (NH-5)
|
256 | BHANDARA TO GHOTITOK
|
257 | BHARATPUR - MAHAVA,NH-11
|
258 | BHARATPUR MAHAVA, NH-11, KM.63 TO KM.120
|
259 | BHARUCH-SURAT PACKAGE BOT-II
|
260 | BHDRK-CH'KHOL GQ
|
261 | BHDRK-CH'KHOL GQ
|
262 | BHILADI TO PORBANDAR-I
|
263 | BHILADI TO PORBANDAR (PACK..-I) PH.-II KM.52.5 TO 2.0, NH-8B
|
264 | BHILWARA BYPASS - CHITTORGARH (GQ) KM.120-KM.183 (NH-79)
|
265 | BHOKAR TO SARSAM
|
266 | BHOPAL-BIORA (4L) OF NH-12 IN MP
|
267 | BHOPAL-SANCHI
|
268 | BIJAPUR-HUNGUND SECTION
|
269 | BIJNI TO ASSAM /WB.BORDER (NH-31.C)(NHAI)
|
270 | BIJNI TO ASSAM WB BORDER (NH-31.C)(1)(NHAI)
|
271 | BIJNI-ASSAM/WB BORDER
|
272 | BIKANER - PHALODI SECTION TO FOUR LANING FROM KM.4.200 TO KM 55.25 AND TWO-LANE PAVED SHOULDER FROM 55.25 TO KM.163.500
|
273 | BIORA-RAJASTHAN BORDER (2L) OF NH-12EXT IN MP
|
274 | BODHWAD TO STATE BORDER
|
275 | BORDUMSA NAMCHIK (BURIDEHING - JAIRAMPUR) ROAD ON NH-52B (NEW NH-215) FROM KM. 0.15 (STARTING CHAIN AGE NEAR BURIDEHING BRIDGE) TO KM. 22.380 IN THE STATE ARUNACHAL PRADESH ON EPC BASIS.
|
276 | BR-1:PURNEA-FORBESGANJ
|
277 | BR-2:PURNEA-FORBESGANJ
|
278 | BRAHMPUTRA BRIDGE,NH NO-31
|
279 | BRIDGES-SECTION (GQ) KM.61-KM.199 (NH-5)
|
280 | BRIDGS GQ
|
281 | C'GAR BYPASS(RJ-6),NH-76
|
282 | CAPICITY AUGMENTATION OF THE EXISTING 4 LANE STRETCH FROM ICHAPURAM TO NARASANNAPETA FROM KM 470.415 TO 580.700 OF NH-16 (OLD NH-5)
|
283 | CH'PET-ONGOLE GQ
|
284 | CH'WATI-VIZAG GQ
|
285 | CH'WATI-VIZAG GQ
|
286 | CHAKUR LOHA SECTION OF NH-361 FROM KM 114.600 TO KM 187.80
|
287 | CHALISGAON TO NANDGAON
|
288 | CHALLAKERE TO HARIYUR SECTION FROM KM 358.500 TO KM 414.205 OF NH150 A
|
289 | CHAMBAL BRIDGE, NH-76 (RJ-5)
|
290 | CHAMPAWATI-VISHAKHAPATNAM (GQ) KM.49-KM.28 (NH-5)
|
291 | CHANGTONGYA TO LONGLENG ROAD PKG-2
|
292 | CHENGAPALLI TO COIMBATORE BYPASS KM-102.035-144.740 KM
|
293 | CHENNAI BYPASS (NHAI) OTHERS, NH-45, 4 AND 5
|
294 | CHI'DURGA-SIRA GQ
|
295 | CHI'GARH-M'WAR GQ
|
296 | CHI'GARH-M'WAR GQ
|
297 | CHI'PET-VIJ.NH5: 4LANING
|
298 | CHIKALI TO DHAD
|
299 | CHIKALI TO KHAMGAON
|
300 | CHIKLI TO TAKARKHED
|
301 | CHILKALURIPET-VIJAYWADA 6 LANE (KM 355 TO KM 434.15)
|
302 | CHILKAURIPET-ONGOLE (GQ)
|
303 | CHILKAURIPET-ONGOLE (GQ) KM.357.9-KM.291 (NH-5)
|
304 | CHIMUR TO WARORA
|
305 | CHITRADURGA-SIRA (GQ) KM.189-KM.122.3 (NH-4)
|
306 | CHITRADURGA-TUMKUR(NH-4)
|
307 | CHITTORGARH BYPASS,KM 253-213 NH-76
|
308 | CHITTORGARH-MANGALWAR (GQ) KM.220-KM-172 (NH-76)
|
309 | CITTORGARH-NEEMACH (4L) OF NH-79 AND NIMBAHARA PRATAPGARH (2L+PS) OF NH-113 UNDER PPP.
|
310 | CONST. OF CANACONA BYPASS FROM KM.68/00 (CH.00/00) TO KM. 85/740 (CH. 7/740 ON PANAJI - MANGALORE SECTION) OF NH-17 (NEW NH-66) IN THE STATE OF GOA ON EPC MODE.
|
311 | CONST. OF MISSING LINK BETWEEN KM. 11/680 TO KM. 14/020 AND WIDENING OF EXISTING TWO LANE ROAD
|
312 | CONST.OF 4 LANES WITH PAVED SHOUDLERS OF HARIKE BYPASS FROM EXISTING KM.158.350 TO 166.925 OF NH-15(NEW NH-54)
|
313 | CONST.OF NEWPORT ,ENNORE
|
314 | CONST.OF SANGRUR BYPASS(EXISTING KM.106.170 TO 116.950) AND DHANOULA BYPASS(EXISTING KM.138.030 TO KM.142.950 ON NH-64(NEW NH-07).
|
315 | CONSTN FOR FOUR LANING OF BABATPUR-VARANASI SECTION OF NH-56 (231) KM 263.00 TO 280.25 (EPC MODE)
|
316 | CONSTN. OF 4 LANING IN KM.69.00 TO 100.00 DESIGN RD 94.600 TO 125.920 PACKAGE IV (EPC)
|
317 | CONSTN. OF 4 LANING IN KM.99.00 TO 114.375 PACKAGE-V (EPC) INCLUDING BHIWANI BYPASS
|
318 | CONSTRUCION OF 2 LANE ROAD FROM KM. 28700-292.00, 322.00-342.00 AND 352.00- 400.00 OF NH 63 (OLD NH-16) (BHOPALPATNAM-JAGDALPUR ROAD) IN CHATTISGARH UNDER LWE SCHEME.
|
319 | CONSTRUCTION OF FOUR LANING OF UP/HARYANA NH-73
|
320 | CONSTRUCTION / UP-GRADATION OF 2-LANE WITH PAVED SHOULDER OF NH-70 FROM MUNABAO (NH-25E)-TANOT FROM KM 0.000 TO 46.000 AND KM 82.600 TO 310.467
|
321 | CONSTRUCTION AND UPGRADATION OF EXISTING ROAD TO 2 LANE WITH PAVED SHOULDER FROM KM 368.00 TO KM 399.00 OF LAMERI TO KARANPARYAG
|
322 | CONSTRUCTION OF 1 ROB CUM FLYOVER FROM KM 136.200 TO 137.800 AND 2 FLYOVERS
|
323 | CONSTRUCTION OF 13.0 KM 2 LANE WITH PAVED SHOULDERS KOLLAM BYPASS ON NH47 (NEW NH 66) FROM KM 486/500 TO 499/500 IN THE STATE OF KERALA ON EPC BASIS WITH 50:50 COST SHARING
|
324 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 0.00 TO KM 44.35 (PACKAGE 1) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHWAYS
|
325 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 117.56 TO KM 163.59 (PACKAGE 4) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHW
|
326 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 206.66 TO KM 247.05 (PACKAGE 6) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHW
|
327 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 247.05 TO KM 284.92 (PACKAGE 7) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHW
|
328 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 284.92 TO KM 314.25 (PACKAGE 8) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHW
|
329 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 314.25 TO KM 351.383 (PACKAGE 9) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGH
|
330 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 44.35 TO KM 77.95 (PACKAGE 2) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHWAY
|
331 | CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 77.95 TO KM 117.56 (PACKAGE 3) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHWA
|
332 | CONSTRUCTION OF 2 LANE WITH HARD SHOULDER FROM DESIGN CHAINAGE KM 283.000 TO KM 325.440 (5- LEGGED JUNCTION AT OLD AKHEGWO) TO (AKASH BRIDGE) OF AKEGWO- JESSAMI SECTION OF NH-202 PACKAGE-1
|
333 | CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER FROM KM. 168 TO 183.783 (YESEMYONG TO UNGER) ON MOKOKCHUNG TO TULI SECTION OF NH-61 UNDER EPC MODE IN THE STATE OF NAGALAND.
|
334 | CONSTRUCTION OF 2 LANING OF EXISTING HUNLI-ANINI ROAD ON EPC BASIS FROM DESIGN KM 37.500 TO KM 53.500 (EXISTING40.160KM TO 56.320 KM) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE.
|
335 | CONSTRUCTION OF 2 LANING OF EXISTING HUNLI-ANINI ROAD ON EPC BASIS FROM DESIGN KM 106.200 TO KM 120.00(EXISTING KM 111.60 TO KM 126.875) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE
|
336 | CONSTRUCTION OF 2 LANING OF EXISTING HUNLI-ANINI ROAD ON EPC BASIS FROM DESIGN KM 53.500 TO KM 92.500 (EXISTING KM 56.320 TO KM 97.650) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE
|
337 | CONSTRUCTION OF 2 LANING OF EXISTING HUNLI-ANINI ROAD ON EPC BASIS FROM DESIGN KM 92.500 TO KM 106.500 (EXISTING KM 97.670 TO KM 111.600) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE.
|
338 | CONSTRUCTION OF 2-LANE MELLI MANPUR NAMCHI ROAD IN SOUTH SIKKIM
|
339 | CONSTRUCTION OF 2-LANE NAYABAZAR - LEGSHIP ROAD IN WEST SIKKIM.
|
340 | CONSTRUCTION OF 2-LANE ROAD FROM EXISTING KM 21.500 OF HUNLI-ANINI ROAD( NEAR ITHUN BRIDGE) TO KM 37.500 IN THE STATE OF ARUNACHAL PREDESH ON EPC MODE.
|
341 | CONSTRUCTION OF 2-LANE ROAD FROM EXISTING KM. 37.500 OF HUNLI-ANINI ROAD (NEAR ITHUN BRIDGE) TO KM. 53.50 IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE.
|
342 | CONSTRUCTION OF 2-LANE TARKU DAMTHANG NAMCHI ROAD IN SOUTH SIKKIM.
|
343 | CONSTRUCTION OF 2-LANE WITH HARD SHOULDER OF PEREN-DIMAPUR SECTION ON NH129A FROM DESIGN KM109.494 TO KM126.775 PKG-1
|
344 | CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM KM 16.000 TO KM 32.500 OF STRETCH TARKU – RABONGLA OF NH-510 ON EPC BASIS UNDER SARDP –NE PHASE ‘A’ IN THE STATE OF SIKK
|
345 | CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF FLEXIBLE PAVEMENT FROM KM 42.80 TO KM 60.30 ON NH NO.150 DURING 2016-17 IN THE STATE OF MIZORAM ON EPC MODE UNDER NH(O). JOB NO. 150/MZ/2016-17/107)
|
346 | CONSTRUCTION OF 4 LANE BANGALORE - CHENNAI EXPRESSWAY FROM KM 26.400 TO KM 53.500 SECTION OF NE-7 (MALUR TO BANGARPET SECTION) IN THE STATE OF KARNATAKA UNDER BHARATMALA ON HYBRID ANNUITY MODE (PHASE
|
347 | CONSTRUCTION OF 4 LANE BANGALORE -CHENNAI EXPRESSWAY FROM KM 53.500 TO KM 71.000 SECTION OF NE-7 (BANGARPET TO BETHAMANGALA SECTION) IN THE STATE OF KARNATAKA UNDER BHARATMALA ON HYBRID ANNUITY MODE (
|
348 | CONSTRUCTION OF 4 LANE BANGALORE-CHENNAI EXPRESSWAY FROM KM 0.000 TO KM 26.400 NE-7(ALONG WITH 0.700KM APPROACH TOWARDS NH 207 WITH ITC ON NH4 AT START POINT) BANGALORE TO MALUR SECTION IN THE STATE O
|
349 | CONSTRUCTION OF 4 LANE ELEVATED VIADUCT AT KM. 7.500 MUNSHI PULIA OF NH-24A
|
350 | CONSTRUCTION OF 4 LANE NH-29 BYPASS PHASE-II CONNECTING NH-29 WITH NH-2 AS PART OF VARANASI RING ROAD INCLUDING INTERCHANGE LOOP AT NH-2 IN THE STATE OF UTTAR PRADESH UNDER NHDP PHASE-VII ON HYBRID AN
|
351 | CONSTRUCTION OF 4 LANING BY CC PAVEMENT ON KOTA-DARAH OF NH-12 FROM 256/550 TO 289/550 UNDER EPC.
|
352 | CONSTRUCTION OF 4-LANE BYPASS TO VIJAYANAGARAM TOWN ON NH43 (NEW NH26) FROM 537/6 TO 552/0 (RAIPUR-VIJAYANAGARAM SECTION) TO 4-LANE ON EPC MODE
|
353 | CONSTRUCTION OF 4-LANE GREEN FIELD DELHI-AMRITSAR-KATRA EXPRESSWAY (NE-05) FROM JUSSUR KHERI ON KMP EXPRESSWAY TO JUNCTION WITH ROHTAK-PANIPAT ROAD (NH-709) NEAR RUKHI PAANI VILLAGE (KM. 0+000 TO KM.
|
354 | CONSTRUCTION OF 4-LANE LADDOWAL BYPASS
|
355 | CONSTRUCTION OF 4-LANE NH-344P-PACKAGE-4 (FROM KM 0+000 TO KM 29+600, 29.6KM), STARTING FROM BAWANA INDUSTRIAL AREA, DELHI (AT KM 7+750 OG NH-344M) TILL SONIPAT BYPASS OF NH-352A AT VILLAGE BARWASINI,
|
356 | CONSTRUCTION OF 6.80 KM 2 LANE WITH PAVED SHOULDERS ALAPPUZHA BYPASS ON NH47 NEW NH 66 FROM KM 408.100 TO 414.900 IN THE STATE OF KERALA ON EPC BASIS WITH 50:50 COST
|
357 | CONSTRUCTION OF 8 LANE DWARKA EXPRESSWAY (NH-248BB PACKAGE IV FROM RAIL OVER BRIDGE (ROB) TILL END POINT KM 40 NH 8 SPR INTERSECTION NEAR KHERKI DAULA OF 8.76 KM LENGTH, FROM KM 19.700 TO KM 28.460
|
358 | CONSTRUCTION OF 8LANE DIVIDED CARRIAGEWAY STARTING AT SOHNA GURUGRAM ROAD NE 4 NEAR ALIPUR VILLAGE AND ENDS AT CH. 18.461 BEFORE THE KMP EXPRESSWAY CH. 0+000 TO CH. 18+461 SECTION OF DELHI VADODARA GR
|
359 | CONSTRUCTION OF 8LANE EXPRESSWAY NE4 STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH. 47+000 NEAR KHANPUR GHATI KM. 18+500 TO CH. 47+000 SECTION OF DELHI VADODARA GREENFIELD ALIGNMENT ON EPC MODE UNDER
|
360 | CONSTRUCTION OF A NEW 2-LANE HIGHWAY FROM KM 0.00 (ON NH-54 NEAR LAWNGTLAI)
|
361 | CONSTRUCTION OF A NEW 2-LANE HIGHWAY FROM KM 38/00 TO 71/00 IN MIZORAM TO SUPPORT KALADAN MULTI MODAL TRANSIT TRANSPORT PROJECT IN PHASE 'A' OF SARDP-NE ( PACKAGE MM-II)
|
362 | CONSTRUCTION OF A NEW 2-LANE HIGHWAY FROM KM 38/00 TO 71/00 IN MIZORAM TO SUPPORT KALADAN MULTI MODAL TRANSIT TRANSPORT PROJECT IN PHASE 'A' OF SARDP-NE ( PACKAGE MM-II)
|
363 | CONSTRUCTION OF A NEW 2-LANE HIGHWAY FROM KM 71/00 TO 99/83 IN MIZORAM TO SUPPORT KALADAN MULTI MODAL TRANSIT TRANSPORT PROJECT IN PHASE 'A' OF SARDP-NE ( PACKAGE MM-III)
|
364 | CONSTRUCTION OF BHAGALPUR BYPASS FROM KM 124/175 TO 140/200 OF NH-80 UNDER EPC MODE
|
365 | CONSTRUCTION OF BRIDGE INCLUDING APPROACHES ACROSS RIVER ZUARI ON NH-17 (NH-66) ON PANJIM-MANGALORE SECTION IN THE STATE OF GOA ON EPC MODE. (PACKAGE-II)
|
366 | CONSTRUCTION OF CHHIATHLANG -SERCHHIP BYPASS (PKG-1) ON AIZAWL-TUIPANG SECTION OF NH-54
|
367 | CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY CARRIAGEWAY FROM BANI VILLAGE TO BARDAWADI VILLAGE OF MANDSAUR DISTRICT (CH. 517.420 TO CH. 546.920 PKG 19
|
368 | CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY CARRIAGEWAY FROM BARDAWADI VILLAGE TO MANDSAUR VILLAGE OF RATLAM DISTRICR (CH. 546+920 TO CH. 572+220) PKG 20
|
369 | CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY CARRIAGEWAY FROM JODMI VILLAGE TO BANI VILLAGE OF MANDSAUR DISTRICT (CH. 484.420 TO CH. 517.420) PKG 18
|
370 | CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY CARRIAGEWAY FROM RAJASTHAN/MP BORDER TO JODMI VILLAGE OF MANDSAUR DISTRICT (CH. 452+420 TO CH. 484+420) PKG 17
|
371 | CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY FROM KM 217.500 TO KM 254.430 OF VADODARA MUMBAI EXPRESSWAY ENA TO KIM SECTION IN THE STATE OF GUJARAT ON HAM MODE UNDER BHARATMALA PARIYOJANA P
|
372 | CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING AT CH. 47+000 NEAR KHANPUR GHATI AND ENDS AT HARYANA RAJASTHAN BORDER CH. 47+000 TO CH. 78+800 SECTION OF DELHI VADODARA GREENFIELD ALIGNMENT NE-4 UNDER
|
373 | CONSTRUCTION OF EIGHT LANE VADODARA KIM EXPRESSWAY FROM KM 279.00 TO 292.00 (ANKLESHWAR TO MANUBAR SECTION OF VADODARA MUMBAI EXPRESSWAY) PACKAGE-IV
|
374 | CONSTRUCTION OF EIGHT LANE VADODARA KIM EXPRESSWAY FROM KM 355.00 TO KM 378.740 (PADRA TO VADODARA SECTION OF VADODARA MUMBAI EXPRESSWAY) PACKAGE-I
|
375 | CONSTRUCTION OF FLYOVER AT LAKHANI TOWN ON NH-53 (OLD NH-6)
|
376 | CONSTRUCTION OF FLYOVER FROM KM 604/252 TO 607/060 (MARTHANDAM JUNCTION) AND FROM KM 630/116 TO 631/650 (PARVATHIPURAM JUNCTION) OF NH 47 IN THE STATE OF TAMIL NADU
|
377 | CONSTRUCTION OF FLYOVER IN SAKOLI TOWN ON NH-53 (OLD NH-6)
|
378 | CONSTRUCTION OF FLYOVER/UNDERPASS FOR IMPROVEMENT OF EXISTING JUNCTIONS AT IFFCO CHOWK AT KM. 28.211, SIGNATURE CHOWK AT KM. 29.650 AND RAJIV CHOWK AT KM.33.180 ON DELHI-GURGAON
|
379 | CONSTRUCTION OF FOUR-LANE GREENFIELD DELHI-AMRITSAR-KATRA EXPRESSWAY FROM JUNCTION WITH ROHTAK-PANIPAT ROAD (NH-709) NEAR RUKHI PAANI VILLAGE TO JUNCTION WITH JIND-PANIPAT ROAD (NH-352A) NEAR GANGANA
|
380 | CONSTRUCTION OF GAVANPHATA INTERCHANGE FROM 14.740 TO KM 15.894 ( OLD SH -54) PKG-2
|
381 | CONSTRUCTION OF GODAVARI RIVER BRIDGE NEAR VENKATPURAM INCLUDING APPROACH ROAD ON NH-202 UNDER LWE SCHEME
|
382 | CONSTRUCTION OF GORAKHPUR BYPASS FROM EXISTING KM 79.670 OF NH-29E TO EXISTING KM 251.700 OF NH-28 THROUGH AN ENGINEERING. PROCUREMENT AND CONSTRUCTION(EPC) CONTRACT UNDER NHDP-IV IN THE STATE OF UP
|
383 | CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS INDRAVATI RIVER ON NH-63 (ERSTWHILE NH-16) AND CONSTRUCTION OF ROAD FROM KM 267.00 TO 287.80
|
384 | CONSTRUCTION OF HL BRIDGE ACROSS GADAVARI RIVER AND ITS APPROACHES FOR MISSING LINK BETWEEN SIRONCHA IN MH AND KALESHWARAM IN AP
|
385 | CONSTRUCTION OF ISLAMPUR BY PASS
|
386 | CONSTRUCTION OF KARALPHATA INTERCHANGE FROM 3.600 TO KM 6.073 OF NH4B AND FROM 5.300 TO KM 7.422 ( OLD SH -54) PKG-1
|
387 | CONSTRUCTION OF MAJOR BRIDGE ACROSS MANJRA RIVER NEAR YESGI VILLAGE @ KM, 166/500 ON NH 63 TQ BILOLI DIST NANDED IN STATE OF MAHARASHTRA. ON EPC MODE
|
388 | CONSTRUCTION OF MAJOR BRIDGE OVER HUMPHREY STRAIT CREEK BETWEEN KM. 129.420 TO KM. 130.600 OF NH 4 CONNECTING MIDDLE AND NORTH ANDAMAN ISLANDS
|
389 | CONSTRUCTION OF MAJOR BRIDGE WITH APPROACHES ACROSS PRANHITA RIVER AT KM 57.300 ON NH-63(16)
|
390 | CONSTRUCTION OF MARGOA WESTERN BYPASS FOR NH-17 (NEW NH-66 ) FROM KM. 26 /200 ( CHAINAGE 00/00) TO KM. 38/100 (CHAINAGE 11/900) (P.M. SECTION) IN THE STATE OF GOA ON EPC MODE.
