SELECT PROJECT


S.No.PROJECT NAME
12880.4
23RD LINE BETWEEN BHUSAWAL-JALGAON
3AGARTALA SABROOM, NL, NEFR
4AGARTALA-AKHAURA NL
5AHMEDABAD-BOTAD (GC)
6AHMEDABAD-HIMMATNAGAR-UDAIPUR (WR)
7AJMER(NASIRABAD)- SAWAI MADHOPUR (CHAUTH KA BARWARA) VIS TONK NL
8AJMER-BANGURGRAM
9AJMER-CHITTAURGARH -UDAIPUR-UMRA (GC),NWR
10AJMER-KOTA (NASIRABAD-JAUNDRI)
11AJMER-PHULERA-RINGUS-REWARI (G.C.)(NWR)(RVNL)
12ALIGARH-GAZIABAD 3RD LINE DOUBLING (RVNL)
13ALUABARI ROAD SILIGURI JUNCTION VIA GALGALIA, NEFR
14ALWAR-BANDIKUI DOUBLING
15AMBALA CANTT-DHAPPER PH-1 WITH NEW MM OF DHAPPER-CHANDIGARH
16AMBALA-MORADABAD(RE)
17AMBARI FALAKATA TO NEW MAYNAGURI
18AMRAVATI-NARKHER NL(CR)
19ARA-BHABHUA ROAD (NL)
20ARSIKERE-HASSAN-MANGALORE(GC),SWR
21ARSIKERE-TUMKUR
22ATTIPATTU - KORUKKUPETTAI : 3RD LINE (18 KM) DOUBLING
23AUNRIHAR - JAUNPUR PATCH DOUBLING .
24AUNRIHAR MANDUADIH
25AZIMGANJ-MURSHIDABAD (JIYAGANJ) INCL. RLY. BRIDGE OVER RIVER BHAGIRATHI
26BANASPANI- JAKHPURA - DOUBLING
27BANDEL-BOINCHI 3RD LINE
28BANDEL-NAIHATI NEW RAIL BRIDGE IN REPLACEMENT OF JUBILEE BRIDGE NO.8 (ER)
29BANGALORE- HUBLI,SR
30BANGURGRAM-GURIYA PATCH DOUBLING
31BANKURA DAMODAR VALLEY RIVER 96 KM WITH MM FOR EXTENSION OF NEW LINE FROM BOWAICHANDI KHANA 24.4 KM RAINAGAR MASGRAM 20.9 KM BANKURA MUKUTMANIPUR 48.3 KM MUKUTMANIPUR UPARSOL 26.7 KM BANK
32BARABANKI AKBARPUR DOUBLING
33BARDHAMAN-KATWA (GC)
34BAZAR SAU -AZIMGANJ JN. DOUBLING
35BELAPUR- PANVEL
36BELAPUR-PANVEL COMMUTERS(MTP)
37BELAPUR-SEAWOOD-URAN ELECTRIFIED DOUBLE LINE(MTP)
38BHADRACHALAM ROAD-SATTUPALLI
39BHARUCH-SAMNI-DAHEJ GAUGE CONVERSION
40BHILD SAMDRIANDSAMDAR-J.PU
41BHILD SAMDRIANDSAMDAR-J.PU
42BHILDI-SAMDARI (GC)
43BHILDI-VIRAMGAM GAUGE CONVERSION INCLUDING GC OF MAHESANA-TARANGA HILL AS MATERIAL MODIFICATION
44BHIMSEN - JHANSI DOUBLING WITH ELECTRIFICATION
45BHOJIPUR TANAKPUR VIA PILIBHIT
46BHOPAL BINA 3D LINE DOUBLING
47BHUBANESWAR-KOTTAVALASA(RE)
48BHUBNESWAR- VIZAG
49BHUJ-NALIYA(GC) WITH EXTENSION FROM NALIYA TO VAYOR (WR)
50BILASPUR-URKURA (DL)
51BINA - KOTA DOUBLING WITH RE
52BOINCHI-SHAKTIGARH 3RD LINE
53BORIVILI-VIRAR QUADRUPLING,WR (MTP)
54BPUTRA BRIDGE AT BOGIBIL AND LINK LINES NEFR
55BUDNI-BARKHERA - 3RD LINE (33 KM)
56CALICUT-MANGALORE (DL) (SR)
57CHAKRADHARPUR TO GOILKERA 3RD LINE (34 KM)
58CHAMPA-JHARSUGUDA 3RD LINE
