SELECT PROJECT


S.No.PROJECT NAME
1(I) CONSTRUCTION OF FOUR/SIX LANING FROM KM 132.375 TO KM 158.058 (TOTAL NEW ALIGNMENT LENGTH OF 20.683 KM) OF DABOKA- DIMAPUR SECTION (DIMAPUR BYPASS) OF NH-36 AND 39
2(II) CONSTRUCTION OF DIMAPUR BYPASS (ASSAM PORTION) OF 4/6 LANE PAVEMENT ON EPC BASIS FROM EXISTING KM 159.400 OF NH-36 TO EXISTING KM 102.500 OF NH-39 AND UPTO END POINT OF ASSAM PORTION [DESIGN KM 1
32 LANE WITH HARD SHOLDER , REHABILITATION AND UP GRADATION OF SECTION FROM KM 242.0 TO KM 298.0 OF NH 223 (NEW NH 4) (PACKAGE II)
42 LANE WITH PAVED SHOULDER FROM KM 16+900 (BOGAPANI) TO KM 27+150 (GOLAI GAON) ON EXISTING DIBRUGARH TO LEDO SECTION WITH PROPOSED DIGBOI BYPASS SECTION-4
52 LANE WITH PAVED SHOULDER FROM KM 399.00 TO KM 430.00 OF KARANPARYAG TO CHAMOLI UNDER CHARDHAM PARIYOJNA
62 LANE WITH PAVED SHOULDER FROM KM 430.00 TO KM 468.00 OF CHAMOLI TO PAINI UNDER CHARDHAM PARIYOJNA
72 LANING FROM MANU-SIMLUNG PKG-2
82 LANING OF DINDIGUL - PERIGULAM THENI- KUMILI
92 LANING OF KOHIMA - JESSAMI SECTION (PACKAGE II)
102 LANING OF KOHIMA - JESSAMI SECTION (PACKAGE V)
112 LANING WITH PAVED SHOULDER FROM KM 30.800 TO KM 70.800 AND 2 LANING WITHOUT PAVED SHOULDER FROM KM 70.800 TO KARNATAKA/GOA BORDER (KM 84.120) OF NH-4A IN THE STATE OF KARNATAKA ON EPC MODE (PACKAGE
122- LANE WITH PAVED SHOULDERS OF HINOTIYA TO MEHULWA FROM DESIGN KM 27+000 9OF EXISTING SH-19 KM 26+530) NEAR HINOTIYA VILLAGE TO DESIGN KM 75+700 (OF EXISTING SH-19 KM 74+820) NEAR MEHULWA VILLAGE SEC
132-LANE EXISTING RAMPUR BYPASS OF RAMPUR TO BE DEVELOPED TO 4-LANE ON EPC MODE IN THE STATE OF UTTAR PRADESH (KM 0+000 TO KM 10+190)
142-LANE WITH PAVED SHOULDER CONFIGURATION OF LAMBASINGI TO PADERU SECTION (KM 205+000 TO KM 253+974) OF NH-516E
15 2-LANE WITH PS OF BEWAR TO NEAR KARRI VILLAGE SECTION OF NH-92 FROM KM.0.00 TO 30.00 UNDER GNHCP
162-LANE WITH PS OF NEAR KARRI VILLAGE TO ETAWAH SECTION OF NH-92 FROM KM.30.000 TO 57.346 UNDER GNHCP
172-LANING FROM JOLAIBARI - BELONIA
182-LANING FROM YAINGANGPOKPI TO FINCH CORNER (PKG-I)
192-LANING FROM YAINGANGPOKPI TO FINCH CORNER (PKG-II)
202-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- 2A)
212-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- 2B)
222-LANING OF CHURACHANDPUR TUIVAI SECTION OF NH-102B (PKG- IB)
232-LANING WITH PS SITARGANJ BAREILY SECTION
242-LANNING WITH PS MOTIHARI-RAXAUL
252.0 MTPA BHOJUDIH NLW WASHERY
2625.5 MW WIND POWER PROJECT AT KAYATHAR IN TAMILNADU
272L NH-1 FROM KM 8.660 TO KM 33.775 (SUMBAL TO WAYUL) TO 4L DUAL CARRIAGEWAY NH STANDARD AS PART OF SRINAGAR RING ROAD PHASE II (DESIGN CH. 41.907 TO CH. 66.609)
282L PS SRIGANGANAGAR TO RAISINGHNAGAR (DESIGN CHAINAGE -0.500 KM TO DESIGN CHAINAGE 101.000 KM) (PACKAGE-1) ON NH-911
292L+PS FOR WORK OF NH-325 (BALOTRA TO SANDERAO VIA JALORE) BY CONSTRUCTION OF BYPASSES:(1) ASOTRA- BRAHMDHAM BYPASS (2) SIWANA BYPASS (3) MOKALSAR BYPASS (4) MAJOR REALIGNMENT AT KATHADI (5) MAJOR REAL
302L+PS FROM KM. 0+000 TO KM. 32+000 (MUDIGUBBA TO PUTTAPARTHI) OF NH-342
312LPS FROM GONDIGUDA TO ARAKU BHALLAGUDA KM 27.480 TO KM 51.772 SECTION OF NH 516E
322LPS FROM KM36.400 TO KM. 107.224 OF NH167BG FROM DUTTALUR TO KAVALI SECTION
332LPS OF BIJNOR TO KOTAWALI SECTION OF NH-709AD, PKG-IV
342LPS OF CHAPRATHIPALEM TO LAMBASINGI SECTION OF NH 516E
352LPS OF KOYYURU TO CHAPRATHIPALEM SECTION OF NH 516E
36300 MW SOLAR POWER PROJECT UNDER CPSU SCHEME
373L MAJOR BRIDGE OVER RIVER BRAHMANI AT KM. 401.250 (DUBURI CHANDIKHOLE SECTION) OF NH 200 (NEW NH 53)
383RD AND 4TH LINE - SARAGBUNDIA AND MADWARANI
393RD LINE BETWEEN DHANBAD SONNAGAR
404 LANE CONNECTOR FROM DELHI MEERUT EXPRESSWAY KM 50.000 TO KM 8.520 OF NH 235 IN THE STATE OF UTTAR PRADESH ON EPC BASIS
414 LANE FROM KM 56.400 TO KM 120.300 FROM B.KOTHAPALLI JUNCTION TO GORANTLA OF NH 716G
424 LANE OF BILASPUR TO URGA PROJECT (KM 0.00 TO KM 70.2) OF NH-130A
434 LANE WITH PAVED SHOULDER AGARTALA BYPASS (WESTERN SIDE) CONNECTING NH-8
444 LANE WITH PAVED SHOULDER FROM KM 0.000 TO KM 51.119 OF TADIPATRI TO MUDDANUR OF NH67
454 LANING FROM EXISTING KM 39.380 (DESIGN CH. 37.000) TO KM 74.450 (DESIGN CH. 69.000) OF MUCHUKOTA – BUGGA SECTION OF NH 544D ON HYBRID ANNUITY MODE UNDER NH(O) IN THE STATE OF ANDHRA PRADESH
464 LANING FROM JAMUGURI TO BISWANATH CHARIALI FROM KM 182 TO KM 208 OF NH-52
474 LANING FROM RANGAGARA TO KALIABHOR TINALI FROM KM 297.00 TO KM 315.315 OF NH-37 ON EPC BASIS.
484 LANING OF NH 37 SECTION BETWEEN END OF MORAN BYPASS TO BOGIBEEL JUNCTION NEAR LAPETKETA (KM. 561.700-KM. 580.778) ON EPC MODE.
494 LANING OF ITANAGAR TO BANDARDEWA SECTION OF NH-415 FROM KM 40+430 TO KM 51+735 (PACKAGE B) ON EPC MODE IN THE STATE OF ARUNACHAL PRADES
504 LANING OF JAGADHRI TAJEWALA ROAD SECTION OF NH 907 (OLD NH 73A) UNDER NH(O) (PKG 1) IN THE STATE OF HARYANA
514 LANING OF JORHAT TO JHANJI SECTION FROM KM. 453.00 TO KM. 491.08 (DESIGN KM 403.200 TO KM 454.240)
524 LANING OF KHED SINNAR SECTION OF NH 50
534 LANING OF NAJIBABAD BYPASS OF NH-119 FROM KM. 105.423 TO KM. 118.373 (EXCLUDING 2.45 KM. OF NH-74 BYPASS) IN THE STATE OF UTTAR PRADESH
544 LANING OF NH 544D FROM EXISTING KM 346.300 OF NH 44 (DESIGN CHAINAGE KM 0.000) TO KM 39.380 (DESIGN CHAINAGE KM 37.000) OF ANANTAPUR-MUCHUKOTA SECTION ON HYBRID ANNUITY MODE UNDER NH (O) IN THE STAT
554 LANING OF NH-31D FROM GHOSHPUKUR - SALSALABARI ( KM 0.00 TO KM . 83.785)
564 LANING OF NH-37 SECTION BETWEEN DEMOW TO END OF MORAN BYPASS (FROM KM. 534.800 TO KM. 561.700) ON EPC MODE.
574- LANING OF ROHTAK-JIND SECTION FROM KM. 307+000 TO KM. 347+800 OF NH-71 AND CONNECTING LINK FROM KM. 347.800 OF NH-71 TO KM. 9+400 OF NH-71A (BALANCE WORK) ON EPC MODE UNDER BHARATMALA
584-L DHUBRI PHULBARI BRIDGE WITH APPROACH ROAD
594-LANE WITH PAVED SHOULDERS FROM KM 32/0 TO KM 79/650 (DESIGN CHAINAGE KM 32+000 TO KM 78+760) PUTTAPARTHI KODURU SECTION OF NH-342
604-LANING OF GOA/KARNATAKA BORDER-KUNDAPUR SECTION
614-LANING OF GOHANA-SONIPAT (PKG-2) SECTION FROM KM 40.601 TO KM 78.837 (LENGTH = 38.236KM) OF NH-352A IN THE STATE OF HARYANA UNDER BHARATMALA PARIYOJNA UNDER NH (O) TO BE IMPLEMENTED ON HYBRID ANNUIT
624-LANING OF HAPACHARA - TULUNGIA SECTION
634-LANING OF HOSKOTE-DOBBASPET
644-LANING OF KAMALAPURAM - ODDANCHATRAM SECTION OF NH-209
654-LANING OF KASHIPUR-SITARGANJ SECTION
664-LANING OF MADATHUKULAM - POLLACHI SECTION OF NH-209 (NEW NH-83)
674-LANING OF MEERUT NAJIBABAD SECTION FROM KM. 11.500 TO KM 39.250 AND KM 86.590 TO KM. 112.545.IN THE STATE OF UTTAR PRADESH ON HAM MODE.
684-LANING OF MELUR - PILLAYARPATTI - KARAIKUDI SECTION OF NH-338, NH-36, NH-383
694-LANING OF VADIPPATTI - THAMARAIPATTI SECTION OF NH-744A (MADURAI RING ROAD)
704-LANNING OF BODHRE-DHULE SECTION(KM 390.000 TO 452.800)
714-LANNING OF CHAPRA-HAJIPUR
724-LANNING OF HARIDWAR-NAGINA SECTION OF NH 74 FROM (KM 204.300 OF NH 58) TO KM 73.00
734-LANNING OF KODINAR TO VERAVAL SECTION OF NH-8E FROM KM 221.610 TO KM 263.000
744-LANNING OF NH17 AND NEW NO. NH66 FROM KM 161/600 TO 205/400 UNDER HYBRID ANNUITY MODE
754-LANNING OF NH17 AND NEW NO. NH66 FROM KM 241/300 TO 281/300 UNDER HYBRID ANNUITY MODE
764-LANNING OF STHIYATHOPU-CHOLOPURAM
774/6L ACCESS CONTROL EXPRESSWAY FROM DESIGN CHAINAGE KM 515.000 TO 528.300 (KUNJWANI TO SIDHRA SECTION OF NH-44) AND FROM DESIGN CHAINAGE KM 550.900 TO KM 566.520 (DOMEL TO KATRA SECTION) (PHASE II-PAC
784/6L GREENFIELD LUDHIANA RUPNAGAR HIGHWAY FROM JUNCTION WITH NE 05 VILLAGR NEAR TO MANEWAL (LUDHIANA) TO JUNCTION WITH NH 205 NEAR BHEORA VILLAGE (RUPNAGAR) FROM KM 66.000 TO KM 91.000 INCLUDING SPUR
