SELECT PROJECT


S.No.PROJECT NAME
13RD AND 4TH LINE - SARAGBUNDIA AND MADWARANI
23RD LINE BETWEEN DHANBAD SONNAGAR
34000/3000 HPDIESEL LOCOS
44TH LINE - BHATAPARA-HATHBAND (8.8 KM) (PB#72/NR/2022-23)
54TH LINE - BHILAI-BHILAI NAGAR (8.8 KM) (PB#72/NR/2022-23)
64TH LINE - DADHAPARA-BELHA (9.2 KM) (PB#72/NR/2022-23)
74TH LINE - RAJNANDGAON-DONGARHGARH (31.2 KM) (PB#72/NR/2022-23)
84TH LINE BETWEEN BAREJADI NANDEJ (GERATPUR)- SANAND (38.20 KM) (AHMEDABAD BYPASS).
9ADRAJ MOTI-VIAJAPUR (39.75 KM)
10AGRA FORT-BANDIKUI
11AHMEDNAGAR-PARLI VAIJNATH(NL) CR
12ALIGARH-DAUD KHAN - 3RD LINE 6.9 KM AND CONSTRUCTION OF FLYOVER AT DAUD KHAN
13ALIGARH-HARDUAGANJ FLYOVER (22 KM)
14ALLAHABAD-BAMHRAULI - 4TH LINE (10 KM) WITH FLY-OVER AT SUBEDARGANJ
15AMBIKA KALNA NABADWIP DHAM DOUBLING
16ANAND VIHAR-TILAK BRIDGE 3RD AND 4TH LINE
17ARARIA-SUPAUL (NL)
18BAGALKOT-KUDACHI NL
19BAGHUAPAL FLY OVER (20 KM)
20BAHRAICH - NANPARA -NEPALGANJ (56.15 KM)
21BAHRAICH SRAVASTI BALRAMPUR (TULSIPUR)
22BAIYYAPPANAHALLI-HOSUR (48 KM)
23BANGALORE-WHITEFIELD-BANGALORE CITY-KRISHNARAJAPURAM QUADRUPLING
24BARABANKI MALHAUR 3RD AND 4TH LINE (32.84 KM)
25BARAMATI - LONAND
26BARAUNI- BACHWARA 3RD AND 4TH LINE
27BELGAUM-DHARWAD VIA KITTUR (73.10 KM) (UMBRELLA WORK PB#22/2019-20/NR)
28BHADRAK - NERGUNDI 3RD LINE
29BHANDAI - FLYOVER FOR ETAWAH BOUND DOWN TRAINS
30BHANUPALI-BILASPUR BERI NL
31BHATNI - AUNRIHAR WITH ELECTRIFICATION (125 KM) (EXCL INDARA - MAU (116.95 KM))
32BONDAMUNDA RANCHI DOUBLING
33BONGAIGAON-GOALPARA-GUWAHATI (176 KM)
34BRUNDAMAL-JHARSUGUDA- FLYOVER CONNECTION FOR JOINING DN LINE
35BUDHAPANK - SALEGAON VIA RAJATGARH 3RD AND 4TH LINE.
36BURHWAL - GONDA - 3RD RUNNING LINE.