59CHANDIGARH-LUDHIANA(NEW BG LINE),NR
60CHENGALPATTU-VILLUPURAM DOUBLING WITH NEW MM FOR TAMBARAM-CHENGALPATTU 3RD LINE GC ALONWITH ELECTRIFICATION
61CHENGANNUR-CHINGAVANAM
62CHENNAI BEACH-CHENGALPATTU VIA TAMBARAM(MTP)
63CHENNAI BEACH-CHENGALPATTU- TRICHY GC (SR)
64CHENNAI BEACH-TAMBARAM-CHENGALPATTU SUBURBAN GC
65CHENNAI-CHE-NGAL-TRICHY
66CHHAPRA-SETTING UP OF WHEEL MANUFACTURING PLANT
67CHHINDWARA - NAGPUR (GC)(SECR)
68CHHINDWARA -NAGPUR(SECR)
69CHHINDWARA NAINPUR MANDLA FORT GAUGE CONVERSION PROJECT
70CHHITAUNI TAMKUHI ROAD KUSHINAGAR GOPALGANJ UP
71CHURCHGATE-VIRAR CONV.OF 1500V DC TRACTION TO 25 KV AC,WR
72CONSTRUCTION OF 3RD LINE BETWEEN PENDRA ROAD AND ANUPPUR (50.1 KM) IN BILASPUR DIVISION OF SEC RAILWAY
73CONSTRUCTION OF NEW LINE FROM HARMATI-ITANAGAR/NARHARIAGUN, NEFR
74CONSTRUCTION OF NL FROM KUMARGHAT-AGARTALA
75CONSTRUCTION OF STEEL SUPERSTRUCTURE AND OTHER ANCILLARY WORKS OF RAIL CUM ROAD BRIDGE. FABRICATION ERECTION OF 2X 64M + 36X 123M TRIANGULATED STEEL GIRDER IN FINAL POSITION OVER BEARINGS. PROVISION
76CUDDALORE-SALEM VIA VRIDDHACHALAM GC
77CUDDLORE - SALEM VIA VRIDHACHALAM (GC) (SR)
78Chinnasalem-Kallakurichi New Line (MM of cuddalore- Salem 191 KM)
79DABHOI-CHANDOD (17.07KM) -GC WITH EXTENSION UPTO KEVADIYA(32.68KM) =49.75KM
80DAITARI-KEONJHAR-BANSPANI NEW LINE(ECOR)
81DAKSHIN-BARASAL-LAKSHMIKANTAPUR
82DANGOAPOSI-RAJKHARSWAN 3RD LINE DOUBLING
83DANKUNI-CHANDANPUR 4TH LINE, 1ST PHASE OF DANKUNI-SHAKTIGARH 4TH LINE WITH MM BARUIPARA FURFURA NL
84DARBHANGA - BYPASS LINE CONNECTING SHISHO HALT AND KAKARGHATI EXCL DARBHANGA YARD (7.64 KM)
85DAUND-GULBARGA - DOUBLING (224.9 KM) AND PUNE-GUNTAKAL -ELECTRIFICATION (641.37 KM)
86DAUSA-GANGAPUR CITY(NL),NWR
87DEHRI-ON SONE-MUGHALSARAI III LINE DOUBL.(ER)
88DELANG-PURI DOUBLING
89DEOGHAR-DUMKA NEW BG LINE (DOUBL.)(ER)
90DHARMAVARAM-PAKALA (GC), SCR
91DHARMAVARAM-PAKALA GC
92DHASA-JETALSAR (GC)
93DIGARU-HOJAI (102 KM)
94DIGHA-JALESWAR INCLUDING MM FOR DIGHA-EGRA
95DINDIGUL-POLLACHI-PALGHAT-POLLACHI AND COIMBATORE
96DIPU (DHANSIRI) TO KARONG (NEFR),NL
97DOUBLING OF TRACK BETWEEN GOOTY AND DHARMAVARAM OF SOUTH CENTRAL RAILWAY
98DUDHNOI-MENDHIPATHAR
99DUVVADA-VIJAYAWADA
100EASTERN DEDICATED FREIGHT CORRIDOR PROJECT
101ELECTRIFICATION OF ERNAKULAM-TRIVANDRUM (RE)