794/6L OF SPUR TO HARIDWAR (GREENFIELD) FROM KM. 0.000 TO KM. 49.000
804/6L OF BANGALORE - PUNE SECTION OF BYPASS CONNECTING DHARWAD - HUBLI FROM KM. 403.80 TO KM. 433.20
814000/3000 HPDIESEL LOCOS
8244 LANE DIVIDED CARRIAGEWAY OF BARMER BYPASS OF NH-15 (NEW NH-68) IN THE STATE OF RAJASTHAN ON EPC MODE.
834L GREENFIELD ALIGNMENT FROM KALYANAPUR TO TAL DASHRAHA OF NH-119D (PKG-III)
844L AMBALA - KALAAMB FROM KM. -0.800 TO KM. 33.015 OF OLD NH-72
854L BANGALORE-CHENNAI EXPRESSWAY FROM KM. 230.000 TO KM. 261.705 OF KANCHEPURAM TO SRIPERUMBUDUR SECTION (PHASE-III/PACKAGE-IV)
864L FROM GAJU VILLAGE AT KM 32.982 TO DEVINAGAR BYPASS (END) AT KM 208.000 OF NH 530B (PKG 1C)
874L FROM KM 196.87 (SANKHA) TO KM 219.6 (KHAJURI) ON NH-75 [REHLA / GARHWA BYPASS]
884L FROM MATHURA BYPASS (START) AT EXISTING KM. 154.20 OF NH-44 TO GAJU VILLAGE AT KM 32.982 OF NH-530B (PKG-IB)
894L GREENFIELD A. MALOUT BYPASS FROM CH. KM 44.500 TO CH. KM 35.500 ON NH-07 AND CH. KM 0.000 TO KM 6.984 ON NH-09 B. MANDI DABWALI BYPASS FROM CH. 38.450 KM TO KM 27.910 PKG-02
904L GREENFIELD ALIGNMENT OF AMAS TO SHIVRAMPUR FROM 0.000 KM. TO 55.002 KM. OF NH 119 D (PKG-I)
914L GREENFIELD ALIGNMENT OF SHIVRAMPUR TO RAMNAGAR FROM KM. 55.002 TO KM. 109.300 OF NH 119 D (PKG-II)
924L GREENFIELD ROAD CONNECTING NORTH AND SOUTH INDUSTRIAL CLUSTER OF KHANDALERU CREEK NEAR KRISHNAPATNAM PORT AT THAMMINAPATNAM TO MOLLUR FROM KM 0.0 TO KM 16.046, PART I & 6L EXTENSION OF DEDICATED PO
934L GREENFIELD RUDHI TO DESHGAON (PKG V OF BETUL-KHANDWA/DESHGAON) - N/04015/06003/MP
944L GREENFIELD SPUR FROM DELHI-VADODARA GREENFIELD EXPRESSWAY NEAR BANDIKUI TO JAIPUR
954L KODINAR - VERAVAL (PACKAGE VI) FROM KM. 222.400 TO KM. 230.00 (KODINAR BYPASS) OF NH-8E (NH 51 NEW)
964L MEDINIPUR TO BALLUPUR FROM KM. 458.65 TO KM. 487.65 OF NH-07(PKG-2)
974L MISSING LINK (OF REWA BYPASS) FROM JN. WITH NH 30 NEAR BELA TO JN. WITH MPRDC RING ROAD (NEAR SILPARA) ON KM 0.00 TO KM. 13.100 OF SH-9
984L MITIGATION MEASURE STRUCTURES ON CH/MH BORDER TO WAINGANGA BRIDGE SECTION OF NH-53
994L OF CHANDESARA TO KHEDAKHAJURIYA FROM KM. 0.000 TO (-) 750 AND KM 0.000 TO KM 41.400 OF NH-752D (PKG-I)
1004L OF ADDAHOLE TO BANTWAL CROSS SECTION
1014L OF ADDAHOLE TO BANTWAL CROSS SECTION INCLUDING FLYOVER AT KALLADKA TOWN
1024L OF AMRITSAR GHOMAN TANDA UNA SECTION FROM KM 8.270 TO KM 54.000 OF NH 503A PACKAGE I
1034L OF BAL WORKS OF MAHUVA TO KAGVADAR FROM 100.450 KM. TO 140.470 KM. OF NH-8E (PKG- III)
1044L OF BAL WORKS OF TALAJA - MAHUVA FROM 54.990 KM. TO 100.450 KM. OF OLD NH-8E (PACKAGE-II)
1054L OF BARAMATI TO INDAPUR (PKG-II) FROM KM. 41.400 TO KM. 84.550 OF NH-965G (SAINT TUKARAM MARG)
1064L OF BEAS-MEHTA-BATALA-DERA BABA NANAK FROM INTERSECTION WITH JALANDHAR-AMRITSAR HIGHWAY (NH-3) NEAR BEAS TILL START OF BATALA BYPASS NEAR VILLAGE ACCHHAL (FROM KM. 0.000 TO KM. 31.300) (PKG-1)
1074L OF CHANNARAYAPATNA BYPASS AND HASSAN BYPASS WITH STRUCTURES IN DEVIHALLI -HASSAN SECTION
1084L OF END OF PINJORE BYPASS - BADDI - NALAGARH SECTION (KM. 4.200 TO KM. 35.370) OF NH21A
1094L OF EXISTING 2/4L STRETCH FROM LONAND TO DIVE GHAT (KM 166.400 TO KM 220.900 ) OF MOHOL – ALANDI SECTION OF NH-965 (PKG - V)
1104L OF EXISTING BEAS – BABA BAKALA - DERA BABA NANAK SECTION FROM START OF BATALA BYPASS TILL INTERSECTION WITH AJNALA GURDASPUR HIGHWAY (NH 354) NEAR DERA BABA NANAK ( FROM KM. 31.300 TO KM. 69.100 )
1114L OF GREENFIELD ALIGNMENT FROM KM. 47.000 TO KM. 89.210 OF BALBHADARPUR TO BELA NAWDA SECTION OF NH-119D
1124L OF HARIDWAR NAGINA SECTION DESIGN CH. LME FROM KM 13.829 TO KM 17.110 AND KM 26.077 TO KM 27.508 AND DESIGN CH. RME FROM KM 13.839 TO KM 17.120 AND KM 26.078 TO KM 27.509 OF EUP MITIGATION MEASURES
1134L OF HP/PUNJAB BO4L OF HP/PUNJAB BORDER - MO FROM KM. 11.00 TO KM. 42.00 OF OLD NH-20 (NEW NH-154) (PACKAGE-IA)RDER - MO FROM KM. 11.00 TO KM. 42.00 OF OLD NH-20 (NEW NH-154) (PACKAGE-IA)
1144L OF INDAPUR TO TONDLE (PKG-III) FROM KM.84.550 TO KM. 131.00 OF NH-965G (SAINT TUKARAM MARG)
1154L OF INDORA CHOWK TO PACHPAOLI AND AGRASEN CHOWK - ASHOKA CHOWK
1164L OF INDORE - BOREGAON (PKG-III) [BALWARA TO DHANGAON] FROM KM. 42.260 TO KM. 82.660 OF NH347BG AND 753L
1174L OF KARWAR (KM. 281.980 OF NH-62 NAGAUR ROAD) TO DANGIYAVAS OF JODHPUR RING ROAD (PKG-II)
1184L OF KM.165.092 TO KM.171.855 (NORTH BOUND) AND FROM KM.166.895 TO KM.173.638 (SOUTH BOUND), EXCL. CERTAIN REACHES OF NORTH BOUND AND SOUTH BOUND OF RAMBAN TO BANIHAL (PKG-III) OF OLD NH-1A (NEW NH-
1194L OF KODAD (DESIGN KM 0.00/EXISTING KM 185.00 OF NH-65) TO KHAMMAM (DESIGN KM 31.800/EXISTING KM 29.400) OF NH-365A
1204L OF LEFT-OVER WORKS INCLUDING ADDITIONAL STRUCTURES FROM KERALA/TAMIL NADU BORDER TO KANYAKUMARI SECTION FROM KM 43.0 TO KM 96.174 OF NH66 UNDER EPC MODE IN THE STATE OF TAMILNADU.
1214L OF MADANAPALLE TO PILERU SECTION FROM KM 0.000 TO KM 55.900 OF NH-71(PACKAGE-I) - N/05060/01002/AP
1224L OF MIRZA CHAUKI TO FARKKA SECTION OF NH80 FROM KM 215.00 TO KM 260.00 ON HAM MODE IN THE STATE OF JHARKHAND PACKAGE I
1234L OF MO - SIHUNI FROM KM. 42.00 TO KM. 51.00 OF OLD NH-20 (NEW NH-154) (PACKAGE-IB)
1244L OF NAGPUR-KATOL SECTION FROM KM. 13.00 TO KM. 62.900 OF NH-353J
1254L OF OBEDULLGANJ - BUDNI SECTION FROM KM. 8.400 TO KM. 20.700 IN RATANPANI WILDLIFE AREA OF NH - 69 (NEW NH-46)
1264L OF PALMA TO GUMLA SECTION OF NH23 FROM KM. 26.00 TO KM. 89.170 ON HAM MODE IN THE STATE OF JHARKHAND.
1274L OF PILERU TO KALUR SECTION FROM KM 55.900 TO KM 92.800 AND KM 94.500 TO KM 95.717
1284L OF RAJURA-KORPANA-ADILABAD ROAD UPTO M.S. BORDER FROM KM 32.910 TO KM 89.090 OF NH-353B
1294L OF RATNAGIRI - KOLHAPUR SECTION FROM KM 112.340 TO KM 145.300 OF NH-166 (PKG–III)
1304L OF RATNAGIRI - KOLHAPUR SECTION FROM KM 67.140 TO KM 112.340 OF NH-166 (PKG – II)
1314L OF RATNAGIRI - KOLHAPUR SECTION OF NH-166 FROM KM 0.000 TO KM 19.769 AND KM 31.000 TO KM 67.140 (PKG – I)
1324L OF SAGAR - MOHARI FROM KM.8 TO KM.50 (PKG-I)
1334L OF SANNUR TO BIKARNAKATTE SECTION FROM KARKALA TO MANGALORE
1344L OF SHAMLI BYAPSS- SAHARANPUR FROM KM 92.2 TO KM 155.025 SECTION OF NH-709B, PKG-II
1354L OF THIRUMANGALAM TO VADUGAPATTI SECTION FROM KM 0.000 TO KM 36.000 OF NH-744
1364L OF TWIN TUBE TUNNEL CONFIGURATION INCLUDING APPROACHES FROM MAROG TO DIGDOL (FROM KM.154.210 TO KM.158.650 (NORTH BOUND) AND FROM KM.155.940 TO KM.160.260 (SOUTH BOUND)) OF RAMBAN TO BANIHAL (PKG-
1374L OF VADUGAPATTI TO THERKUVENGANALLUR (RAJAPALYAM) SECTION FROM KM 36.000 TO KM 71.600 OF NH744 UNDER EPC MODE IN THE STATE OF TAMILNADU.
1384L POANTA SAHEB–MEDNIPUR FROM KM. 435.65 TO KM. 458.65 OF NH-07(PKG-1)
1394L PS FROM KURNOOL (EXISTING KM. 5.400 OF NH-40/DESIGN KM.0.000) TO MANDLEM (EXISTING KM.38.000/DESIGN KM 30.600) OF NH-340C(PACKAGE-1)
1404L PS FROM MANDLEM (EXISTING KM. 38.000/DESIGN KM.30.600) TO ATMAKUR (EXISTING KM.73.000/DESIGN KM 66.115) OF NH-340C (PACKAGE-2)
1414L PS MYDUKUR BADVEL FROM KM 585.820 TO KM 630.960 SECTION OF NH 67
1424L PS OF SAVALI VIHIR TO START OF AHMEDNAGAR BYPASS (KM 88.400 TO KM 163.400) OF NH 160
1434L SPUR OF PANIPAT - SHAMLI CONNECTING NH-709AD (PANIPAT – SHAMLI – MUZAFFARNAGAR) AND NH-709A (KARNAL – MEERUT) BYPASSING SHAMLI DISTRICT (UP)
1444L SPUR OF SHAMLI-MUZZAFARNAGAR CONNECTING NH-709AD (PANIPAT-SHAMLI-MUZAFFARNAGAR) AND NH-58 (MEERUT - ROORKEE) BYPASSING MUFFARNAGAR TOWN
1454L SUNDER NAGAR BYPASS FROM KM173.900 TO KM 179.600 OF NH-21 IN THE STATE OF HP
1464L TWIN TUBE TUNNEL INCLUDING APPROACHES FROM DIGDOL TO KHUNI NALLAH (NORTH BOUND CONNECTING WITH EXISTING MAJOR BRIDGE ON NB) AND SOUTH BOUND CONNECTING WITH TUNNEL T4 ,SINGLE TUBE TUNNEL OF RAMBAN T
1474L+PS OF NH -58 FROM BEAWAR-GOMTI (OLD CH KM 58.245 TO KM. 108.600) PKG-I.
1484LBERKHEDI TO GODPEHRA NH-44
1494LPS OF MUZAFFARNAGAR TO MIRANPUR SECTION OF NH-709AD, PKG-III
1504TH LINE - BHATAPARA-HATHBAND (8.8 KM) (PB#72/NR/2022-23)
1514TH LINE - BHILAI-BHILAI NAGAR (8.8 KM) (PB#72/NR/2022-23)
1524TH LINE - DADHAPARA-BELHA (9.2 KM) (PB#72/NR/2022-23)
1534TH LINE - RAJNANDGAON-DONGARHGARH (31.2 KM) (PB#72/NR/2022-23)
1544TH LINE BETWEEN BAREJADI NANDEJ (GERATPUR)- SANAND (38.20 KM) (AHMEDABAD BYPASS).