37CHANDIGARH-BADDI
38CHHAPRA-BALLIA UP
39CHIRIMIRI-NAGPUR HALT
40CHOTTAUDEPUR-DHAR(NL)
41DAHOD-INDORE VIA SARDARPUR, JHABUA AND DHAR (NL)
42DALLIRAJHARA - ROWGHAT (95 KM) {PART OF DALLIRAJHARA-JAGDALPUR (235 KM)}
43DALLIRAJHARA ROWGHAT JAGDALPUR
44DAUND - MANMAD (236 KM)
45DEDICATED TEST TRACK FOR RDSO (PHASE II)
46DETAIL, DESIGN AND CONSTRUCTION OF B.G. NEW RAILWAY LINE FROM DHARAM TO QAZIGUND (KM 100.88 TO KM 168)IN J K. SCOPE COVERS CONSTRUCTION OF 09 NOS. TUNNELS, 14 NOS. MAJOR BRIDGES, 30 NOS. MINOR BRIDGES
47DHOLPUR-SIRMUTTRA WITH EXTENSION TO GANGAPURCITY AND MOHARI-TANTPUR AND TANPUR-BANSI PAHARPUR
48DHULE (BORVIHIR)-NARDANA (UMBRELLA WORK)
49DLW GM 4000 / 3000 HP DIESEL LOCOS
50DOMINGARH - GORAKHPUR - GORAKHPUR CANTT - KUSUMHI - 3RD RUNNING LINE (21.15 KM)
51DOUBLING BETWEEN BHIWANI-DOBH BAHALI
52DOUBLING BETWEEN GOOTY-PENDAKALLU (29.225)
53DOUBLING BETWEEN JAUNPUR JN-ZAFFARABAD (6.28 KM)
54DOUBLING BETWEEN REWARI-KATHUWAS (27.73 KM)
55DOUBLING OF BORIDAND - AMBIKAPUR ( SURAJPUR)
56DOUBLING OF PRADHANKHUNTA JN -PATHERDIH BAZAR-BHOJUDIH
57ERNAKULAM-KUMBALAM - PATCH DOUBLING (7.71 KM)
58EXTENSION OF MRTS FROM VELACHERY TO STN. THOMAS, MTP
59FATUHA-ISLAMPUR INCL. MM FOR EXTENSION OF NEW LINE FORM BIHARSHARIF-BARBIGHA, DANIYAWAN-BIHARSHARIF, BARBIGHA-SHEIKHPURA AND NEORA-DANIYAWAN.
60GADAG-WADI NL
61GANDHAMARDAN IRON ORE MINES TO GOALDIH STATION
62GC OF NATHDWARA - DEVGARH MADARIYA (82.5KM)
63GODRA-INDOREDEWAS-MAKSI
64GOMOH - FLYOVER FOR DOWN TRAINS
65GUDHA THATHANA MITHRI TEST TRACK FOR RDSO
66GUNTUR-GUNTAKAL
67GWALIOR-SEOPURKALA WITH EXTENSION TO KOTA (GC)
68Gauge conversion of Raipur(Kendri)-Dhamtari and Abhanpur-Rajim branch (67.20 km)
69HAJIPUR-SUGAULI VIA VAISHALI (NL), ECR
70HASSAN (ALUR) - BELUR (32 KM) (UMBRELLA WORK PB#23/2018-19/NR)
71HIMMATNAGAR-KHEDBRAHMA (54.83 KM)
72HOSPET-HUBLI-LONDA-VASCODAGAMA DL
73HOTGI-KUDGI-GADAG
74INDORE BUDNI (INDORE JABALPUR)
75ITARSI-NAGPUR (BAL.) - 3RD LINE (267 KM)
76JAGADALPUR-KORAPUT DOUBLING
77JANGHAI PRATAPGARH AMETHI DOUBLING
78JANGHAI-PHAPHAMAU - DOUBLING WITH ELECTRIFICATION (46.79 KM)
79JARAPADA - BUDHAPANK WITH FLY OVER AT TALCHER ROAD 3RD AND 4TH LINE
80JAYNAGAR-BIJALPURA INCLUDING EXTENSION BIJALPURA-BARDIBAS(NEPAL) GC
81JEYPORE MALKANGIRI NEW LINE
82JEYPORE NABARANGPUR NEWLINE
83JHAJHA - BATIA (UMBRELLA WORK PB#23/2018-19/NR)
84JHANSI BINA DOUBLING
85JHANSI MANIKPUR AND KHAIRAR BHIMSEN DOUBLING
86JHARSUGUDA-BILASPUR 4TH LINE
87JIRIBAM TO IMPHAL (TUPUI)(NL)(NEFR)
88JUNAGARH -VISAVADAR (42.28) KM
89KADUR CHIKMAGALUR SAKLESHPUR NEW LINE (93 KM)
90KALIPAHARI - BAKHTARNAGAR 5TH LINE (17.61 KM)
