SELECT PROJECT


S.No.PROJECT NAME
1140 MW BILHAUR SOLAR PV PROJECT BILHAUR UP
2150 MW SOLAR PV PROJECT IN GUJARAT (LIMBDI, MESANKA AND RADHANPUR)
3400 KV D/C BAHARAMPUR (PG) - BHERAMERE (B'DESH) LINE CKT II (INDIA PORTION)
4400KV D/C TEESTA III - KISHANGANJ TRANSMISSIAN LINE (JV)
5400KV TRANS LINES ST-2
650 MW SOLAR POWER PROJECT
7765 KV POOLING STATION AND NETWORK WITH DVC AND MAITHOB RBC
8765 KV SYSTEM FOR CENTRAL PART OF NORTHERN GRID PART-I
9765KV SYSTEM FOR CENTRAL PART OF NORTHERN REGION GRID - PART-II
10765KV SYSTEM FOR CENTRAL PART OF NORTHERN REGION GRID - PART-III
11800 KV KISHANPUR MOGA TR.LINE (P.GRID)
1285 MW BILHAUR SOLAR PV PROJECT BILHAUR UP
13ADDL VINDHY.TR.LINE-I
14ADDL. VINDHYACHAL TRANSMISSIONSYSTEM - I (P.GRID)
15AGARTALA GTPP
16AGARTALA G.T.P.P.(NEEPCO)
17AGARTALA GAS TURBINE PLANT COMBINED CYCLE EXTENSION PROJECT (51 MW)
18AMELIA COAL MINE
19ANTA SOLAR 90 MW
20ASSOCIATED TRANSMISSION SYSTEM FOR NABINAGAR-II TIPS
21AUGMENTATION OF TRANSFORMATION CAPACITY IN SOUTHERN REGION
22AUGMENTATION OF TRANSFORMATION CAPACITY IN SOUTHERN REGION.
23AUGMENTATION OF TRANSFORMERS IN NORTHERN REGION - PART B
24AUGMENTION OF TRANSFORMERS IN NORTHEN REGION - PART A
25BARH STPP
26BARH STPP STAGE -II
27BARH STPP(3X660MW) NTPC
28BHENSARA 320 MW
29BINA-NAGDA TRANSMISSION SYSTEM (P.GR.)
30BOKARO B-II TPP
31BOKARO THERMAL POWER STATION-A
32BONGAIGAON THERMAL POWER PROJECT
33BRBCL-NABINAGAR TPP- JV (4X250 MW)
34CHAMERA STAGE-III
35CHAMERA H.E. PROJECT ST-II (NHPC)
36CHAMERA H.E.PROJECT
37CHAMERA HEP
38CHAMERA,STAGE-III (NHPC)
39CHANDRAPUR HVDC BACK TO BACK (P.GRID)
40CHATTI BARIATU COAL MINING PROJECT
41CHHATTARGARH 150 MW
42CHUTAK HYDRO-ELECTRIC PROJECT
43COMMON SYS. ASSOCIATED WITH EAST COAST ENERGY PVT LTD AND NCC POWER PROJECTS LTD LTOA GEN PART- B
44COMMON SYSTEM ASSOCIATED WITH COASTAL ENERGEN PRIVATE LIMITED AND IND-BARATH POWER(MADRAS) LIMITED LTOA GENERATION PROJECTS IN TUTICORAN AREA (PART-B)
45COMMON SYSTEM ASSOCIATED WITH EAST COAST ENERGY PVT. LTD. AND NCC POWER PROJECTS LTD. LTOA GENERATION PROJECTS IN SRIKAKULAM AREA-PART A
46COMMON SYSTEM ASSOCIATED WITH ISGS PROJECTS IN KRISHNAPATTNAM OF ANDHRA PRADESH(PGCIL)
47COMMON TR. SYS. ASSOCIATED WITH EAST COAST AND NCC POWER PROJECTS IN SRIKAKULAM AREA A.P. PART- C
48COMMON TRANSMISSION SCHEME WITH ISSG PROJECTS IN NAGAPATTINAM/CUDDALOR OF TAMIL NADU - PART A1
49CONNECTIVITY FOR KUDANKULAM 3 AND 4 (2000MW) WITH INTERSTATE TRANSMISSION SYSTEM
50CREATION OF 400/220 KV SUBSTATIONS IN NCT OF DELHI DURING 12TH PLAN PERIOD (PART-A)
51CREATION OF 400/220KV SUBSTATIONS IN NCT OF DELHI DURING 12TH PLAN PERIOD (PART-B1)
52DADRI GBCCPP
53DARLIPALLI STPP STAGE-I (2X800 MW)
54DEVIKOT SOLAR 150MW
55DEVIKOT SOLAR 90MW
56DHAULIGANGA BAREILY LINE TRANSMISSION(P.GRID)
57DHAULIGANGA H.E.P.-I
58DHAULIGANGA H.E.P.-I (NHPC)
59DHAULINGANGA TRANS.