15550 MW SOLAR POWER PROJECT -NEYVELI MINED OUT AREA
15650 MW WIND POWER PROJECT PART OF 150 MW SECI HYBRID
157500 BEDDED HOSPITAL INCLUDING 50 SUPERSPECIALITY BEDS FOR ESIC AT PUNE
1585TH STREAM ALUMINA REFINERY EXPANSION PROJECT
1596 L OF AURANGABAD TO BIHAR-JHARKHAND BORDER (CHORDAHA) SECTION FROM KM. 180.000 TO KM. 209.827 OF NH-2 (PKG-01).
1606 LANING FROM KM 9.90 TO KM 19.948 (ARAMGARH-SAMSHABAD SECTION) OF HYDERABAD-SAMSHABAD SECTION OF NH-44 IN THE STATE OF TELANGANA
1616 LANING OF EXISTING 4-LANE STRETCH FROM KALKALLU AT KM.454+000 TO GUNDLA POCHAMPALLY AT KM.471+000, ON NAGPUR – HYDERABAD SECTION (DESIGN LENGTH 17.000 KM) OF NH-44 IN THE STATE OF TELANGANA UNDER BH
1626-LANE AMRITSAR-BATHINDA GREENFIELD SECTION OF NH-754A FROM JUNCTION WITH MOGA JALANDHAR ROAD (NH-703) NEAR DHARAMKOT TO JUNCTION WITH BHAGTA BHAI KA-BHADAUR ROAD NEAR DYALPURA BHAI KA (FROM KM. 39+00
1636-LANING OF KOZHIKODE BYPASS (CALICUT BYPASS) (I.E. VENGALAM JN. TO RAMANATTUKARA JN.) SECTION OF NH-17 (NEW NH-66) IN THE STATE OF KERALA UNDER NHDP PHASE III
1646-LANING OF VIJAYAWADA BYPASS FROM GOLLAPUDI (DESIGN CH. 30+000) TO CHINNAKAKANI (DESIGN CH. 47+881) INCLUDING MAJOR BRIDGE ACROSS RIVER KRISHNA IN VIJAYAWADA GUNDUGOLANU SECTION OF NH-16 IN THE STATE
16560 KTA POLYPROPYLENE PROJECT
166600 MW SOLAR POWER PROJECT UNDER CPSU SCHEME
1676L ACCESS CONTROL GREENFIELD HIGHWAY OF VILL-KARAUNDA MAHAJAN TO VILL-KHYAWARI FROM KM. 56.500 TO KM. 82.000 (PKG-3)
1686L ACCESS CONTROL GREENFIELD HIGHWAY OF VILL-KHYAWARI TO VILL-LATIFPUR AT SAHARANPUR BYPASS FROM KM. 82.000 TO KM. 119.790 (PKG-4)
1696L ACCESS CONTROL GREENFIELD HIGHWAY OF VILL-LOHADDA TO VILL-KARAUNDA MAHAJAN FROM KM. 27.000 TO KM. 56.500 (PKG-2)
1706L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM AUDIREDDIPALLE 160.000 KM. TO MALLAPALLE 176.000 KM. PACKAGE 7
1716L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM CHANDRASEKHARAPURAM (CH. 228+000) TO POLAVARAM (CH. 260+000)OF [NH-544G] (PACKAGE-11)
1726L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM KODUR 0.000 KMS TO VANAVOLU 24.300 KMS OF NH 544G PACKAGE 1
1736L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM MALLAPALLE 176.000 KM. TO KAVULAKUNTLA 196.000 KM. PACKAGE 8
1746L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM MARRIPUDI (CH. 285+500) TO SOMAVARAPPADU (CH. 314+600) OF [NH-544G] (PACKAGE-13)
1756L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM NALLACHERUVU PALLI 96.300 KM. TO YERRAGUDIPADU 129.000 KM. OF NH 544G PACKAGE 5
1766L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM NARAYANMPET (CH. 203+500) TO CHANDRASEKHARPURAM (CH. 228+000)(PACKAGE-10)
1776L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM ODULAPALLE 72.000 KM. TO NALLACHERUVUPALLI 96.300 KM. OF NH 544G PACKAGE 4
1786L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM POLAVARAM (CH. 260+000) TO MARRIPUDI (CH. 285+500) OF [NH-544G](PACKAGE-12)
1796L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM SOMAVARAPPADU (CH.314.600) TO MUPPAVARAM (CH.343+240) OF [NH-544G] (PACKAGE-14)
1806L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM VANAVOLU 24.300 KM. TO VANKARAKUNTA 45.700 KM. OF NH 544G PACKAGE 2
1816L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM VANKARAKUNTA 45.700 KM. TO ODULAPALLE 72.000 KM. OF NH 544G PACKAGE 3
1826L ACCESS CONTROLLED GREENFIELD HIGHWAY FROM YERRAGUDIPADU 129.000 KM. TO AUDIREDDIPALLE 160.000 KM. OF NH 544G PACKAGE 6
1836L ACCESS CONTROLLED GREENFIELD HIGHWAY OF JULEKAL VILLAGE TO DINNEDEVARAPADU VILLAGE FROM KM 242.200 TO KM 280.400 (PKG-2)
1846L ACCESS CONTROLLED GREENFIELD HIGHWAY OF JUNCTION OF EPE (VILL.-MAVIKALAN) TO VILL.-LOHADDA FROM KM. 0.000 TO KM. 27.000 (PKG-1)
1856L ACCESS CONTROLLED GREENFIELD HIGHWAY OF NANDINNE VILLAGE TO JULEKAL VILLAGE FROM KM 202.900 TO KM 242.200 (PKG-1)
1866L ACCESS CONTROLLED HIGHWAY FROM DND MAHARANI BAGH JN. WITH JAITPUR PUSHTA ROAD OF NH 148NA FROM KM. 0.00 TO KM. 9.00 IN NCR
1876L ACCESS CONTROLLED LUDHIANA-BATHINDA GREENFIELD HIGHWAY FROM JN. WITH AMRITSAR-BATHANDA GREENFIELD ROAD (NH-754A) NEAR RAMPURA PHUL TO JN. WITH MOGA-BARNALA ROAD (NH-703) NEAR VILLAGE TALLEWAL FROM
1886L ACCESS-CONTROLLED HIGHWAY FROM (GANESHPUR) TO(NEAR MOHAND) OF GANESHPUR – DEHRADUN SECTION FROM KM.0 TO KM.8.3 OF NH-72A (PACKAGE-1)
1896L ACCESS-CONTROLLED HIGHWAY OF DAAT KALI TUNNEL - DEHRADUN OF GANESHPUR – DEHRADUN SECTION FROM KM.16.380 TO KM.19.785 OF NH-72A (PACKAGE-3)
1906L ALURU - JAKKUVA SECTION OF NH-130CD ROAD FROM KM 365.033 TO KM 396.800 (PKG. 1)
1916L AMRITSAR BATHINDA GREENFIELD SECTION FROM VILLAGE TIBA ON NE 5A TO JN. WITH MOGA JALANDHAR ROAD NH 703 NEAR DHARAMKOT FROM KM 0.000 TO KM 39.000 OF NH-754A PKG-1
1926L AMRITSAR-BATHINDA GREENFIELD SECTION FROM JN. WITH BHAGTA BHAI KA-BHADAUR ROAD NEAR DYALPURA BHAI KA TO JN. WITH MANDI DABWALI BATHINDA ROAD ON NH-54 NEAR SANGAT KALAN FROM KM 93.000 TO KM 154.866
1936L FROM BELGAUM TO SANKESHWAR BYPASS FROM KM 515.000 TO KM 555.017 OF NH 48
1946L FROM SANKESHWAR BYPASS TO MH KNT BORDER FROM KM. 555.017 TO KM. 592.853 OF NH-48 (PKG II)
1956L GREENFIELD BARAJA - KANDILI SECTION OF NH- 130-CD ROAD FROM KM 338+500 TO KM 342+500 (PACKAGE-OD-7)
1966L GREENFIELD KANDILI - ALURU SECTION OF NH-130-CD ROAD FROM KM 342+500 TO KM 365+033 (PACKAGE-OD-8)
1976L GREENFIELD BAUNSAGUAR - BARAJA SECTION OF NH-130-CD ROAD FROM KM 293+000 TO KM 338+500 (PACKAGE – OD-6)
1986L GREENFIELD KALIAGURA – BAUNSAGUAR SECTION OF NH-130-CD ROAD FROM KM 249+000 TO KM 293+000 (PACKAGE – OD-5)
1996L GREENFIELD KANPUR - LUCKNOW (EXPRESSWAY) PKG II FROM KM. 28.500 TO KM. 73.744
2006L JAKKUVA – KORLAM SECTION OF NH-130CD ROAD FROM KM 396.800 TO KM 421.100 (PKG 2)
2016L KANTAKAPALLE – SABBAVARAM SECTION OF NH-130CD ROAD FROM KM 445.100 TO KM 464.662 (PKG-4)
2026L MINOR BRIDGE (PALOLI PALAM) AT KM. 203.160 and MAJOR BRIDGE (MORAD) AT KM. 204.895 AND ALLIED WORKS
2036L OF ACCESS-CONTROLLED HIGHWAY FROM MOHAND TO DAAT KALI TUNNEL OF GANESHPUR – DEHRADUN SECTION FROM KM.8.30 TO KM.16.380 OF NH-72A (PACKAGE-2)
2046L OF AGRA BYPASS (NORTHERN) CONNECTING KM. 174.500 OF NH-2 (NEW NH-19) TO KM. 141.000 OF YAMUNA EXPRESSWAYS
2056L OF AMBALA-CHANDIGARH GREENFIELD SECTION FROM KM. 0.000 TO KM. 25.000 WITH 4L SPUR TO LALRU FROM KM. 0.000 TO KM. 5.828 AND SPUR TO PR-7 ROAD FROM KM. 0.000 TO KM. 11.157
2066L OF AZHIYUR-VENGALAM FROM KM. 189.200 TO KM. 230.400 OF NH-66
2076L OF BADAKUMARI - KARKI SECTION FROM KM 179.000 TO KM 226.500 OF NH-130-CD (PACKAGE – OD-3)
2086L OF CHILKARARUPET BYPASS FROM KM. 357.400 TO KM. 371.920 OF NH-16
2096L OF CHITTOOR TO THATCHUR FROM KUMARAJAPET TO VEERA KAVERI RAJA PURAM FROM KM 43.800 TO KM 61.380 OF NH-716B (PKG-II)
2106L OF DHANARA - HATIBENA SECTION FROM KM 124.611 TO KM 146.50 OF NH-130-CD (PACKAGE – OD-1)
2116L OF EXISTING 4L FROM GUNDLAPOCHAMPALLY TO BOWENPALLY FROM KM 471.300 TO KM 481.331 OF NH-44
2126L OF HATIBENA - BADAKUMARI SECTION FROM KM 146.50 TO KM 179.00 OF NH-130-CD (PACKAGE – OD-2)
2136L OF IT CITY CHOWK TO KURALI CHANDIGARH ROAD
2146L OF JODHPUR ROMANA (BATHINDA) - MANDI DABWALI (PUNJAB HARYANA BORDER) SECTION OF NH-54 FROM KM. 0.000 TO KM. 27.400 OF NH-54
2156L OF KAGAL-SATARA SECTION FROM KM 592.240 TO KM 658.000 OF NH-48 (PKG-I)
2166L OF KAGAL-SATARA SECTION FROM KM 658.000 TO KM 725.000 OF NH-48 (PKG-II)
2176L OF KARKI – KALIAGURA SECTION FROM KM 226.500 TO KM 249.000 OF NH-130-CD (PACKAGE – OD-4)
2186L OF MADURAVOYAL TO SRIPERUMBUDUR SECTION FROM KM. 13.800 TO KM. 37.000 OF NH-4 THROUGH STATE HIGHWAYS DEPARTMENT
2196L OF MH/KN BORDER (NIMBAL VILLAGE) TO KN/TS BORDER (SINGNODI VILLAGE) FROM KM. 26.000 TO KM. 97.000 IN GULBARGA OF NH-150C (PKG-II)
2206L OF PONDAVAKKAM TO KANNIGAIPAIR FROM KM 96.040 TO KM 116.100 OF NH 716B (PKG-IV)
2216L OF SRIPERUMBUDUR TO KARAIPETTAI FROM KM 37.000 TO KM 71.015 OF NH 48
2226L OF VARADHARAJULA TO KUMARAJAPET FROM KM 0.000 TO KM 43.800 OF NH-716B (PKG-I)
2236L OF VEERA KAVERI RAJA PURAM TO PONDAVAKKAM FROM KM 61.380 TO KM 96.040 OF NH 716B (PKG-III)
2246L OF WAINGANGA BRIDGE - BHANDARA (INCLUDING BHANDARA BYPASS) SECTION FROM KM 485.000 TO KM 499.800 OF NH-53
2256L STANDALONE FLYOVERS AT BONGAIGAON, CHAPAGURI, PATHSALA, SIMLAGURI CHOWK AND BAIHATA BYPASS JUNCTIONS ON STRETCHES OF NH-31 AND NH-27
2266L STANDALONE FLYOVERS AT RAHA, DEMOW, BORGHAT, KATHIATALI JUNCTIONS AND ROB AT JAGIROAD ON STRETCHES OF NH 36 AND NH 27
2276L WITH ACCESS CONTROL PROVISION SAHARANPUR BYPASS TO GANESHPUR SECTION FROM 13.89 KM TO 41.820 KM OF DELHI- DEHRADUN ECONOMIC CORRIDOR (PACKAGE-2)
2288L OF DWARKA EXPRESSWAY PKG-II (RUB NEAR DWARKA SECTOR 21-DL/HR BORDER) FROM 5.300 KM.TO 9.500 KM. OF NH-248BB
229ABC_ GUJARAT
230ABC_CHANDIGARH
231ACCESS CONTROLLED HIGHWAY OF 4 LANE WITH PAVED SHOULDERS FROM TIRUVALLUR (DESIGN CHAINAGE KM 17+56) TO TN/AP BRODER (DESIGN CHAINAGE KM 61+51) OF NH-716 (CHENNAI-TIRUPATI PACKAGE-1)
232ACCESS CONTROLLED HIGHWAY OF 4 LANE WITH PAVED SHOULDERS FROM TN/AP BORDER (DESIGN CHAINAGE KM 61+51) TO PUTTUR (DESIGN CHAINAGE KM 81+540) OF NH-716 & 6 LANE WITH PAVED SHOULDERS FROM MALLAVARAM TO R
233 ACCESS ROAD/BRIDGE CONNECTIVITY FROM NH-09 AT KM.40 NEAR JAGBUDA BRIDGE (INDIA) TO BOUNDARY PILLAR NO. 802/11 OF INDO-NEPAL BORDER
234ACRYLICS OR OXO-ALCOHOL PROJECT AT GUJARAT REFINERY
235ADASA UG TO OC (1.50 MTY)
236 ADDITIONAL INFRASTRUCTURE AT IISC BANGALORE SH RCC MONOLITHIC FOR MEN WOMEN HOSTEL
237ADDITIONAL STRUCTURES ON 6LGURGAON-JAIPUR SECTION OF NH-48 BETWEEN KM 42.700 TO KM 273.00
238ADDITIONAL TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM BHADLA-III PS AS PART OF RAJASTHAN REZ PHASE III SCHEME [20 GW] [SPV NAME POWERGRID BHADLA-III POWER TRANSMISSION LIMITED]
239ADRAJ MOTI-VIAJAPUR (39.75 KM)
240AGRA FORT-BANDIKUI
241AGRA METRO RAIL PROJECT
242AGRA: DEVELOPMENT OF NEW CIVIL ENCLAVE AT AGRA AIRPORT.