91KALYAN-KASARA 3RD LINE
92KALYAN-MURBAD VIA ULHASNAGAR (UMBRELLA WORK)
93KATIHAR-KUMEDPUR AND KATIHAR-MUKURIA (64.5 KM) (UMBRELLA WORK PB#57/2019-20/NR)
94KATNI - SINGRAULI DOUBLING PROJECT
95KATNI GRADE SEPARATOR/BYE PASS
96KAZIPET-BALHRSHA
97KAZIPET-VIJAYAWADA 3RD LINE WITH ELECTRIFICATION
98KHAGARIA-KUSHESHWAR ASTHAN (NL) (ECR)
99KHARAGPUR-ADITYAPUR - 3RD LINE (132 KM)
100KHARSIA DHARAMJAIGARH WITH SPUR LINE EAST CORRIDOR-PHASE I
101KHURDA ROAD-BOLANGIR(NL)ECOR
102KIRANDUL - JAGDALPUR DOUBLING
103KODERMA-TILAIYA (NL), ECR
104KODINGAMALI BAUXITE MINES TO SINGARAM RAILWAY STATION
105KORAPUT - SINGAPUR ROAD DOUBLING
106KOTLPALLI-NARASAPUR (NL) (SCR)
107KOTTAVALSA - KORAPUT DOUBLING
108KUMBALAM-THURAVUR - PATCH DOUBLING (15.59 KM)
109LALITPUR - BIRARI WITH FLYOVER AT LALITPUR
110LALITPUR-SATNA-REWA-SINGRULI NL, (NCR)
111LODHMA TO PISKA LINK LINE BY PASSING HATIA/RANCHI WITH Y CONNECTION (17.2 KM)
112LUDHIANA KILA RAIPUR (19 KMS) WITH FREIGHT LINE AT GILL STATION ON LDH-JHL SECTION
113LUDHIANA MULLANPUR DOUBLING
114MALUGUR-PALASAMUDRAM (17.98 KM) (PB#29/NR/2022-23)
115MANMAD - JALGAON - 3RD LINE (160 KM)
116MANOHARABAD-KOTHPALL NEW LINE(SCR)
117MARIKUPPAM - KUPPAM
118MATHURA-JHANSI-3RD LINE (273.80 KM)
119MIYAGAM-KARJAN-DABHOI-SAMLAYA (GC)
120MODASA- SHAMLAJI NEW LINE ( MM OF AHMEDABAD-HIMMATNAGAR-UDAIPUR (299.2 KM))
121MORAPPUR-DHARMAPURI
122MUGHALSARAI - ALLAHABAD - 3RD LINE
123MULTI MODAL LOGISTICS PARK AT SWARUPGANJ
124 MUMBAI AHMEDABAD HIGH SPEED RAIL PROJECT
125MUMBAI CENTRAL VIRAR VADODARA AHMEDABAAD TRAIN PROTECTION SYSTEM 500 RKM
126MUMBAI URBAN TRANSPORT PROJECT IIIA
127MUMBAI URBAN TRANSPORT PROJECT PHASE-II
128MURARAI - BARHARWA 3RD LINE (48.90 KM)
129MURKONGSELEK-PASIGHAT NL
130MUZAFFARPUR SAGAULI DOUBLING 100.60 KM
131NADIAD-PETLAD (37.26 KM)
132NADIKUDE-SRI KALAHASTI
133NAGAPATTINAM THIRUTURAIPUNDI (38KM)- NEW LINE PROJECT
134NAGPUR- NAGBHIR RAILWAY LINE GAUGE CONVERSION PROJECT
135NAHATI - RANAGHAT 3RD LINE (MM OF KALINARAYANPUR - KRISHNANAGAR)
136NANGALDAM-TALWARA(NL),NR
137NARAYANGARH TO BHADRAK 3RD LINE (155 KM)
138NEW B.G. LINE FROM ARARIA TO GALGALIA (THAKURGUNG), NEFR
139NEW BG LINE BETWEEN NALIYA-JAKHAU PORT
140NEW BG LINE FROM BALURGHAT TO HILLY NFR
141NEW BG LINE FROM JAGBANI TO BIRATNAGAR
142NEW BG LINE INTERSECTION (5 NOS) BETWEEN GERATPUR-SANAND AND BOTAD-AHMEDABAD (16.51 KM) (PB29/NR/2022-23)
143NEW LINE FROM DIMAPUR TO ZUBZA(KOHIMA) NATIONAL PROJECT (NEFR)
144NEW WORK FOR CONSTRUCTION OF METRO RAILWAY FROM BARANAGAR TO BARRACKPORE AND DAKSHINESHWAR (MTP)
145NEW WORK FOR CONSTRUCTION OF METRO RAILWAY FROM JOKA TO BINOY BADAL DINESH BAGH.