|
391 | CONSTRUCTION OF MECHI BRIDGE AND APPROACHES ON INDIA-NEPAL BORDER LINKING KAKARVITTA AND PANITNAKI IN INDIA UNDER ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) MODE
|
392 | CONSTRUCTION OF NAGAUR BYPASS FROM EXISTING KM 166/260 TO KM 180/500 OF NH-65 ON EPC MODE.
|
393 | CONSTRUCTION OF NEW 4-LANE BRIDGE ACROSS VARSOVA CREEK AND ITS APPROACHES WITH INTERCHANGE IN THE STATE OF MAHARASHTRA
|
394 | CONSTRUCTION OF NH-24 4-LANE BYPASS STARTING FROM KM 479.500 OF NH-24 AND TERMINATING AT KM 17.600 OF MDR-77C IN THE STATE OF UTTAR PRADESH UNDER NHDP PHASE-VII ON EPC MODE
|
395 | CONSTRUCTION OF NH-24 EXTENSION 4-LANE BYPASS STARTING FROM BEHTA ROAD AND TERMINATING AT SITAPUR ROAD CHAINAGE 479.500 PACKAGE-2
|
396 | CONSTRUCTION OF NH-28 4-LANE BYPASS STARTING FROM KM 17.600 OF MDR-77C AND TERMINATING AT KM 15.650 OF NH-28
|
397 | CONSTRUCTION OF NH-4B FROM KM.21.200 TO KM.27.270( D TO E SECTION) AND FROM KM.0.000 TO KM.4.492 ( D TO G SECTION) OF JNPT PHASE -II (PKG-IV)
|
398 | CONSTRUCTION OF PARTIALLY ACESS CONTROLLED FOUR LANE ELEVATED HIGHWAY BETWEEN SAMRALA CHOWK (DESIGN CHAINAGE KM 0+000) TO LUDHIANA MUNCIPAL LIMIT(DESIGN CHAINAGE KM 12+951) OF NH-95(SECTION PASSING TH
|
399 | CONSTRUCTION OF PAVED SHOULDERS IN KM.81/0 TO 203/0 INCLUDING RECONSTRUCTION AND WIDENING OF CULVERTS ON NH 234
|
400 | CONSTRUCTION OF PAVED SHOULDERS INCULDING STRENGTHENING OF EXISTING CARRIAGEWAY FROM KM 0-0-51-0 I-E FOUR LANING FROM KM 34-0 TO 39-0 IN NEYVELI TOWN LIMIT
|
401 | CONSTRUCTION OF ROAD APPROACHES TO RAIL-CUM-ROAD BRIDGE ACROSS RIVER GANGA AT MUNGER GHAT NEAR MUNGER SECTION OF NH-333B IN THE STATE OF BIHAR ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC)MODE
|
402 | CONSTRUCTION OF ROAD FROM KM. 1 TO KM. 49/4 OF NH-26A IN THE STATE OF MADHYA PRADESH.
|
403 | CONSTRUCTION OF ROB AND ITS APPROACHES IN LIEU OF UNMANNED LEVEL CROSSING AT KM 303.9 ON NH-60 (PANDABESHWAR).
|
404 | CONSTRUCTION OF ROB –FLYOVER AT RANICHAK, HALDIA
|
405 | CONSTRUCTION OF SIGNATURE BRIDGE BETWEEN DWARKA AND BEY DWARKA AND ITS APPROACHES IN THE STATE OF GUJARAT
|
406 | CONSTRUCTION OF SILCHAR BYPASS ON NH-53 IN ASSAM
|
407 | CONSTRUCTION OF TWINS 2-LANE ROB AND ITS APPROACHES IN REPLACEMENT OF EXISTING LEVEL CROSSING GATE NO. -KA-34 (RLY KM 160/25-160/27) BETWEEN MINDAPORE BANKURA STATIONS IN KUBAI AT KM 154.617 OF NH-6
|
408 | CONSTRUCTION OF TWO LANE FLEXIBLE PAVEMENT WITH PAVED SHOULDER FROM KM 3.650 TO KM 58.325 OF NH-709 EXTN. (RAJGARH-HARIYANA BORDER) IN THE STATE OF RAJASTHAN THROUGH EPC UNDER NH(O) DURING 2017-18.
|
409 | CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF CHAKABAMA-ZUNHEBOTO ROAD FROM EXISTING KM 00.000 TO KM 25.760 [DESIGN KM. 00.000 TO KM. 25.000] (DESIGN LENGTH - 25.00 KM) IN THE STATE OF NAGALAND UNDE
|
410 | CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF CHAKABAMA-ZUNHEBOTO ROAD FROM EXISTING KM 79.040 TO KM 100.345 [DESIGN KM. 75.000 TO KM. 95.000] (DESIGN LENGTH - 20.00 KM) IN THE STATE OF NAGALAND UND
|
411 | CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF CHAKABAMA-ZUNHEBOTO ROAD FROM EXISTING KM100.345 TO KM 122.250 [DESIGN KM. 95.000 TO KM. 115.534] (DESIGN LENGTH - 20.534 KM) IN THE STATE OF NAGALAND U
|
412 | CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD FROM EXISTING KM 00.000 TO KM 20.456 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH - 20.00 KM) IN THE STATE OF NAGALAND UND
|
413 | CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD FROM EXISTING KM 41.065 TO KM 60.345 [DESIGN KM. 40.000 TO KM. 59.000] (DESIGN LENGTH - 19.00 KM) IN THE STATE OF NAGALAND UND
|
414 | CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF PFUTSERO-PHEK ROAD FROM EXISTING KM 19.900 TO KM40.090 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH - 20.00 KM) IN THE STATE OF NAGALAND UNDER SARDP
|
415 | CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF SELLING-DULTE SECTION OF NH-06 (PKG-II)
|
416 | CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF SELLING-DULTE SECTION OF NH-06 (PKG-IV)
|
417 | CONSTRUCTION OF TWO LANE WITH PAVED SHOULDERS OF JORAM KOLORIANG ROAD (NH 713) ON EPC BASIS FROM EXISTING KM 88.700 TO KM 104.850 [DESIGN KM. 77.363 TO KM. 92.363] (DESIGN LENGTH 15 KM) IN THE STATE O
|
418 | CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD FROM EXISTING KM 00.000 TO KM19.900 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH - 20.00 KM)
|
419 | CONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS WITH FLEXIBLE PAVEMENT ON KHALGHAT TO SARWARDEWLA ROAD (NH-347C) DESIGN LENGTH- 79.59 KM (EXCLUDING KASRAWAD, SELANI, KHARGONE & BISTAN BYPASSES) IN T
|
420 | CONSTRUCTION, OPERATION AND MAINTENANCE OF Z-MORH TUNNEL INCLUDING APPROACHES ON NH-01 SRINAGAR-SONAMARG SECTION CONNECTING NH-01 IN THE UT OF J&K ON DESIGN, BUILD, FINANCE, OPERATE & TRANSFER (DBFOT)
|
421 | CONSTRUCTION/ UP-GRADATION OF 2LANE WITH PAVED SHOULDER OF NH FROM RAISINGHNAGAR-POOGAL (DESIGN CH. 101.000 TO DESIGN CH. 263.460) SECTION (LENGTH-162.460 KM) UNDER PHASE-I OF BHARATMALA PARIYOJANA ON
|
422 | CONSTUCTION/UPGRADATION OF EXISTING HIGHWAY TO 2 LANE WITH PAVED SHOULDER FROM KM 26.10 TO KM 40.00 NH-717A BAGRAKOT-KAFER IV D.
|
423 | CRUDE AND POL FOR MRPL
|
424 | CUDDAPAH-MYDUKUR-KURNOOL KM-167.750-356.502 KM
|
425 | D'KUNI-L'GHAT GQ
|
426 | D'ON-SON-AU'BAD GQ
|
427 | D'PUR-UP BDR:LMNHP9:NH28
|
428 | D'VARAM-R'MUNDRY
|
429 | D'VARAM-R'MUNDRY
|
430 | DABOKA KATHKATI PACKAGE-2
|
431 | DABOKA KATHKATI PACKAGE-4
|
432 | DAKOBA TO NAGAON (NH-36)(NHAI)
|
433 | DARBHANGA-MUZAFFARPUR(KM 30 TO KM 0), NH-57 (NHAI)
|
434 | DARBHANGA-MUZAFFARPUR, NH-57 (NHAI)
|
435 | DASTAPUR TO KARANJA
|
436 | DEESA TO RADHANPUR (PACK.-VI) PHASE-II, KM.372.60-458, NH-14
|
437 | DEHRI-ON-SONE-AURANGABAD (GQ) KM.140-KM.180 (NH-2)
|
438 | DEHRION-SONE-AURANGABAD
|
439 | DELHI AGRA APPROVED LENGTH 180.0 KM
|
440 | DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 29
|
441 | DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-VI) FROM JUNCTION WITH PATIALA-SAMANA-PATRAN ROAD (SH-10) NEAR GHAGGA VILLAGE TO JUNCTION WITH PATIALA-BATHINDA ROAD (NH-7) NEAR BHAWANIGARH (KM 157+250 TO
|
442 | DELHI-GURGAON SECTION (OTHERS) KM.143-KM.42 (NH-8)
|
443 | DELHI-MEERUT EXPRESSWAY PKG-I KM 0 TO 8.360 KM
|
444 | DELHI-MEERUT EXPRESSWAY PKG-III 6 LANNING FROM KM 27.740 TO 49.346 KM
|
445 | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-08) (CH. 214.260 - CH. 247.31) [START OF ROB NEAR JUNCTION WITH NH-11A TO JUNCTION WITH MDR-1 (BAONLI-JHALAI ROAD)]
|
446 | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-11) (CH. 319.400 TO CH. 331.030) [HARDEOGANJ VILLAGE NEAR INDERGARH TO MAJOR BRIDGE ON MEJ RIVER]
|
447 | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-12) (CH. 331.030 TO CH. 359.170) [MAJOR BRIDGE ON MEJ RIVER TO JUNCTION WITH SH-37A]
|
448 | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-13) (CH. 359.170 TO CH. 388.420) [JUNCTION WITH SH-37A TO JUNCTION WITH NH- 76]
|
449 | DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-16) (CH. 427.300 TO CH.452.420) [MAJOR BRIDGE OVER TAKLI RIVER NEAR NAYAGAON JAGEER VILLAGE TO RAJASTHAN/MP BORDER]
|
450 | DELI-G'GAON-OTHER
|
451 | DEMBUEN - BRUNI
|
452 | DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-3)
|
453 | DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-4)
|
454 | DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-5)
|
455 | DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-8)
|
456 | DEOLI KOTA
|
457 | DEORI TO AMGAON
|
458 | DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM DASNA TO MEERUT FROM 27.740 OF NH-24 TO KM 51.975 OF NH-58 (DESIGN CHAINAGE 28.000 TO 59.777) IN THE STATE OF UTTAR PRADESH ON EPC BASIS
|
459 | DEULGAON SAKARSHA TO MEHKAR
|
460 | DEVELOPMENT AND OPERATION OF BIKANER- SURATGARH SECTION OF NH-15 BY 2L+PS IN THE STATE OF RAJASTHAN THROUGH PUBLIC PRIVATE PARTNERSHIP ON "DBFOT" BASIS.(DIV-BIKANER)
|
461 | DEVELOPMENT OF 4-LANING SECTION OF NH-31 FROM KM 551.36 (GHOSHPUKUR) TO KM 563.26 (BIHAR MORE, BAGDOGRA) IN DARJEELING DISTRICT, WEST BENGAL ON EPC MODE. (PROJECT LENGTH - 11.90 KM) UNDER ANNUAL PLAN
|
462 | DEVELOPMENT OF 4L UER II [PACKAGE - V] (SPUR TO BAHADURGARH BYPASS) (NH-10) FROM KM. 0.00 TO KM.7.30
|
463 | DEVELOPMENT OF 6L UER II [PACKAGE - III] (NANGLOI - NAJAFGARH ROAD TILL SECTOR 24 DWARKA) FROM KM. 28.45 TO KM. 38.111
|
464 | DEVELOPMENT OF ADIQUATE ROAD CONNECTIVITY TO CHENNAI- ENNORE PORT CONNECTIVITY
|
465 | DEVELOPMENT OF CHILODA GANDHINAGAR SARKHEJ OF NH 147 OLD NH 8C FROM KM 0/0 TO KM 44/042 IN THE STATE OF GUJARAT TO SIX LANE WITH PAVE SHOULDER WITH BOTH SIDE CONTINUOUS SEVICE ROAD
|
466 | DEVELOPMENT OF DELHI MEERUT EXPRESSWAY FROM KM.0.000 TO KM 27.500 INCLUDING 6/8 LANNING OF NH-24 FROM KM.0.000 TO KM 49.923(HAPUR BYPASS) IN THE STATE OF DELHI AND UTTAR PRADESH UNDER (DESIGN LENGTH-4
|
467 | DEVELOPMENT OF MULTILANE CARRIAGEWAY FROM KANHAN TO AUTOMATIVE SQUARE (KM 704.200 TO KM 723.000)
|
468 | DEVELOPMENT OF SIX LANE EASTERN PERIPHERAL EXPRESSWAY ( PKG-I)
|
469 | DEVELOPMENT OF SIX LANE EASTERN PERIPHERAL EXPRESSWAY ( PKG-I)_NEW
|
470 | DEVELOPMENT OF SIX LANE EASTERN PERIPHERAL EXPRESSWAY ( PKG-II)
|
471 | DEVELOPMENT OF SIX LANE EASTERN PERIPHERAL EXPRESSWAY ( PKG-III)
|
472 | DEVELOPMENT OF SIX LANE EASTERN PERIPHERAL EXPRESSWAY ( PKG-IV)
|
473 | DEVELOPMENT OF SIX LANE EASTERN PERIPHERAL EXPRESSWAY ( PKG-V)
|
474 | DEVELOPMENT OF SIX LANE EASTERN PERIPHERAL EXPRESSWAY ( PKG-VI)
|
475 | DEVELOPMENT TO FOUR LANE WITH PAVED SHOULDERS OF SHAHKOT-MOGA SECTION OF NH-71 (NEW NH-52) FROM EXISTING KM.44.600 TO 77.200 INLUDING CONST.OF DHARAMKOT BYPASS IN THE STATE OF PUNJAB.
|
476 | DEVELOPMENT TO FOUR LANE WITH PAVED SHOULDERS OF TALLEWAL-BARNALA SECTION OF NH-71 FROM EXISTING KM 114.000 OF NH-71 TO KM 136.070 (INCLUDING CONSTRUTION OF BARNAL BYPASS)
|
477 | DEVIHALLI-HASSAN
|
478 | DHAD BHOKARDAN TO BHOKARDHAN SILLOD
|
479 | DHANGAON - BORGAON SECTION (KM 81.000 TO KM 139.000) [INDORE - EDLABAD PKG IV]
|
480 | DHANGIPIMPRI TO JALNA AND AMBAD CHOWK TO MANTH CHOWK
|
481 | DHANKUNI-KOLAGHAT (GQ) KM.17.6-KM.72 (NH-6)
|
482 | DHARAMTUL TO SONAPUR (AS-19)
|
483 | DHARAMTUL TO SONAPUR,KM 205-183 (AS-20)
|
484 | DHARMAVARAM-RAJAMUNDRY (GQ) KM.253-KM.200 (NH-5)
|
485 | DHOLPUR - MORENA SECTION (INCLUDING CHAMBOL BRIDGE) NH-3
|
486 | DHULE(NH-3)-PIMPALGAON
|
487 | DHULE-PIMPALGAON, NH-3, KM.380 TOKM. 265
|
488 | DIBRUGARH-LAHOAL-CHABUA BYPASS PACKAGE-1
|
489 | DIBRUGARH-LAHOAL-CHABUA BYPASS PACKAGE-2
|
490 | DONIPAWA TO ASHAJIPORA BYPASS PKG-7
|
491 | DULTE- KWALKULH - CHAMPAI PKG.1
|
492 | DULTE- KWALKULH - CHAMPAI PKG.3
|
493 | DWARKA EXPRESSWAY PKG-III (DELHI/HR BORDER TO START OF ROB GURUGRAM)
|
494 | ELEVATED HIGHWAY FROM SILK BOARD JUNCTION TO ELECTRONIC CITY JUNCTION
|
495 | END OF DURG BYPASS-CHHATISGARH/MAHARASHTRA BORDER
|
496 | ENGINEERING, PROCUREMENT, AND CONSTRUCTION OF REHABILITATION AND UPGRADING TO 2-LANES/2 -LANE WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING (KM 0 TO KM 69.6) OF NH-30A
|
497 | ETAWA-R'PUR GQ
|
498 | ETAWAH CHAKERI
|
499 | ETAWAH-RAJPUR (GQ) KM.321.1-KM.393 (NH-2)
|
500 | F'PUR-KHAGA GQ
|
501 | FARDAPUR TO JALGAON
|
502 | FARUKHANAGAR TO KOTAKOTTA,KM 80.05-135.47 (NH-7)(NHAI)
|
503 | FARUKHANAGAR TO KOTTAKATA (NH-7)
|
504 | FATEHPUR-KHAGA (GQ) KM.38-KM.115 (NH-2)
|
505 | FOR REHABILITATION AND UPGRADATION FROM 2-LANE TO 4-LANE OF VARANASI - DEGAMAPUR (PKG-1) UNDER NHDP - IV IN THE STATE OF UTTAR PRADESH
|
506 | FORBESGANJ TO SIMRAHI (NH-57)(NHAI)
|
507 | FORMATION OF BYPASS ROAD TO KADIRI TOWN FROM ON NH42
|
508 | FOUR / SIX LANING OF RAIPUR - SIMGA ( PKG-1)
|
509 | FOUR LANING FROM GOHPUR TO HOLONGI SECTION FROM KM 264.10 OF NH 52 TO KM 20.37 OF NH 52A
|
510 | FOUR LANING FROM MPMAHARASHTRA BORDER TO NAGPUR IC KAMPTEE KANOON AND NAGPUR BYPASS
|
511 | FOUR LANING OF 5.122 KM OF NH9(NEW NH 65) FROM KM 269.900(DESIGN CH0.0) TO KM 275/622(DESIGN CH 5.122) I.E, CONNECTING NH9(1.40KM) WITH NH5(3.60KM) INCLUDING 6 LANE ELIVATED FLYOVER FROM BHAVANIPURAM
|
512 | FOUR LANING OF AKKALKOT-SOLAPUR SECTION OF NH-150E WITH PAVED SHOULDER FROM DESIGN CHAINAGE KM. 99.400 TO KM. 138.352/EXISTING CHAINAGE FROM KM. 102.819 TO KM. 141.800 (DESIGN LENGTH 38.952 KM.) INCLU
|
513 | FOUR LANING OF ALIGARH - KANPUR SECTION PKG-I FROM ALIGARH - BHADWAS
|
514 | FOUR LANING OF ALIGARH - KANPUR SECTION PKG-II FROM BHADWAS - KALYANPUR.