243AHMEDABAD METRO RAIL PROJECT PHASE 1
244AHMEDABAD METRO RAIL PROJECT PHASE II
245AHMEDNAGAR-PARLI VAIJNATH(NL) CR
246AKASH BRIDGE - JESSAMI SECTION PKG-2
247ALIGARH-DAUD KHAN - 3RD LINE 6.9 KM AND CONSTRUCTION OF FLYOVER AT DAUD KHAN
248ALIGARH-HARDUAGANJ FLYOVER (22 KM)
249ALL INDIA INSTITUTE OF MEDICAL SCIENCES AT MANETHI, HARYANA.
250ALLAHABAD-BAMHRAULI - 4TH LINE (10 KM) WITH FLY-OVER AT SUBEDARGANJ
251AMADAND OPENCAST EXPANSION PROJECT
252AMALGAMATED DHANKASA JAMUNIA UG (1.84 MTY)
253AMALGAMATED GAURI PAUNI EXPANSION OC
254AMALGAMATED GONDEGAON - GHATROHAN EXPANSION OCM
255AMALGAMATED INDER-KAMPTEE DEEP OC (3.20 MTY)
256AMALGAMATED NTST KUJAMA OCP 8.5 MTY
257AMALGAMATED YEKONA-I YEKONA-II
258AMBIKA KALNA NABADWIP DHAM DOUBLING
259AMERA OC RCE
260AMGAON OPENCAST PROJECT RCE
261AMRITSAR AIRPORT JUNCTION RAMDAS FROM KM. 100.835 TO KM. 139.813 PKG IV
262ANAND VIHAR-TILAK BRIDGE 3RD AND 4TH LINE
263ANDHERI RESIDENTIAL TOWERS MUMBAI
264ARARIA-SUPAUL (NL)
265ASSAM DUMMY TEST
266ATF PIPELINE FROM JAWAHARLAL NEHRU PORT TRUST (JNPT) TO NAVI MUMBAI INTERNATIONAL AIRPORT (NMIA)
267AUGMENTATION AT FATEHGARH-II PS, FATEHGARH-IV PS (SECTION-II) AND BARMER-I
268AUGMENTATION OF 1500MVA 3RD 765/400KV TRANSFORMATION CAPACITY AT KURNOOL NEW SUBSTATION
269AUGMENTATION OF BANASKANTHA (RAGHANESDA) PS (GIS)
270AUGMENTATION OF DIMAPUR DEPOT, DIMAPUR
271AUGMENTATION OF FACILITIES AT MATHURA BITUMEN PLANT
272AUGMENTATION OF TRANSFORMATION CAPACITY AT BIDAR PS
273AUGMENTATION OF TRANSFORMATION CAPACITY AT JAM KHAMBHALIYA PS [GIS] [SPV NAME POWERGRID JAM KHAMBHALIYA TRANSMISSION LIMITED]
274AUGMENTATION OF TRANSFORMATION CAPACITY AT KPS2 AND KPS2
275AUGUMENTATION OF SALAYA MATHURA CRUDE OIL PIPELINE SYSTEM
276AURANGABAD TO SILLOD
277BADAM COAL MINING PROJECT
278BADARPUR – CHURAIBARI PKG-6
279BAGALKOT-KUDACHI NL
280BAGDOGRA AIRPORT: DEVELOPMENT OF NEW CIVIL ENCLAVE AT BAGDOGRA AIRPORT. SUB-HEAD : CONSTRUCTION OF NEW TERMINAL BUILDING, MLCP, ALLIED STRUCTURE AND EXTERNAL DEVELOPMENT WORKS ON ENGINEERING PROCUREME
281BAGHUAPAL FLY OVER (20 KM)
282BAHRAICH - NANPARA -NEPALGANJ (56.15 KM)
283BAHRAICH SRAVASTI BALRAMPUR (TULSIPUR)
284BAIYYAPPANAHALLI-HOSUR (48 KM)
285BAKHTIYARPUR RAJAULI PKG-II FROM KM 54.405 TO KM 101.630 NH20
286BAL. WORKS OF FAGNE (KM. 510.000) TO MAHARASHTRA/GUJARAT BORDER (KM. 650.794)
287BALABHADRA OCP
288BALANCE WORK - WB-10 (GANDAK BRIDGE) KM 402.00 TO KM 440.00 (DEVANPUR - KOTWA)
289BALANCE WORK OF 2L PS FROM KM 30.800 TO 70.800 AND 2L WITH RIGID CARRIAGEWAY FROM 70.800 TO KM 84.120 OF KHANAPUR KA/GOA BORDER SECTION OF NH 4A
290BALANCE WORK OF 4 LANING OF PANVEL TO INDAPUR SECTION OF NH-66(OLD NH- 17) FROM KM 0.000 (PANVEL) TO KM 42.300 (KASU) UNDER BHARATMALA PARIYOJNA ON EPC MODE IN THE STATE OF MAHARASHTRA.
291BALANCE WORK OF 4- L ANING OF PATNA-GAYA-DOBHI SECTION (KM.83.00 TO KM. 127.217) OF NH-83 IN THE STATE OF BIHAR- PKG-III
292BALANCE WORK OF 4- LANING OF PATNA-GAYA-DOBHI SECTION (KM. 0.00 TO KM. 127.217) OF NH-83 IN THE STATE OF BIHAR TO BE EXECUTED UNDER JICA ODA LOAN ASSISTANCE -PKG-I
293BALANCE WORK OF 4- LANING OF PATNA-GAYA-DOBHI SECTION (KM. 39.00 TO KM. 83.00) OF NH-83 IN THE STATE OF BIHAR- PKG-II
294BALANCE WORK OF 4L OF NARIMBANGLO–JATINGA JUNCTION- HARANGAJO ROAD SECTION FROM KM 0.000 TO KM 49.230 OF NH-27
295BALANCE WORK OF 4L OF NAURADEHI SANCTUARY DE-SCOPED STRETCH OF HIRAN RIVER TO SINDOOR RIVER FROM KM. 66.00 TO 130.00 NH-12 (NEW NH-45)
296BALANCE WORK OF CONSTRUCTION OF TWO/FOUR LANE WITH PAVED SHOULDER FROM KM 422.000 TO 523.600 ( CHITRADURGA TO SHIVAMOGGA ) OF NH-13 IN THE STATE OF KANATAKA ON EPC MODE.
297BALANCE WORK OF CONTSRUCTION OF TWO/FOUR LANE WITH PAVED SHOULDER FROM KM. 54.370 TO KM. 101.400 (BIDAR TO HUMNABAD SECTION) OF NH50 IN THE STATE OF KARNATAKA ON EPC MODE
298BALANCE WORK OF PANIKOILI RIMULI SECTION OF NEW NH-20 FROM KM 0.00 TO KM. 163.000
299BALANCE WORK OF REHABILITATION AND UP-GRADATION TO NH-166F FROM MAHAD JUNCTION (AT KM 123/400 ON NH-66) TO RAIGAD FORT UP TO CHITTAA DARWAZA, PACHAD TO TOMB OF JIJAUMATA AND HIRKANIWADI CONNECTOR [LEN
300BALANCE WORK OF REHABILITATION AND UPGRADING TO 2LANE/2LANE WITH PAVED SHOULDER CONFIGURATION AND STRENGTHENING FROM FROM KM 343.80 TO 400.33 OF GOWRIBIDANUR CHIK BALLAPUR SECTION IN THE STATE OF KARN
301BALANCE WORK OF TWO LANING WITH PAVED SHOULDER OF PIPRAKOTHI–MOTIHARI- RAXAUL SECTION OF NH-28A FROM
302BALANCE WORKS OF 4 LANE DIVIDED CARRIAGEWAY OF MISSING LINK SECTION OF NH-39 (REWA BYPASS) FROM JUNCTION WITH NH 30 NEAR BELA TO JUNCTION WITH MPRDC RING ROAD NEAR SILPARA ON SH 9 (DESIGN LENGTH 13.10
303BALANCE WORKS OF 4-LANNING OF RAMPUR-KATHGODAM SECTION OF NH-87 (NEW NH NO. 09) FROM KM. 0.000 (KM 190.000 OF NH-24) TO KM 42.791 (DESIGN CHAINAGE KM 43.446) (PACKAGE-I)
304BALANCE WORKS OF 4L PANVEL-INDAPUR SECTION OF NH-66 (OLD NH-17) FROM KM 42.300 (KASU) TO KM 84.600 (INDAPUR)
305BALANCE WORKS OF FOUR LANE FROM KM 43+950 (THIRUVALLUR BYPASS) TO KM 61+470 (VEPPAMPATTU BYPASS) PASSING THROUGH THANNERKULAM THOZUR AND SEVAPET BYPASS (17.520 KMS) OF TIRUPATI-TIRUTTANI-CHENNAI SECTI
306BALANCE WORKS OF FOUR LANING FROM RAMBAN KM 151.00 TO BANIHAL KM 187.00 OF NH-1A (NOW NH-44) WITH VALUE ADDITION AT CRITICAL LOCATION ON ENGINEERING PROCUREMENT AND CONSTRUCTION MODE (EPC MODE) IN THE
307BALARAM EXPANSION OCP
308BALLARPUR NORTHWEST OC MINE
309BANGALORE CHENNAI EXPRESSWAY (PHASE-II PKG-I) FROM KM.71.000 TO KM 96.000 (BETHAMANGALA IN THE STATE OF KARNATAKA TO BYREDDYPALLI)
310BANGALORE CHENNAI EXPRESSWAY (PHASE-II PKG-II) FROM KM.96.000 TO KM 127.000 (BAIREDDYPALLE TO BANGARUPALEM SECTION)
311BANGALORE CHENNAI EXPRESSWAY (PHASE-II PKG-III) FROM KM.127.000 TO KM 156.000 (BANGARUPALEM TO GUDIPALA SECTION)
312BANGALORE CHENNAI EXPRESSWAY PHASE-III PACKAGE II (WALAJAHPET TO ARAKKONAM) FROM KM 180.000 TO KM 204.500
313BANGALORE CHENNAI EXPRESSWAY PHASE-III PACKAGE III (ARAKKONAM TO KANCHEEPURAM) FROM KM 204.500 TO KM 230.000
314BANGALORE CHENNAI EXPRESSWAY PHASE-III – PACKAGE I (GUDIPALA TO WALAJAJHPET) FROM KM 156.000 TO KM 180.000
315BANGALORE METRO RAIL PROJECT LIMITED. PHASE. 2A AND 2B
316BANGALORE METRO RAIL PROJECT PHASE-2
317BANGALORE-WHITEFIELD-BANGALORE CITY-KRISHNARAJAPURAM QUADRUPLING
318BANGALORE/TN BORDER TO HOSKOTE
319BANIHAL BYPASS (DELINKED FROM SRINAGAR - BANIHAL) FROM KM. 187.00 TO KM. 189.350
320BARABANKI MALHAUR 3RD AND 4TH LINE (32.84 KM)
321BARAMATI - LONAND
322BARAUNI REFINERY CAPACITY EXPANSION FROM 6.0 TO 9.0 MMTPA
323BARAUNI- BACHWARA 3RD AND 4TH LINE
324BAREILY-SITAPUR (NH-24)
325BARELA-MANDLA SECTION OF NH-12A IN MADHYA PRADESH KM 22/8 TO KM 89/6 OF NH-12A
326BAROUD OC EXPANSION (3-10 MTY)
327BARSINGSAR THERMAL POWER STATION EXTENSION
328BASUNDHARA (WEST) OC EXTN(7.00 MTY)
329BELAGAVI AIRPORT- EXPANSION OF TERMINAL BUILDING AND ASSOCIATED WORKS
330BELAKERI PORT TO KUMTA - SIRSI ROAD FROM KM 0.00 - KM 4.265 OF BELEKERI PORT ROAD LINK RD. AND KM 4.965 - KM 60.00 OF SH-69
331BELGAUM-DHARWAD VIA KITTUR (73.10 KM) (UMBRELLA WORK PB#22/2019-20/NR)
332BHADLA-II 500MW SOLAR PV PROJECT
333BHADRAK - NERGUNDI 3RD LINE
334BHANDAI - FLYOVER FOR ETAWAH BOUND DOWN TRAINS
335BHANEGAON OC (1.15MTY)
336BHANUPALI-BILASPUR BERI NL
337BHARATMALA PARIYOJANA OF BOKARO JAINA MORE - GOLA SECTION OF NH-320 FROM KM. 21.110 TO KM. 53.600 IN THE STATE OF JHARKHAND PKG1
338BHATADI EXPANSION OC
339BHATINDA SANGRUR PIPELINE
340BHATNI - AUNRIHAR WITH ELECTRIFICATION (125 KM) (EXCL INDARA - MAU (116.95 KM))
341BHOGAN KHURD TO KASHEDI
342BHOPAL METRO RAIL
343BHUBANESWARI EXPANSION OCP
344BHUJ SOLAR 300MW (TRANCHE-IV WIND SOLAR HYBRID)
345BIKANER SOLAR POWER PROJECT
346BILASIPURA- GUWAHATI ROAD PKG-1
347BILASIPURA- GUWAHATI ROAD PKG-2
348BILASIPURA-GUWAHATI ROAD PKG-10
349BILASIPURA-GUWAHATI ROAD PKG-8
350BILASIPURA-GUWAHATI ROAD PKG-9
351BINA KAKRI AMALGAMATION OCP 14 MTPA
352BITHNOK LIGNITE MINE PROJECT (2.25 MTPA)
353BITHNOK LIGNITE THERMAL POWER STATION
354BLOCK-B EXPANSION OPENCAST PROJECT
355BLOCK-E OCP (15 MTY)
356BONDAMUNDA RANCHI DOUBLING
357BONGAIGAON-GOALPARA-GUWAHATI (176 KM)
358BONJEMEHARI EXPANSION OCP
359BORHOLLA GGS LIFE EXTENSION PROJECT
360BRUNDAMAL-JHARSUGUDA- FLYOVER CONNECTION FOR JOINING DN LINE
361BUDHAPANK - SALEGAON VIA RAJATGARH 3RD AND 4TH LINE.