60DHUKWAN SMALL HYDRO PROJECT
61DULHASTI COMBINED TR.SYSTEM(P.GRID)
62DULHASTI HYDROELECTRIC PROJECT(NHPC)
63DULHASTI TR.LINE
64DURGAPUR PP-III (2X20 MW) - NSPCL
65EAST-WEST TRANSNISSION CORRIDOR STRENGTHNING SCHEME
66EASTERN REGION STRENGTHENING SCHEME XX
67EASTERN REGION STRENGTHENING SCHEME - XXIII
68EASTERN REGION STRENGTHENING SCHEME -IX
69EASTERN REGION STRENGTHENING SCHEME XI
70EASTERN REGION STRENGTHENING SCHEME XIV
71EASTERN REGION STRENGTHENING SCHEME-I
72EASTERN REGION STRENGTHENING SCHEME-II
73EASTERN REGION STRENGTHENING SCHEME-III
74EASTERN REGION STRENGTHENING SCHEME-V
75EASTERN REGION STRENGTHENING SCHEME-XII
76EASTERN REGION STRENGTHENING SCHEME-XVIII
77EASTERN REGION STRENGTHENNING SCHEME-XV
78EASTERN REGION STRENTHENING SCHEME XVII( PART B)
79ER WR TRANSMISSION LIMITED
80EST. OF 400/220 KV GIS POOLING STATION NEAR CHAMERA-II HEP
81ESTABLISHMENT OF 220/66KV GIS AT UT CHANDIGARH ALONG WITH 220KV D/C LINE FROM CHANDIGARH GIS TO 400/200KV PANCHKULA(PG) SUB STATION
82ESTABLISHMENT OF FIBER OPTIC COMMUNICATION SYSTEM IN NORTHERN REGION
83ESTABLISHMENT OF FIBER OPTIC COMMUNICATION SYSTEM IN NR UNDER FIBER OPTIC EXPANSION PROJECT (ADDITIONAL REQUIREMENT)
84ESTABLISHMENT OF POOLING STATIONS AT CHAMPA AND RAIGARH FOR IPP GENERATION PROJECT IN CHHATTISGARH
85ESTABLISHMENT OF POOLING STATIONS AT RAJGARH AND RAIPUR FOR IPP GENERATION PROJECTS IN CHATTISGARH
86ETTAYAPURAM SOLAR 230MW
87FARAKKA STPP-III
88FARAKKA S.T.P.P. STAGE III (NTPC)
89FARAKKA STPP STAGE-III
90FARAKKA STPPST-II
91FARIDABAD CCGPP
92FARIDABAD CCGPP(NTPC)
93FATEHGARH SOLAR 296MW
94FG UNCHAHAR TPP STAGE-III (1X210MW)(NTPC)
95FGUTPP, UNCHAHAR STAGE-IV (1X500 MW)
96GADARWARA SUPER THERMAL POWER PROJECT STAGE-I
97GANDHAR GPP ST-I
98GANDHAR TR. SYSTEM ST-I
99GANDHAR TRANSMISSION SYSTEM STAGE - I (P.GRID)
100GAZUVAKA HVDC BACK TO BACK PROJECT - II (500 MW)
101GREEN ENERGY CORRIDORS - INTER STATE TRANSSMISSION SCHEME PART-D
102GREEN ENERGY CORRIDORS INTER-STATE TRANSMISSION SCHEME (ISTS) - PART A
103GREEN ENERGY CORRIDORS INTER-STATE TRANSMISSION SCHEME -PART B
104GREEN ENERGY CORRIDORS: INTER-STATE TRANSMISSION SCHEME (ISTS) - PART C
105GUJRAI SOLAR POWER PROJECT
106GURHAH SOLAR POWER PROJECT
107HVDC BACK TOBACK
108HVDC BACK TOBACK GAZUVAK
109HVDC BACK TOBACK J'PORE-
110HVDC BIPOLE LINK BETWEEN WESTERN REGION (RAIGARH, CHATTISGARH) AND SOUTHERN REGION (PUGALAR, TM) NORTH TRICHUR (KERALA)- SCHEME-III PUGALUR TRICHUR 2000MW VSC BASED HVDC SYSTEM
111HVDC BIPOLE LINK BETWEEN WR (RAIGARH, CHATTISGARH) AND SR (PUGALUR-NORTH TRICHUR-SCHEME-I: RAIGARH-PUGALOR 600 MW
112HVDC BIPOLE LINK BETWEEN WR AND SR -NORTH TRICHUR - SCHEME -II AC SYSTEM STRENGTHENING AT PUGALUR END
113IMMEDIATE EVACUATION SYSTEM FOR NABINAGAR TPS