|
515 | FOUR LANING OF AURANGABAD - YEDISHI
|
516 | FOUR LANING OF BAL. WORKS OF BARASAT-KRISHNAGAR FROM KM.48.553 TO KM.115.272
|
517 | FOUR LANING OF BALACHERA-HARANGAJAO SECTION OF NH-54 (EXT) FROM KM 275.00 TO KM 244.000 IN THE STATE OF ASSAM ON EPC MODE
|
518 | FOUR LANING OF BANAVARA TO BETTADAHALLI SECTION FROM KM. 119+790 (DESIGN KM. 121+900) TO KM. 166+100 (DESIGN KM. 170+415) OF NH-206 ON HAM UNDER BHARATHMALA PARIYOJANA, IN THE STATE OF KARNATAKA. (PAC
|
519 | FOUR LANING OF BARHI - KODERMA SECTION OF NH - 31
|
520 | FOUR LANING OF BARHI-HAZARIBAGH NH-33
|
521 | FOUR LANING OF BHAVNAGAR-TALAJA SECTION OF NH-8E FROM KM. 7.090 TO KM. 53.585 (DESIGN CH FROM KM. 6.945 TO KM. 54.990) (PACKAGE –I) IN THE STATE OF GUJARAT
|
522 | FOUR LANING OF BHOJPUR TO BUXAR
|
523 | FOUR LANING OF BIAORA –DEWAS SECTION OF NH-3 FROM KM 426.100 TO KM 566.450 IN THE STATE OF MADHYA PRADESH UNDER NHDP PHASE IV ON DBFOT BASIS.
|
524 | FOUR LANING OF CHANDIGARH - KHARAR
|
525 | FOUR LANING OF DANGIAWAS (KM 96.595 TO NH-112) TO JAJIWAL (KM 283.500 OF NH 65 NAGAUR ROAD) SECTION – PACKAGE-I (DESIGN LENGTH 74.619 KM) OF JODHPUR
|
526 | FOUR LANING OF DELINKED STRETCH OF SEONI – MP/MH BORDER OF NH-7 (LENGTH 28.70 KM) FROM KM 624.480 TO KM 653.225 UNDER NHDP PHASE-II ON EPC MODE IN THE STATE OF MADHYA PRADESH
|
527 | FOUR LANING OF DIMAPUR KOHIMA ROAD FROM DESIGN KM 138.775 TO KM 152.490 (EXISTING KM 140.000 TO KM 156.000) EXCLUDING DIMAPUR AND KOHIMA BYPASS IN THE STATE OF NAGALAND
|
528 | FOUR LANING OF EXISTING 2 LANE SECTION FROM MALOUT (DESIGN KM 44.500, EXISTING KM 80.200 OF NH-07) VIA ABOHAR (DESIGN KM 76.500, EXISTING KM 48.200 OF NH-07) TO SADHUWALI (DESIGN KM 33.000, EXISTING K
|
529 | FOUR LANING OF EXISTING TWO LANE WITH PS FROM TALWANDI BHAI TO FEROZPUR IN THE STATE OF PUNJAB
|
530 | FOUR LANING OF FORBESGANJ - JOGBANI
|
531 | FOUR LANING OF GHAGHRA BRIDGE TO VARANASI (PKG-II)
|
532 | FOUR LANING OF GHAGHRA BRIDGE TO VARANASI (PKG-III)
|
533 | FOUR LANING OF GUNA TO BIAORA SECTION OF NH-3 FROM KM 332.100 TO KM. 426.100 IN THE STATE OF MADHYA PRADESH UNDER NHDP PHASE IV ON BOT (TOLL) ON DBFOT PATTERN
|
534 | FOUR LANING OF GUNDUGOLANU-DEVARAPALLI-KOVVURU SECTION OF NH-16 FROM KM 15.320 (EXISTING KM 15.700) TO KM 85.204 (EXISTING KM 81.400) (DESIGN LENGTH=69.884 KM)
|
535 | FOUR LANING OF GWALIOR-SHIVPURI
|
536 | FOUR LANING OF HISAR - DABWALI SECTION WITH PS - PACKAGE -2
|
537 | FOUR LANING OF HISAR - DABWALI SECTION WITH PS - PACKAGE -I
|
538 | FOUR LANING OF HOSPET - CHITRADURGA
|
539 | FOUR LANING OF ITANAGAR - HOLONGI SECTION OF NH-52A (19.26 KM) IN ARUNACHAL PRADESH UNDER PHASE 'A' OF SARDP-NE
|
540 | FOUR LANING OF JABALPUR - LAKHNADON
|
541 | FOUR LANING OF JIND GOHANA GREENFIELD ALIGNMENT PACKAGE 1 IN THE STATE OF HARYANA UNDER HYBRID ANNUITY MODE
|
542 | FOUR LANING OF KAITHAL - RAJASTHAN BORDER
|
543 | FOUR LANING OF KALAGAM TO KARUPPUR FROM KM.38+700 TO KM. 50+382 AND TWO LANING WITH PAVED SHOULDERS FROM KARUPPUR TO MEENSURUTTI FROM KM. 50+382 TO KM. 98+433 OF NH-277 UNDER BHARATMAL PARIYOJANA (RES
|
544 | FOUR LANING OF KARADI TO BANAVARA SECTION FROM KM. 66+540 (DESIGN KM. 65+195) TO KM. 119+790 (DESIGN KM. 121+900) OF NH-206 ON HAM UNDER BHARATHMALA PARIYOJANA, IN THE STATE OF KARNATAKA. (PACKAGE II)
|
545 | FOUR LANING OF KHARAR - KURALI SECTION OF NH-21
|
546 | FOUR LANING OF KOILWAR TO BHOJPUR
|
547 | FOUR LANING OF MADURAI - RAMANATHAPURAM (KM 5. TO KM 81) AND TWO LANING WITH PS KM 81 TO KM 120
|
548 | FOUR LANING OF MADURAI- CHETTIKULAM SECTION OF NH-785 FROM MADURAI (KM 0/000) TO CHETTICULAM (7/300)
|
549 | FOUR LANING OF NH 161 FROM KANDI (DESIGN KM 0.000) (KM 498.250 OF NH 65) TO RAMSANPALLE (DESIGN KM 39.980 EXISTING KM 44.757) (DESIGN LENGTH 39.980 KM)
|
550 | FOUR LANING OF NH 161 FROM MANGLOOR (DESIGN KM 135.751 EXISTING KM 140.873) (DESIGN LENGTH 48.963 KM)
|
551 | FOUR LANING OF NH 161 FROM RAMSANPALLE (DESIGN KM 39.980 EXISTING KM 44.757) TO MANGLOOR (DESIGN KM 86.788 EXISTING KM 91.350) (DESIGN LENGTH 46.808 KM)
|
552 | FOUR LANING OF NH-363 FROM REPALLEWADA (DESIGN KM 40.000/EXISTING KM 288.510) TO TELANGANA/MAHARASHTRA BORDER (DESIGN KM 94.602/EXISTING KM 342.000) (DESIGN LENGTH=52.602 KM)
|
553 | FOUR LANING OF NH-52 FROM END OF BISWANATH CHARIALI BY-PASS (KM 208.00) TO GOHPUR (KM 265.50) (TOTAL LENGTH =57.50 KM) IN THE STATE OF ASSAM ON EPC BASIS UNDER SARDP-NE
|
554 | FOUR LANING OF NUMALIGARH TO JORHAT SECTION FROM KM. 402.500 TO KM. 453.000 (DESIGN KM 403.200 TO KM 454.240) EXCEPT DERGAON BYPASS (WITH TOLL PLAZA)
|
555 | FOUR LANING OF ORISSA/CHATTISGARH BORDER - AURANG SECTION
|
556 | FOUR LANING OF PARWANOO -SOLAN
|
557 | FOUR LANING OF POONDIYANKUPPAM (KM.67/000) TO SATTANATHAPOURAM (KM.123/800) SECTION OF NH-45A ON HAM UNDER BHARATMALA PARIYOJANA PHASE-I (RESIDUAL WORKS UNDER NHDP) IN THE STATE OF TAMIL NADU
|
558 | FOUR LANING OF REWA - KATNI - JABALPUR - PACKAGE -I
|
559 | FOUR LANING OF REWA - KATNI - JABALPUR - PACKAGE -II
|
560 | FOUR LANING OF REWA - KATNI - JABALPUR - PACKAGE -IV
|
561 | FOUR LANING OF SANGLI - SOLAPUR (PKG I) [SANGLI - BORGAON KM 182.556 - KM 224.00]
|
562 | FOUR LANING OF SANGLI - SOLAPUR (PKG II) [BOREGAON-WATAMBARE] FROM KM. 224.00 TO KM. 276.00
|
563 | FOUR LANING OF SANGLI - SOLAPUR (PKG III) [WATAMBARE-MANGALWEDHA] FROM KM 276.0 - KM 321.60
|
564 | FOUR LANING OF SANGLI - SOLAPUR (PKG IV) [MANGALWEDHA-SOLAPUR] FROM KM 321.6 - KM 378.10
|
565 | FOUR LANING OF SARAGAON - BILASPUR
|
566 | FOUR LANING OF SHIVPURI - GUNA PACKAGE - I
|
567 | FOUR LANING OF SIMGA - SARAGAON
|
568 | FOUR LANING OF SULTANPUR TO VARANASI (PKG-I)
|
569 | FOUR LANING OF SULTANPUR TO VARANASI (PKG-II)
|
570 | FOUR LANING OF TRICHY TO KALLAGAM SECTION ON NH-227 IN THE STATE OF TAMIL NADU
|
571 | FOUR LANING OF UNA TO KODINAR OF NH-8E FROM KM. 180.478 TO KM 221.610 (PACKAGE-V) IN THE STATE OF GUJARAT
|
572 | FOUR LANING OF VARANASI BYPASS
|
573 | FOUR LANING OF VILUPPURAM TO PUDHUCHERRY (DESIGN CH. KM. 00/000 TO KM. 29/000) SECTION OF NH-45A ON HAM UNDER BHARATMALA PARIYOJANA PHASE -1 (RESIDUAL WORKS UNDER NHDP) OF TAMIL NADU
|
574 | FOUR LANING OF YADGIRI - WARANGAL
|
575 | FOUR LANING WIDENING AND STRENGTHENING OF NH-29E FROM KM 81.420 TO 99.00 SONAULI - GORAKHPUR ROAD (JANGAL KAUDIYA TO MOHADDIPUR SECTION).)
|
576 | FOUR LANING WITH PS TALEBANI -SMBALPUR
|
577 | FOUR LANNING BALANCE WORK FOR BHOPAL-BIAORA SECTION OF NH-12 FROM MUBARAKPUR TO BIAORA FROM KM 124.00 TO 423.400 (PKG-2)
|
578 | FOUR LANNING FROM MP/MAHARASHTRA BORDER TO NAGPUR, NAGPUR BYPASS
|
579 | FOUR LANNING OF AP/TN BORDER TO NALAGAMPALLI VILLAGE(KM 133.360 TO 172.00) OF NH-4 (NEW NH-40)
|
580 | FOUR LANNING OF BAR-BILARA-JODHPUR SECTION OF NH-112 (EXISTING KM 0+000TO KM
|
581 | FOUR LANNING OF CHICHRA-KHARAGPUR SECTION OF NH-6 FROM KM 185.150 TO KM 134.400 INCLUDING REHABILITATION OF EXISTING FOUR-LANE FROM KM 134.400 TO KM 129.600 IN THE STATE OF WEST BENGAL UNDER NHDP PHAS
|
582 | FOUR LANNING OF DARAH JHALWAR TEENDHAR FROM KM 29.000 TO KM 346.540
|
583 | FOUR LANNING OF HUBLI-HOSPET SECTION OF NH-63 FROM KM. 129.249 PHASE-IVB
|
584 | FOUR LANNING OF JAGDISHPUR-FAIZABAD SECTION FROM KM 47.930 TO KM 107.680 OF NH-330A
|
585 | FOUR LANNING OF JHANSI-KHAJURAHO SECTION(PKG-I) FROM KM 0.00 TO KM 76.3(EXISTING KM 106.300 OF NH-25 KANPUR –JHANSI SECTION TO KM 82.10) OF NH-75/76 IN THE STATE OF UP/MP UNDER NHDP PHASE-III ON HYBR
|
586 | FOUR LANNING OF JHANSI-KHAJURAHO SECTION(PKG-II) OF NH-75/76 FROM DESIGN CHAINAGE KM 76.3(EXISTING CHAINAGE 82.100)NEAR VILLAGE CHHATIPAHARI TO DESIGN CHAINAGE KM 161.7(EXISTING CHAINAGE KM. 57.9)NEAR
|
587 | FOUR LANNING OF LUDHIYANA- TALWANDI SECTION
|
588 | FOUR LANNING OF NH-4A(NH-748) FROM KM 118 TO 125 INCL.FOUR LANE KHNDEAPAR BRIDGE
|
589 | FOUR LANNING OF NH-9 FROM VIJAYWADA-MACHLIPATNAM (KM 0.000 TO 63.800)
|
590 | FOUR LANNING OF RAMPUR- KATHGODAM SECTION OF NH-87 FROM KM 0.000 (KM. 190.000 OF NH-24) TO KM 42.791 (DESIGN CHAINAGE 43.446) PKG-1
|
591 | FOUR LANNING OF RAMPUR- KATHGODAM SECTION OF NH-87 FROM KM 42.791 (DESIGN CHAINAGE 43.446) TO KM 88.000 (DESIGN CHAINGAGE KM 93.226)PKG-2
|
592 | FOUR LANNING OF TAKOLI-KULLU SECTION OF NH-21 (KM 242+000 TO KM 272+000)
|
593 | FOUR LANNING OF TULJAPUR-AUSA SECTION
|
594 | FOUR LANNING OF WALAYAR-VADAKKANCHERRY SECTION
|
595 | FOUR LANNING WORK FROM HIRAN RIVER TO SINDOOR RIVER
|
596 | FUNDED ) 2 LANING FROM CHANGLANG DISTRICT BOUNDARY -KHONSA (42.844KM) SECTION OF NH-52B IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE
|
597 | G'HAR-B'ADDA GQ
|
598 | G'PUR-AYODYA:LMNHP4:NH28
|
599 | G'PUR-AYODYA:LMNHP5:NH28
|
600 | G'PUR-AYODYA:LMNHP6:NH28
|
601 | G'PURA-BH'WARA GQ
|
602 | G'PURA-BH'WARA GQ
|
603 | G'TAMI-G'GOLANU GQ
|
604 | G'TAMI-G'GOLANU GQ
|
605 | GADCHIROLI TO MUL
|
606 | GAGODHAR TO GARAMORE-IV
|
607 | GAGODHAR-GARAMORE(PK-IV,NH15) KM 245 TO 281.3 AND 308 TO 254
|
608 | GANGA BRG.- RAMADEVI CR.
|
609 | GANGA BRIDGE TO RAMDEVI CROSSING PH.II NH-25, KM.75-80.06
|
610 | GANJAM-I'PURAM GQ
|
611 | GANJAM-I'PURAM GQ
|
612 | GANJAM-ICCHAPURAM (GQ) KM.284-KM.223 (NH-5)
|
613 | GANJAM-ICCHAPURUM,NH-5(NHAI)
|
614 | GARAMORE TO BAMANBORE (PACK.-III) PH.-II, KM.254-KM.182.60
|
615 | GARHMUKTESHWAR-MURADABAD (NHAI) OTHERS KM.93-149.25, NH-24
|
616 | GHAZIABAD-ALIGARH NH-91
|
617 | GOGUDA-U'PUR(RJ36),NH-76
|
618 | GOGUNDA TO UDAIPUR (RJ-3) NH.76 KM.104 TO KM.73
|
619 | GOHARGANJ TO BHOPAL SECTION OF NH-12 IN MADHYA PRADESH KM 43 TO 93
|
620 | GONDE-VADAPE(THANE), NH-3, KM.440/000 TO KM.539/500
|
621 | GONDE-VADAPE(THANE),NH-3
|
622 | GORAKHPUR BYPASS, NH-28, PHASE-II EAST-WEST CORRIDOR
|
623 | GORAKHPUR-AYODHYA (LMNHP-4),NH-28, KM.164.00 TO KM.135.00
|
624 | GORAKHPUR-AYODHYA (LMNHP-5),NH-28, KM.208.00 TO KM.164.00
|
625 | GORAKHPUR-AYODHYA (LMNHP-6),NH-28, KM.251.70 TO KM.208.00
|
626 | GORHAR-BARWA ADDA (GQ) KM.320-KM.398.75 (NH-2)
|
627 | GOWTHAMI-GUNDUGOLANU (GQ) KM.164.5-KM.80 (NH-5)
|
628 | GUJARAT/MAHARASHTRA BORDERSURAT-HAZIRA PORT SECTION
|
629 | GULABPURA-BHILWARA BYPASS (GQ) KM.70-KM.120 (NH-79)
|
630 | GURGAON - KOTPUTLI - JAIPUR (SIX LANE)
|
631 | GURGAON-KOTPUTLI KM 42.70 TO 54.4 KM
|
632 | GUWAHATI TO NALBARI (AS-5)
|
633 | GUWHATI TO NALBARI (AS-4)
|
634 | GWALIOR BYPSS, NH-75,3
|
635 | GWALIOR-JHANSI, NH-75
|
636 | H'HAR-CHI'DURGA GQ
|
637 | HALDIA PORT (PORT CONNECTIVITY) (NH-41)
|
638 | HALDIAPORT-P.CONNECT
|
639 | HANDIA-VARANASI (GQ) KM.245-KM.317 (NH-2)
|
640 | HANDIA-VARANAST GQ
|
641 | HAPUR-GARHMUKTESWAR (OTHERS) KM.58-93, NH-24
|
642 | HARANGAJO - MAIBANG:AS23
|
643 | HARANGAJO TO MAIBANG (AS-23), KM.126.450 TO KM.140.700
|
644 | HARIHAR-CHITRADURGA (GQ) KM.284-KM.207 (NH-4)
|
645 | HAVERI- HARIHAR (GQ)
|
646 | HAVERI-HARIHAR (GQ) KM.340-KM.284 (NH-4)
|
647 | HAZARIBAGH-RANCHI
|
648 | HELWAK TO KARAD
|
649 | HI'NGR-CHILODA GQ
|
650 | HIMATNAGAR- CHILODA (GQ)
|
651 | HIMATNAGAR-CHILODA (GQ) KM.443-KM.495 (NH-8)
|
652 | HIMAYATNAGAR TO PHULSAWANGI
|
653 | HOSUR-K'GIRI GQ
|
654 | HOSUR-K'GIRI GQ
|
655 | HOSUR-KRISHNAGIRI (GQ) KM.48.6-KM.94.0 (NH-7)
|
656 | HUBLI-HAVERI (GQ) KM.404-KM.340 (NH-4)\
|
657 | HUBLI-HAVERI GQ
|
658 | HUNGUND-SURATHKAL AND MANGALORE-KNT/KERALA BORDER
|
659 | HYD-B'LORE-NS
|
660 | HYDERABAD BANGALORE SECTION(NH-7)(NHAI)
|
661 | HYDERABAD-BANGALORE SEC.(NS CORR.PH-II)[KM 211-251]
|
662 | HYDERABAD-BANGALORE SEC.(NS CORR.PH-II)[KM 251-293.4],N
|
663 | HYDERABAD-BANGALORE SEC.(NS CORR.PH-II)[KM 293.4-336]
|
664 | HYDERABAD-BANGALORE SEC.(NS CORR.PH-II)[KM 336-376]
|