362BURHWAL - GONDA - 3RD RUNNING LINE.
363BUXAR THERMAL POWER PLANT (1320 MW)
364BYPASS ROAD TO ADONI TOWN CONNECTING NH-167 (HAGARI - JADCHARLA ROAD) FROM KM.62/700 TO 71/400 IN KURNOOL
365Bagodara Solar Power Project
366C/O AIIMS AT AWANTIPORA (KASHMIR) JAMMU AND KASHMIR
367C/O OF 152 NOS TYPE-II, 304 NOS, TYPE-III, 76 NOS, TYPE-IV QTRS. FOR INCOME TAX DEPARTMENT AT CENTRAL REVENUE COLONY, ANNA NAGAR, CHENNAI.
368C/O OF NITB AND ASSOCIATED WORK AT VIJAYAWADA AIRPORT
369C/O PERMANENT CAMPUS OF IIT PALAKKAD PHASE IA AT PUDESSERY VILLAGE,KANJIKODE WEST, DISTRICT PALAKKAD,KERALA
370C/O RESIDENTIAL COMPLEX BUILDING FOR CENTRAL BOARD OF INDIRECT TAXES AND CUSTOMS AT SECTOR-9, DWARKA, NEW DELHI.
371C/o separate family accommodation (Phase-I) on EPC basis for SSB at Faridabad (Haryana)"
372CALICUT AIRPORT - DEVELOPMENT OF ADDITIONAL RESA ON EITHER END ON RUNWAY 10-28 AT CALICUT AIRPORT
373CAPACITY AUGMENTATION OF THE EXISTING 4 LANE STRETCH FROM ICHHAPURAM TO NARASANNAPETA IN THE STATE OF ANDHRA PRADSEH
374CAPACITY EXPANSION OF DIGBOI REFINERY FROM 0.65 TO 1.0 MMTPA
375 CAPACITY EXPANSION OF PANIPAT REFINERY FROM 15 TO 25 MMTPA
376CBR 9 MMTPA PROJECT
377CCS INTERNATIONAL AIRPORT , LUCKNOW
378CDMA WLL EQUIPMENT-2
379CGD PROJECT AT BEED, JALGAON AND JALNA DISTRICTS
380CGD PROJECT AT DHARMAPURI AND KRISHNAGIRI DISTRICTS
381CGD PROJECT AT EAST MEDNIPORE, WEST MEDNIPORE AND JHARGRAM DISTRICTS
382CGD PROJECT AT JAMMU DISTRICTS
383CGD PROJECT AT KHAGARIA, SAHARSA AND MADHEPURA
384CGD PROJECT AT KURNOOL, GUNTUR AND PRAKASAM DISTRICTS
385CGD PROJECT AT PATHANKOT DISTRICT
386CGD PROJECT IN BIHAR JHARKHAND
387CGD PROJECT IN WEST BENGAL 11TH ROUND
388CGD PROJECTS AT FAZILKA (EXCEPT AREA ALREADY AUTHORIZED) GANGANAGAR AND HANUMANGARH DISTRICTS
389CGD PROJECTS AT THE NILGIRIS AND ERODE DISTRICTS
390CHAMPAK NAGAR TO KHAYERPUR SECTION (DESIGN KM 242+500 TO KM 261+610)
391CHANDIGARH-BADDI
392CHANDRAGUPT OCP
393CHENNAI MEGA CITY PROJECT TAMILNADU
394CHHAL OC SEAM -III (6.00 MTY)
395CHHAPRA-BALLIA UP
396CHIRIMIRI-NAGPUR HALT
397CHITRA EAST (RCE) OCP
398CHITRESH ODISHA
399CHOITHAR TO MARREM KHULLEN SECTION IMPHAL- UKHRUL - JESSAMI PKG-5
400CHOTTAUDEPUR-DHAR(NL)
401CHUPERBHITA- SIMLONG OCP
402CHURACHANPUR TUIVAI PKG-3
403CITY GAS DISTRIBUTION NETWORK PROJECT AT SAHARANPUR
404CITY GAS DISTRIBUTION PROJECTS AT ALIPURDUAR AND COOCH BEHAR
405CITY GAS DISTRIBUTION PROJECTS AT DARBHANGA, MADHUBANI, SUPAUL, SITAMARHI AND SHEOHAR DISTRICTS
406CITY GAS DISTRIBUTION PROJECTS AT GOPALGANJ SIWAN WEST CHAMPARAN EAST CHAMPARAN AND DEORIA DISTRICTS
407CITY GAS DISTRIBUTION PROJECTS AT LAKHIMPUR KHERI , SITAPUR, BAHRAICH, SHRAVASTI,BALRAMPUR,
408COMMERCIAL POLYMER FLOODING PROJECT IN BECHRAJI FIELD
409COMPLETION OF BALANCE WORKS PENDING IN BIT AND PIECES (INCOMPLETE STRETCH AT 7 LOCATIONS) AND LISTED BALANCE WORKS FROM KM. 274.800 TO 338.030 IN AP PORTION AND OTHER LISTED BALANCE WORKS FROM KM. 0.0
410COMPREHENSIVE PLANNING, DESIGNING, EXECUTION OF ALL INDIA INSTITUTE OF MEDICAL SCIENCES AT BIBINAGAR, TELANGANA
411COMPREHENSIVE SCHEME FOR THE STRENGHTENING OF THE TRANSMISSION AND DISTRIBUTION SYSTEM IN A P
412CONSTRUCTION OF FOUR LANING OF UP/HARYANA BORDER-YAMUNANGAR-SAHA-BARWALA-PANCHKULA SECTION OF NH-73 FROM KM 160357 TO KM 179.249 (DESIGN KM 157.192 TO KM 176.400) THE STATE OF
413CONSTRUCTION AND DEVELOPMENT OF NATINAL INSTITUTE OF TECHNOLOGY MEGHALAYA PERMANENT CAMPUS AT SOHRA (CHERRAPUNJEE) - PHASE I
414CONSTRUCTION AND UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER FROM KM27.200 (END OF RONGLI BYPASS) TO KM37.600(NEW ROLEP BRIDGE) OF RHENOK-MENLA SPUR ( II B)
415CONSTRUCTION AND UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER FROM NEW ROLEP BRIDGE AT KM 37.600 TO CHOCHENPHERI AT KM 52.00 OF RONGLI TO CHOCHENPHERI (PKG-II C)
416CONSTRUCTION AND UPGRADATION OFEXISTINGROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT OF KAFER- LAVA MORE SECTION FROM KM 40.00 TO KM 61.100 (PKG-VA)
417CONSTRUCTION AND UPGRADATION OFEXISTINGROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT OF SECT. FROM PEDONG BYPASS TO RESHI BORDER KM 79.700 TO KM96.254 (LAVA MORE-RISHI BORDER )PKG
418CONSTRUCTION FOR MITIGATION MEASURES KM 368.00-UTTARAKHAND-TO KM 433.00 ON NH-07-PKG-1
419CONSTRUCTION FOR MITIGATION MEASURES KM 450.00-UTTARAKHAND-TO KM 468.00 ON NH-07-PKG-3
420CONSTRUCTION FOR MITIGATION MEASURES PKG-2
421CONSTRUCTION OF (I) 4-LANE HIGHWAY FROM VIDISHA TO HINOTIYA FROM KM. 0.000 TO KM. 27.000 (LENGTH=27 KM) (VIDISHA-MEHULWA-TALBEHAT PKG.-I) SECTION OF NH-346 AND (II) 4-LANING OF VIDISHA TO MORIKORI FRO
422CONSTRUCTION OF (I) CONNECTING ROAD FROM Z-MORH TUNNEL TO ZOJILA TUNNEL AND (II) 14.150 KM LONG BI-DIRECTIONAL TUNNEL ACROSS ZOJI LA PASS ON SONAMARG-KARGIL SECTION OF NH-01 ON EPC MODE IN THE UNION T
423CONSTRUCTION OF 1 NOS ROB, 2 NOS VUPS, SERVICE ROADS, PROVISION OF LIGHTING AND CONSTRUCTION OF OTHER MISCELLANEOUS WORKS AT VARIOUS STRETCHES INCLUDING MAINTENANCE OF EXISTING SECTION OF NH-4 FROM AP
424CONSTRUCTION OF 1003 NO. FAMILY QUARTERS
425CONSTRUCTION OF 2 LANE BARPETA BYPASS FROM KM 77+900(BARADI) TO KM 86+150( DEURIKUCHI) (LENGTH=8.25KM) ON NH-427 IN THE STATE OF ASSAM UNDER EPC MODE(JOB NO.427/AS/2022-23/245)
426CONSTRUCTION OF 2 LANE BRIDGE ACROSS RIVER KOSI WITH APPROACH ROAD FROM BHEJA TO BAKAUR SECTION OF NH 527A DESIGN CHAINAGE KM 0.000 TO KM 13.300 UNDER BRT SCHEME OF BHARATMATA PARIYOJANA PHASE I IN TH
427CONSTRUCTION OF 2 LANE ROAD OF POTIN TO PANGIN SECTION OF NH 13 FROM KM 163.59 TO KM 206.66 (PACKAGE 5) ON EPC MODE IN THE STATE OF ARUNACHAL PRADESH UNDER ARUNACHAL PRADESH PACKAGE OF ROADS AND HIGHW
428CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER FROM KM 55.6 TO KM 90.7 (EXISTING CHAINAGES) OF NH-766C (COMPLETE REALIGNMENT OF 13.76 KM) WITH 2 MAJOR BRIDGES ACROSS SHARAVATHI BACKWATERS IN THE STATE OF
429CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER NORTHERN BYPASS PHASE-II OF KOTA CITY FROM DESIGN CHAINAGE KM.0/0 (KM. 178+300 OF SH-33) TO KM 12/915 (KM. 236+800 OF NH-52) ON EPC MODE IN THE STATE OF RAJA
430CONSTRUCTION OF 2 LANE WITH PAVED SHOULDERS (BARAMULLA BYPASS) GREENFIELD BYPASS FROM EXISTING CH. KM 47+020 TO KM 56+720 AND DESIGN CH. FROM 48+500 TO 62+600 (TOTAL LENGTH= 14.100 KM) ON ROAD SRINAGA
431CONSTRUCTION OF 2-LANE MAJOR BRIDGE INCLUDING APPROACHESOVER BRAHMAPUTRA BETWEEN MAJULI ON NORTH BANK AND JORHAT ON SOUTH BANK, LENGTH OF BRIDGE 6812.5 METRE (PACKAGE II) ON NH-715 K IN THE STATE OF A
432CONSTRUCTION OF 2-LANE ROAD FROM KM 33 TO KM 65.00 OF AKAJAN-LIKABALI-BAME ROAD IN ARUNACHAL PRADESH
433CONSTRUCTION OF 2-LANE ROAD WITH PAVED SHOULDER (GREENFIELD ALIGNMENT) OF EXISTING STRETCH BETWEEN LEGSHIP - GYALSHING FROM KM75.00 TO KM 90.210 (PKG-6I)
434CONSTRUCTION OF 2-LANE ROAD WITH PAVED SHOULDERS FROM KM16.00 OF ROING-HUNLI SECTION TO KM 21.500 OF HUNLI-ANINI ROAD (GREENFIELD ALIGNMENT) (NH-313)(TOTAL LENGTH= 74.863 KM) IN ARUNACHAL PRADESH UNDE
435CONSTRUCTION OF 2-LANE SPECIFICATION ROAD WITH PAVED SHOULDER AS REALIGNMENT (GREENFIELD ALIGNMENT) OF EXISTING STRETCH BETWEEN LEGSHIP - GYALSHING FROM KM58.840-KM75.00 (PKG- V)
436CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER GANGTOK BYPASS ROAD FROM RANIPOOL TO BURTUK (L=23.316KM) IN THE STATE OF SIKKIM
437CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM KM 0.000 TO KM 16.000 OF STRETCH SINGTAM – TARKU OF NH-510 ON EPC BASIS UNDER SARDP –NE PHASE ‘A’ IN THE STATE OF SIKKIM
438CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF KOHIMA-BYPASS ROAD FROM DSIGN KM32.0 TO KM43.454 [DESIGN LENGTH=11.454] (PKG.- 4)
439CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF KOHIMA-BYPASS ROAD FROM DESIGN KM 0.00 TO KM 10.500 [DESIGN LENGTH- 10.500 KM] PACKAGE- I
440CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF KOHIMA-BYPASS ROAD FROM DESIGN KM10.500 TO 21.00KM [DESIGN LENGTH- 10.500 KM] PACKAGE- 2
441CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF KOHIMA-BYPASS ROAD FROM DESIGN KM21.0 TO KM32.0 [DESIGN LENGTH=11.0 KM] (PKG.- 3)
442CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF NEW GREEN FIELD ALIGNMENT FROM CHOCHENPHERI AT KM 52.000 TO HELIPAD NEAR MENLA AT KM82.00 OF RHENOK-MENLA SPUR (PKG-3A)
443CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER OF SHILLONG WESTERN BYPASS STARTING FROM NH-06 NEAR LADUMSAW (EXISTING KM 60.900 OF OLD NH-40) TO NH106 (OLD NH-44E), KM 0+000 TO KM 12+800 PACKAGE-1
444CONSTRUCTION OF 2-LANE WITH PAVED SHOULDERS OF SHILLONG WESTERN BYPASS STARTING FROM NH-06 NEAR LADUMSAW (EXISTING KM 60.900 OF OLD NH40) TO NH106 (OLD NH 44E) (PACKAGE-III), FROM KM 24+700 TO KM 38+2
445CONSTRUCTION OF 2-LANING WITH HARD SHOULDER ROAD OF UKHRUL - TOLOI - TADUBI SECTION OF NH-102A FROM DESIGN CHAINAGE 50.850 KM TO 81.870 KM (PACKAGE -3)