114IMMEDIATE EVACUATION SYSTEM WITH BARH-II TPS
115IMPLEMENTATION OF 500 MVAR THYRISTOR CONTROLLED REACTOR AT KURUKSHETRA
116INSTALLATION OF BUS REACTORS AT CUDDAPAH NELLORE KURNOOL RAICHUR AND TIRUVALAM SUB STATION
117INSTALLATION OF BUS RECTOR AND ICT IN WESTERN REGION
118INSTALLATION OF STATCOMS IN WESTERN REGION
119INTEGRATION OF POOLING STATION IN CHATTISGARH WITH CENTRAL PART OF WR FOR IPP GENERATION PROJECTS IN CHATTISGARH -C
120INTER-REGIONAL SYSTEM STRENGTHENING SCHEME IN WR AND NR (PART-A)
121INTER-REGIONAL SYSTEM STRENGTHENING SCHEME IN WR AND NR (PART-B)
122 INTERCONNECTION BETWEEN ELECTTRICAL GRIDS OF INDIA AND BANGLADESH -INDIAN PORTION
123JETSAR SOLAR 160 MW
124JEYPORE-GAZUWAKA HVDC BACK TO BACK
125KAHAL GAON STPP STAGE - II (NTPC)
126KAHALGAON STPP ST-I
127KAHALGAON TR.LINES I
128KAHALGAON-II(PHASE-I) TRANSMISSION SYSTEM (PGCIL)
129KAHALGOAN-II TR.SYS:PH-1
130KAHALGOAN-II TR.SYS:PH-2
131KAHALGOAN-II(PH.-II) TRANSMISSION SYSTEM (PGCIL)
132KAIGA 3 AND 4 TR. SYSTEM
133KAIGA 3 AND 4 TRANSMISSION SYSTEM (PGCIL)
134KALPI SOLAR POWER PROJECT
135KAMENG HYDROELECTRIC PROJECT (NEEPCO)
136KATHALGURI GB CC PP
137KATHALGURI GPP TR.LINES
138KATHALGURI GAS BASED COMBINED CYCLE POWER PROJECT.(NEEPCO)
139KATHALGURI GBCCPP TRANSMISSIONLINES(P.GRID)
140KAWAS GPP
141KAWAS SOLAR 56 MW
142KAYAMKULAM COMB.CYCLE
143KAYAMKULAM COMBINED CYCLE POWER PLANT (NTPC)
144KAYAMKULAM SOLAR 70 MW
145KBUNL-MUZAFFARPUR TPP STAGE-II- SUBSIDIARY (2X195 MW)
146KERANDARI COAL MINING PROJECT
147KHARGONE STPP STAGE I (1320 MW)
148KISHANGANGA HEP (3X110 MW)
149KOEL KARO HEP
150KOEL KARO HYDRO ELECTRIC PROJECT(NHPC)
151KOLDAM HEP (NTPC)
152KOLDAM HEP TRANSMISSION LINE (PGCIL)
153KOLHAPUR-MA-PUSA 400 KV
154KOLHAPUR-MAPUSA 400 KV LINE (P.GRID)
155KOTESHWAR HEP(THDC)
156KOTESWAR TR. SYSTEM
157KOTESWAR TRANSMISSION SYSTEM (PGCIL)
158KUDGI STPP STAGE 1
159KUNADANKULAM APP TR.SYS.
160KUNADANKULAM APP TRANS SYSTEM (PGCIL)
161LARA SUPER THERMAL POWER PROJECT STAGE-I (2 X 800 MW)
162LDANDC SCHEME IN NER
163LDANDC SCHEME IN NER(P.GRID)
164LDC,NR
165LOAD DESPATCH SCHEME (LDC) FORNORTHERN REGION
166LOKTAK D/S HEP(NHPC)
167MADURAI-THIRUVANANTHAPURAM 400 KV D/C LINE(P.GRID)
168MADURI-THIRU VANANTHAPUR
169MAUDA TRANSMISSION SYSTEM
170MEJIA THERMAL POWER PROJECT (DVC)
171MEJIA TPP
172MEMRAMUNDALI-JEYPORE D/C
173MERAMUNDALI-JEYPORE 400 KV D/C LINE(P.GRID)
174MOUDA STPP
175MOUDA STPP STAGE 2
176MUNPL-MEJA TPP - JV (2X660 MW)
177NAITWAR MORI HEP
178NATHPA JHAKRI H.E.P. (NJPC)
179NATHPA JHAKRI TRANSMISSION SYSTEM (P.GRID)
180NATHPA JHKRI H.E.P.
181NATHPA JHKRITR.SYSTEM
182NATIONAL CAPITAL THERMAL POWER PROJECT STAGE-II
183NCR TPP DADRI
184NEELAMANGALAM-MYSORE TRANSMISSION SYSTEM (P.GR.)
185NEELAMANGLAM MYSORE TR.