665 | HYDERABAD-BANGALORE SEC.(NS CORR.PH-II)[KM 376-418]
|
666 | HYDERABAD-BANGALORE SEC.(NS CORR.PH-II)[KM 418-463.16]
|
667 | HYDERABAD-VIJAYWADA KM. 40 TO 221.50 KM
|
668 | HYDERABAD-YADGIRI N.H NO-202
|
669 | IMP. OF NH-8 IN HARYANA AND RAJASTHAN (NHAI)
|
670 | IMPHAL – MOREH (PACKAGE 4)
|
671 | IMPHAL – MOREH PACKAGE- 3
|
672 | IMPROVEMENT AND UP-GRADATION OF EXISITING CARRIAGEWAY TO TWO LANE WITH PAVED SHOULDER FROM KM 0.00 TO KM 55.00 OF NH-227A
|
673 | IMPROVEMENT AND UP-GRADATION OF EXISTING ROAD TO 4L PS FROM KM 175.080 TO 229.070, FROM END OF HARDOI BYPASS TO END OF HARDOI DISTRICT OF NH 731 (PKG-3)
|
674 | IMPROVEMENT FROM KM 0 TO KM 68.0 (KANAKTORA TO JHARSUGUDA SECTION) TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDERS INCLUDING BY PASS AT BELPAHAR AT KM 52 OF NH 200 (NEW NH 49 FROM KM 197.300 TO KM 265.300
|
675 | IMPROVEMENT FROM KM 0/0 TO 68/0
|
676 | IMPROVEMENT OF ACCESS OF GQ WITHIN CHENNAI CITY(NHAI) OTHERS
|
677 | IMPROVEMENT OF AMRITSAR BYPASS BY CONSTRUCTION OF ADDITIONAL STRUCTURE AND SERVICE ROADS ON NH-1
|
678 | IMPROVEMENT OF CITY PORTION OF KOHIMA AND DIMAPUR CITY OF NH-39 IN THE STATE OF NAGALAND UNDER EPC MODE DURING 2016-17 ( PACKAGAE -I DIMAPUR CITY FROM KM 106.90 TO 124.20)
|
679 | IMPROVEMENT OF JUNCTION AT DHAULA KUAN ON NH-8
|
680 | IMPROVEMENT/ WIDENING TO TWO LANING WITH PAVED SHOULDER OF UDAIPUR-SABROOM SECTION FROM KM 55.00 TO KM 128.712 OF NH-44 IN THE STATE OF TRIPURA UNDER SARDP-NE PHASE ‘A’
|
681 | IMPROVEMENT/WIDENING TO 2 LANING OF STRETCH FROM KHONGSANG TO TAMENGLONG OF NH-137
|
682 | IMPROVEMENT/WIDENING TO 2-LANE WITH EARTHEN SHOULDERS FROM RANIKOR TO NONGJRI EXISTING CHAINAGE FROM 0+000 TO 31+700 (DESIGN LENGTH-33.250 KM)
|
683 | INDAPAUR TO AGARDANDA
|
684 | INDO-NEPAL BORDER TO RUDHAULI SECTION OF NH-233 IN UTTAR PRADESH KM 0/0 TO 65/870
|
685 | INDORE-DEWAS(NH-3)
|
686 | INDORE-JHABUA-GUJRAT/MP
|
687 | INDORE-KALAGHAT
|
688 | INTEGRATED STRUCTURE WITH DEVELOPMENT OF OTHER ALLIED STRUCTURES ON BOTH SIDES OF CHANDNI CHOWK JUNCTION FROM 841.400 KM TO 843.600 KM OF OLD NH-4
|
689 | ISLAM NAGAR TO KADTAL
|
690 | ISMAILABAD-NARNAUL PKG-1
|
691 | ISMAILABAD-NARNAUL PKG-2
|
692 | ISMAILABAD-NARNAUL PKG-3
|
693 | ISMAILABAD-NARNAUL PKG-4
|
694 | ISMAILABAD-NARNAUL PKG-5
|
695 | ISMAILABAD-NARNAUL PKG-6
|
696 | ISMAILABAD-NARNAUL PKG-7
|
697 | ISMAILABAD-NARNAUL PKG-8
|
698 | J'PUR BYPASS PH2 GQ
|
699 | J'PURBYPASS PH2 GQ
|
700 | JABALPUR TO HIREN RIVER SECTION OF NH-12 IN MADHYA PRADESH KM 11/400 TO 66/400
|
701 | JABALPUR-BARELA SECTION OF NH-12A IN MADHYA PRADESH KM 477/6 OF NH-7 TO KM 22/8 OF NH-12A
|
702 | JAHIRABAD TO LATUR
|
703 | JAIPUR BYPASS PH:II (GQ) KM 221 OF NH-8 - KM 246 OF NH-11
|
704 | JAIPUR-REENGUS
|
705 | JAIPUR-TONK-DEOLI
|
706 | JAISALMER - BARMER
|
707 | JALANDAR - AMRITSAR
|
708 | JALANDAR-AMRITSAR, KM.407/100 TO KM.456/100, NH-1
|
709 | JALANDHAR - AMRITSAR
|
710 | JALGAON TO BHADGAON
|
711 | JALGAON TO NANDURA
|
712 | JALKOT TO TOGRI
|
713 | JAMMU-UDHAMPUR KM.27.5 TO KM.67.00
|
714 | JAWAHARLAL NEHRU PORT (PH-I) (PORT CONNECTIVITY) (NH-4B AND 4)
|
715 | JETPUR TO BHILADI
|
716 | JETPUR TO BHILADI (PACK. -II) PH.-II KM.117 TO.52.50, NH-8B
|
717 | JHAJHARPUR TO DARBANGA (BR-7)
|
718 | JHANSI - SIVPURI
|
719 | JHANSI - BYPASS(UP-3)
|
720 | JHANSI - SHIVAPURI
|
721 | JHANSI BYPASS (UP-3), KM.104-KM.91, NH-25
|
722 | JHANSI TO LALITPUR, NH-25,26
|
723 | JHANSI TO LALITPUR, NH-26
|
724 | JHANSI-SHIVPURI ,NH-25 KM-91-50
|
725 | JHANSI-SIVAPURI PH.-II NH-25, KM.91-50 (UP-11 KM.8 MP KM.30)
|
726 | JHANSI-SIVPURI (EW-II)(NHAI) NH-25, KM.50 TO KM.15, NH-25
|
727 | JHARPOKHARIA-BARIPADA-BALESHWAR SECTION
|
728 | JIA BHARALI BRIDGE ALONG WITH ITS APPROACH ROAD
|
729 | JINTUR TO PARBHANI
|
730 | JNPT-PORTCONNECT NH-4B
|
731 | JNPT-PORTCONNECT NH-4B
|
732 | JODHPUR - BARMER SECTION OF PACKAGE -I
|
733 | JODHPUR - BARMER SECTION OF PACKAGE -II
|
734 | JORAM – KOLORIANG ROAD FROM EXISTING KM 70.00 TO KM 88.700 (PKG-4)
|
735 | JORAM – KOLORIANG ROAD FROM EXISTING KM104.850 TO KM 122.60 (PKG-6)
|
736 | JORBAT - BARAPANI
|
737 | JUNAGADH BYPASS
|
738 | JUNCTION WITH MDR-13 NEAR JARWAL TO BAHRAICH SECTION OF NH-28C IN UTTAR PRADESH KM 43 TO 93
|
739 | K'GHAT-KH'PUR GQ
|
740 | K'GHAT-KH'PUR GQ
|
741 | K'GIRI-V'BADI GQ
|
742 | K'GIRI-V'BADI GQ
|
743 | K'PUR-FATEPUR GQ
|
744 | K'RIAJI-RTNPUR GQ
|
745 | K'RIAJI-RTNPUR GQ
|
746 | KADAL TO ARMUR, NH-7
|
747 | KADLOOR YELLAREDDY TO GUNDLA POCHAMPALLI
|
748 | KAIJ TO KUSALAM
|
749 | KAIJALI-MANOR (GQ) KM.381.6-KM.439 (NH-8)
|
750 | KAIJALI-MANOR GQ
|
751 | KAIJALI-MANOR GQ
|
752 | KAILASHAHAR TO KHOWAI PKG-2
|
753 | KAILASHAHAR TO KHOWAI PKG-3
|
754 | KAILASHAHAR TO KHOWAI PKG-5
|
755 | KALGHAT-MP/MAHARASHTRA BORDER KM 16.6-84.70
|
756 | KALMAB TO RALEGAON
|
757 | KALMATH TO ZARAP
|
758 | KANCHI-PMALLI GQ
|
759 | KANCHIPURAM-POONAMALEE (GQ) KM.70.2-KM.13.8 (NH-4)
|
760 | KANPUR-FATEHPUR (GQ) KM.470-483-KM.0-KM.38 (NH-2)
|
761 | KARAD TO TAGAON
|
762 | KARAD TO VITA
|
763 | KARASWADA TO BAMBOLIM
|
764 | KARGIL-ZANSKR PACKAGE-5
|
765 | KARGIL-ZANSKR PACKAGE-6
|
766 | KARGIL-ZANSKR PACKAGE-7
|
767 | KARUR TO MADURAI:NH-4
|
768 | KARUR TO MADURAI:TN-5
|
769 | KARUR TO MADURAI (NH-7), KM.305.6 TO KM.373.275, NH-7
|
770 | KARUR TO MADURAI (TN-5), KM.373.275 TO KM.426.6, NH-7
|
771 | KASIA TO GORAKHPUR (NH-28)(NHAI)
|
772 | KATNI TO UMARIYA SECTION OF NH-78 IN MADYA PRADESH KM 0 TO 68/4
|
773 | KATOL TO WARUD
|
774 | KAVALI-NELLORE (GQ) KM.222-KM.178 (NH-5)
|
775 | KAVALI-NLR GQ
|
776 | KAVALI-NLR GQ
|
777 | KEIFANG - TUVAI PKG-1
|
778 | KESARIAJI RATANPUR (GQ) KM.340-KM.388.4 (NH-8)
|
779 | KH'PUR-L'NATH GQ
|
780 | KHAGA-K'RAJ GQ
|
781 | KHAGA-K'RAJ GQ
|
782 | KHAGA-KOKHRAJ (GQ) KM.115-KM.158 (NH-2)
|
783 | KHAMGAON TO DEULGAON SAKARSHA
|
784 | KHAMGAON TO SHEGAON
|
785 | KHARAGPUR-LAXMANNATH (GQ) KM.53.41-KM.119.275 (NH-60)
|
786 | KHELLANI-KHANABAL PKG-6
|
787 | KHERDA TO NAGZARI
|
788 | KHUDUS TO DHARAMPURI PACKAGE 3 SANT DNYANESHWAR MAHARAJ PALKHI MARG SECTION OF NH965
|
789 | KHURDA - SUNAKHALA:GQ
|
790 | KHURDA-S'KHALA GQ
|
791 | KHURDA-SUNAKHALA (GQ) KM.388-KM.338 (NH-5)
|
792 | KISHANGARH-AJMER-BEAWER
|
793 | KM120/M'RAI-TIRUNLVELII
|
794 | KOLAGHAT-KHARAGPUR (GQ) KM.72-KM.132.45 (NH-6)
|
795 | KOLDE TO KHETIYA
|
796 | KOLHA TO NASRATPUR
|
797 | KONDHALI-TELEGAON
|
798 | KOSI BRIDGE INCLUDING APPROACHES AND GUIDE BOND AND AFFLUX-BOND (BR-5)
|
799 | KOTA BYPASS,RJ-4, NH-76 (NHAI)
|
800 | KOTA TO CHITTORGARH (RJ-7) NH-76 KM.316 TO KM.253
|
801 | KOTA TO CHITTORGARH (RJ-8) NH-76 KM.381 TO KM.316
|
802 | KOTA-C'GARH (RJ-7),NH-76
|
803 | KOTA-C'GARH (RJ-8),NH-76
|
804 | KOTHARI TO DHANORA
|
805 | KOTWA TO DEWAPUR(10 LMNHP),NH-28 PHASE-II, KM.440 TO KM.402
|
806 | KOTWA-D'PUR (LMNHP):NH28
|
807 | KRISHNAGIRI TO THOPURGHAT (NHAI), KM.94 TO KM.156, NH-7
|
808 | KRISHNAGIRI-VANIYAMBADI (GQ) KM.0.0-49.0 (NH-46)
|
809 | KRISHNANAGAR-BERHAMPUR
|
810 | KUMBHARI PHTA TO DEULGAON RAJA
|
811 | KUNDRAL TO WAZAR
|
812 | KURALI-KIRATPUR, NH-21
|
813 | KURUDWADI TO PANDHARPUR
|
814 | KUSUMBA TO MALEGAON
|
815 | L'NATH-B'SHWAR GQ
|
816 | LAKHNAADON TO MP/MH BORDER,KM 596.75-653.22 (NS-1/BOT/MP-2),NH7
|
817 | LAKHNADON TO MP/MH BORDER (NS-1/BOT/MP-2), NH-7
|
818 | LALITPUR TO SAGAR KM 132 TO KM 187, NH-26 (NHAI)
|
819 | LALITPUR TO SAGAR, NH-26 (NHAI)
|
820 | LANKA TO DABOKA (NH-54)(NHAI)
|
821 | LATUR TO PANGAON
|
822 | LAXMANNATH-BALESHWAR (GQ) KM.0-KM.53.41 (NH-60)
|
823 | LKO BY PASS EW NH 25AND28
|
824 | LUCKNOW RING ROAD PKG-1 (SULTANPUR ROAD TO BEHTA ROAD) [BYPASS CONNECTING NH-56 AT KM. 17.40 AND TERMINATING NEAR BEHTA ROAD]
|
825 | LUCKNOW-RAIBAREILI
|
826 | M'PURE-K'GARH GQ
|
827 | M'PURE-K'GARH GQ
|
828 | M'RAI-A'TAI TUTICORIN
|
829 | M'TRA BRDR BLGM GQ
|
830 | M'TRA BRDR BLGM GQ
|
831 | M'WAR-UDAIPUR GQ
|
832 | M'WAR-UDAIPUR GQ
|
833 | MADURAI -KANIAKUMARI SECTION (NS-41/TN) NH-7,KM.80 TO KM.120
|
834 | MADURAI -KANNIAKUMARI SEC. (NS-42/TN) NH-7, KM.120 TO KM.160
|
835 | MADURAI-ARUPKOTTAI-TUTICORIN, KM.138.8 TO KM.264.5, NH-45 B
|
836 | MADURAI-KANNIAKUMARI, KM.42 TO KM.80, NH-7
|
837 | MADURAI-TIRUNVELI SECTION INCLUDING MADURAI-BYPASS, NH-7
|
838 | MAHAPURA-KISHANGARH (GQ) KM. 273.5 - KM. 363 - 885 (NH-8)
|
839 | MAHARASHTRA BORDER-BELGAUM (GQ) KM.592-KM.575 (NH-4)
|
840 | MAHARASHTRA/AP BORDER TO ISLAM NAGAR,(NS-2/BOT/AP-6),NH-7
|
841 | MAHUA-JAIPUR NH-11
|
842 | MAHUA-JAIPUR, NH-11, KM.120 TO KM.228
|
843 | MAIBANG TO KUNDING:AS24
|
844 | MAIBANG TO KUNDING:AS25
|
845 | MAIBANG TO KUNDING:AS26
|
846 | MAIBANG TO KUNDING:AS27
|
847 | MAIBANG TO LUMDING (AS-24), KM.111.000 TO KM.126.450
|
848 | MAIBANG TO LUMDING (AS-25), KM.83.400 TO KM.111.000
|
849 | MAIBANG TO LUMDING (AS-26), KM.60.500 TO KM.83.400, NH-54
|
850 | MAIBANG TO LUMDING (AS-27), KM.40.000 TO KM.60.500
|
851 | MAJALGAON TO KAIJ
|
852 | MALE VILLAGE TO PUNE RAIGARH DISTRICT BORDER
|
853 | MALEGAON TO RISOD
|
854 | MALEWADA TO CHIMUR
|
855 | MANDLA-CHILPI SECTION OF NH-12A IN MADHYA PRADESH KM 89/6 TO KM 192/4 OF NH-12A
|
856 | MANGALWR-UDAIPUR (GQ) KM.172-KM.113.825 (NH-76)
|
857 | MANGAON TO DIGHI PORT
|
858 | MANGAWA-MP/UP BORDER SECTION OF NH-27 (4L) IN MP
|
859 | MANGRUPHIR TO MAHAN
|
860 | MANJUSUMBA TO CHUMBALI
|
861 | MANSAR TO SALAIKHURD
|
862 | MANTHA TALUKAS BORDER TO PARTUR
|
863 | MARIAM - PEREN (PKG 2A)
|
864 | MARIAM - PEREN PKG-2B
|
865 | MDR-K'KUMARI(NS40/TN)NH7
|
866 | MDR-K'KUMARI(NS41/TN)NH7
|
867 | MDR-K'KUMARI(NS42/TN)NH7
|
868 | MECH. COAL HANDLNG
|
869 | MEDSHI (KM 47.700) TO WASHIM (KM 92.200) OF NH-161 IN MAHARASHTRA
|
870 | MEERUT-BULANDSHAHAR
|
871 | MEERUT-MUZAFFARNAGAR, NH-58 PHASE-III, KM.52.25 TO KM.131.00
|
872 | MEHKAR TO AJISPUR
|
873 | MEHKAR TO CHIKALI
|
874 | MEHSI TO KOTWA:LMNHP2
|
875 | MEHSI TO KOTWA (LMNHP-II), PH.II, KM.480 TO KM.440, NH-28
|
876 | MOHANIA - SASARAM (GQ)
|
877 | MOHANIA-SASARAM (GQ) KM.65-KM.110 (NH-2)
|
878 | MOHANIA-SASARAM GQ
|
879 | MOHOL TO WAKHARI PACKAGE1 SANT DNYANESHWAR MAHARAJ PALKHI MARG SECTION OF NH965
|
880 | MOPA AIRPORT
|
881 | MORSHI TO ACHALPUR
|
882 | MORSHI TO MAH/MP BORDER
|
883 | MP/MAHARASHTRA BORDER-DHULA
|
884 | MUL TO CHANDRAPUR
|
885 | MULAKALACHERUVU TO MADANAPALLE SECTION OF NH42 FROM KM 202.050 TO KM 245.640 EXCLUDING RETAINED STRETCH FROM KM 208.270 TO KM 209.970 KM 220.190 TO KM 221.620
|
886 | MURADABAD-BAREILY
|
887 | MUZAFFARNAGAR-HARIDWAR
|
888 | MUZAFFARPUR-MESI:LMNHP12
|
889 | MUZZAFFARPUR TO MEHSI (LMNHP-12), KM.520 TO 480, NH-28
|
890 | NAGAJ TO VAIJAPUR
|
891 | NAGAON BYPASS (NH-37)(NHAI)
|
892 | NAGAON TO DHARAMTUL (AS-2)
|
893 | NAGAUR-BIKANER OF NH-11 (2L+PS) UNDER PPP.
|
894 | NAGAUR-BIKANER SECTION FROM KM 177.00 TO KM 267.325 ON NH-89
|
895 | NAGBHID TO ARMORI
|
896 | NAGPUR - KONDHALI
|
897 | NAGPUR RING ROAD PACKAGE-1
|
898 | NAGPUR-KONDHALI,NH-6(NHAI)
|
899 | NAGPUR-WAINGANGA BRIDGE
|
900 | NAIGAONBANDI TO MANGRULPIR
|
901 | NALBARI T BIJNI (AS-7)
|
902 | NALBARI TO BIJNI (AS-6)
|
903 | NALBARI TO BIJNI (AS-8)
|
904 | NANDGAON TO MORSHI
|
905 | NANDHI HILLS CROSS-DEVANHALLI (NS AND EW-PH-I) KM.556-539
|
906 | NAS'BAD-G'PURA GQ
|
907 | NAS'BAD-G'PURA GQ
|
908 | NASHIK TO PETH
|
909 | NASHRI- CHANANI
|
910 | NASIRABAD-GULABPURA (GQ) KM.15 - KM.70 (NH-79)
|
911 | NATIONAL HIGHWAY DEV. PROJECT PH-I
|
912 | NATIONAL HIGHWAY DEV.-I
|
913 | NATIONAL HIGHWAY DEV.-I
|
914 | NEELAMANGALAR JUNCTION ON NH-4 SMITH NH-48 TO DEVIHALLI
|
915 | NELLORE-TADA (GQ)
|
916 | NELLORE-TADA (GQ) KM.163.6-KM.52.8 (NH-5)
|
917 | NETRA VILLAGE TO MANDORE SECTION OF NH-65 KM 267+500 TO 296+070 (4L) UNDER EPC.