446CONSTRUCTION OF 2-LANING WITH HARD SHOULDER ROAD OF UKHRUL - TOLOI - TADUBI SECTION OF NH-102A FROM DESIGN CHAINAGE 81.870 KM TO 105.825 KM PACKAGE -4
447CONSTRUCTION OF 2-LANING WITH HARD SHOULDERS OF ARROWA-KHUPA-HAYULIANG SECTION OF NH-113 FROM CH.68.550 TO CH.91.633
448CONSTRUCTION OF 2-LANING WITH HARD SHOULDERS OF DEMWE-BRAHMAKUND SECTION OF NH-13 FROM CH.0.00 KM TO 18.464KM ON EPC
449CONSTRUCTION OF 2L+PS FROM PASARLAPUDI-DHINDI (105/700 TO 127.500 OF NH-214) OF NH-216
450CONSTRUCTION OF 300 BEDDED HOSPITAL
451CONSTRUCTION OF 300 BEDDED HOSPITAL AND TEACHING BLOCK IN DR YS PARMAR GMC AT NAHAN HIMACHAL PRADESH
452CONSTRUCTION OF 4 LANE ACCESS CONTROLLED HIGHWAY FROM CHILLAKURU CROSS ROAD TO TURPUKANUPUR KM 0+000 TO KM 23+770 INCLUDING 6 LANE FLYOVER ON NH-16 (LENGTH KM 1.050) AND 6 LANE FROM TURPUKANUPUR TO PO
453CONSTRUCTION OF 4 LANE ACCESS CONTROLLED NEW GREENFIELD HIGHWAY SECTION OF NH 365BG FROM RECHARLA VILLAGE TO GURVAYGUDEM VILLAGE (DESIGN CHAINAGE 105.236 TO 132.664) UNDER HAM MODE UNDER BHARATMALA PA
454CONSTRUCTION OF 4 LANE ACCESS CONTROLLED NEW GREENFIELD HIGHWAY SECTION OF NH-365BG (KHAMMAM-DEVARAPALLE) FROM GURVAYGUDEM TO DEVARAPALLE (DESIGN CHAINAGE 132+664 TO 162+126 ) UNDER BHARATMALA PARIYOJ
455CONSTRUCTION OF 4 LANE ELEVATED HIGHWAY AND AT-GRADE IMPROVEMENTS AT GOPALGANJ TOWN FROM DESIGN CH: 384+000 (EXISTING CH: 384+000)TO DESIGN CH: 386+750 (EXISTING CH: 386+410) ON NH-28 (NEW NH-27) ON E
456CONSTRUCTION OF 4 LANE ELEVATED SECTION AND AT- GRADE IMPROVEMENTS AT BEGUSARAI TOWN SECTION OF NH-31 FROM DESIGN CHAINAGE 221+047 TO 225+302 IN THE STATE OF BIHAR ON EPC MODE
457CONSTRUCTION OF 4 LANE FLYOVER AT NAGPUR RTO CHOWK TO NAGPUR UNIVERSITY CAMPUS FROM CH 2/250 TO 5/100 AND 4 LANE FLYOVER AT WADI/MIDC JUNCTION FROM KM 8/360 TO KM, 10/300 ON NH 53 IN STATE OF MAHARASH
458CONSTRUCTION OF 4 LANE GAURIPUR BYPASS ON NH-17 IN THE STATE OF ASSAM
459CONSTRUCTION OF 4 LANE GREEN FIELD NORTHERN EAST SIDE GORAKHPUR BYPASS (26.616 KMS) STARTING FROM NH 29E (CHAINAGE 83.308) AND END AT NH 28 (CHAINAGE 285.100) IN THE STATE OF UTTAR PRADESH UNDER BHARA
460CONSTRUCTION OF 4 LANE ROB AND ITS APPROACHES AT THE LEVEL OF CROSSING (L C NO. 29-B) OF KM 29 (EKANGANSARAI) AT NH-110(NEW NH-33) & RAILWAY KM 32.63 OF FATWA(FUT) - ISLAMPUR (IPR) SECTION IN THE STAT
461CONSTRUCTION OF 4 LANE ROB WITH APPROACHES IN LIEU OF LC NO. RV-172 AT KM 176.00 OF NH-201 (PRESENT NH-26) AT KESINGA INCLUDING LAND ACQUISITION IN THE STATE OF ODISHA ON EPC MODE UNDER ANNUAL PLAN 20
462CONSTRUCTION OF 4 LANE WITH PAVED SHOULDER (PATTAN BYPASS) GREENFIELD BYPASS FROM EXISTING CH. KM 24+320 TO KM 33+760 AND DESIGN CH. FROM KM 24+400 TO KM 35+300, TOTAL LENGTH= 10.900 KM ON ROAD SRINAG
463CONSTRUCTION OF 4 LANE WITH PAVED SHOULDER FROM (DESIGN CH. 14+200 TO 24+400), (DESIGN CH. 35+300 TO 44+294) AND (DESIGN CH. 44+958 TO 48+500) OF TOTAL LENGTH 22.736 KMS (NH-01) IN THE UT OF JAMMU
464CONSTRUCTION OF 4 LANE WITH PAVED SHOULDERS THIRUVAYARU BYPASS IN BETWEEN EXISTING KM.55/926 TO 62/680 IN NH 226EXTN. (NEW NH 136)
465CONSTRUCTION OF 4 NOS GRADE SEPARATOR BETWEEN KM. 281.000 TO KM 307.600 KM. 286.400 KUMHARI KM. 299.000 TRANSPORT NAGAR KM. 302.000 POWER HOUSE KM. 304.000 CHANDRA MOURA CHOWK TO KM. 305.00 SUPELA OF
466CONSTRUCTION OF 4-LANE ACCESS CONTROLLED GREENFIELD HIGHWAY SECTION ON NH-163G (KHAMMAM - VIJAYAWADA) FROM BRAHMANAPALLI (K) VILLAGE AT DESIGN CH 250.400 KM TO REMIDICHERLA VILLAGE AT DESIGN CH. 280.2
467CONSTRUCTION OF 4-LANE ACCESS CONTROLLED GREENFIELD HIGHWAY SECTION ON NH-163G (KHAMMAM-VIJAYAWADA) FROM V. VENKATAYAPALEM VILLAGE AT DESIGN CH. 220.480 KM TO BRAHMANAPALLI (K) VILLAGE AT DESIGN CH. 2
468CONSTRUCTION OF 4-LANE FLYOVER AT AMBERPET-X ROAD, HYDERABAD ON NH-202 (NEW NH-163) IN THE STATE OF TELANGANA
469CONSTRUCTION OF 4-LANE FROM BARELA TO MANEGAON SECTION OF NH-30 FROM DESIGN CH. 2.900 TO DESIGN CH. 19.050 (JABALPUIR RING ROAD) UNDER BHARATMALA PARIYOJANA IN THE STATE OF MADHYA PRADESH EPC MODE (PA
470CONSTRUCTION OF 4-LANE GREEN FIELD HIGHWAY FROM KM. 35.000 TO KM. 49.155 OF NH-731A WITH PAVED SHOULDERS ON HYBRID ANNUITY MODE IN THE STATE OF UTTAR PRADESH
471CONSTRUCTION OF 4-LANE GREENFIELD JALBEHRA - SHAHBAD SECTION OF NH – 152G FROM KM 0+000 TO KM 22+850 (PART OF SHAHBAD - THOL FEEDER ROUTE) IN THE STATE OF HARYANA ON HYBRID ANNUITY MODE UNDER BHARATMA
472CONSTRUCTION OF 4-LANE HIGHWAY FROM SAMARLAKOTA TO ACHAMPETA JUNCTION (FROM KM. 0.000 TO KM. 12.250) AS PART OF KAKINADA PORT TO NH-16 CONNECTIVITY IN THE STATE OF ANDHRA PRADESH UNDER BHARATMALA PAR
473CONSTRUCTION OF 4-LANE HIGHWAY WITH PAVED SHOULDERS FROM KM 49.155 TO KM 74.700 OF NH-731A ON HYBRID ANNUITY MODE IN THE STATE OF UTTAR PRADESH
474CONSTRUCTION OF 4-LANE PANCHGRAM BYPASS FROM DESIGN CHAINAGE KM 15+500 ON NH-37 (OLD NH-53) AT KALINAGAR PT.-II VILLAGE TO DESIGN CHAINAGE KM 27+300 AT CROSSING WITH NH-6 (OLD NH-44) NEAR SIDDESWAR PT
475CONSTRUCTION OF 4-LANING OF BHIWANI HANSI ROAD SECTION OF NH 148B (DESIGN LENGTH 42.934 KM) UNDER BHARATMALA PARIYOJANA IN THE STATE OF HARYANA ON HYBRID ANNUITY MODE
476CONSTRUCTION OF 4.5 KM LONG SILKYARA TUNNEL BETWEEN KM 25.40 TO 50.25 KM (TUNNEL WORK)
477CONSTRUCTION OF 5 HL BRIDGES AT KM 379/000 (PANGAM), KM 439/400 (POTTERU), KM 444/237 (KONGURUKONDA), KM 457/075 (MV-90) AND KM 468/150 (MV-96) OF NH-326 (MALKANGIRI-MOTU ROAD) IN THE STATE OF ODISHA.
478CONSTRUCTION OF 564 MLD 124 MGD WASTE WATER TREATMENT PLANT WITH EFFLUENT STANDARDS OF BOD – 10MG/L, TSS – 10 MG/L OR BETTER AND POWER GENERATION ON DBO BASIS AT OKHLA ON TURNKEY BASIS AND DEMOLITION
479CONSTRUCTION OF 6 LANE BRIDGE ON GANGA ON NH-96 AND ITS APPROACHES IN PHAPHAMAU ALLAHABAD ON EPC MODE
480CONSTRUCTION OF 6 LANE DURG RAIPUR ARANG BYPASS PKG 1 SECTION OF NH 53 FROM CH 0.000 TO CH 44.500 IN THE STATE OF CHHATTISGARH
481CONSTRUCTION OF 6 LANE DURG RAIPUR ARANG BYPASS PKG 2 SECTION OF NH 53 FROM CH 44+500 TO CH.92+230 IN THE STATE OF CHHATTISGARH
482CONSTRUCTION OF 6 LANE ELEVATED CORRIDOR ALONG WITH DEVELOPMENT OF EXISTING 4 LANE ROAD AT GROUND LEVEL FROM AROOR TO THURAVOOR THEKKU SECTION OF NH-66 FROM KM. 366.330 TO KM. 379.082 OF NH-66 (LENGT
483CONSTRUCTION OF 6- LANE BRIDGE AND ITS APPROACHES ACROSS RIVER GANGA AS PART OF PATNA RING ROAD (NH-131G) STARTING FROM DESIGN KM. 8+480 NEAR SHERPUR TO KM. 23+000 NEAR DIGHWARA UNDER BHARATMALA PARIY
484CONSTRUCTION OF 6-LANE ELEVATED / EXTRA DOSE CABLE BRIDGE ON RIVER GANGA PARALLEL TO AND WESTERN SIDE OF DIGHA-SONEPUR RAIL CUM-ROAD BRIDGE OF NH 139W IN THE STATE OF BIHAR
485CONSTRUCTION OF 6-LANE GREENFIELD AMBALA RING ROAD STARTING FROM JUNCTION WITH SHAMLI-AMBALA SECTION OF NH-344GM NEAR VILLAGE KAPURI (DESIGN KM 18+226) AND TERMINATING AT ISMAILABAD - AMBALA SECTION O
486CONSTRUCTION OF 6-LANE GREENFIELD KARNAL RING ROAD STARTING FROM NH-44 NEAR VILLAGE SHAMGARH (DESIGN KM 0+000 ) AND TERMINATING AT KARNAL - MUNAK ROAD (MDR -115) NEAR VILLAGE SAMALAKHA (DESIGN KM 34+5
487CONSTRUCTION OF 726 Nos RESIDENTIAL QUARTERS CHENNAI
488CONSTRUCTION OF 8 LANING OF EXISTING 4 LANE VADAPE TO THANE FROM KM 539.202 TO KM 563.000 SECTION OF NH-3 (NEW NH-848)
489CONSTRUCTION OF 80000MT LPG CAVERN AT MANGALORE
490CONSTRUCTION OF A NEW 4 LANE BRIDGE PARALLEL TO EXISTING MG SETU WITH ITS APPROACHES FROM KM 0.00 TO KM 14.500 ACROSS RIVER GANGA ON NH 19 AT PATNA IN THE STATE OF BIHAR
491CONSTRUCTION OF A NEW 4 LANE MAJOR BRIDGE ACROSS RIVER KOSI AT PHULAUT INCLUDING RHABILITATION AND UPGRADATION OF EXISTING BIRPUR-BIHPUR SECTION OF NH-106 FROM KM 106 TO 136 TO 2- LANE PAVED SHOULDER
492CONSTRUCTION OF ADDITIONAL 3 LANE WITH PAVED SHOULDER (DESIGN LENGTH 8.87 KM) AS REALIGNMENT OF BAKANER GHAT (BETWEEN INDORE TO KHALAGHAT SECTION FROM EXISTING KM 59+190 TO KM 66+120) OF NH 52 (OLD NH
493CONSTRUCTION OF ADDITIONAL TANKAGES AND ALLIED FACILITIES AT JNPT TERMINAL
494CONSTRUCTION OF AMETHI BYPASS (PART-II) AT KM.30.050 OF NH-931 UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
495CONSTRUCTION OF AVIATION FUEL FARM FACILITIES AT BHOGAPURAM AIRPORT
496CONSTRUCTION OF BALRAMPUR BYPASS WITH 2L FLEXIBLE PAVEMENT CONFIGURATION FROM KM.223.000 OF NH-330 TO KM.328.300 OF NH-730 UNDER EPC MODE
497CONSTRUCTION OF BASEMENTG FLOOR10 STORIES BUILDING FOR THE STATE OF THE ART, DG, GSI AT SECTOR-V, SALT LAKE, KOLKATA
498CONSTRUCTION OF BASTI RING ROAD (PHASE-I) WITH 4L CONFIGURATION FOR BASTI CITY IN THE STATE OF UTTAR PRADESH ON HAM MODE
499CONSTRUCTION OF BHABHUA BYPASS FROM CH. 10+800(DESIGN CH. 10+800) TO CH. 19+860 (DESIGN CH. 18+150) AND CHAND BYPASS FROM CH. 38+060 (DESIGN CH. 36+250) TO CH. 40+460 (DESIGN CH. 38+650) AND WIDENING
500CONSTRUCTION OF BYPASS FOR PROVIDING INTER CONNECTIVITY AMONG (NHS) AROUND THE PRATAPGARH CITY (PRATAPGARH BYPASS) ON EPC MODE
501CONSTRUCTION OF BYPASS ON NH-59 FROM KM 336/350 TO 349/910 (13.56 KM) NEAR BERHAMPUR TOWN INCLUDING 4-LANE ROB IN THE STATE OF ODISHA.