186NEYVELI TS-II TRANSIMISSION SYSTEM (PGCIL)
187NEYVELI-II TR. SYSTEM
188NIMOO BAZGO HYDROELECTRIC PROJECT
189NOKHRA
190NORHEN REGION SYSTEM STRENGTHENING-II (P.GRID)
191NORTH EAST-NORTHERN/ WESTERN INTERCONNECTOR-I, PART-C
192NORTH EASTERN REGION STRENGTHENING SCHEME - III
193NORTH EASTERN REGION STRENGTHENING SCHEME IV
194NORTH EASTERN REGION STRENGTHENING SCHEME-VIII
195NORTH EASTERN REGION STRENGTHENING SCHEME-XII
196NORTH KARANPURA STPP (3X660 MW)
197NORTH- EAST NORTH WESTERN INTERCONNECTOR I PROJECT
198NORTH-EAST HVDC LINK
199NORTH-EAST HVDC LINK(P.GRID)
200NORTHERN REGION SYSTEM STRENGHENING SCHEME - XXXII
201NORTHERN REGION SYSTEM STRENGHENING SCHEME XVI
202NORTHERN REGION SYSTEM STRENGHTENING SCHEME-IX
203NORTHERN REGION SYSTEM STRENGHTENING SCHEME-V
204NORTHERN REGION SYSTEM STRENGHTENING SCHEME-VIII
205NORTHERN REGION SYSTEM STRENGHTENING SCHEME-XII
206NORTHERN REGION SYSTEM STRENGHTENING SCHEME-XIII
207NORTHERN REGION SYSTEM STRENGHTENING SCHEME-XIX
208NORTHERN REGION SYSTEM STRENGHTENING SCHEME-XV
209NORTHERN REGION SYSTEM STRENGHTENING SCHEME-XVII
210NORTHERN REGION SYSTEM STRENGHTENING SCHEME-XVIII
211NORTHERN REGION SYSTEM STRENGHTENING SCHEME-XX
212NORTHERN REGION SYSTEM STRENGTHENING - I (P.GRID)
213NORTHERN REGION SYSTEM STRENGTHENING - XL
214NORTHERN REGION SYSTEM STRENGTHENING SCHEME - XXX
215NORTHERN REGION SYSTEM STRENGTHENING SCHEME-VI
216NORTHERN REGION SYSTEM STRENGTHENING SCHEME-X
217NORTHERN REGION SYSTEM STRENGTHENING SCHEME-XXI
218NORTHERN REGION SYSTEM STRENGTHENING SCHEME-XXII
219NORTHERN REGION SYSTEM STRENGTHENING SCHEME-XXIV
220NORTHERN REGION SYSTEM STRENGTHENING SCHEME-XXV
221NORTHERN REGION SYSTEM STRENGTHENING SCHEME-XXVI
222NORTHERN REGION SYSTEM STRENGTHENING SCHEME-XXVIII
223NORTHERN REGION SYSTEM STRENGTHENING-XI
224NORTHERN REGION SYSTEM STRENGTHING SCHEME - III (P.GR.)
225NORTHERN REGION TRANSMISSION STRENGTHENING SCHEME
226NPGCPL-NABINAGAR STPP - JV (3X660 MW)
227OMKARESHWAR FLOATING SOLAR POWER PROJECT (90 MW)
228PAKRI BARWADIH COAL MINING PROJECT
229PARASAN SOLAR POWER PROJECT
230PARBATI H.E.P. STAGE -III (NHPC)
231PARBATI HEP (4X200 MW) (NHPC) II
232PARBATI HEP STAGE-III
233PARE HYDRO ELECTRIC PROJECT
234PG WORK ASSOCIATED WITH TBCB LINES UNDER COMMON TRANSMISSION SYSTEM FOR PH -II GEN. PROJ. IN ODHISHA
235PG WORKS ASSOCIATED WITH COMMON TRANSMISSION SYSTEM FOR PHASE-II GENERATION PROJECT IN ODISHA
236POWERGRID NEEMUCH TRANSMISSION SYSTEM LIMITED
237POWERGRID WORK ASSOCIATED WITH SYSTEM STRENGTHENING FOR IPP IN CHATTISGARH AND OTHER GEN. PROJECT IN WESTERN REGION
238PROVISION OF SERIES REACTORS IN NORTHERN REGION
239PROVISION OF STATECOM AT NALAGARH AND LUCKNOW IN NORTHERN REGION
240RAGHANESDA SOLAR POWER PROJECT
241RAGHUNATHPUR THERMAL POWER STATION PHASE-I
242RAIPUR-CHANDRA PUR 400KV
243RAIPUR-CHANDRAPUR 400KV LINE (P.GRID)
244RAIPUR-RURK-ELA 400KV DC
245RAIPUR-RURKELA 400KV D/C LINE (P.GRID)
246RAMAGUNDAM STPP ST-III
247RAMAGUNDAM FLOATING SOLAR 100 MW
248RAMAGUNDAM STPP ST - III(NTPC)
249RAMAGUNDAM-III TRANSMISSION SYSTEM (P.GRID)
250RAMAGUNDEM- III TR.SYST.