|
918 | NEW MANGALORE PORT NH-17 AND 48
|
919 | NH 79 CHITTORGARH NEEMUCH MP BORDER FOUR LANING AND NH 113 NIMBAHERA PRATAPGARH TWO LANING
|
920 | NH 79 OF CHITTORGARH NEEMUCH MP BORDER KM 183 000 TO KM 221 400 BY FOUR LANING WITH PAVED SHOULDER AND NIMBAHERA PARTAPGARH KM 5 400 TO KM 80 000 BY TWO LANING
|
921 | NH CONNECTIVITY TO ICTT VALLARPADAEU NH - SH
|
922 | NH167B FROM KM 99.103 CS PURAM TO KM 143.320 MALAKONDA TO 2LPS
|
923 | NH167B FROM KM.143.320 MALAKONDA TO 189.050 SINGARAYAKONDA ON NH 16 TO TWO LANE WITH PAVED SHOULDERS
|
924 | NH1:4LANING KARNAL-PB/HR
|
925 | NH1:4LANING KARNAL-PB/HR
|
926 | NH25:ORAI TO JHANSI:UP-5
|
927 | NH58:MEERUT-MUZAFFARNAGR
|
928 | NH5:4-LANING OF CHIPET VIJAYAWADA-(KM 355 TO 420) (GQ)
|
929 | NH76:MP BDR.TO KOTA:RJ-9
|
930 | NH76:MP BDR.TO KOTA:RJ11
|
931 | NH8:IMP. IN HRY AND RAJ
|
932 | NH8:IMP. IN HRY AND RAJ
|
933 | NILAJPHATA TO BHANDARA
|
934 | NLR-TADA GQ
|
935 | OMREGA TO AUSA
|
936 | ONGOLE-KAVALI (GQ) KM.291-KM.222
|
937 | ONGOLE-KAVALI GQ
|
938 | ONGOLE-KAVALI GQ
|
939 | ORAI TO JHANSI (UP-4),NH-25, KM.170.0 TO KM.104.0
|
940 | ORAI TO JHANSI (UP-5),NH-25, KM.220.0 TO KM.170.0
|
941 | ORAI-JHANSI (UP-4),NH-25
|
942 | OSMANNAGAR TO KUNDRAL
|
943 | OUR LANNNING OF DOLABARI TO JAMUGURI SECTION FROM KM 17.300 OF NH 37A TO KM 182.00 OF NH52 IN THE STATE OF ASSAM UNDER SARDP-NE , PHASE'A' ON EPC MODE
|
944 | P'GARH-P'STT GQ
|
945 | P'GARH-P'STT GQ
|
946 | P'KONDA-W'PET GQ
|
947 | P'KOT-B'PUR NS37/PB:NH44
|
948 | P'SIT-D'KUNI GQ
|
949 | P'SIT-D'KUNI GQ
|
950 | P'WARA-B'RIA(RJ1)NH76AND14
|
951 | PACKAGE-21 CONSTRUCTION OF EIGHTLANE ACCESS- CONTROLLED EXPRESSWAY CARRIAGEWAY FROM KAMLIYA VILLAGE TO KANDARWASA VILLAGE OF RATLAM DISTRICT (CH.572+220 TO 602+420)
|
952 | PACKAGE-23 CONSTRUCTION OF DELHI-VADODARA EIGHT LANE ACCESS- CONTROLLED EXPRESSWAY FROM BAWDI VILLAGE (NEAR SHIVGARH) OF RATLAM DISTRICT TO RANNI VILLAGE OF JHABUA DISTRICT CH.627+420 TO 652+720
|
953 | PACKAGE-24 CONSTRUCTION OF EIGHTLANE ACCESS- CONTROLLED EXPRESSWAY CARRIAGEWAY FROM RANNI VILLAGE TO MIYATI VILLAGE OF JHABUA DISTRICT CH.652.270 TO 673.770
|
954 | PACKAGE-25 CONSTRUCTION OF EIGHTLANE ACCESS- CONTROLLED EXPRESSWAY CARRIAGEWAY FROM MIYATI VILLAGE TO MP-GUJARAT BORDER CH. 673.770 TO 696.920
|
955 | PADALUR-TRICHY, NH-45
|
956 | PADI - DAHOD
|
957 | PAHUR TO BODHWAD
|
958 | PALANPUR TO SWAROOPGANJ,NH-14
|
959 | PALASA-S'KAKULAM GQ
|
960 | PALASA-S'KAKULAM GQ
|
961 | PALASA-SRIKAKULAM (GQ) KM.171-KM.97 (NH-5)
|
962 | PALLIKONDA- WALAHJAPE:GQ
|
963 | PALLIKONDA-RANIPET Q WALAHJAPET (GQ) BYPASS KM.100.0-KM.145
|
964 | PALSIT DANKUNI (GQ) KM.581-KM.646 (NH-2)
|
965 | PANAGARH-PALSIT (GQ) KM.517-KM.581 (NH-2)
|
966 | PANDHARPUR TO SANGOLA
|
967 | PANIPAT ELEVATED HIGHWAY, NH-1
|
968 | PANIPAT-ROHTAK
|
969 | PARADIP PORT,NH-5A (PORT CONNECTIVITY) KM 0 - KM 77
|
970 | PARBHANI TO GANGKHED
|
971 | PARLI PIMPLA DAHIGUDA
|
972 | PARSHURAM GHAT TO ARAWALI
|
973 | PARTUR TO MAJALGAON
|
974 | PATAS-VASUNDE PHATA - BARAMATI BYPASS
|
975 | PATGAON KHOPOLI SECTION I
|
976 | PATHANKOT- BHOGPUR, KM.26-KM.70, NS-38 NH-1A
|
977 | PATNA-BAKTZARPUR KM.181.3 TO KM.231.95
|
978 | PATRADEVI TO KARASWADA 4L
|
979 | PHALODI -JAISALMER SECTION OF NH-15 TO TWO/FOUR LANE WITH PS
|
980 | PIMPLA TO MANJARSUMBHA
|
981 | PKG-VI:DEESA - RADHANPUR
|
982 | PONDICHERRY TO TINDIVANAM SECTION OF NH-66
|
983 | PONDICHERY - TINDIVANAU NH-66
|
984 | PROPOSED DEVELOPMENT FOR ROAD CORRIDOR COMPONENT OF AH-02 INVOLVING NH-327B, NH-31C, NH-31 NH-10 ON SUB-REGIONAL ROAD CONNECTIVITY AMONG BANGLADESH, BHUTAN, INDIAN NEPAL UNDER THE LOAN ASSISTANCE
|
985 | PROPOSED DEVELOPMENT FOR ROAD CORRIDOR COMPONENT OF AH-48 INVOLVING NH-717, NH-31, NH-31C, NH-317A ON SUB-REGIONAL ROAD CONNECTIVITY AMONG BANGLADESH, BHUTAN, INDIAN NEPAL UNDER THE LOAN ASSISTANCE
|
986 | PUNE TO MALE VILLAGE
|
987 | PUNE-SATARA(NH-4)
|
988 | PUNE-SHOLAPUR,PKG-II
|
989 | PUNE-SHOLAPUR,PKG1
|
990 | PURNEA-FORBESGANJ (BR-1) PHASE-II, KM.309 TO 268, NH-57
|
991 | PURNEA-FORBESGANJ (BR-2) PHASE-II, KM.268 TO 230, NH-57
|
992 | PURNEA-G'KOTEW
|
993 | PURNEA-GOYAKOTA SEC.(EW) (NS AND EW-PH-I) KM.419-KM.447, NH-31
|
994 | QUAZIGUND-BANIHAL KM.220.00 TO KM.188.00
|
995 | R AND U FROM KM 385.00 TO KM 420.000 TO 2- LANE WITH PS (EXCLUDING ROB AND ITS APPROACHES AT KM.404.950 & MAJOR BRIDGES AT KM.387.360 AND KM.409.610 ) OF NH-730
|
996 | R AND U OF KHUTAR -LAKHIMPUR SECTION (KM 82.00 TO KM140.00) OF NH-730 TO 2L WITH PS
|
997 | R AND U OF LAKHIMPUR - SISIYA SECTION (KM140.00 TO 188.800) OF NH-730 TO 2L WITH PS
|
998 | R'PUR-HIMTNGR GQ
|
999 | R'PUR-HIMTNGR GQ
|
1000 | RADHANPUR TO GAGODHAR(PACKAGE-V) PHASE-II
|
1001 | RADHANPUT TO GAGODHAR-V
|
1002 | RAJASTHAN/MP BORDER TO KOTA(RJ-10), KM.509 TO KM.449.15, NH-76
|
1003 | RAJGANJ-B'KATA GQ
|
1004 | RAJKOT BYPASS AND GONDAL JETPUR (PACKAGE-VII) PHASE-II
|
1005 | RAJKOT-GON- DAL JETPUR
|
1006 | RAJMARG CHORAHA TO LAKHNANDON,KM 297 TO KM 351, NH-26 (NHAI)
|
1007 | RAJMARG CHORAHA TO LAKHNANDON,KM 351 TO KM 405.7, NH-26 (NHA
|
1008 | RALEGAON TO RAMTIRTH
|
1009 | RANIKOR-MAHESHKHOLA- BAGHMARA (RMB) PKG-3
|
1010 | RANIKOR-MAHESHKHOLA- BAGHMARA (RMB) PKG-4 (KANAI-RONGARA)
|
1011 | RASISAR (NEAR BIKANER)-DEOGARH (NEAR DHANDHANIYA) (PHASE-I) (AJ/RD-PACKAGE-1)
|
1012 | RASISAR (NEAR BIKANER)-DEOGARH (NEAR DHANDHANIYA) (PHASE-I) (AJ/RD-PACKAGE-2)
|
1013 | RASISAR (NEAR BIKANER)-DEOGARH (NEAR DHANDHANIYA) (PHASE-I) (AJ/RD-PACKAGE-3)
|
1014 | RASISAR (NEAR BIKANER)-DEOGARH (NEAR DHANDHANIYA) (PHASE-I) (AJ/RD-PACKAGE-5)
|
1015 | RATANPUR-HIMATNAGAR (GQ) KM.388-KM.443 (NH-8)
|
1016 | REDESIGNING, REHABILITATION AND UPGRADATION TO FOUR LANE CONFIGURATION STRENGTHENING OF ROHNA/HASSANGARH TO JHAJJAR SECTION FROM KM 44.800 TO KM 80.250 (DESIGN CHAINAGE) (LENGTH 35.450KM) OF NH-334B
|
1017 | REENGUS SIKAR
|
1018 | REHABILATION AND UPGRADATION OF NH-222(61) FOM KM 161.570 TO 211.00
|
1019 | REHABILATION AND UPGRADATION OF NH-222(61) FOM KM 284 TO 337
|
1020 | REHABILATION AND UPGRADATION OF NH-222(61) FOM KM 342.00 TO 444.00
|
1021 | REHABILATION AND UPGRADATION TO 2 LANE WITH PAVED SHPULDERS CONFIGURATION OF BEAWAR-ASIND SECTION (KM 74.00 TO KM 116.750 ) OF NH 158 IN THE STATE OF RAJASTHAN PKG-III.
|
1022 | REHABILATION AND UPGRADATION TO TWO LANES WITH PAVED SHOULDER CONFIGURATION FROM WATUR TO CHARTHANA SECTION OF NH 752 I FROM KM 0.00 TO KM 27.00 (DESIGN CHAINAGES) ON EPC MODE IN THE STATE OF MAHARASH
|
1023 | REHABILIATION OF 4-LANE 5.575 KM LONG,4-LANE MG SETU OVER GANGA RIVER ON NH-19 FROM KM 212.72 TO KM 218.95
|
1024 | REHABILITAITON AND UPGRADATION OF REPALLE TO EEPPURPALEM SECTION FROM KM 128/927 TO KM 195/000 OF NH214A(NEW NH216) TO TWO LANE WITH PAVED SHOULDER UNDER NHDP-IV ON EPC BASIS
|
1025 | REHABILITAITON AND UPGRADATION TO FOUR LANING OF BINJHABAHAL TO TELEBANI SECTION, KM 414.000 TO KM 491.710 (DESIGN CHAINAGE KM 414.982 TO KM 493.300) OF NH-6 (NEW NH-49) IN THE STATE OF ODISHA UNDER N
|
1026 | REHABILITATION UPGRADATION OF NH214(NH216) FROM KM41.161 TO KM59.800(GURJANAPALLI TO POLEKURU SECTION) NH4(NH216) FROM KM70.400 TO KM105.170(KOMAGIRI TO PASARLAPUDI SECTION) TO TWO LANE WITH PAVED
|
1027 | REHABILITATION & UPGRADATION OF NH-67 FROM KM 641.000 TO KM 695.000 (DORNALA T JUNCTION TO ATMAKUR SECTION) IN THE STATE OF
|
1028 | REHABILITATION AND UP GRADATION OF NH-43 FROM KM.81.500-KM 130.00 DHAMTARI- KANKER SECTION.
|
1029 | REHABILITATION AND AUGMENTAION OF NH-222 FROM KM 101.00 TO 161.570 UNDER NHDP-IV ON EPC MODE. JOB NO. 21 OF 2013-14
|
1030 | REHABILITATION AND AUGMENTATION OF NEW NH 354 (OLD-SH-21) OF SECTION KHEMKARAN TOWN TO START OF AMRITSAR BY PASS FROM DESIGN CHAINAGE KM 22.673 (EXISTING KM 65.477 OF SH) TO DESIGN CHAINAGE KM 71.496
|
1031 | REHABILITATION AND AUGMENTATION OF NEW NH 354 (OLD-SH-25) OF SECTION RAMDAS TO GURDASPUR FROM DESIGN CHAINAGE KM 140.000 (EXISTING KM 46.320 OF SH) TO DESIGN CHAINAGE KM 187.492 (EXISTING KM 3.185 OF
|
1032 | REHABILITATION AND UP GRADATION OF NH-12A FROM KM191.422-KM 242.300 CHILPI- KAWARDHA SECTION.
|
1033 | REHABILITATION AND UP GRADATION OF NH-12A FROM KM246.849-KM 317.406 KAWARDHA- SIMGA SECTION.
|
1034 | REHABILITATION AND UP GRADATION OF EXISTING 2-LANE TO 4-LANE STANDARDS TO END OF KAMAKHYANAGAR BYPASS – DUBURI SECTION (KM 335.946 – KM 388.382) ON EPC MODE (PKG-II).
|
1035 | REHABILITATION AND UP GRADATION OF NH-544E FROM KM 56/803 TO KM 99/179 OF MADAKASIRA TO SIRA SECTION (TILL AP/KNT BORDER) TO TWO LANE WITH PAVED SHOULDER IN THE STATE OF ANDHRA PRADESH UNDER NH(O) ON
|
1036 | REHABILITATION AND UP-GRADATION FROM 2 LANE TO 4 LANE OF NH STRETCH UNDER NHDP IV B FOR LALGANJ-HANUMANHA SECTION OF NH-7 (PKG-3)
|
1037 | REHABILITATION AND UP-GRADATION FROM 2 LANE TO 4 LANE OF NH STRETCH UNDER NHDP-IVB FOR DAGAMAGPUR-LALGANJ SECTION OF NH-7 (PKG-2) ON EPC MODE
|
1038 | REHABILITATION AND UP-GRADATION FROM 2 LANE WITH PAVED SHOULDER FOR BHIWANI-MUNDAL-JIND ROAD FROM DESIGN CHAINAGE KM 6+875 TO KM 68+857 (LENGTH - 61.982 KM) OF NH-709A
|
1039 | REHABILITATION AND UP-GRADATION FROM 2 LANE WITH PAVED SHOULDER FOR JIND - KARNAL SECTION FROMEXISTING KM 68+660 (DESIGN CHKM 68+857) I.E. JUNCTION WITH NARWANA ROAD (NH-352) AT SUBHASH CHOWK AND ENDS
|
1040 | REHABILITATION AND UP-GRADATION OF BIRAMITRAPUR TO BRAHMANI BYPASS (PKG-I)
|
1041 | REHABILITATION AND UP-GRADATION OF EXISTING 2-LANE TO 4 LANE OF KOIDA (KM206.20) TO RAJAMUNDA (KM 259.453) PKG-II ON EPC MODE
|
1042 | REHABILITATION AND UP-GRADATION OF EXISTING 2-LANE TO 4 LANE OF RIMULI (KM 163.0) TO KOIDA (KM 206.20) PKG-I ON EPC MODE
|
1043 | REHABILITATION AND UP-GRADATION OF EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2L+PS FLEXIBLE PAVEMENT FROM KM 119+650 (END OF CHANDIAGHAT REALIGNMENT) TO KM 163+850(AT JUNCTION WITH NH-30 KATNI B
|
1044 | REHABILITATION AND UP-GRADATION OF NH-149 FROM KM 0.00 TO KM 68.280 (PALLAHARA-PITRI JUNCTION) IN THE STATE OF ODISHA TO 2-LANE WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS.
|
1045 | REHABILITATION AND UP-GRADATION OF NH-214 (NEW NH-216) FROM KM 0.0 TO 26.150(KATHIPUDI TO START OF KAKINADA BYPASS SECTION)
|
1046 | REHABILITATION AND UP-GRADATION OF NH-221 (NEW NH-30) FROM KM 0.0 TO 32.735(IBRAHIMAPATNAM TO CHANDRAGUDEM SECTION) IN THE STATE OF ANDHRA PRADESH TO TWO LANE WITH PAVED SHOULDER UNDER NDP-IV
|
1047 | REHABILITATION AND UP-GRADATION OF NH-221 (NEW NH-30) FROM KM 32.735 TO KM 71.200 (CHANDRAGUDEM TO AP/TELANGANA BORDER SECTION) IN THE STATE OF ANDHRA PRADESH TO TWO LANE WITH PAVED SHOULDER UNDER NH
|
1048 | REHABILITATION AND UP-GRADATION OF ROAD FROM DESIGN KM 11.800 TO KM 25.250 OF KAILASHAHAR-KURTI BRIDGE SECTION TO 2- LANE WITH PAVED SHOULDER (PACKAGE-II)
|
1049 | REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER OF MUDKI-JAWAHAR SINGH WALA SECTION OF NH-254 FROM DESIGN CHAINAGE KM 0.00 TO KM 38.00 IN THE STATE OF PUNJAB ON EPC MODE [JOB NO. NH-254-
|
1050 | REHABILITATION AND UP-GRADATION TO 2 LANE WITH PS 131 TO 189 OF NH-86
|
1051 | REHABILITATION AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER OF ABOHAR-SITOGUNNO-DABWALI ROAD OF NH-354E FROM KM 0.000 TO KM 50.885 IN THE STATE OF PUNJAB ON EPC MODE [JOB NO. NH-354E-PB-2017-18-493]
|
1052 | REHABILITATION AND UP-GRADATION TO 2LPS 81 TO 175
|
1053 | REHABILITATION AND UPGRADATION BY 4-LANING OF SINGHARA TO BINJHABAHAL SECTION FROM KM 311.000 TO KM 414.000
|
1054 | REHABILITATION AND UPGRADATION FROM KM.425 400 TO 509 400 NH-565 OF PENCHALAKONA TO YERPEDU CONTRACT BASIS
|
1055 | REHABILITATION AND UPGRADATION OF ALLAHABAD -MIRZAPUR FROM KM 400.878 TO KM 450.000 OF NH-76E TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1056 | REHABILITATION AND UPGRADATION OF BALRAMPUR-TULSIPUR FROM KM 323.745 TO KM 351.000 OF NH-730 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1057 | REHABILITATION AND UPGRADATION OF BARAICH -SHRAWAST FROM KM 248.400 TO KM 310.000 OF NH-730 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1058 | REHABILITATION AND UPGRADATION OF EXISTING PAVEMENT TO 2 LANE WITH PS FROM KM 537.000 TO KM 564.750 (KAPTANGANJ TO PADRAUNA) OF NH-730 ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1059 | REHABILITATION AND UPGRADATION OF HARPALPUR -SUGIRA FROM KM 89.600 TO KM 133.520 OF NH-76 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1060 | REHABILITATION AND UPGRADATION OF PRATAPGARH-ALLAHABAD BYPASS ROAD AND JUNCTION SECTION OF NH-96 FROM KM 100.800 TO KM 135.230 TO 4-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADE
|
1061 | REHABILITATION AND UPGRADATION OF RAMNAGAR TO SISWA BABU SECTION FROM KM 484.000 TO KM 505.120 OF NH-730 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1062 | REHABILITATION AND UPGRADATION OF TULSIPUR -BARHANI SECTION FROM KM 351.000 TO KM 385.000 OF NH-730 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1063 | REHABILITATION AND UPGRADATION OF ALLAHABAD -MIRZAPUR SECTION FROM KM 450.000 TO KM 486.770 (EXCEPT MAJOR BRIDGE AT KM.472.135) OF NH-76E TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTT
|
1064 | REHABILITATION AND UPGRADATION OF BARELI TO GOHARGANJ SECTION OF NH-12 FROM EXISTING KM 193/0 TO KM 255/300 IN THE STATE OF MADHYA PRADESH TO FOUR LANES WITH PAVED SHOULDERS ON EPC MODE UNDER NHDP-III
|
1065 | REHABILITATION AND UPGRADATION OF BHOKARDAN TO KUMBHARI FATA DESIGN CH. (KM 13+500 TO 17+00) AND RAJUR TO JALNA DESIGN CH. (KM 39+850 TO 62+420) SECTION OF NH-753H TO 2LANE/4LANE CONFIGURATION ON EPC
|
1066 | REHABILITATION AND UPGRADATION OF DHINDI-DIGAMARRU SECTION FROM KM126/510 TO KM135/740 OF NH214(NH216) AND DIGAMARRU-LOSARI SECTION FROM KM0/000 TO KM34/230 OF NH214A(NH216) TO TWO LANE WITH PAVED
|
1067 | REHABILITATION AND UPGRADATION OF EEPURUPALEM-ONGOLE SECTION FROM KM195.000 TO 254.500 OF NH214A(NH216) TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF ANDHRA PRADESH UNDER EPC BASIS
|
1068 | REHABILITATION AND UPGRADATION OF END OF AHMEDNAGAR BYPASS TO KHARWANDI KASAR SECTION OF NH-222 FROM KM 232.0 TO 284.00 IN THE STATE OF MAHARASHTRA UNDER NHDP-IV
|
1069 | REHABILITATION AND UPGRADATION OF EXISTING NH-167 FROM KM 70/000 TO KM 125-150
|
1070 | REHABILITATION AND UPGRADATION OF EXISTING NH-565 FROM KM.86.057 TO 133.922 OF NAGARJUNASAGAR DAM TO DAVULAPALLY SECTION IN A. P.