502CONSTRUCTION OF BYPASS ROAD TO BALANGIR TOWN FROM KM 72/400 (DESING KM 0/0) TO KM 79/800 (DESIGN KM 11/670) OF NH-26 IN THE STATE OF ODISHA.
503CONSTRUCTION OF BYPASS TO GUDIYATHAM TOWN IN KM 23/100 – 29/250 INCLUDING LA AND SHIFTING OF NH-234 (MANGALORE -VILLUPURAM ROAD) (NEW NH-75)
504CONSTRUCTION OF BYPASS TO KHORDHA TOWN FROM KM 294/000 TO 300/300 ON NH-57 INCLUDING LA IN THE STATE OF ODISHA ON EPC MODE.
505CONSTRUCTION OF BYPASS TO MADURAI - ACHAMBATHU - VIRATIPATHU IN KM 6/850 - 10/382 OF NH 49 EXTN. (NEW NH 85) INCLUDING LA & SHIFTING OF UTILITIES
506CONSTRUCTION OF BYPASS TO NAYAGARH TOWN FROM KM 235.469 TO 252.482 OF NH-57 INCLUDING LAND ACQUISITION IN THE STATE OF ODISHA.
507CONSTRUCTION OF EIGHT LANE ACCESS CONTROLLED EXPRESSWAY FROM KM 103.400 TO KM 128.000 OF VADODARA MUMBAI EXPRESSWAY TALASARI TO KARVAD SECTION IN THE STATE OF GUJARAT AND MAHARASHTRA ON HAM MODE UNDER
508CONSTRUCTION OF EIGHT LANE EXPRESSWAY FROM KM 190.000 TO KM 217.500 GANDEVA TO ENA SECTION OF VADODARA MUMBAI EXPRESSWAY IN THE STATE OF GUJARAT ON HAM MODE UNDER BHARATMALA PARIYOJANA PHASE I PACKAGE
509CONSTRUCTION OF EIGHT LANE VADODARA KIM EXPRESSWAY FROM KM 254.430 TO KM 279.000 (KIM TO ANKLESHWAR SECTION OF VADODARMUMBAI EXPRESSWAY) PACKAGE V
510CONSTRUCTION OF ELEVATED CORRIDOR FROM KM. 135.650 TO 136.300 ON 63, FROM KM. 249 TO KM. 250.050 ON OLD NH4 AND FROM KM. 192.910 TO KM. 193.350 ON NH218 FROM DECONGESTION OF TRAFFIC IN RANICHENNAMMA C
511CONSTRUCTION OF EMERGENCY LANDING FACILITY FROM KM. 246.60 TO KM. 249.70 ON SRINAGAR - BANIHAL SECTION
512CONSTRUCTION OF ENGINEERING CORE LAB FOR IIT KANPUR
513CONSTRUCTION OF FLYOVER AT KM.544.650 INCLUDING ROB ,SERVICE ROADS ,FOOTPATH FOR RCC DRAINS ON URBAN LINK TO NAGPUR -RAIPUR ROAD
514CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF DSIR ZONE OF AHMEDABAD DISTRICT TO ADHELAI VILLAGE OF BHAVNAGAR DISTRICT (CH 71.00 TO CH109.019) SECTION OF AHMEDABAD DHOLERA GREENFILD ALIGNMENT (NH
515CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF SARDAR PATEL RING ROAD TO SINDHREJ VILLAGE (CH. 0.00 TO CH. 22.00) SECTION OF AHMEDABAD DHOLERA GREENFILD ALIGNMENT (NH 751) UNDER BHARATMALA PARIYOJ
516CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF SINDHREJ VILLAGE (CH. 22.00 TO CH. 48.52) SECTION OF AHMEDABAD DHOLERA GREENFILD ALIGNMENT (NH 751) UNDER BHARATMALA PARIYOJANA IN THE STATE OF GUJAR
517CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM START OF VEJALLKA VILLAGE TO START OF DSIR ZONE OF AHMEDABAD DISTRICT (CH. 48.52 TO CH. 71.06) SECTION OF AHMEDABAD DHOLERA GREENFILD ALIGNMENT (NH 751) IN TH
518CONSTRUCTION OF FOUR LANE GREENFIELD PROJECT OF DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-III) FROM JUNCTION WITH JIND-PANIPAT ROAD (NH-352A) NEAR GANGANA VILLAGE TO JUNCTION WITH JIND-KARNAL ROAD
519CONSTRUCTION OF FOUR LANE GREENFIELD PROJECT OF DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-IV) FROM JUNCTION WITH JIND-KARNAL ROAD (NH-709A) NEAR ALEWA VILLAGE TO JUNCTION WITH AMBALA-KAITHAL-HISSAR
520CONSTRUCTION OF FOUR LANE GREENFIELD PROJECT OF DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-V) FROM JUNCTION WITH AMBALA-KAITHAL-HISSAR ROAD (NH-152) NEAR KHARAK PANDWA VILLAGE TO JUNCTION WITH PATIA
521CONSTRUCTION OF FOUR LANE HIGHWAY FORM GHAZIPUR BALLIA UP BIHAR STATE BORDER (GREENFIELD) SECTION OF NH31 PACKAGE I FROM HRIDAIPUR KM 0.000 TO SHAHAPUR KM 42.500 ON EPC MODE IN THE STATE OF UTTAR PRAD
522CONSTRUCTION OF FOUR LANE HIGHWAY FROM GHAZIPUR BALLIA UP BIHAR STATE BORDER (GREENFIELD) SECTION OF NH31 PACKAGE II FROM SHAHAPUR (KM 42.500) TO PINDARI (KM 78.150) ON EPC MODE IN THE STATE OF UTTAR
523CONSTRUCTION OF FOUR LANE HIGHWAY FROM GHAZIPUR BALLIA UP BIHAR STATE BORDER (GREENFIELD) SECTION OF NH31 PACKAGE III FROM PINDARI KM 78.150 TO RAWALGANJ BYPASS KM 117.120 ON EPC MODE IN THE STATE OF
524CONSTRUCTION OF FOUR LANE HIGHWAY FROM GHAZIPUR BALLIA UP BIHAR STATE BORDER GREENFIELD SECTION OF NH31 PACKAGE IV FROM BUXUR SPUR OF LENGTH KM 17.270 ON EPC MODE IN THE STATE OF UTTAR PRADESH
525CONSTRUCTION OF FOUR LANE HIGHWAY WITH PAVED SHOULDER FROM KM.74.700 TO KM.112.950 OF NH-731A (I/C YAMUNA BRIDGE) ON HAM IN THE STATE OF UTTAR PRADESH.
526CONSTRUCTION OF FOUR LANE PINJORE BYPASS FROM KM 0.00 TO 7.70 ON EPC MODE.
527CONSTRUCTION OF FOUR LANE RINGROAD BYPASS SRINAGAR CITY
528CONSTRUCTION OF FOUR LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LEVEL CROSSING NO. RV-71 AT KM 435 ON NH-217 (NEW NH-353) AT KHARIAR INCLUDING LAND ACQUISITION UNDER NH(O) IN ANNUAL PLAN 2021-22
529CONSTRUCTION OF FOUR-LANE CONCRETE ROAD FROM POLICE HEADQUARTER GONDIA CITY TO RAWANWADI VILLAGE (BIRSI AIRPORT JUNCTION) FROM DESIGN KM 0.000 TO KM 15.781  (EXISTING KM 39/720 OF NH-753 TO EXISTING K
530CONSTRUCTION OF FOUR-LANE ELEVATED VIADUCT FROM KM.4+634 TO KM.6+345 ON NH-24A INCLUDING RETAINING WALL, SERVICE LANE, AT GRADE ROAD AND IMPROVEMENT OF JUNCTIONS, ON EPC MODE
531CONSTRUCTION OF FOUR-LANE “WESTERN SIDE SPUR OF RAMPUR-RUDRAPUR SECTION CONNECTING NH-24 TO NH-87 BYPASSING RAMPUR TOWN” (DESIGN KM 00+000 TO KM DESIGN KM 13+700(LENGTH= 13.70 KM) ON EPC MODE IN THE S
532CONSTRUCTION OF FOUR/SIX LANE GREENFIELD LUDHIANA – RUPNAGAR NATIONAL HIGHWAY NO. NH-205K UNDER BHARATMALA PARIYOJANA IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE, PACKAGE-1 (DESIGN CH. 0.000 TO DESI
533CONSTRUCTION OF GREENFIELD CONNECTIVITY TO JEWAR INTERNATIONAL AIRPORT FROM DND FARIDABAD BALLABHGARH BYPASS KMP LINK SPUR TO DELHI MUMBAI EXPRESSWAY
534CONSTRUCTION OF GURGAON - PATAUDI - REWARI SECTION OF NH-352W (DESIGN LENGTH 46.11 KM) AS FEEDER ROUTE IN THE STATE OF HARYANA ON HYBRID ANNUITY MODE.