251RAMPUR HEP(412 MW)
252RANGANADI HEP
253RANGANADI HYDRO ELECTRIC PROJECT, STAGE I(NEEPCO)
254RANGIT H.E.P.-III(NHPC)
255RANGIT HEP- III
256RAPP 5 AND 6 TR. SYSTEM
257RAPP 5 AND 6 TRANSMISSION SYSTEM (PGCIL)
258RELIABLE COMMUNICATION SCHEME UNDER CENTRAL SECTOR FOR NORTHERN REGION
259RELIABLE COMMUNICATION SCHEME UNDER CENTRAL SECTOR FOR SOUTHERN REGION
260REMOVAL OF CONSTRAINTS IN 400KV BAYS EXTENSIONS AT 400KV VEMAGIRI SS
261RIHAND - II TRANSMISSION (P.GRID)
262RIHAND STPP ST - II(NTPC)
263RIHAND STPP ST-II
264RIHAND STTP STAGE-III (2X500MW)
265RIHAND-II TRANSMISSION
266ROURKELA PP-II EXPANSION (1X250 MW) - NSPCL
267S/S EXTENSION FOR TRANSMISSION SYSTEM ASSOCIATED WITH VINDHYACHAL-V PROJECT OF NTPC (PART B)
268S/S WORK ASSOCIATED WITH ADDITIONAL INTER REGIONAL AC LINK FOR IMPORT IN TO SOUTHERN REGION I.E WARORA WARANGAL AND CHILAKALURIPETA HYDERABAD KURNOOL 765 LINK
269SALAL HEP-II
270SAMBHU KI BHURJ SOLAR 250 MW
271SAMBHU KI BHURJ-II SOLAR 300MW
272SCHEME TO RELIEVE HIGH LOADING OF WR-NR INTER REGIONAL CORRIDOR
273SEWA- II H.E.P (NHPC)
274SIMHADRI STPP STAGE -II
275SIMHADRI TPP ST-I (NTPC)
276SIMHADRI TPPST-I
277SIPAT ST.-II TR. SYSTEM
278SIPAT STAGE-II TRANSMISSION SYSTEM (PGCIL)
279SIPAT STPP STAGE - I (NTPC)
280SIPAT STPP STAGE -II (2X500 MW)(NTPC)
281SIPAT TRANSMISSION SYSTEM STAGE-1 (P.GR.)
282SIPAT-II TR. SYSTEM
283SIPAT-II SUPP. TRANS. SYSTEM (PGCIL)
284SOLAPUR STPP
285SOUTHERN REGION STRENGTHENING SCHEME-XXI
286SOUTHERN REGION SYSTEM STRENGTHENING - XXV
287STATIC VAR COMPENSATORS (SVCS) IN NORTHERN REGION
288STRENGTHENING OF TRANSMISSION SYSTEM BEYOND VEMAGIRI
289SUB STATION WORK ASSOCIATED WITH STRENGTHENING OF TRANSMISSION SYSTEM BEYOND VEMAGIRI
290SUB-STATION EXT. WORKS ASSOCIATED WITH TRANS. SYSTEM REQUIRED FOR EVACUATION OF POWER FROM KUDGI TPS OF NTPC LTD.
291SUB-STATION WORKS ASSOCIATED WITH SYSTEM STRENGTHENING IN SOUTHERN REGION FOR IMPORT OF POWER FROM ER
292SUBSTATION WORKS ASSOCIATED WITH HYDERABAD (MAHESHWARAM) POOLING STATION
293SUPPLEMENTARY TRANS. SYSTEM FOR UMSPP AT BANASKANTHA (RADHANESDA) GUJARAT
294SUPPLEMENTARY TRANSMISSION ASSOCIATED WITH VELLUR TPS
295SUPPLIMENTARY TRANSMISSION ASSOCIATED WITH DVC AND MAITHON RBC
296SYS. STREN.-3OF S.REGION
297SYS.STREN. -VII OF S.REG
298SYS.STRENGT-HENING IN SR
299SYSTEM STRENGHTENING -XI IN SOUTHERN REGION
300SYSTEM STRENGTHENING - VII OF SOUTHERN REGION (PGCIL)
301SYSTEM STRENGTHENING - XVII IN SOUTHERN REGIONAL GRID
302SYSTEM STRENGTHENING - XX IN SOUTHERN REGIONAL GRID
303SYSTEM STRENGTHENING -III OF SOUTHERN REGION (PGCIL)
304SYSTEM STRENGTHENING -X OF SR
305SYSTEM STRENGTHENING -XIX IN SOUTHERN REGIONAL GRID
306SYSTEM STRENGTHENING COMMON FOR WR AND NR (LINE BAYS AND REACTOR PROVISION)
307SYSTEM STRENGTHENING IN EASTERN REGION (P.GRID)
308SYSTEM STRENGTHENING IN NORTH AND WEST PART OF WR FOR IPP PROJECTS IN CHATTISGARH
309SYSTEM STRENGTHENING IN NR FOR SASAN AND MUNDRA (UMPP)