|
1071 | REHABILITATION AND UPGRADATION OF EXISTING NH-565 OF FROM KM.154.900 TO 198.694 OF DAVULAPALLY TO MARKAPURAM SECTION IN A.P
|
1072 | REHABILITATION AND UPGRADATION OF EXISTING PAVEMENT TO FOUR LANE WITH PAVED SHOULDER FROM KM 135.230 TO KM 153.00 OF NH-96 IN THE STATE OF UTTAR PRADESH
|
1073 | REHABILITATION AND UPGRADATION OF FOUR LANING OF NH-23 (NEW NH NO. 143) FROM KM. 240.250 I.E. BRAHMANI BY-PASS END BESIDE BNR WEIGH BRIDGE TO KM.287.200 I.E. RAJAMUNDA SECTION IN THE STATEOF ODISHA UN
|
1074 | REHABILITATION AND UPGRADATION OF GIDDALUR-VINUKONDA SECTION OF NH-544D FROM DESIGN KM 212.983 (EXISTING KM 213.000) TO DESIGN KM 322.800 (EXISTING KM 322.840) (DESIGN LENGTH 112.797 KM) IN THE STATE
|
1075 | REHABILITATION AND UPGRADATION OF HYDERABAD OUTER RING ROAD TO MEDAK SECTION OF NH-765D FROM EXISTING KM.15.970 (DESIGN KM.0.0) TO EXISTING KM.78.70 (DESIGN KM.62.92) TO TWO LANE WITH PAVED SHOULDER/F
|
1076 | REHABILITATION AND UPGRADATION OF INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2 LANE PAVED SHOULDER RIGID PAVEMENT ON SHUJALPUR-ASHTA ROAD FROM KM 41+800 TO KM 82+300 ON SHUJALPUR TO ASHTA SECTION OF NEWLY
|
1077 | REHABILITATION AND UPGRADATION OF JHAJJAR-LOHARU SECTION FROM KM 130.770 TO KM 228.630 (DESIGN CHAINAGE KM 0.000 TO KM 97.864) OF NH-334B
|
1078 | REHABILITATION AND UPGRADATION OF KABRAI-BANDA FROM KM 178.00 TO KM 215.00 OF NH-76 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1079 | REHABILITATION AND UPGRADATION OF KALUPUR-LALTA FROM KM 285.00 TO KM 326.00 OF NH-76 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1080 | REHABILITATION AND UPGRADATION OF LOSARI-MACHAVARAM SECTION FROM KM34/230 TO KM84/550 OF NH214(NH216) TO TWO LANE WITH PAVED SHOULDERS UNDER (EPC) BASIS
|
1081 | REHABILITATION AND UPGRADATION OF MACHILIPATNAM TO AVANIGADDA SECTION FROM KM84/550 - 124/200 OF NH214(NEW NH216) TO TWO LANE WITH PAVED SHOULDER IN THE STATE OF AP UNDER NHDP-IV THROUGH EPC BASIS
|
1082 | REHABILITATION AND UPGRADATION OF MAU-JASRA FROM KM 326.000 TO KM 379.555 OF NH-76 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1083 | REHABILITATION AND UPGRADATION OF NEW NH-544DD (OLD SH-30) FROM DESIGN CHAINAGE KM 0.000 TO 56.000 (EX.KM 0.460 TO EX. KM 58.344) OF ANANTHAPURAMU-KALYANDURG SECTION TO TWO LANE WITH PAVED SHOULDERS O
|
1084 | REHABILITATION AND UPGRADATION OF NEW NH-544E FROM KM. 0.000 TO KM 56.803 OF KODIKONDA - MADAKASIRA SECTION TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
|
1085 | REHABILITATION AND UPGRADATION OF NH -18 FROM KM 57/0 TO KM 108/850 PILERU TO RAYACHOTY SECTION TO TWO LANE WITH PAVED SHOULDERS INCLUDING 4 LANING IN 1.45 KM
|
1086 | REHABILITATION AND UPGRADATION OF NH -365 FROM KM 154.00 TO 187.00 (MANGALWARPET TO MALLAPLLY SECTION) TO TWO-LANES WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS. (WARANGAL)
|
1087 | REHABILITATION AND UPGRADATION OF NH -365 FROM KM 72.600 TO 121.00 (THANAMCHERLA TO JAMANDLAPALLY SECTION) TO TWO-LANES WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS.(WARANGAL)
|
1088 | REHABILITATION AND UPGRADATION OF NH -67 FROM KM 589/0 TO 641/0 (MYDUKUR TO DORNALA T-JUNCTION ) IN THE STATE OF ANDHRA PRADESH TO TWO-LANES WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS
|
1089 | REHABILITATION AND UPGRADATION OF NH -765 FROM KM 23.00 TO 108.00 (HYDERABAD TO DINDI SECTION) TO TWO-LANES WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS.(HYDERABAD)
|
1090 | REHABILITATION AND UPGRADATION OF NH 111 FROM KM 163.400 TO 215.800 SHIVNAGAR TO AMBIKAPUR SECTION
|
1091 | REHABILITATION AND UPGRADATION OF NH 200 FROM KM 127.500 TO 178.944 DARRIGHAT TO BANARI SECTION
|
1092 | REHABILITATION AND UPGRADATION OF NH 200 FROM KM 178.944 TO 241.553 BANARI VILLAGE TO MASANIA KALA VILLAGE SECTION
|
1093 | REHABILITATION AND UPGRADATION OF NH 200 FROM KM 241.553 TO 312.600 MASANIAKALA TO RENGAPALI ODISHA BORDER SECTION
|
1094 | REHABILITATION AND UPGRADATION OF NH 226 E FROM 0-1 - 66-20 TO 2 LANE WITH PAVED SHOULDERS ON EPC MODE
|
1095 | REHABILITATION AND UPGRADATION OF NH 78 FROM KM 531.250 TO KM 597.946 KUNKURI TO CG JH BORDER SECTION
|
1096 | REHABILITATION AND UPGRADATION OF NH-111 FROM KM. 82.500 TO 163.400 (KATHGHORA TO SHIVNAGAR SECTION ) UNDER NHDP-IV
|
1097 | REHABILITATION AND UPGRADATION OF NH-149 FROM KM 0.00 TO KM 68.280 (PALLAHARA TO PITRI JUNCTION) IN THE STATE OF ODISHA TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDERS UNDER NHDP IV ON EPC BASIS.
|
1098 | REHABILITATION AND UPGRADATION OF NH-167 FROM DESIGN KM.157.707 TO 187.723 (DESIGN LENGTH 30.016 KMS) TO TWO LANE WITH PAVED SHOULDERS OF ALINAGAR-MIRYALAGUDA SEC ON EPC MODE IN THE STATE OF TELANGANA
|
1099 | REHABILITATION AND UPGRADATION OF NH-167 FROM KM 70
|
1100 | REHABILITATION AND UPGRADATION OF NH-219 FROM KM 58-600 TO KM 140-750 IN THE STATE OF ANDHRA PRADESH UNDER CORRIDOR APPROACH ON EPC MODE
|
1101 | REHABILITATION AND UPGRADATION OF NH-221 FROM KM 71/2 TO 121/0 (OF VIJAYAWADA-JAGDALPUR AP BORDER TO RUDRAMPUR) (WARANGAL)
|
1102 | REHABILITATION AND UPGRADATION OF NH-340 FROM KM 0/0 TO KM 60/380 (DESIGN CH. 0/000 TO 60/025 EXCLUDING KM 55.600 TO 57.650(2.050KM)) (RAYACHOTY TO ANGALLU SECTION) TO TWO LANE WITH PAVED SHOULDERS ON
|
1103 | REHABILITATION AND UPGRADATION OF NH-4 FROM NALAGAMPALLI TO AP/KARNATAKA BORDER
|
1104 | REHABILITATION AND UPGRADATION OF NH-42 (OLD NO.205) FROM KM.134/0 TO 202/050 (MUDIGUBBA TO ANANTHAPURAMM SECTION) TO TWO LANE WITH PAVED SHOULDERS INCLUDING 4-LANE IN 8.75 KM IN URBAN TOWN LIMITS UND
|
1105 | REHABILITATION AND UPGRADATION OF NH-42 FROM 76/000 TO KM 102/130 (DESIGN CH. 76/000 TO 99.971 EXCLUDING KM 77.300 TO 78.350) (RAPTHADU TO BATHALAPALLI SECTION) TO FOUR LANE UNDER CORRIDOR APPROACH TH
|
1106 | REHABILITATION AND UPGRADATION OF NH-42 FROM KM 4 to350 TO KM 75 to 600 TO TWO LANE WITH PAVE SOLDOULDERS
|
1107 | REHABILITATION AND UPGRADATION OF NH-42 FROM KM 4-350 TO KM 75-600
|
1108 | REHABILITATION AND UPGRADATION OF NH-43 KM. 180.00 TO 241.00 ( BEDMA-DAHIKONDA) UNDER NHDP-IV
|
1109 | REHABILITATION AND UPGRADATION OF NH-43 KM. 241.000 TO 298.000 (DAHIKONDA TO JAGDALPUR) UNDER NHDP-IV
|
1110 | REHABILITATION AND UPGRADATION OF NH-565 FROM KM 294.00 TO 361.327 (VAGGAMPALLE- DORNALA T-JUNCTION) TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF ANDHRA PRADESH UNDER NHDP-IV ON EPC BASIS
|
1111 | REHABILITATION AND UPGRADATION OF NH-565 FROM KM.198/694 TO 294/0 (MARKAPURAM TO VAGGAMPALLE SECTION) OF NH-565
|
1112 | REHABILITATION AND UPGRADATION OF NH-64 FROM KM.0.00 TO 28.110(ZIRAKPUR TO PATIALA SEC.) TO 4 LANE IN THE STATE OF PB.(EPC MODE)
|
1113 | REHABILITATION AND UPGRADATION OF NH-64 FROM KM.28.110 TO 50.000(ZIRAKPUR TO PATIALA SEC.) TO 4 LANE IN THE STATE OF PB.(EPC MODE)
|
1114 | REHABILITATION AND UPGRADATION OF NH-67 FROM KM 695.000 TO KM 741.950 (ATMAKUR – NELLORE SECTION) IN THE STATE OF ANDHRA PRADESH TO TWO LANES WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS
|
1115 | REHABILITATION AND UPGRADATION OF NH219(NEW NH42) FROM KM 244.930 TO 299.775 (MADANAPALLI PUNGANURU PALAMANERU ROAD SECTION) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
|
1116 | REHABILITATION AND UPGRADATION OF NH326A FROM KM 0/0 TO 41/979 (EXCLUDING KM 2/255 TO 3/372 AND KM 36/820 TO 38/275) TO TWO LANE WITH PAVED SHOULDERS UNDER NH(O) ON EPC MODE
|
1117 | REHABILITATION AND UPGRADATION OF NH565 FROM EXISTING KM 361.330(DORNALA T JUNCTION) TO KM 420.800(PENCHALAKONA JUNCTION) DESIGN KM 360.156 TO KM 402.468) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
|
1118 | REHABILITATION AND UPGRADATION OF NH67 FROM KM 424.650 TO 487.693 OF GOOTY-TADIPATRI SECTION TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
|
1119 | REHABILITATION AND UPGRADATION OF PILIBHIT TO PURANPUR SECTION FROM KM 0.00 TO KM 38.00 OF NH-730 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1120 | REHABILITATION AND UPGRADATION OF PUNDIBARI TO BAXIRHAT (WB/ASSAM BORDER) SECTION OF NH-31 FROM KM 770-816 OF NH-31 TO TWO LANES WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS.
|
1121 | REHABILITATION AND UPGRADATION OF PURANPUR - KHUTAR SECTION FROM KM 38.00 TO KM 82.00 OF NH-730 TO 2-LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1122 | REHABILITATION AND UPGRADATION OF ROAD FROM DESIGN KM 0.00 TO KM 11.800 OF KAILASHAHAR-KURTI BRIDGE SECTION TO 2-LANE (PKG- I )
|
1123 | REHABILITATION AND UPGRADATION OF SINDOOR RIVER TO START OF BARELI BYPASS SECTION OF NH-12 FROM EXISTING KM 130/10 TO KM 194/0 [DESIGN CH. 130.000 TO CH. 193.000] IN THE STATE OF MADHYA PRADESH TO 4L+
|
1124 | REHABILITATION AND UPGRADATION OF SULTANPUR BYPASS SECTION OF NH-96 FROM KM 60.000 TO KM 90.865 TO 2-LANE WITH PAVED SHOULDER ON EPC MODE IN THE STATE OF UTTAR PRADESH
|
1125 | REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER OF MOGA (DESIGN CH 0.000) TO MAKHU (DESIGN CH 33.611) AND HARIKE (DESIGN CH 44.680) TO KHALRA (DESIGN CH 86.236) INCLUDING CONSTRUCTION
|
1126 | REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION OF NANDAKUMAR-CONTAI-CHANDESHWAR ROAD FROM KM 0-25.5 AND KM 41-64.70 OF NH-116B.
|
1127 | REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDER FROM JIND-GOHANA ROAD FROM DESIGN CHAINAGE KM 0+000 TO KM 50+505 (LENGTH-50.505 KM) OF NH-352A ON EPC MODE UNDER NH (O)
|
1128 | REHABILITATION AND UPGRADING TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND STRENGTHENING OF NAUPARHA TO BANGO MUNDA SECTION (KM 90 TO KM 158) OF NH 217 IN THE STATE OF ORISSA UNDER PHASE I OF NHIIP
|
1129 | REHABILITATION AND UPGRADING TO 2 LANE WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF ANISHABAD- AURANGABAD- HARIHARGANJSECTION (KM 0.00 TO 154.625 ) OF NH-98 LOT-II
|
1130 | REHABILITATION AND UPGRADING TO 2 LANE WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF ANISHABAD- AURANGABAD- HARIHARGANJSECTION OF NH-98 LOT-I
|
1131 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF "MADHUGIRI-MULBAGAL SECTION (KM 343.800 TO KM 483.151) NH-234 IN KARNATAKA FOR LOT-II(KM 400.330 TO KM 483.151)
|
1132 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF ANISABAD-AURANGABAD-HARIHARGANJ SECTION (KM 0.0 - KM 154.625) OF NH-98 IN BIHAR.
|
1133 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF ANISABAD-AURANGABAD-HARIHARGANJ SECTION (KM 0.0 – KM 154.625) OF NH-98 IN BIHAR FOR LOT-II(PACKAGE NO.
|
1134 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF BANKUARA- PURULIA (KM 0.000 TO KM 84.000)OF NH-60A IN WEST BENGAL
|
1135 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF BHOJPUR-CHHATABAR (KM 131.000 TO KM 192.000) OF NH-200 IN ODISHA
|
1136 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF LALSOT-KARAULI (KM 0.000 TO KM 85.000) OF NH-11B IN RAJASTHAN
|
1137 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF NABARANGPUR-KOKSARA (KM 25.000 TO KM 80.000) OF NH-201 IN ODISHA
|
1138 | REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF PRATAPGARH-PADI (KM 80.000 TO KM 180.000) OF NH-113 IN RAJASTHAN
|
1139 | REHABILITATION AND UPGRADING TO 2 LNES-2 LANE WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF PRATAPGARH PADI SECTION
|
1140 | REHABILITATION SIX LANING UPGRADATION CHANDIKHOLE BHADRAK
|
1141 | REHABILITATION UPGRADATION OF NH-67 FROM KM 641.000 TO KM 695.000 (DORNALA T JUNCTION TO ATMAKUR SECTION) IN THE STATE OF ANDHRA PRADESH TO TWO LANES WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS
|
1142 | REHABLITATION AND UPGRADATION OF AMBOLI JUNCTION (DESIGN CH. 71+530) TO AJARA (DESIGN CH.100+835) SECTTION IN THE STATE OF MAHARASHTRA.
|
1143 | REMAINING WORK OF 2L+PS OF TRICHY - KARAIKUDI SECTION OF NH-210, INCLUDING TRICHY BYPASS
|
1144 | REPL.7 SUB- MARINE PLINE
|
1145 | RHENOK-RORAHTHANG-PAKYONG ON NH 717A
|
1146 | RINGBUNDS TO JHAJHANPUR (BR-6)
|
1147 | RISOD TO HINGOLI
|
1148 | RJ/MP BORDER TO KOTA(RJ-11) NH-76, KM.579 TO KM.509
|
1149 | RJ/MP BORDER TO KOTA(RJ-9) NH-76, KM.449.15 TO KM.406
|
1150 | RJ/MP BRD.TO KOTA(RJ-10)
|
1151 | ROHTAK-BAWAL
|
1152 | RUDHAULI TO GHAGRA BRIDGE SECTION OF NH-233 IN UTTAR PRADESH KM 65/870 TO 122/270
|
1153 | S'HABAD-ETAWA GQ
|
1154 | S'HABAD-ETAWA GQ
|
1155 | S'KAKULAM-CH'WATI GQ
|
1156 | S'KAKULAM-CH'WATI GQ
|
1157 | S'KHALA-G'JAM GQ
|
1158 | S'PURI B'PAS-MP/RJ BRD.