102ELECTRIFICATION OF KHURJA-MEERUT-SAHARANPUR AND G'BAD-MEERUT
103ERODE-ERNAK-ULAM
104ERODE-ERNAKULAM(RE)
105EXECUTION OF RAIL CONNECTIVITY PROJECT FOR COAL TRANSPORTATION IN ODISHA FOR MCRL
106 FLYOVER AT BILASPUR (KHODRI-ANUPPUR) 10 KM
107GANDHIDHAM-PALANPUR(GC),WR
108GANDHINAGAR REDEVELOPMENT OF STATION ALOGWITH CONSTRUCTION OF 300 ROOMS HOTEL ON AIR SPACE OF STATION BUILDING
109GARHWA ROAD-RAMNA
110GC-CHENNAI- CHENGALPATTU
111GEVRA ROAD PENDRA ROAD
112GHAZIPUR - AUNRIHAR (40 KM)
113GHUTIASHARIF-CANNING (ER)
114GODHRAINDOREDEWAS-MAKSI
115GOELKERA-MANOHARPUR,(LD)(SER)
116GONDA - BAHRAICH (60 KIMS.) OF GONDA-BAHRAICH-SITAPUR-LUCKNOW
117GONDA GORAKHPUR LOOP WITH ANAND NAGAR NAUTANWA GC (260 KM)
118GONDA-GORAKHPUR LOOP WITH ANAND NAGAR-NAUTANWA GC (NER)
119GONDIA-CHA- NDAFORT,SER
120GONDIA-CHANDAFORT GC(SCR)
121GONDIA-JABALPUR(GC),(SECR)
122 GOOTY- RENIGUNTA PATCH DOUBLING PH-II (DL) (SCR)
123GULBARGA-BIDAR,SCR(NL)
124GUNA-ETAWAH VIA SHIVPURI-GWALIOR -BHIND NL, (NCR)
125GUNTUR-G'KAL-KALLURU:SCR
126GUNTUR-GUNTAKAL AND GOOTY- KALLURU-DHARMAVARAM GC(SCR)
127GUNTUR-GUNTAKAL-GOOTY,
128GUNTUR-GUNTAKAL-KALLURU(GL)(SCR)
129GURIYA-MARWAR AND KARJODA-PALANPUR
130HAJIPUR - BACHAWARA
131HAJIPUR-RAMDAYALUNAGAR DOUBLING
132HANSDIHA-GODDA NL
133HARIDASPUR-PARADEEP(NL)
134HARIDWAR-LAKSAR
135HARMATI-ITANAGAR / NAHARLAGUN (NL) (NEFR)
136HARMUTI-ITANAGAR(NL),NEFR
137HARMUTI-NAHARLAGUN
138HASSAN-BANGALORE VIA SHRAVANA-BELGOLA(NL),SWR
139HOSADURGA - CHICKJAJUR (28.89 KM)
140HOSPET-HUBLI-GOA GC(SCR)
141HOSPET-HUBLIGOA(SCR)
142HOTGI-GADAG(GC),SWR
143HOWRAH DIVISION- PLATFORM SHELTER (40 C CATEGORY STATIONS)
144HUBLI- ANKOLA,SWR
145HUBLI- CHIKJAJUR
146INDARA - DOHRIGHAT GAUGE CONVERSION.
147INDORE-DEWAS-UJJAIN (80 KMS)
148JAGGAYYAPET - MELLACHERUVU
149JAIPUR - RINGUS - CHURU AND SIKAR - LOHARU GUAGE CONVERSION (NWR)
150JAKHAL-MANSA DOUBLING ON SPR SECTION
151JALANDHAR-PATHANKOT-JAMMU TAWI
152JAUNPUR AKBARPUR (TANDA) DOUBLING
153JAYANAGAR-DARBHANGA-NARKATIA GANJ(GC),ECR
154JHARSUGUDA-RENGALI DOUBLING
155JIND-SONEPAT (NL),NR
156JODHPUR (RAI KA BAGH) - DEGANA DOUBLING (145 KM)
157KADUR-CHIKMAGALUR-SAKLESHPUR (NL),(SWR)
158KALOL-KADI-KATOSAN ROAD (37.23 KM)
159KANPUR KASGANJ MATHURA(GC) NER
160KAPTANGANJ-THAWE-SIWAN-CHHAPRA GC (NER)
161KARAIKAL PERALAM(23KM)-NEW LINE PROJECT
162KARAILA ROAD - SHAKTINAGAR DOUBLING