310SYSTEM STRENGTHENING IN SOUTH-ERN REGION(P.GRID)
311SYSTEM STRENGTHENING IN SOUTH-WESTERN PART OF NORTHERN GRID (PART-A) SCHEME
312SYSTEM STRENGTHENING IN SOUTH-WESTERN PART OF NORTHERN GRID (PART-B) SCHEME
313SYSTEM STRENGTHENING IN SOUTHERN REGION - XXII
314SYSTEM STRENGTHENING IN SOUTHERN REGION - XXIII
315SYSTEM STRENGTHENING IN WARDHA-AURANGABAD CORRIDOR FOR IPP PROJECTS IN CHATTISGARH
316SYSTEM STRENGTHENING SCHEME IN NORTH REGION XXXVII
317SYSTEM STRENGTHENING SCHEME IN NORTHERN REGION XXXVIII
318SYSTEM STRENGTHENING SCHEME FOR EASTERN AND NORTH EASTERN REGION
319SYSTEM STRENGTHENING SCHEMES AT TUTICORIN-II (ERSTWHILE TIRUNELVELLI GIS) AND BHUJ PS
320SYSTEM STRENGTHENING XII OF SR
321SYSTEM STRENGTHENING XXIV IN SOUTHERN REGION
322SYSTEM STRENGTHENING-XVIII IN SOUTHERN REGION GRID
323SYSTEM STRENTHENING IN RAIPUR WARDHA CORRIDOR FOR IPP PROJECTS IN CHHATTISGARH
324SYTEM STRENGTHENING OF SOUTHERN REGION - XIV
325SYTEM STRENGTHENING XIII OF SR GRID
326TALA-SILIGURI TRANSMISSION LINE (P.GRID)
327TALAIPALLI COAL MINING PROJECT
328TALCHER STPP ST-I
329TALCHER STPP ST-II
330TALCHER STPP ST-II(NTPC)
331TALCHER SUPER THERMAL POWER PROJECT ST I (NTPC)
332TALCHER-II TRNS.SYSTEM
333TALCHER-II TRANSMISSION SYSTEM(P.GRID)
334TANAKPUR HEP
335TANDA TPP STAGE-II (2X660 MW)
336TAPOVAN-VISHNUGAD HEP (4X130MW) (NTPC)
337TARAPUR 3 AND 4 TRANSMISSION SYSTEM (P.GRID)
338TARAPUR 3AND4 TR.SYSTEM
339TEESTA HE PROJECT STAGE-V (NHPC)
340TEESTA LOW DAM HEP:ST.4
341TEESTA LOW DAM HEP, STAGE-IV (4X40 MW) (NHPC)
342TEESTA LOW DAM STAGE III HYDROELECTRIC POWER PROJECT (NHPC)
343TEHRI DAM AND H.P.P.(THDCL)
344TEHRI TR. SYSTEM(P.GRID)
345TELANGANA SUPER THERMAL POWER PROJECT PHASE I
346TR SYSTEM FOR ESTABLISHMENT OF 400/220 KV GIS SUBSTATION AT MAGARWADA IN UT DD
347TR SYSTEM FOR PHASE-I GENERATION PROJECTS IN JHARKHAND AND WEST BENGAL-PART-A2
348TR. SYS. FOR PHASE-I PROJ. IN JHARKHAN AND WEST BENGAL PART-B
349TR. SYSTEM ASSOCIATED WITH CHAMERA III HEP
350TR. SYSTEM ASSOCIATED WITH MUNDRA ULTRA MEGA POWER PROJECT
351TR. SYSTEM ASSOCIATED WITH RAMPUR HEP
352TR. SYSTEM ASSOCIATED WITH TUTICORIN JV TPS
353TR. SYSTEM FOR STARTUP POWER TO DVC AND MAITHON RB GEN. PROJ.
354TR. SYSTEM FOR STARTUP POWER TO DVC AND MAITHON RB GEN. PROJ.
355TR. SYSTEM STRENGTHENING IN BIHAR(P.GRID)
356TR.KISHANPURMONGA
357TR.SYS.(HEP) PARBATI-II
358TR.SYS.WITH BARH GEN.PR.
359TR.SYSTEM STRNGTHENING
360TR.SYSTEM ASSOCIATED WITH TALA HEP.(P.GRID)
361TRAMISSION SYSTEM FOR SOLAR PARK AT BHADLA RAJISTHAN
362TRANMISSION SYSTEM ASSOCIATED WITH ALUSTENG (SRINAGAR)- DRASS- KARGIL-KHALSTI-LEH PROJECT
363TRANSMISSION NETWORK EXPANSION IN GUJARAT ASSOCIATED WITH INTEGRATION OF RE PROJECTS FROM KHAVDA POTENTIAL RE ZONE
364TRANSMISSION NETWORK EXPANSION IN GUJARAT TO INCREASE ATC FROM ISTS: PART C
365TRANSMISSION SY. ASSOCIATED WITH BARH GENER. PROJECT(P.GR.)