|
1159 | S'RAM-D'ON-SON GQ
|
1160 | SAGAR - RAJMARG CHORAHA,KM 211 TO KM 255, NH-26 (NHAI)
|
1161 | SAGAR - RAJMARG CHORAHA,KM 255-297, NH-26 (NHAI)
|
1162 | SAGAR BY PASS,KM 187 TO KM 211 , NH-26 (NHAI)
|
1163 | SAKOLI TO BHANDARA
|
1164 | SALAIKHURD TO TIRORA
|
1165 | SALEM - U / UNDRUPET(BOT -1/TN-06) NH -68
|
1166 | SALEM TO KARUR (NS-21 OF TN-2), KM.207.050-KM.248.625, NH-7
|
1167 | SALEM TO KARUR, KM.258-645 TO KM.292.6
|
1168 | SALEM TO KERALA BORDER SEC(TN6), KM.203.96 NH7 TO KM 53 NH47
|
1169 | SALEM TO KERALA BORDER SEC. (TN-7), KM.53 TO KM.100, NH-47
|
1170 | SALEM-KARUR (NS-2/JN-3)
|
1171 | SALEM-KARUR (NS-2/TN-2)
|
1172 | SAMAIKHIALI - GANDHIDHAM
|
1173 | SAMBALPUR-BARGARH-CHHATISGARH/ORISSA BORDER
|
1174 | SANCHORE - SANTALPUR FROM KM 4.888 - KM 35.000 OF NH-754K (AJ-RGBS-PACKAGE-1)
|
1175 | SANGARIYA (NEAR CHAUTALA)-RASISAR (NEAR BIKANER) (AJ/SR-PACKAGE-4)
|
1176 | SANGARIYA (NEAR CHAUTALA)-RASISAR (NEAR BIKANER) (AJ/SR-PACKAGE-9)
|
1177 | SANGARIYA (NEAR CHAUTALA)-RASISAR (NEAR BIKANER) (PHASE-I) (AJ/SR-PACKAGE-1)
|
1178 | SANGARIYA (NEAR CHAUTALA)-RASISAR (NEAR BIKANER) (PHASE-I) (AJ/SR-PACKAGE-2)
|
1179 | SANGARIYA (NEAR CHAUTALA)-RASISAR (NEAR BIKANER) (PHASE-I) (AJ/SR-PACKAGE-3)
|
1180 | SANGARIYA (NEAR CHAUTALA)-RASISAR (NEAR BIKANER) (PHASE-I) (AJ/SR-PACKAGE-5)
|
1181 | SANGARIYA (NEAR CHAUTALA)-RASISAR (NEAR BIKANER) (PHASE-I) (AJ/SR-PACKAGE-6)
|
1182 | SANGARIYA (NEAR CHAUTALA)-RASISAR (NEAR BIKANER) (PHASE-I) (AJ/SR-PACKAGE-8)
|
1183 | SANGARIYA (NEAR CHAUTALA)-RASISAR (NEAR BIKANER) SECTION OF NH-754K (PHASE-I) (AJ/SR-PACKAGE-7)
|
1184 | SANGOLA TO JATH
|
1185 | SARAD VANI PIMPALGAON
|
1186 | SASARAM-DEHRI ON-SONE (GQ) KM.110-KM.140 (NH-2)
|
1187 | SATARA MURVAD PILLOV PANDHARPUR
|
1188 | SATARA-KAGAL (GQ) KM.725-KM.592.24 (NH-4)
|
1189 | SATARA-KAGAL GQ
|
1190 | SATARA-KAGAL GQ
|
1191 | SELDOH TO PANVAR
|
1192 | SHAHDOL TO ANUPPUR-MP/CHATTISGARH BORDER SECTION OF NH-78 IN MADYA PRADESH KM 142/200 TO 245/0
|
1193 | SHAHPUR PATGAON SECTION I
|
1194 | SHEGAON TO DEORI PHATA
|
1195 | SHEWALI (SAKRI) - NANDURBAR
|
1196 | SHIKOHABAD -ETAWAH:NH-2
|
1197 | SHIKOHABAD ETAWAH (NH-2) (NHAI) GQ, KM.250.5-KM.307.5, NH-2
|
1198 | SHIKOHABAD-ETAWAH (GQ) KM.250.5-KM.307.5 (NH-2)
|
1199 | SHIROD SHAHPURER TO NANDED
|
1200 | SHIVPURI BYPASS AND UPTO MP/RJ BORDER (EW-2-MP-1) NH-25 AND 76
|
1201 | SHIVUR TO YEOLA
|
1202 | SHRIRAMPUR (KM. 0.000) TO KOCHUGAON (KM. 30.000) OF BIJNI TO ASSAM./WEST BENGAL BORDER SECTION OF NH-31C IN ASSAM, AS-12 (INCLUDING BALANCE WORKS)
|
1203 | SIKANDARA-BHAUNTI (GQ) KM.393-KM.470 (NH-2)
|
1204 | SILCHAR-UDARBAND (PH.II) HN-54, KM.309 TO KM.275
|
1205 | SILIGURI TO ISLAMPUR (WB-7)
|
1206 | SILLIGURI TO ISLAMPUR (WB-6)
|
1207 | SINNAR-SHIRDI (INCLUDING SINNAR BYPASS)
|
1208 | SIRA-TUMKUR (GQ) KM.116.4-KM.75 (NH-4)
|
1209 | SIRA-TUMKUR GQ
|
1210 | SIRA-TUMKUR GQ
|
1211 | SITAPUR-LUCKNOW
|
1212 | SIX / FOUR LANING OF NH 5 (NEW NH 16) FROM PUINTOLA TO TANGI (KM. 284.000 TO KM. 355.000)
|
1213 | SIX LANING AND STREGTHENING OF NH-248A FROM EXISTING KM 2.740 (RAJIV CHOWK) TO KM 11.682 (PACKAGE-I) IN GURUGRAM UNDER NHDP PHASE-IV
|
1214 | SIX LANING AND STRENGTHENING OF NEW NH-248A FROM EXISTING KM 11+682 TO EXISTING KM 24+400 IN THE STATE OF HARYANA PACKAGE-2: EXISTING CH. KM 11+682 TO KM 24+200 (DESIGN CH. KM 9+282 TO KM 22+000)
|
1215 | SIX LANING OF ANANDAPURAM PENDURTHI ANAKAPALLI SECTION OF NH-5 NEW NH-16 FROM KM.681.000 EXISTING KM.681.000 TO KM.731.780 EXISTING KM.742.400 DESIGN LENGTH 50.78 KM IN THE STATE OF ANDHRA PRADESH UND
|
1216 | SIX LANING OF CHAKERI TO ALLAHABAD SECTION OF NH-2 FROM KM 483.687 TO KM 628.753 (DESIGN LENGTH – 145.066 KM) IN THE STATE OF UTTAR PRADESH UNDER NHDP PHASE – V
|
1217 | SIX LANING OF CHANDIKHOL-JAGATPUR-BHUBANESWAR
|
1218 | SIX LANING OF CHENNAI-TADA SECTION OF NH-5 FROM KM 11/0 TO KM 54/4 IN THE STATE OF TAMIL NADU TO BE EXECUTED UNDER DBFOT BASIS UNDER NHDP PAHSE V – BALANCE WORK IN KM 21.400 TO KM 54.400 (LENGTH 33.00
|
1219 | SIX LANING OF CHITRADURGA-DAVANGERE INCLUDING CHITRADURGA BYPASS(KM 189+000 TO KM 260+000 OF NH-48(OLD NH-4)) STATE OF KARNATAKA
|
1220 | SIX LANING OF DAVANGERE-HAVERI FROM KM 260+000 TO KM 338+923 OF NH-48(OLD NH-4) STATE OF KARNATAKA
|
1221 | SIX LANING OF EXISTING 4-LANE ROAD FROM GUNDUGOLANU (DESIGN KM 1023.280) TO KALAPARRU (DESIGN KM 1050.680) OF NH-5 (NEW NH-16) (DESIGN LENGTH : 27.400 KM) IN THE STATE OF ANDHRA PRADESH UNDER NHDP PHA
|
1222 | SIX LANING OF EXISTING 4-LANE ROAD FROM KALAPARRU (DESIGN KM 1050.680) TO CHINNA AVUTUPALLI (DESIGN KM 1076.480) OF NH-5 INCLUDING 6-LANE HANUMAN JUNCTION BYPASS FROM (EXISTING KM 1055.680 TO KM 1060.
|
1223 | SIX LANING OF NARASANNAPETA – RANASTALAM SECTION OF NH-16 (OLD NH-5) FROM DESIGN KM 580.671 (EXISTING KM 580.700) TO DESIGN KM 634.861 (EXISTING KM 634) (DESIGN LENGTH=54.19 KM) IN THE STATE OF ANDHRA
|
1224 | SIX LANING OF NH-140 FROM CHITTOR (DESIGN KM 0.000/EXISTING KM 158.000 OF NH-4) TO MALLAVARAM (DESIGN KM 61.128/EXISTING KM 41.800 OF NH-140) (DESIGN LENGTH = 61.128 KM ) IN THE STATE OF ANDHRA PRADES
|
1225 | SIX LANING OF NIDAGATTA-MYSORE SECTION, KM 74.20 TO KM 135.304 OF NH-275, IN THE STATE OF KARNATAKA ON DBFOT BASIS.(RFQ)
|
1226 | SIX LANING OF PIMPALGAON-NASHIK-GONDE SECTION OF NH-3 FROM KM 380.000 TO 440.000 IN THE STATE OF MAHARASHTRA -BALANCE/ADDITIONAL WORKS ON EPC MODE
|
1227 | SIX LANNING FROM EXISTING KM 494.410(DESIGN CHAINAGE 540.595) TO EXISTING KM 509.550(DESIGN CHAINAGE 555.905)STATE OF GUJARAT.
|
1228 | SIX LANNING FROM KM 287.400 TO KM 401.200 SECTION OF NH- 8 IN THE STATE OF RAJASTHAN AND GUJARAT(APPROX. LENGTH 113.800 KM) ON DBFOT(TOLL) UNDER NHDP PHASE-V (PACKAGE-V)
|
1229 | SIX LANNING OF CHITTORGARH-UDAIPUR SECTION OF NH-76 FROM DESIGN CHAINAGE KM. 214.870 TO KM 308.370 IN THE STATE OF RAJASTHAN (LENGTH 93.500 KM) ON DBFOT (TOLL) MODE UNDER NHDP PHASE V (PACKAGE-III)
|
1230 | SIX LANNING OF HOSUR- KRISHNAGRI NH-7 KM.33.130 TO KM.93.00
|
1231 | SIX LANNING OF KISHANGARH UDAIPUR AHMEDABAD SECTION FROM KM.90.000 (NEAR GULABPURA) TO KM. 214.870 (END OF CHITTORGARH BYPASS) OF NH-79 IN THE STATE OF RAJASTHAN PACKAGE-2 UNDER NHDP PHASE-V ON BOT (T
|
1232 | SIX LANNING OF KRISHNAGIRI- WALAJHAPET SECTION KM.0.00 TO KM.148.3 NH-46
|
1233 | SIX LANNING OF MANDI DABWALI (PUNJAB/HARYANA BORDER)- CHAUTALA ROAD SECTION FROM PROPOSED MANDI DABWALI BYPASS (DESIGN CH. 27.00) TO CHAUTALA (DESIGN CH. 62.200) OF NH-54 UNDER BHARATMALA PARIYOJNA (D
|
1234 | SIX LANNING OF NELLORE-CHILKALURIPET KM.1182.802 TO KM.1366.547
|
1235 | SIX LANNING OF NH-5 (NEW NH-16) FROM TANGI TO BHUBANESHWAR (KM 355.000 TO KM 414.000)
|
1236 | SIX LANNING OF RANASTALAM-ANANDAPURAM SECTION OF NH-16 FROM KM 634.000 TO KM 681.000
|
1237 | SIX LANNING OF VADAKKANCHERRY THRISSURESECTION KM 240 270KM
|
1238 | SIX-LANING OF BANGALORE – NIDAGATTA SECTION, KM 18.000 TO KM 74.200 OF NH-275 IN THE STATE OF KARNATAKA
|
1239 | SIX-LANNING OF GREENFIELD PROPOSED UDAIPUR BYPASS PKG-IV
|
1240 | SKDRA-BAUNTI GQ
|
1241 | SONAPUR TO GUWAHTI (AS-3)
|
1242 | SONOULI TO GORAKHPUR SECTION OF NH-29E IN UTTAR PRADESH KM 0/0 TO 80/0
|
1243 | SRIKAKULAM - CHAMPAWATI
|
1244 | SRIKAKULAM - CHAMPAWATI, KM.97-KM.49, NH-5
|
1245 | SRIKAKULAM-CHAMPAWATI (GQ) KM.97-KM.49 (NH-5)
|
1246 | SRINAGAR TO BANIHAL
|
1247 | STRENGTHENING AND CONSTRUCTION OF PAVED SHOULDERS INCLUDING REHABILITATION/REPAIRING OF BRIDGES FROM KM. 325.000 TO 344.000, KM. 351.000 TO 355.000 AND FROM KM.
|
1248 | STRENGTHENING AND WIDENING OF NH-44 FROM KM.173.125 TO KM. 272.241 OF NH-44 AND ALONG THE KARIMGANJ BY-PASS CONSTRUCTED BY BRO
|
1249 | STRENGTHENING AND WIDENING TO 2 LANE WITH PAVED SHOULDER FROM KM 103.865 TO 142.050 (GAYA-GOH) OF NH-120
|
1250 | STRENGTHENING AND WIDENING TO TWO LANE WITH PAVED SHOULDER OF NH-61 FROM KM 40.00 TO KM 72.40 UNDER EPC MODE IN THE STATE OF NAGALAND DURING 2016-17 (PACKAGE-I FROM KM 40.00 TO KM 56.00)
|
1251 | STRENGTHENING AND WIDENING TO TWO LANE WITH PAVED SHOULDER OF NH-61 FROM KM 40.00 TO KM 72.40 UNDER EPC MODE IN THE STATE OF NAGALAND DURING 2016-17 (PACKAGE-II FROM KM 56.00 TO K 72.40)
|
1252 | STRENGTHENING AND WIDENING WORK OF EXISTING 2-LANE TO TWO LANE WITH PAVED SHOULDER AND GEMETRIC IMPROVEMENT FROM KM 64.00 TO 97.00 OF NH-28B
|
1253 | STRENGTHENING OF 6-LANE PIMPALGAON-NASHIK-GONDE (KM. 380 - KM. 440) SECTION OF NH-3 IN MAHARASHTRA USING THIN WHITE TOPPING (TWT) AND BC OVERLAY ON SERVICE ROAD & VIADUCT/ DECK OF STRUCTURES ON EPC MO
|
1254 | STRENGTHENING OF CHURAIBARI - AGARTALA SECTION OF NH-08
|
1255 | STRENGTHENING OF EXISTING TWO LANE I/C PAVED SHOULDER FROM MAO - SENAPATI FROM KM 212.325 TO KM 260.000 (47.675 KM)
|
1256 | STRENGTHENING WITH PAVED SHOULDER FROM KM 30/0 TO KM 46/0, KM 54/0 TO KM 61/0, KM 69/0 TO KM 80/0 AND KM 80/0 TO KM 96/0 OF NH-39 FOR THE YEAR 2015-16 INCLUDING TOLL PLAZA 30/0 TO KM 46/0, KM 54/0 TO
|
1257 | STRENGTHENING WITH PROVISION OF PAVED SHOULDER IN KM. 0.00 TO 46.470 OF NH-96(330) EPC MODE
|
1258 | STRENGTHING AND WIDINING OF EXISTING CARRIAGEWAY TO 10 M IN KM, 156/160 TO 229/160 (TEMBHURNI - KUSLAMB) SECTION OF NH 548 C I.E. TEMBHURNI KURDUWADI BARSHI KUSLAMB ROAD IN THE STATE OF MAHARASHTRA.
|
1259 | SUNAKHALA-GANJAM (GQ) KM.338-KM.284 (NH-5)
|
1260 | SURAT- DAHISAR(SIX LANE) KM 263 TO KM 502
|
1261 | SURAT-ATUL (GQ) KM.263.4-KM.343 (NH-8)
|
1262 | SURAT-ATUL GQ
|
1263 | SURAT-ATUL GQ
|
1264 | SWAROOPGANJ TO BAKARIA (RJ-1) PH.II, KM.29-KM.0 (NH-76)
|
1265 | T'BRM-T'VNM OTHER
|
1266 | T'BRM-T'VNMOTHER
|
1267 | TADA-CHENNAI (GQ) KM.52.8-KM.11 (NH-5)
|
1268 | TADA-CHENNAI GQ
|
1269 | TADA-CHENNAI GQ
|
1270 | TAKARKHED TO JALNA
|
1271 | TALEGAON TO GONAPUR
|
1272 | TALEGAON-AMRAVATI
|
1273 | TALGAON TO KALMATH
|
1274 | TAMBARAM-TINDIVANAM (OTHERS) KM.28-KM.121 (NH-45)
|
1275 | TASGAON TO SHIRDHON
|
1276 | TEMBHURNI PANDHARPUR MANGALWEDHA MARWADE UMDI
|
1277 | THANJAUR-TRICHY,NH-67(NHAI)
|
1278 | THANJAVUR - PUDUKOTTAI SECTION OF NH-226
|
1279 | THIRUMAYAM - MANAMADURAI SECTION
|
1280 | THRISSUR TO ANGAMALI (NH-47)
|
1281 | TINDIVANAM-UIUNDURPET,KM 121-192.25 NH-45
|
1282 | TIRUNELVEI-PANAGUDI,KM 160-203(T.N)
|
1283 | TIRUPATI - TIRUTHANI - CHENNAI
|
1284 | TN-6:SALEM -KERALA BRD.
|
1285 | TN-7:SALEM -KERALA BRD.
|
1286 | TOVARAMKURCHI-MADURAI,NH45B (NHAI)
|
1287 | TRICHY - DINDIGUAL NH-45
|
1288 | TRICHY - KARUR
|
1289 | TRICHY - KORUR NH-67
|
1290 | TRICHY BYPASS END TO TOVARAMKURCHI (NH-45B)(NHAI)
|
1291 | TRUNELVELI- PANGUDI:NS43
|
1292 | TULUNGIA-JOGIGHOPA-PAIKAN PKG-5
|
1293 | TUMKUR-N'MANGAL GQ
|
1294 | TUMKUR-N'MANGAL GQ
|
1295 | TUMKUR-NEELMANGALA (GQ) KM.62-KM.29.5 (NH-4)
|
1296 | TUNI-D'VARAM GQ
|
1297 | TUNI-D'VARAM GQ
|
1298 | TUNI-DHARMAVARAM (GQ) KM.300-KM.253 (NH-5)
|
1299 | TUTICORIN PORT DREDGIN
|
1300 | TUTICORIN-PORT
|
1301 | TWO LANE WITH PAVED SHOULDERS OF BIJAPUR - GULBARGA - HOMNABAD - SECTION OF NH-218 ( NEW NH NO -50)
|
1302 | TWO LANE WITH PAVED SHOULDERS OF CHAS -RAMGARH SECTION OF NH-23
|
1303 | TWO LANE WITH PAVED SHOULDERS OF JODHPUR - POKARAN SECTION OF NH-114 ( NEW NH NO -50)
|
1304 | TWO LANING OF AKAJAN LIKABALI BAME ROAD ON EPC BASIS FROM EXISTING KM 71.000 TO KM 99.000 (DESIGN KM. 65.810 TO KM. 91.928) IN THE STATE OF ARUNACHAL PRADESH
|
1305 | TWO LANING OF EXISTING HAYULIANG HAWAI ROAD ON EPC BASIS FROM DESIGN KM. 17.000 (KHUPA) TO KM. 34.000 [EXISTING KM 16.950 TO KM 34.310 (HAYULIANG HAWAI ROAD)] IN THE STATE OF ARUNACHAL PRADESH
|
1306 | TWO LANING OF EXISTING HAYULIANG HAWAI ROAD ON EPC BASIS FROM DESIGN KM. 34.000 TO KM. 51.825 [EXISTING KM 26.625 TO KM 45.050 (HAYULIANG HAWAI ROAD)] IN THE STATE OF ARUNACHAL PRADESH
|
1307 | TWO LANING OF EXISTING KHUPA HAYULIANG HAWAI ROAD ON EPC BASIS FROM DESIGN KM. 0.000 (KHUPA) TO KM. 17.000 [EXISTING KM 95.800 OF (KHUPA HAYULIANG ROAD) TO KM 8.970 (HAYULIANG HAWAI ROAD)]
|
1308 | TWO LANING OF GOBOK - SIJON NALLAH (CORRECSPONDING TO EXISTING CH: 27.00 TO KM75.00) IN ARUNACHAL PRADESH UNDER ARUNACHALPRADESH PACKAGE OF SARDP-NE
|
1309 | TWO LANING OF HOJ POTIN SECTION OF NH 229 (19.06 KM) IN ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF SARDP
|
1310 | TWO LANING WITH PAVED SHOULDER BARMER - SANCHOR - GUJARAT BODER ( UP TO GANDHAV BRIDGE) SECTION OF NH-15
|
1311 | TWO LANING WITH PAVED SHOULDER OF KARAUII - DHOLPUR
|
1312 | TWO LANING WITH PAVED SHOULDER OF MEENSURUTTI (KM. 98.433) TO CHIDAMBARM (KM. 129.965.) SECTION OF NH-227
|
1313 | TWO LANING WITH PS OF BIHARAHARIF -BARBIGHA - MOKAMA
|
1314 | TWO LANING WITH PS OF CHHAPRA -GOPALGANJ
|
1315 | TWO LANING WITH PS OF CHHAPRA -REWAGHAT - MUZAFFARPUR
|
1316 | TWO LANING WITH PS OF JOWAI -MEHALAYA /ASSAM BORDER SECTION OF NH-44
|
1317 | TWO LANING WITH PS OF UNCHA NAGLA - KHANUWARA - ROPPAS -DHOLPUR
|
1318 | TWO LANNING WITH PAVED SHOULDER OF MANOHARPUR-DAUSA SECTION OF NH-11A(NEW NH-148) FROM KM 62.100 KM (DESIGN CHAINAGE 0.000 TO KM 0.000 DESIGN CHAINAGE 62.318) IN THE STATE OF RAJASTHAN ON EPC MODE
|
1319 | TWO LANNING WITH PAVED SHOULDER OF SALASAR-NAGAUR
|
1320 | TWO- LANE WITH PAVED SHOULDER CONFIGURATION OF IMPHAL - MOREH SECTION OF NH-39 FROM KM 330 TO KM 350.00 IN THE STATE OF MANIPUR.(PACKAGE-1)
|
1321 | TWO- LANE WITH PAVED SHOULDER CONFIGURATION OF IMPHAL - MOREH SECTION OF NH-39 FROM KM 350.00 TO KM 395.680 IN THE STATE OF MANIPUR.
|
1322 | TWO-LANING OF JORAM – KOLORIANG ROAD (NH-713) FROM DESIGN KM. 20+000 TO KM. 32+050 [EXISTING KM 20.000 TO KM 35.150
|
1323 | TWO-LANING OF JORAM – KOLORIANG ROAD (NH-713) FROM DESIGN KM. 32+050 TO KM. 44+000 [EXISTING KM 35.150 TO KM 50.050]
|
1324 | TWO/FOUR LANNING OF BRT TIGER RESERVE BOUNDARY TO BANGALORE SECTION OF NH-209(EXISTING CHAINAGE FROM 287.520 TO 461.550) IN THE STATE OF KARNATAKA TO BE EXECUTED ON BOT (HYBRID ANNUITY) BASIS UNDER NH
|
1325 | TWO/FOUR LANNING WITH PAVED SHOULDERS OF GOVINDPUR (RAIGANJ)-CHAS-WEST BENGAL BORDER SECTION OF NH-32 FROM KM 0.000 TO KM 56.889 IN THE STATE OF JHARKHAND UNDER NHDP PHASE-IV ON
|
1326 | UDAIPUR-K'RIAJI GQ
|
1327 | UDAIPUR-K'RIAJI GQ
|
1328 | UDAIPUR-KESARIAJI (GQ) KM.278-KM.340 (NH-8)
|
1329 | UGRADATION OF HYDERABAD-BANGALORE SECTION
|
1330 | UIUWDURPET-PADALUR,NH-45
|
1331 | UP GRADATION OF NEWLY DECLARED NH 341 TO TWO LANE WITH PAVED SHOULDER CONFIGURATION BETWEEN KM. 65.478 TO KM 162.209 BHUJ AIRPORT JN KHAVDA INDIA BRIDGE TO DHARMSHALA SECTION IN THE STATE OF GUJARAT
|
1332 | UP-GRADATION OF TIRORA-GONDIA, STATE HIGHWAY FROM EXISTING KM 163+213 (ON SH-335, TIRORA) TO KM 191+456 ( ON SH-335, GONDIA JN) [DESIGN KM.87.000 TO KM. 115.200] (CONSTRUCTION LENGTH=28.200 KM) NH 753
|
1333 | UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FOR SECTION FROM KM 118.900 TO KM 156.955 BALOTRA TOSANDERAO VIA JALORE SECTION OF NH 325 (PKG-III)
|
1334 | UP-GRADATION TO 4-LANE WITH PAVED SHOULDER OF JAMMU-AKHNOOR SECTION OF NH-144A FROM CANAL HEAD (KM 0.800) TO GANESH VIHAR (KM 6.000) OF 5.2 KM LENGTH IN THE STATE OF JAMMU KASHMIR TO BE EXECUTED ON
|
1335 | UP-GRADATION TO TWO LANE WITH PAVED SHOULDER FOR SECTION FROM KM 58.000 TO KM 91.600 (BALOTRA TO SANDERAO SECTION VIA JALORE ) OF NH 325 (PKG-II)
|
1336 | UP-GRADATION TO TWO LANING WITH PAVED SHOULDER OF AJMER-NAGAUR SECTION BY EXECUTING BALANCE WORK FROM KM. 0.000 TO KM. 148.25 ON NH 89
|
1337 | UP/BIHAR BORDER TO KASIA (NH-28)(NHAI)
|
1338 | UP/HARYANA BORDER - YAMUNA NAGAR -SAHA- BARWALA - PANCHKULA ( PKG - 1)
|
1339 | UP/HARYANA BORDER - YAMUNA NAGAR -SAHA- BARWALA - PANCHKULA( PKG - 2)
|
1340 | UPGRADATION AND REHABILITATION TO TWO LANE WITH PAVED SHOULDER OF BARMER GHAGARIYA SECTION FROM KM 0.972 TO 69.910 ON OF NH-25 EXT. IN THE STATE OF RAJASTHAN ON EPC MODE.