163KARUR-SALEM(NL),SR
164KATAKHAL TO BHAIRABI
165KATIHAR - JOGBANI (GC)(NEFR)
166KATNI-BINA 3RD LINE (263 KM)
167KATWA-PATULI DOUBLING WITH NEW MM FOR AHMEDPUR-KATWA GC
168KHARAGPUR- BHUBANESWAR(RE) INCL. ADRA-MIDNAPORE (RE)
169KISHANGANJ JALALGARH, NL, NEFR
170KODERMA GIRIDH (NL), ECR
171KODERMA-RANCHI VIA BARKAKANA (NL),ECR
172KOLAR-CHICKBALAPUR GC
173KOLAYAT-PHALODY (NL) NWR
174KOLKATA CIRCULAR RAILWAY (MTP)
175KONKAN RAILWAY PROJECT
176KONKAN RLY. KRCL
177KOSI BRIDGE (NL), ECR
178KRISHNANAGAR-BETHUA DAHRI DOUBLING
179KUMARGHAT-AGARTALA(NL),NEFR
180KURUPPANTHARA-CHINGAVANAM
181KUTTIPURAM-CALICUT INCLD. SHORANUR-M-LORE (DL) (SR)
182LILUAH-DANKUNI 3RD LINE, MM FOR DANKUNI-JONGALPARA-FURFURA SHARIF NL
183LUCKNOW- PILIBHIT VIA SITAPUR, LAKHIMPUR GC
184LUMDING- DIBRUGARH
185LUMDING-DIB-RUGARH RH
186LUMDING-DIBRUGARH (628 KM) INCL. LINK BRANCH LINES OF HAIBARGAON-MAIRABARI (89 KM)
187LUMDING-DIBRUGARH GC(NFR)
188LUMDING-DIBRUGARH PROJECT INC-LUDING LINK BRANCH LINES,NEFR
189LUMDING-HOJAI PATCH DOUBLING PROJECT
190LUMDING-SILCHAR JIRIBAM, BADARPUR-BARAIGRAM KUMARGHAT NATIONAL PROJECT
191LUMDING-SILCHAR(GC),NEFR
192LUNI-BARMER-MUNABAO(GC),(NWR)
193LUNI-BARMER-MUNABAO,NWR
194MADURAI - MANIYACHI - TUTICORIN (160 KM) DOUBLING
195MADURAI - RAMESWARAM (161 KM) GAUGE CONVERSION
196MADURAI-BODINAYAKKANUR
197MADURAI-DINDIGUL (INCL. AMBADUTURAI-KODAIKANNAL ROAD) (62.05 KM) DOUBLING
198MADURAI-RAMESWARAM(GC).SR
199MADURAI-RAMESWARAM-GC
200MAHARAJGANJ-MASRAKH (NL) - NER
201MANAMADURAI - VIRUDHUNAGAR (66.55 KM) GAUGE CONVERSION.
202MANDARHILL-DUMKA-RAMPURHAT (NL),ER
203MANDHANA - BRAHMAWART NEW LINE PROJECT.
204MANIYACHI - NAGERCOIL (102 KM) DOUBLING
205MANOHARPUR-BONDAMUNDA 3RD LINE DOUBLING
206MANSA-BHATINDA (PHASE-I), INCL. NEW MATERIAL MODIFICATION FOR RAMA MANDI (RAMAN) - SADA SINGHWALA VIA TALWANDI SABO (29.11 KM) - NEW LINE
207MANSI-PURNIA (EXTENSION OF MANSI-SAHARSA) GAN ECR
208MATHURA-PLWAL 4TH LINE (80KM)
209MAU-GHAZIPUR-TARIGHAT NEW LINE
210MAVLI JUNCTION-BARI SADRI, MM OF AJMER- CHITTSURGARH-UDAIPUR
211MAYLADUTHURAI-THIRUVARUR-KARAIKUDI-THIRU 'PONDI'-AGASTIYAMPALLI
212MEERUT-MUZAFARNAGAR PATCH DL
213MEHSANA PALANPUR DOUBLING PROJECT 65.10 KMS
214MIRAJ-LATUR ROAD(GC),CR
215MONIGRAM- NIMTITA
216MULANTURUTTI - KURUPPANTARA (24 KM) DOUBLING.