366TRANSMISSION SYS ASSOCIATED WITH KRISHNAPATNAM UMPP-PART C1
367TRANSMISSION SYSTEM - TEESTA-V HEP(3*170) (P.GRID)
368TRANSMISSION SYSTEM ASSOCIATED WITH GADARWARA STPS (2X800 MW) OF NTPC (PART A)
369TRANSMISSION SYSTEM ASSOCIATED WITH DARLIPALLI TPS
370TRANSMISSION SYSTEM ASSOCIATED WITH FARAKKA-III
371TRANSMISSION SYSTEM ASSOCIATED WITH GADARWARA STPS OF NTPC PART-B
372TRANSMISSION SYSTEM ASSOCIATED WITH IPPS OF NAGAPATTINAM/ CUDDALORE AREA PACKAGE A
373TRANSMISSION SYSTEM ASSOCIATED WITH KAKRAPAR ATOMIC POWER PROJECT - 3 AND 4
374TRANSMISSION SYSTEM ASSOCIATED WITH KISHENGANAGA HEP
375TRANSMISSION SYSTEM ASSOCIATED WITH KORBA III GENERATION PROJECT
376TRANSMISSION SYSTEM ASSOCIATED WITH KRISHNAPATNAM UMPP-PART B
377TRANSMISSION SYSTEM ASSOCIATED WITH KRISHNAPATNAM-PART-A
378TRANSMISSION SYSTEM ASSOCIATED WITH LARA STPS-I (2X800) GEN. PROJECT OF NTPC
379TRANSMISSION SYSTEM ASSOCIATED WITH MAUDA STAGE-II
380TRANSMISSION SYSTEM ASSOCIATED WITH NORTH-WEST TRANS.(PGCIL)
381TRANSMISSION SYSTEM ASSOCIATED WITH PALLATANA GBPP and BPTS.
382TRANSMISSION SYSTEM ASSOCIATED WITH PARBATI-III HEP
383TRANSMISSION SYSTEM ASSOCIATED WITH RAPP 7 and 8 - PART B
384TRANSMISSION SYSTEM ASSOCIATED WITH SASAN ULTRA MEGA POWER PROJECT
385TRANSMISSION SYSTEM ASSOCIATED WITH SASAN ULTRA MEGA POWER PROJECT
386TRANSMISSION SYSTEM ASSOCIATED WITH WESTERN REGION EXPANSION SCHEME XXVII
387TRANSMISSION SYSTEM ASSOCIATED WITH WESTERN REGION EXPANSION SCHEME-XXVIII AND XXIX
388TRANSMISSION SYSTEM ASSOCIATEDWITH URI-II
389TRANSMISSION SYSTEM ASSOICATED WITH TEHRI PUMP STORAGE PLANT (PSP)
390TRANSMISSION SYSTEM FOR CONNECTIVITY OF MB POWER LIMITED
391TRANSMISSION SYSTEM FOR DEVELOPMENT OF POOLING STN. IN NR PART OF WEST BENGAL AND TRANSFER OF POWER FROM BHUTAN TO NR-WR
392TRANSMISSION SYSTEM FOR ESTABLISHMENT OF 400/220 KV GIS SUB STATION AT KALA IN UT DNH
393TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PHASE-IV PART-I (BIKANER COMPLEX) PART-E
394TRANSMISSION SYSTEM FOR EVACUTION OF POWER FROM NEYVELI LIGNITE CORP LTD TS - I (REPLACEMENT) IN NEYVELI TAMILNADU
395TRANSMISSION SYSTEM FOR IPP GENERATION PROJECTS IN MP AND CHATTISGARH
396TRANSMISSION SYSTEM FOR PHASE-1 GENERATION PROJECTS IN JHARKHAND AND WEST BENGAL-PART-A1
397TRANSMISSION SYSTEM FOR PHASE-I GEN PROJECT IN ORISSA - PART-A
398TRANSMISSION SYSTEM FOR PHASE-I GEN.PROJ.IN ORISSA PART-C
399TRANSMISSION SYSTEM FOR PHASE-I GENERATION PROJECTS IN ORISSA-PART B
400TRANSMISSION SYSTEM FOR POWER EVACUATION FROM ARUN-3 (900MW) HEP, NEPAL OF M/S SAPDC-INDIAN PORTION
401TRANSMISSION SYSTEM FOR PROVIDING CONNECTIVITY TO RE PROJECTS AT BHUJ-II (2000 MW) IN GUJARAT
402TRANSMISSION SYSTEM FOR PROVIDING CONNECTIVITY TO RE PROJECTS AT BIKANER (PG), FATEHGARH-II AND BHADLA–II
403TRANSMISSION SYSTEM FOR SOLAR ENERGY ZONES IN RAJASTHAN
404TRANSMISSION SYSTEM FOR TRANSFER OF POWER FROM GEN.PROJ IN SIKKIM TO NR/WR PART-A
405TRANSMISSION SYSTEM FOR ULTRA MEGA SOLAR PARK (750 MW)
406TRANSMISSION SYSTEM FOR ULTRA MEGA SOLAR PARK IN ANANTPUR DISTRICT, ANDHRA PRADESH- PART A (PHASE-I)
407TRANSMISSION SYSTEM FOR ULTRA MEGA SOLAR POWER AT TUMKUR (PAVAGADA) KARNATAKA PHASE -II (PART II)
408TRANSMISSION SYSTEM FOR ULTRA MEGA SOLAR POWER AT TUMKUR (PAVAGADA) KARNATAKA PHASE-I
409TRANSMISSION SYSTEM FOR ULTRA MEGA SOLAR POWER AT TUMKUR (PAVAGADA) KARNATAKA PHASE-II (PART-B)
410TRANSMISSION SYSTEM FOR ULTRA MEGA SOLAR POWER PARK AT BANASKANTHA (RADHANESDA) GUJARAT
411TRANSMISSION SYSTEM OF VINDHUACHAL -IV AND RIHAND -III GEN. PROJ.