|
1341 | UPGRADATION AND REHABILITATION TO TWO LANE WITH PAVED SHOULDER OF GHAGARIYA- MUNABAO SECTION FROM KM 69.910 TO KM 126.355 OF NH-25 EXT (DESIGN LENGTH 56.445 KM) IN THE STATE OF RAJASTHAN ON EPC MODE.
|
1342 | UPGRADATION AND WIDENING OF MP BORDER TO SURAJPUR SECTION NH 43 FROM KM. 245 TO 331
|
1343 | UPGRADATION OF BIAORA-MAKSUDANGARH ROAD TO 2L + PS
|
1344 | UPGRADATION OF DABOH-UP BORDER ROAD TO 2L + PS
|
1345 | UPGRADATION OF MAKSUDANGARH-SIRONJ ROAD TO 2L + PS
|
1346 | UPGRADATION OF MORENA-PORSA ROAD TO 2L + PS
|
1347 | UPGRADATION OF NEW NATIONAL HIGHWAY NO 168 TO TWO LANE WITH PAVED SIDE SHOULDER CONFIGURATION BETWEEN KM 0/0 TO 41/300 AND KM 43/250 TO 68/174( THARAD DHANERA PANTHAWADA SECTION) INCLUDING IMPROVEMEN
|
1348 | UPGRADATION OF NH 930 JHALMALA TO SHERPER FROM NH KM 30.600 TO KM 67.800 TO TWOFOUR LANE WITH PAVED SHOULDERS IN THE STATE OF CHHATTISGARH ON EPC MODE
|
1349 | UPGRADATION OF NH-31C WITH A MINIMUM OF 2-LANE WITH PAVED SHOULDER CONFIGURATION STARTING FROM KM 105.000 TO KM 145.632 (TOTAL LENGTH 40.632 KM) IN JALPAIGURI ON EPC MODE.
|
1350 | UPGRADATION OF NH-512 WITH A MINIMUM 2-LANE WITH PAVED SHOULDER CONFIGURATION STARTING FROM CH 82.4 KM TO 99.5 KM AND MINIMUM OF 4-LANE CONFIGURATION FROM CH 104.2 KM TO CH 106.607 KM ALONG WITH COST
|
1351 | UPGRADATION OF PACHORE- SHUJALPUR ROAD TO 2L + PS
|
1352 | UPGRADATION OF PAWAI-SALEHA-JASSO-NAGOD ROAD TO 2L + PS
|
1353 | UPGRADATION OF PORSA-BHIND ROAD TO 2L + PS
|
1354 | UPGRADATION OF REWA-SIRMOUR ROAD TO 2L + PS
|
1355 | UPGRADATION TO 2 LANE WITH PAVED SHOULDER/4 LANE OF KHAJUWALA-POOGAL SECTION AND POOGLE -DANTOUR-JAGGASAR-GOKUL-GODDU -RANJEETAPURA -CHARANWALA-NAUKH-BAP SECTION OF NH-911
|
1356 | UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM KM . 0/0 TO 43/900 OF KUNDAL-NAYA KHEDA-JHADOL-SOM-NALWA-DAIYA-IDAR PKG-I (1107)
|
1357 | UPGRADATION TO 2 LANE WITH PAVED SHOULDER WITH RIGID PAVEMETS FROM 37/400 TO KM 66/700 ON NH 848 ON EPC MODE IN THE STATE OF GUJARAT.
|
1358 | UPGRADATION TO 2 LANE WITH PAVED SHOULDER/4 LANE OF GAGARIA - BAORI KALAN - SERWA - BAKHASAR SECTION OF NH-925 AND SATA - GANDHAV SECTION OF NH-925A UNDER BHARATMALA PARIYOJNA IN THE STATE OF RAJASTHA
|
1359 | UPGRADATION TO 2LANE WITH PAVED SHOULDER FROM KM . 43/900 TO 91/0 OF KUNDAL-NAYA KHEDA-JHADOL-SOM-NALWA-DAIYA PKG-II (1108)
|
1360 | V'BADI-P'KOND GQ
|
1361 | V'NANDA BRIDG AND APPCH GQ
|
1362 | V'NASI-MOHANIA GQ
|
1363 | V'PUR-P'KOT NS34/JK:NH1A
|
1364 | V'PUR-P'KOT NS35/JK,NH1A
|
1365 | VADODARA-BHARUCH PACKAGE BOT-I
|
1366 | VADODARA-SURAT SECTION
|
1367 | VADPALE TO BHOGAN KHURD
|
1368 | VANIYAMBADI-PALLIKONDA
|
1369 | VANIYAMBADI-PALLIKONDA (GQ) KM.49.00-KM.100.00 (NH-46)
|
1370 | VARANASI RING ROAD PKG - I
|
1371 | VARANASI-MOHANIA (GQ) KM.317-329 AND KM.0-KM.65 (NH-2)
|
1372 | VIJAYAPUR TO PATHANKOT (J AND K) NH-1A KM.16.35 TO KM.50.00
|
1373 | VIJAYAPUR TO PATHANKOT (NS-35/J AND K) NH-1A KM.50 TO KM.80
|
1374 | VIVEKANANDA BRIDGE AND APPROACH (GQ), NH-2
|
1375 | WADIGODRI TO DHANGRIPIMPRI
|
1376 | WAINGANGA BRIDGE -CHHATISGARH-MAHARASHTRA
|
1377 | WAKAN PALI KHOPOLI
|
1378 | WAKED TO TALEGAON
|
1379 | WAKHARI TO KHUDUS PACKAGE2 SANT DNYANESHWAR MAHARAJ PALKHI MARG SECTION OF NH965
|
1380 | WANDS OF EXISTING SINGLE LANE TO DOUBLE LANE CARRIAGEWAY IN KM 0 TO 40 OF NH-104 IN BIHAR UNDER EPC MODE CONTRACT UNDER NH(O) (JOB NO- 0104-BR-2013-865)
|
1381 | WARDHA TO ARVI
|
1382 | WARDHA TO HINGAGHAT
|
1383 | WASHIM TO DASTAPUR
|
1384 | WIDENING AND REHABILITATION OF THE EXISTING PATIALA BYEPASS FROM EXISTING KM.50/0 TO 69/280) ON NH-64(NEW NH-07) TO FOUR LANES WITH PAVE SHOULDERS
|
1385 | WIDENING AND STG.OF EXISTING TWO-LANE CARRIAGEWAY TO FOUR LANES WITH PAVED SIDE SHOULDERS OF AMRTISAR-TARN-TARAN-HARIKESEC.OF NH-15(NEW NH-54) FROM EXISTING KM.445.250 OF NH-I
|
1386 | WIDENING AND STRENFTHENING OF EXISITNG SL IL TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDER FROM KM 256.880 TO KM 296.515 OF NH 59 ERSTWHILE NH 217 FROM KM 400.0 TO KM 439.635
|
1387 | WIDENING AND STRENFTHENING OF EXISITNG SL IL TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDER INCLUDING GEOMETRICS FROM KM 68.260 TO KM 118.370 OF NH 59 ERSTWHILE NH 217 FROM KM 213.890 TO KM 264.000
|
1388 | WIDENING AND STRENGHENING OF NH-65 TO TWO LANES WITH PAVED SHOULDERS FROM EXISTING
|
1389 | WIDENING AND STRENGTHENING FROM 2 LANE TO 2 LANE WITH PAVED SHOULDER IN AN AGGREGATE LENGTH OF 38 KM ON SELECTED STRETCHES IN DINDIGUL NATHAM SECTION OF NH 383 IN THE STATE OF TAMIL NADU
|
1390 | WIDENING AND STRENGTHENING FROM KM.15.000 TO KM, 58.600 (BHADEWARA -DRAMANDGANJ SECTION) OF NATIONAL HIGHWAY NO.135C
|
1391 | WIDENING AND STRENGTHENING FROM KM.505.00 TO 538.00 OF NH-730 (EPC MODE)
|
1392 | WIDENING AND STRENGTHENING OF EXISTING SL IL DL TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDER FROM KM 246.100 TO KM 321.00 OF NH 53 EXCEPT FROM KM 292.164 TO KM 307.934 AND KM 314.130 TO KM 321.0
|
1393 | WIDENING AND STRENGTHENING OF EXISTING SINGLE INTERMEDIATE LANE CARRIAGEWAY TO 2 LANE CARRIAGE WAY WITH PAVED SHOULDER INCLUDING GEOMETRICS IMPROVEMENT FROM KM 118.40 TO KM 173.40 OF NH 59
|
1394 | WIDENING AND STRENGTHENING OF NH-15 TO TWO LANES WITH PAVED SHOULDER FROM EXISTING KM 173/0 TO KM 249/200
|
1395 | WIDENING AND STRENGTHENING OF NH-65 TO FOUR LANES WITH PAVED SHOULDERS FROM EXISTING KM 267+500 TO KM 296+070 (NETRA VILLAGE TO MANDORE SECTION) ON EPC MODE
|
1396 | WIDENING AND STRENGTHENING TO 2-LANE WITH PS OF NIMBI JODHA-DEGANA-MERTA CITY SECTION
|
1397 | WIDENING AND STRENGTHENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 491/000 TO KM 525/200 OF RAIPUR - VISAKHAPATNAM SECTION OF NH-26 IN THE STATE OF ANDHRA PRADESH
|
1398 | WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 65.00 TO KM 125.00 (PACKAGE-2) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON EP
|
1399 | WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENT FROM KM 0.000 TO KM 16.990 ON CHENANI – SUDHMAHADEV SECTION OF NH-244 IN THE STATE OF JAMMU AND KASHMIR
|
1400 | WIDENING ANDSTRENGTHENING FROM KM.505.00 TO 538.00 OF NH-730 (EPC MODE)
|
1401 | WIDENING EXISTING 2 LANE TO 4 LANE WITH PAVED SHOULDER INCLUDING STRENGTHENING CARRIAGEWAY FROM KM 80/0-KM 125/0 OF SALEM TIRUPATHUR - VANIYAMBADI ROAD OF NH-179A.
|
1402 | WIDENING FROM 2 LANE TO 4 LANE AND STRENTHENING THE EXISTING CARRIAGE WAY FROM KM 36/0 -80/0 OF SALEM - TIRUPATHUR - VANIYAMBADI ROAD (NH - 179 A)
|
1403 | WIDENING FROM TWO LANE TO FOUR LANE WITH PAVED SHOULDER AND STRENGTHNING OF EXISTING PAVEMENT BETWEEN KM 459/500 TO 483/500 (ROAD CONNECTING STATUE OF UNITY DEVALIYA TO RAJPIPLA INCLUDING RECONSTRUCTI
|
1404 | WIDENING FROM TWO LANE TO TWO LANE WITH PAVED SHOULDER FROM KM 34/000 TO 49/000 AND TWO LANE TO FOUR LANE WITH PAVED SHOULDER FROM KM 49/000 - 60/650 WITH STRENGTHENING IN KM 34/000 - 45/000, 46/000 -
|
1405 | WIDENING OF EXISTING IL DL TO 2-LANE WITH 1.5 M WIDE PAVED SHOULDER FROM KM 0.0 TO KM 45.750 (BOLANGIR TO SONEPUR SECTION) OF NH 57 IN THE STATE OF ODISHA.
|
1406 | WIDENING OF EXISTING ROAD TO 2 LANE NH STANDARDS ALONG WITH IMPROVEMENT AND REALIGNMENT FROM NECHIPU TO HOJ (311 KM), VIA SEPPA, KHODASO, SAGGALEE (PART OF TRANS ARUNACHAL HIGHWAY) IN ARUNACHAL PRADES
|
1407 | WIDENING OF EXISTING ROAD TO 2 LANE WITH PAVED SHOULDER FROM HUKANJURI TO KHONSA SECTION OF NH-315A FROM DESIGN CHAINAGE KM 12.240 TO 26.342 (PACKAGE C) IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE
|
1408 | WIDENING OF EXISTING SINGLE/INTERMEDIATE LANE ROAD TO 2 LANE ROAD FROM KM. 83.00 TO KM 101.00 ON NH-61 IN THE STATE OF NAGALAND ON EPC MODE UNDER NH(O) DURING 2018-19
|
1409 | WIDENING OF RAEBARELI TO PRAYAGRAJ SECTION FROM KM. 82.650 TO KM. 161.450 OF NH-30 AND LINK ROAD FROM KM. 161.450 TO KM. 641.350 (NH-2)V
|
1410 | WIDENING OF SL TO 2 L KM. 107-184.80 SUKUMA TO KONTA ON NH 221
|
1411 | WIDENING OF SL TO 2 L KM. 287.0 TO 292.0 322.0 TO 342.0 AND KM 352.0 TO 400.0 OF NH16 INCLUDING 163 CDS
|
1412 | WIDENING STG.OF EXISTING TWO-LANE CARRIAGEWAY TO FOUR LANES WITH PAVED SIDE SHOULDERS OF FARIDKOT-KOTKAPURA-BATHINDA SEC.OF NH-15(NEW NH-54)
|
1413 | WIDENING STG.OF EXISTING TWO-LANE CARRIAGEWAY TO FOUR LANES WITH PAVED SIDE SHOULDERS OF HARIKE-ZIRA-FARIDKOT SEC.OF NH-15(NEW NH-54)
|
1414 | WIDENING TO 2 LANE AND IMPROVEMENT FROM KM 100/700 TO 186/700 OF VIJAYWADA RANCI ROUTE IN ODISHA
|
1415 | WIDENING TO 2 LANE AND IMPROVEMENT VIJAYWADA RANCI ROUTE FROM KM 377-700 TO 471-900 (BERHMAPUR-TAPTAPANI-RAYAGADA ROAD SH-17
|
1416 | WIDENING TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDERS AND STRENGTHENING FROM KM 162.010 TO KM 224.900 OF NH-57 DL 27 KM AND IL 35.89 KM
|
1417 | WIDENING TO 2 LANE PS WITH RECONSTRUCTION OF BRIDGES CULVERT IN KM. 182 TO 266 OF NH-59A
|
1418 | WIDENING TO 2 LANE WITH PAVED SHOULDER AND STRENGTHENING FROM KM 88 TO 130 ON NH-86
|
1419 | WIDENING TO 2 LANE WITH PAVED SHOULDER FROM KM 0.00 TO 40.00 ON EPC MODE ON NH 2C
|
1420 | WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM KM 79.65 TO 118.47 OF NH-150 UNDER EPC MODE IN THE STATE OF KARNATAKA
|
1421 | WIDENING TO 2-LANE WITH PAVED SHOULDER IN/C GEOMETRIC IMPROVEMENT FROM KM 397.00 TO KM 422.00 ( 25 KM) ( DESIGN LENGTH KM 388.650 TO KM 410.439) ( 21.789 KM) ON CHURAIBARI - AGARTALA SECTION OF NH-4
|
1422 | WIDENING TO 2-LANE WITH PAVED SHOULDER IN/C. GEOMETRIC IMPROVEMENT FROM KM 318.00 TO KM 339.940 ON CHURAIBARI-AGARTALA SECTION OF NH-44 IN THE STATE OF TRIPURA UNDER EPC MODE( JOB NO. 8(44)/TR/2016-17
|
1423 | WIDENING TO 2L FROM 228/70 TO 258/70 AND 286/70 TO 327/70 OF VR ROUTE UNDER VRC IN ODISHA
|
1424 | WIDENING TO 2L/2LPS FROM 131/0 TO 192/0 (BHOJPUR TO CHHATABAR) OF NH-200 UNDER NHIIP IN ODISHA
|
1425 | WIDENING TO 2L/2LPS FROM 25/0 TO 80/0 (NABARANGPUR TO KOKSARA) OF NH-201 UNDER NHIIP IN ODISHA
|
1426 | WIDENING TO 2LPS FROM 173/37 TO 229/40 OF NH-59 IN THE STATE OF ODISHA
|
1427 | WIDENING TO 2LPS FROM 181/0 TO 239/28 (BHAWANIPATNA TO KOKSARA) OF NH-26.
|
1428 | WIDENING TO 2LPS FROM 50/0 TO 140/9 OF NH-57 (SONEPUR TO MADHAPUR) IN THE STATE OF ODISHA
|
1429 | WIDENING TO 2LPS FROM 58/00 TO 116/10 OF NH-153B (NAKTIDEUL TO BOUDH) IN THE STATE OF ODISHA
|
1430 | WIDENING TO 4 LANE / 4 LANE WITH PAVED SHOULDERS WITH STRENGTHENING OF EXISTING CARRIAGEWAY IN KM 0/0 - 31/8 OF AVINASHI TIRUPUR AVINASHIPALAYAM OF NH 381 IN THE STATE OF TAMIL NADU
|
1431 | WIDENING TO 4 LANE WITH PAVED SHOULDER WITH CC PAVEMENT FROM KM 256/550 TO KM 289/500 ON KOTA-DARAH SECTION OF NH-12 (KOTA-JHALAWAR ROAD) IN THE STATE OF RAJASTHAN ON EPC MODE
|
1432 | WIDENING TO 4/6 LANES OF EXISTING NH-17 FROM KM 531/934 (AFTER ZUARI BR.) TO KM 536/250 JN. WITH VERNA INDUSTRIAL ONE OF GOA (PACKAGE-III)
|
1433 | WIDENING TO 4/6/8 LANES OF EXISTING NH-17 FROM KM 522/615 (NEAR GMC) TO KM 530/850 JOINING NEW ZUIARI BRIDGE IN PANJIM MANGLORE SECTION IN THE STATE OF GOA (PACKAGE-I) ON EPC MODE.
|
1434 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM.125.626 TO 155 OF NH -167 HAGARI JADECHERLA SECTION IN THE STATE OF KARNATAKA ON EPC MODE (PAAKAGE-I)(JOB NO. NH-167-KNT- 2016-17-814)
|
1435 | WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 59.500 TO KM 132.033 OF MANNEGUDA-RAVULAPALLY SECTTION OF NH-163 ON EPC MODE IN THE STATE OF TELANGANA
|
1436 | WIDENING, STRENGTHENING AND RECONSTRUCTION OF NH-552- EXTN FROM KM 76/600 TO 112/00 (SAWAI MADHOPUR TO SHEOPUR SECTION).
|
1437 | WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM CH.75.330KM TO CH.88.00KM (DESIGN CH.71.800 TO 84.100 KM) OF JOGIGHOPA BRIDGE APPROACH (NEAR PANCHARATNA)- AGIA (NEAR NICHINTA) SECTION (PKG. 6)
|
1438 | WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 66.00 TO KM 81.00 (DESIGN CHAINAGE 65.923 TO 80.930) OF DOKMOKA-LORINGTHEPI SECTION-3 OF NH29
|
1439 | WIDNG WITH PS AND STRNG FROM KM.0.00 TO 50.675 OF NH-730A EPC MODE
|
1440 | YAN TO NIRMAL SEREHABILITATION AND UPGRADATION OF NH -222 FROM KM 615.00 TO 668.60 (KALCTION) TO TWO-LANES WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS.(PERKIT)
|
1441 | ZIRAKPUR(HARYANA) -PARWANOO(HIMACHAL PRADESH)
|