217MULTI MODAL LOGISTICS PARK AT BARHI
218MULTI MODAL LOGISTICS PARK AT KATHUWAS
219MULTI MODAL LOGISTICS PARK AT NAYA RAIPUR
220MULTI MODAL LOGISTICS PARK AT TIHI
221MULTI MODAL LOGISTICS PARK AT VISHAKHAPATNAM
222MULTI MODAL LOGISTICS TRANSPORT AT MIHAN
223 MULTI MODAL TRANSPORT SYSTEM(MMTS) PHASE-II HYDERABAD
224MUMBAI URBAN TRANSPORT PROJECT PHASE-I
225MUNEERABAD-MAHABOOBNAGAR(NL),SCR
226MUZAFFARPUR-SITAMARHI NEW LINE
227NANDYAL-YERRAGUNTLA(NL),SCR
228NATHDWARA-NEW NATHDWARA NEW LINE ( MM OF AJMER-CHITTAURGARH-UDAIPUR)
229NEW BG LINE FROM DUDHNOI-MENDIPATAR
230NEW BONGAIGAON-RANGIA-KAMAKGHYA DOUBLING
231NEW COOCHBEHAR TO SAMUKTALA
232NEW COOCHBEHAR-GUMANIHAT PATCH DOUBLING PROJECT
233NEW GUWAHATI-DIGARU-PATCH DOUBLING
234NEW JALPAIGURI-NEW BONGAIGAON (GC),NEFR
235NEW MAYNAGURI TO JOGIGHOPA VIA CHANGRABANDHA (NL),NEFR
236NEW MAYNAGURI-GUMANIHAT-DOUBLING OF REMAINING PORTION (51.65 KM)
237OBULAVARIPALLE-KRISHNAPATNAM(RVNL)
238OMALUR-METTURDAM- DOUBLINGWITH ELCTRIFICATION 28.93KM
239PALANPUR KHODIYAR ROAD OVER BRIDGE IN LIEU OF LEVEL CROSSING NOS 208 211C 214 AND 220
240PALANPUR-SAMAKHAYALI (DL)
241PALWAL-BHUTESWAR 3RD LINE DOUBLING(NCR)(RVNL)
242PANDABESWAR-CHINPAI DOUBLING (ER)
243PANSPURA-KHARAGPUR 3D LINE
244PATNA GANGA BRIDGE (NL), ECR
245PATNA GANGA BRIDGE AT DIGHAGHAT(BANDS),ER
246PATNA GANGA BRIDGE WITH LINKING LINES BETWEEN PATNA AND HAJIPUR (RAIL CUM ROAD BRIDGE) 19 KM
247PHULERA - DIGANA DOUBLING
248PHULERA-MAR-WAR-AHMEDBAD
249PHULERA-MARWAR-AHMEDABAD GC (WR)
250PHULRA-MERTARD-BIKANER
251PILIBHIT - SHAHJAHANPUR GAUGE CONVERSION
252PIRPAINTI-BHAGALPUR
253PLASSEY-JIAGANJ DOUBLING
254POWARKHEDA - JUJHARPUR - SINGLE LINE FLYOVER IN UP DIRECTION (15.89 KM)
255PURNA-AKOLA (G.C), SCR
256QADIAN-BEAS
257QUILON-TIRUNELVELI - TRICHENDUR, TENKASI
258QUILON-TIRUNELVELI-TENKASI-VIRUDHUNAGAR(SR)(GC)
259RAIL COACH FACTORY,KAPURTHALA PH -II (NR)
260RAIL-CUM-ROAD BRIDGE AT MUNGER (NL), ECR
261RAIPUR - TITLAGARH - DOUBLING
262RAJATGARH-BARANG(LD),ECOR
263RAJGIR HISUA TILAIYA (46KM) INCL. MM NATESHWAR ISLAMPUR
264RAJGIR-TILAIYA (NL), ECR
265RAJPIPLA-ANKELASHWAR, WR (GC)
266RAJPURA-BHATINDA (172.64 KM)
267RAMANAGRAM-MYSORE DOUBLING WITH ELECTRIFICATION OF KENGESII- MUSORE (SWR)
268RANCHI-LOHARDAGA(GC),SER
269RANGIA-MURKONGSELEK ALONG WITH LINKED FINGERS
270RANGIA-MURKONGSELEK, (GC) ALONG WITH LINKED FINGERS NEFR
271RANI-MARWAR JN. PATCH DOUBLING
272RATANGARH-SARDARSAHAR (MM OF SADULPUR-BIKANER AND RATANGARH-DEGANA GC)
273RATLAM-DUNGARPUR VIA BANSWARA (NL)
274RENIGUNTA-GUNTAKAL(RE)
275REWARI-SADULPUR-HISSAR (GC),NWR