412TRANSMISSION SYSTEM STRENGTHENING ASSOCIATED WITH MUNDRA UMPP (PART-B)
413TRANSMISSION SYSTEM STRENGTHENING ASSOCIATED WITH VINDHYACHAL V
414TRANSMISSION SYSTEM STRENGTHENING IN WESTERN PART OF WR FOR IPPS GENERATION PROJECTS IN CHATTISGARH
415TRANSMISSION SYSTEM STRENGTHENING IN WR-NR TRANSMISSION CORRIDOR FOR IPPS IN CHHATTISGARH
416TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHAN (8.1 GW) UNDER PHASE II – PART B1
417TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHAN (8.1 GW) UNDER PHASE-II- PART A
418TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHAN (8.1 GW) UNDER PHASE-II- PART B
419TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHAN (8.1 GW) UNDER PHASE-II- PART C
420TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHAN (8.1 GW) UNDER PHASE-II- PART D
421TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHAN (8.1 GW) UNDER PHASE-II- PART F
422TRANSMISSION SYSTEM STRENTHENING ASSOCIATED WITH MUNDRA UMPP (PART-A)
423TRANSMISSION SYSTEM STRENTHENNING IN INDIAN SYSTEM FOR TRANSFER OF POWER FROM MANGDECHHU HYDROELECTRIC PROJECT IN BHUTAN
424TRIPURA GAS BASED POWER PROJECT
425TUIRIAL HYDRO ELECTRIC PROJECT (60MW)
426ULDCS FOR EASTERN REG.
427ULDCS FOR EASTERN REGION (P.GRID)
428ULDCS,SR
429ULDCS-WR
430UNCHAHAR TR. ST-II
431UNCHAHAR ST-II TRANSIMISSION (P.GRID)
432UNCHAHAR TPP ST-II (NTPC)
433UNCHAHAR TPPST-II
434UNIFIED LOAD DESPATCH AND COMMUNICATION SCHEME W R (PR.GRID)
435UNIFIED LOAD DESPATCH COMMUNI-CATION SYSTEM(ULDCS),SOUTHER
436UNIFIED REAL TIME DYNAMIC STATE MEASUREMENT PHASE-I
437URI H.E.P STAGE -II (NHPC)
438URI H.E.P. STAGE-II
439URI HEP
440URI HYDRO ELECTRIC PROJECT (NHPC)
441VINDHYACHAL ST II TRANSMISSION SYSTEM
442VINDHYACHAL STAGE -III TRANSMISSION SYSTEM (P.GR.)
443VINDHYACHAL STPP ST.-III (NTPC)
444VINDHYACHAL STPP STAGE-V
445VINDHYACHAL STPP-II
446VINDHYACHAL STPP-II (NTPC)
447VINDHYACHAL STTP STAGE-IV
448VINDHYACHAL TR. ST-II
449VINDHYACHAL-KORBA (P.GRID)
450WARDHA-HYDERABAD 765 KV LINK
451WESTERN REGION STRENGHTENING SCHEME-IX
452WESTERN REGION STRENGHTENING SCHEME-X
453WESTERN REGION STRENGTENING SCHEME-XVI
454WESTERN REGION STRENGTHENING SCHEME XVII
455WESTERN REGION STRENGTHENING SCHEME XVIII
456WESTERN REGION STRENGTHENING SCHEME-II
457WESTERN REGION STRENGTHENING SCHEME-V
458WESTERN REGION SYSTEM STRENGHTENING SCHEME-XI
459WESTERN REGION SYSTEM STRENGTHENING - XX
460WESTERN REGION SYSTEM STRENGTHENING SCHEME - 1(PR. GR.)
461WIND POWER PROJECT AT LAKHMANA IN JAISALMER (RAJASTHAN) 50MW
462WIND POWER PROJECT AT SADLA IN DISTT. SURENDRANAGAR (GUJARAT)
463WR-NR HVDC INTERCONNECTOR FOR IPP PROJECTS IN CHHATTISGARH

Back <