146NEW WORK FOR CONSTRUCTION OF METRO RAILWAY FROM NOAPARA-BARASAI VIA BIMANBANDER (MTP)
147NEW WORK FOR CONSTRUCTION OF METRO RAILWAY FROM NSCB AIRPORT TO NEW GARIA VIA RAJARHAT (MTP)
148NIMACH BADI SADRI NEW LINE PROJECT
149NIMACH-RATLAM (133 KM)
150NIPANIA-BHATAPRA (14.4 KM) 4TH LINE (PB#72/NR/2022-23)
151PACHORA-JAMNER WITH EXTENSION UPTO MALKAPUR NG TO BG
152PENUKONDA-DHARMAVARAM, EXCL. DHARMAVARAM (41.5 KM)
153PETLAD-BHADRAN (22.5 KM)
154PIRPAINTI-JASIDIH
155PUNE-MIRAJ-LONDA (467 KM)
156QUADRUPLING BETWEEN GANDHIDHAM - ADIPUR WITH Y CONNECTION AT ADIPUR FOR PROVIDING DIRECT ENTRY TOWARDS MUNDRA PORT AND BHUJ AND HIGH LEVEL PLATFORM AT GOPALPUR (10.69 KM)
157RAJKOT-KANALUS (111.20 KM)
158RAJNANDGAON - NAGPUR - 3RD LINE (SECR)
159RAMGANJMUNDI-BHOPAL (NL),WCR
160RAMPUR DUMRA - TAL - RAJENDRAPUL DOUBLING INCLUDING GANGA BRIDGE
161RATLAM-MHOW-KHANDWA-AKOLA (GC)
162RAYADURGA-TUMKUR NL
163RENIGUNTA WADI GOOTY - BYPASS
164RISHIKESH - KARNAPRAYAG NEW LINE
165ROURKELA-BONDAMUNDA A-CABIN 5TH LINE (10 KM) (UMBRELLA WORK PB#57/2019-20/NR)
166SAGAULI VALMIKINAGAR DOUBLING 109.7 KM
167SAHJANWA - DOHRIGHAT
168SAKRI-HASANPUR ROAD (NL)
169SAMASTIPUR-DARBANGHA
170SAMLAYA-TIMBA ROAD (53.53 KM)
171SAMNI-JAMBUSAR (24.08 KM)
172SATNA - REWA (50 KM)
173SAWAIMADHOPUR - BYPASS LINE (6.98 KM) (UMBRELLA WORK PB#57/2019-20/NR)
174SEVOK RANGPO, NEFR
175SHAHGANJ-BHATNI-PHEPHNA-INDARA, MAU-SHAHGANJ (EXCL. MAU-INDARA) PATCH DOUBLING.
176SHIMOGA-SHIKARIPURA-RANEBENNUR (UMBRELLA WORK PB#23/2018-19/NR)
177SITARAMPUR BYE - PASS LINE (6.59 KM)
178SOLAPUR-TULJAPUR-OSMANABAD (UMBRELLA WORK)
179SONENAGAR BYE PASS LINE FROM CHIRALAPOTHU TO BAGHA BISHUNPUR
180SURFACE TRIANGLE LINE BETWEEN BHADURA STATION AND NEW CROSSING STN KARMA DOUBLING
181TALCHER - ANGUL NEW LINE WITH Y CONNECTION AT TALCHER
182TALCHER-BIMALAGARH(NL)(ECOR)
183TARAKESWAR - BISHNUPUR NEW BG LINE (NL), ER
184TARANGA HILL ABU ROAD VIA AMBAJI NEW LINE
185TIDIVANAM-NAGARI (NL)
186TRIVANDRUM-KANYAKUMARI DOUBLING
187TUMKUR-CHITRADURGA-DAVENGERE NL
188VIJAPUR-AMBLIYASAN (41.53 KM)
189VIJAYAWADA KAZIPET BYEPASS LINE
190VIJAYAWADA-GUDUR
191VIZIANAGARAM -SAMABALPUR 3RD LINE
192WADSA-GADHCHIROLI NEW LINE (52.36 KM)
193WARDHA - NAGPUR - 4TH LINE (76 KM)
194WARDHA-BALHARSHAH - 3RD LINE (132 KM)
195WARDHA-NANDED MAHARASHTRA
196WARDHA-SEWAGRAM NGP 3RD LINE
197WESTERN DEDICATED FREIGHT CORRIDOR
198YESHVANTHPUR-CHANNASANDRA (21.7 KM)

Back