276ROHTAK - BHIWANI DOUBLING
277ROHTAK-MEHAM HANSI
278ROSA-SITAPUR CANTT-BURHWAL DOUBLING
279ROURKELA JHARSUGUDA THIRD LINE 101 KM
280RUNNING OF 12 CAR TRAINS ON HARBOUR LINE
281Rampurhat-Murarai (29.48 km)-3rd line
282S'BAD DR'CH-ELLAM-BOLRAM
283S.MADHOPUR-J.PUR-PHULERA
284S.MADHOPUR-J.PUR-PHULERA
285SADULPUR-BIKANER AND RATANGARH-DEGANA GAUGE CANVESSION (NWR)
286SAINTHIA-TARAPITH 3RD LINE
287SAKRI-NIRMALI AND JHANJHARPUR-LAUKAHABAZAR AND SAHARSA-FORBESGANJ (GC)
288SALKA ROAD -ANUPNAGAR LINE DOUBLING
289SAMBALPUR - ANGUL RLY. ELECTRIFICATION
290SAMBALPUR - TITLAGARH - DOUBLING
291SAMBALPUR-TALCHER DOUBLING
292SECUNDERABAD-DRONACHELLAM- BOLARUM GC(SCR)
293SECUNDERABAD-MAHABUBNAGAR DOUBLING
294SITAMARHI-JAYNAGAR-NIRMALI VIA SURSAND (NL)
295SITARAMPUR- MUGULSARAI
296SITARAMPUR-MUGHALSARAI RE
297SONARPUR-CANNING WITH NEW MM FOR KALIKAPUR-MINAKHAN VIA GHATAKPUR NL
298SONNAGAR MGS3RDLINE
299SONNAGAR MU-GHALSARAI
300SUKINDA ROAD - ANGUL (NL)(ECOR)
301SULINDA ROAD ANGUL(ECOR)
302SULTANGANJ-KATURIA VIA ASARGANJ, TARAPUR AND BELHAR
303SURATPURA - HANUMANGARH - SRIGANGANAGAR GUAGE CONVERSION (NWR)
304SURENDRA NAGAR RAJKOT
305SURENDRANAGAR-BHAVNAGAR(GC),WR
306TAHANJAVUR-VILLUPURAM GAUGE CONVERSION (G.C)(SR)
307TALCHER - BIMALAGARH
308TALGARIA TO BOKARO N/CABIN DOUBLING(38 KM)
309TAMLUK-BASULYA-SUTAHATA DOUBLING
310TARAKESHWAR-MAGRA NEW BG LINE
311THANE-TURBHE-NERUL-VASHI(MTP)
312THANJAVUR - PONMALAI DOUBLING (46.96 KM) WITH BYE-PASS LINE BEFORE PONMALAI (1.13 KM)
313THIRUMAILA - VELACHERY : MASS RAPID TRANSIT SYSTEM (PHASE II)
314THIYAT HAMIRA-SANU
315TINDIVANAM-GINGEE-TIRUVANNAMALAI (NL)
316TINPAHAR - SAHIBGANJ (ER)
317TIRUCHIRAPPALI-NAGORE-KARAIKKAL(SR)(GC)
318TIRUMALAI-VELLACHERI EXTN. OF MRTS (MTP)
319TOLLYGANJ-GARIA WITH EXTENSION TO DUM DUM-NOAPARA AND NOAPARA-NSCB AIRPORT(MTP)
320TRICHY - MANAMADURAI (150 KM) GAUGE CONVERSION
321TRICHY MANAMADURAI (GC) (SR)
322UDHAMPUR-SRINAGAR-BARAMULLA (NL),NR
323UDHNA-JALGAON WITH ELECTRIFICATION(DOUBLING) (WR)
324UNCHAHAR-AMETHI
325UTRATIA-ZAFRABAD, NR (LINE DOUBLING)
326VALLAPARPADM-IDAPALLY,(NL)(RVNL)
327VARANASI-MODHOSINGH-ALLAHABAD DOUBLING
328VIJAYAWADA VIZAG
329VIJAYWADA-GUDUGOLANU-BHIMAVARAM-NARSAPUR DL (221 KM)
330VIJAYWADA-VISAKHAPATNAM(RE)
331VILLUPURAM - KATPADI (161 KM) GAUGE CONVERSION
332VILLUPURAM-DINDIGUL WITH ELECTRIFICATION
333VILLUPURAM-KATPADI (GC)(SR)
334VIRAMGAM- BHILDI
335VIRAMGAM- BHILDI
336VIRAMGAM-SAMAKHIALI (DL)
337VIRAMGAM-SURENDRANAGAR (DL)
338YELAHANKA-PENUKONDA
339YESWANTPUR- SALEM,SR
340YESWANTPUR-SALEM(GC) -SR

Back