535CONSTRUCTION OF HEADQUARTER BUILDING OF CRPF AT LODHI ROAD NEW DELHI
536CONSTRUCTION OF JASRA BYPASS WITH FOUR LANE PAVED SHOULDER CONFIGURATION FROM KM. 379.670 ON NH-76 (NEW NH-35) TO KM. 18.000 ON NH-27 (NEW NH-30) ON EPC MODE
537CONSTRUCTION OF KAITHI-PADARIA KALA BYPASS, PATNA-TAMOLI BYPASS, JASO BYPASS , NAGOD BYPASS (TOTAL LENGTH 15.44 KM) TO 2-LANE WITH PAVED SHOULDERS FLEXIBLE PAVEMENT ON NH-943 IN THE STATE OF MADHYA PR
538CONSTRUCTION OF KUND BYPASS FROM EXISTING KM 33+130 TO KM 41+260 (EXISTING LENGTH: 8.130 KM); DESIGN CHAINAGE: KM 35+130 TO KM 47+700 (DESIGN LENGTH: 12.570 KM) FOR NH-109
539CONSTRUCTION OF LEFT OUT PORTION OF AGRA INNER RING ROAD CONNECTING VILLAGE DEORI TO NH-44 VILLAGE BAD FROM KM. 0.000 TO KM. 7.772
540CONSTRUCTION OF LPG FACILITIES AT KAMARDANGA, ASSAM
541CONSTRUCTION OF LUBE OIL BLENDING AND FILLING PLANT AT RASAYANI
542CONSTRUCTION OF MAJOR BRIDGE ACROSS SHARAVATHI BACKWATERS AND APPROCHES BETWEEN AMBARGODU AND KALASAVALLI NEAR SIGANDHUR IN SAGAR TALUK ON NH 369E IN THE STATE OF KARNATAKA ON EPC MODE.(JOB NO. NH-369
543CONSTRUCTION OF MAJOR BRIDGE AT KM 180.865 ACROSS RIVER KRISHNA ON NH-167 HAGARI – JADERCELA SECTION IN THE STATE OF KARNATAKA [JOB NO. NH-167/KNT (13)/2016-17-009-S&R (B)]
544CONSTRUCTION OF MAJOR BRIDGE OVER MIDDLE STRAIT CREEK BETWEEN KM. 106.590 TO KM. 107.762 OF NH 223 (NEW NO. NH 4)
545CONSTRUCTION OF MANGALDOI BYPASS (NH-15) STARTING AT CH 26+400 AND TERMINATING AT CH 41+505 UNDER RANGIA NH DIVISION ( L= 15.105 KM) IN THE STATE OF ASSAM. JOB NO. 15/AS/2021-22/234
546CONSTRUCTION OF MARIAHU BYPASS WITH FOUR LANE PAVED SHOULDER CONFIGURATION (KM.53.540 TO KM.59.200) OF NH-135A ON EPC MODE IN THE STATE OF UTTAR PRADESH
547CONSTRUCTION OF MIHONA BYPASS, LAHAR BYPASS, DABOH BYPASS and BHANDER BYPASS (TOTAL LENGTH 20.60 KM) TO 2-LANE WITH PAVED SHOULDER FROM ON MIHONA-BHANDER-MP/UP BORDER SECTION OF NH 552E IN THE STATE O
548CONSTRUCTION OF MISSING LINKS (SINGLE LANE) IN LAKHPAT GADULI HAJIPIR ODMA KHAVDA DHOLAVIRA MAUVANA GADKABET SANTALPUR ROAD ALONG THE INDO PAKISTAN BOARDER IN THE STATE OF GUJARAT (NEWLY DECLARED NATI
549CONSTRUCTION OF NEW 2 LANE WITH PAVED SHOULDER OF HAMIRPUR BYPASS (PACKAGE IVA) OF NH-88 (NEW NH-103) (DESIGN CHAINAGE-KM 121+175 TO KM. 138+295, DESIGN LENGTH- 17.120) IN THE STATE OF HIMACHAL PRADES
550CONSTRUCTION OF NEW 4 LANE BRIDGE OVER RIVER GANGA AT DOWNSTREAM OF FARAKKA BARRAGE INCLUDING APPROACHES CONNECTING FARAKKA RAIGANJ SECTION OF NH34 IN THE STATE OF WEST BENGAL ON EPC MODE
551CONSTRUCTION OF NEW 4 LANE PRAYAGRAJ SOUTHERN BYPASS (PHASE-I) FROM DESIGN KM 43+200 (AT MAHUWARI VILLAGE) TO DESIGN KM 50+860 ON NH-19 (AT NABABA URF NIBI KALA UPARHAR VILLAGE) INCLUDING MAJOR BRIDGE
552CONSTRUCTION OF NEW 4 LANE PRAYAGRAJ SOUTHERN BYPASS FROM DESIGN KM 50.860 (NABABA URF NIBI KALA UPARHAR) TO DESIGN KM 64.763 ON NH-19 (NEAR KHODAYAPUR KASGAON) INCLUDING INTERCHANGE LOOP AT NH-19 (DE
553CONSTRUCTION OF NEW 4-LANE BRIDGE (PARALLEL TO EXISTING VIKRAMASHILA SETU)FROM KM 8+920 TO KM 13+375(INCLUDING APPROACH ROAD 35M NAUGACHHIA SIDE &53 M BHAGALPUR SIDE)ACROSS RIVER GANGA ON NEWLY DECLAR
554CONSTRUCTION OF NEW DORNESTIC TERMINAL BUILDING AND OTHER STRUCTURES, PHASE I AND II
555CONSTRUCTION OF NEW DOUBLE TIER 4 LANE ELEVATED CORRIDOR FROM CHENNAI PORT TO MADURAVOYAL IN CHENNAI DISTRICT FROM KM 0.342 TO KM 20.593 PACKAGE 1 FROM KM 0.342 TO KM 4.604
556CONSTRUCTION OF NEW DOUBLE TIER 4L ELEVATED CORRIDOR FROM CHENNAI PORT TO MADURAVOYAL IN CHENNAI DISTRICT FROM KM -0.342 TO KM 20.593 AND PACKAGE II FROM (KM 4.604 TO KM 9.700)
557CONSTRUCTION OF NEW DOUBLE TIER 4L ELEVATED CORRIDOR FROM CHENNAI PORT TO MADURAVOYAL IN CHENNAI DISTRICT FROM KM -0.342 TO KM 20.593 AND PACKAGE III FROM (KM 9.700 TO KM 14.185)
558CONSTRUCTION OF NEW DOUBLE TIER 4L ELEVATED CORRIDOR FROM CHENNAI PORT TO MADURAVOYAL IN CHENNAI DISTRICT FROM KM -0.342 TO KM 20.593 AND PACKAGE IV FROM (KM 14.185 TO KM 20.593)
559CONSTRUCTION OF NEW FOUR LANE BYPASS TO PARBHANI CITY (PARWA TO ASOLA) KM 463/265 TO KM 481/180 (DESIGN CH. 19+220 TO CH. 34+434) (LENGTH-15.214 KM) SECTION OF NH-61 ON EPC MODE IN THE STATE OF MAHARA
560CONSTRUCTION OF NEW INTEGRATED TERMINAL BUILDING AT LGBI AIRPORT GUWAHATI
561CONSTRUCTION OF NEW INTEGRATED TERMINAL BUILDING, CONTROL TOWER CUM TECHNICAL BLOCK, APRON, LINK TAXIWAY AND ASSOCIATED WORKS AT IMPHAL INTERNTIONAL AIRPORT
562CONSTRUCTION OF NEW LINK (NH-133B) FROM KM 0/00 (KM 200/87 OF SAHIBANJ BYPASS) IN JHARKHAND TO KM 15/885 (JUNCTION OF NH-133B AND 131 A ON MANIHARI BYPASS) AND CONSTRUCTION OF MANIHARI BYPASS FROM KM
563CONSTRUCTION OF NEW ROAD AT THE MISSING LINK PORTION OF NH-81 ALONG THE APPROVED ALIGNMENT BETWEEN HARISHCHANDRAPUR EASTER APPROACH OF KALINDRI-BRIDGE, IN THE DISTRICT OF MALDA. (JOB NO. 081-WB-2015
564CONSTRUCTION OF NEW TERMINAL BUILDING AT JODHPUR AIRPORT
565CONSTRUCTION OF PERMANENT CAMPUS FOR INDIAN INSTITUTE OF TECHNOLOGY TIRUPATI AT MERLAPAKA VILLAGE YERPEDU MANDAL CHITTOOR DIST AP PHASE1 STAGE1
566CONSTRUCTION OF PERMANENT CAMPUS OF IIM JAMMU (PHASE 1)
567CONSTRUCTION OF PERMANENT CAMPUS OF INDIAN INSTITUTE OF MANAGEMENT (IIM) AMRITSAR, PUNJAB.
568CONSTRUCTION OF PERMANENT CAMPUSES OF CENTRAL UNIVERSITY OF HIMACHAL PRADESH AT DEHRA AND DHARAMSHALA
569CONSTRUCTION OF PRATAPGARH BYPASS (EXTENSION) CONNECTING NH-31 TO NH-330
570CONSTRUCTION OF PROPOSED 4_LANE REVELGUNJ BYPASS NH-19 IN THE STATE OF BIHAR ON EPC MODE CONNECTING NH 19 TO 85 ORIGIN
571CONSTRUCTION OF PROPOSED REWARI BYPASS (DESIGN LENGTH 14.4 KM) NH-11 AS A FEEDER ROUTE IN THE STATE OF HARYANA ON HYBRID ANNUITY MODE
572CONSTRUCTION OF PROPOSED SRINAGAR BYPASS FROM KM.0.000 TO KM.42,100 ( CROSSING OF SUMBEL ROAD ) IN SRINAGAR IN THE STATE OF JAMMU AND KASHMIR ON EPC MODE
573CONSTRUCTION OF RAEBARELI RING ROAD (PHASE-2) WITH FOUR LANE CONFIGURATION FOR RAEBARELI CITY IN THE STATE OF UTTAR PRADESH ON HYBRID ANNUITY MODEL (HAM) BASIS
574CONSTRUCTION OF REALIGNMENT BETWEEN PANDRASS- PASHKYUN (TOTAL LENGTH 27.10 KM) ON ROAD ZOZILA-KARGIL -LEH (NH-1) I.E. DRASS ALIGNMENT (9.30 KM) KHARBOO REALIGNMENT (6.30 KM) AND KARGIL ALIGNMENT (11
575CONSTRUCTION OF RED MUD POND - II AT NALCO DAMANJODI ODISHA
576CONSTRUCTION OF REHABILITATION AND UPGRADING TO 2 LANES/2 LANE(FOR LOT-I-KM 40.00 TO KM 65.400 AND KM 76.300 TO KM 79.400) WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF SITAMARHI-JAYNAGAR-NA
577CONSTRUCTION OF RESIDENTIAL TOWERS AT BIOM KIRANDUL COMPLEX
578CONSTRUCTION OF RING ROAD AROUND KANPUR FROM KM.000 TO KM. 23.325 (CHACHENDI SACHENDI I TO MAHARAJPUR) (PACKAGE-I)
579CONSTRUCTION OF RING ROAD FOR RAEBARELI CITY (PHASE -I) ON EASTERN SIDE OF NH 24B
580CONSTRUCTION OF ROAD FROM KM 0/0 TO 72/0 OF NH-26 SUCH AS 4 LANE FROM KM 0/0 TO 21/0 (BARGARH TO BARPALI) AND 2L+PS FROM KM 21/0 TO 72/0 (BARPALI TO BOLANGIR)
581CONSTRUCTION OF ROB AND ITS APPROACHES IN LIEU OF LEVEL CROSSING NO 10 B T AT KM 307 050 OF NH 60 BHIMGARH
582CONSTRUCTION OF ROB WITH APPROACHES IN LIEU OF L C NO 165 OF AHMEDABAD PALANPUR BETWEEN RAILWAY STATION KARJODA AND PALANPUR NH 58 IN THE STATE OF GUJARAT
583CONSTRUCTION OF SHOHRATGARH BYPASS ON NH-730 UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
584CONSTRUCTION OF SIKKIM UNIVERSITY CAMPUS PHASE-I, PACKAGE -II AT YANGANG SOUTH SIKKIM
585CONSTRUCTION OF SIX LANE ELEVATED CORRIDOR FROM KM. 508.000 TO KM. 513.150 INCLUDING APPROACHES ON NH-66
586CONSTRUCTION OF SIX LANE ELEVATED CORRIDOR FROM KM.7.950 (UPPAL) TO KM.14.200 OF NH-163 TO DE-CONGEST THE URBAN LIMITS OF HYDERABAD-BHOOPALAPATNAM SECTION ON EPC MODE IN THE STATE OF TELANGANA
587CONSTRUCTION OF SIX LANE FLYOVER AT KATRAJ JUNCTION AT KM, 3/880 OF NH 548-DD (VADGAON - KATRAJ - KONDHWA - MANTARWADI CHOWK - LONI KALBHOR - THEUR PHATA - LONIKAND ROAD) IN PUNE DIST; OF THE STATE OF
588CONSTRUCTION OF SIX LANING OF DEDICATED PORT ROAD TO KRISHNAPATNAM PORT (PACKAGE-I) KM 0+000 TO KM 18+000 ON ENGINEERING PROCUREMENT AND CONSTRUCTION
589CONSTRUCTION OF SIX LANING OF NAIDUPETA JUNCTION - TURPUKANUPUR SECTION FROM KM.57+046 TO KM.91+927 IN THE STATE OF ANDHRA PRADESH ON HAM UNDER BHARATMALA PARIYOJANA, PHASE-I.
590CONSTRUCTION OF STAND ALONE RING ROAD/ BYPASS AROUND JAMMU CITY IN THE STATE OF J AND K ON EPC MODE
591CONSTRUCTION OF STRR (WEST SIDE)-NH948A-BALAGONDAPALLI (TAMIL NADU) TO KARNATAKA/TAMIL NADU BORDER FROM KM 144.170 TO KM 179.936 (35.766 KM) IN THE STATE OF TAMIL NADU ON HYBRID ANNUITY MODE UNDER BHA
592CONSTRUCTION OF TERMINAL BUILDING AND ASSOCIATED WORKS AT LEH AIRPORT
593CONSTRUCTION OF TIMMAPURAM TO GURJANAPALLE SECTION FROM KM 26.150 TO 41.161 OF NH-214(NH216)(KAKINADA BYPASS) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
594CONSTRUCTION OF TUNNELS/VIADUCTS AT IDENTIFIED SLIDING/SLIP ZONES AT KM 130.550 TO KM.130.750; KM. 131.170 TO KM. 131.763; KM. 132.560 TO KM. 133.168; KM. 133.590 TO KM. 133.743 AND KM. 147.877 TO KM
595CONSTRUCTION OF TWIN TUBE TUNNELS ON JAMMU KASHMIR RING ROAD (NH-244A) BETWEEN DESIGN CH. 50+600 TO 51+700 AND DESIGN CH. 53+535 TO 55+700 ON EPC MODE UNDER RESIDUAL NHDP COMPONENT OF BHARATMALA PARIY
596CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD FROM EXISTING KM 20.456 TO KM 41.065 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH - 20.00 KM) IN THE STATE OF NAGALAND UND
597CONSTRUCTION OF TWO LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD FROM EXISTING KM 60.345 TO KM 98.065 [DESIGN KM. 59.000 TO KM. 86.835] (DESIGN LENGTH - 27.835 KM) IN THE STATE OF NAGALAND UN
598CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FOR FATEHPUR BYPASS, MANDAWA BYPASS AND JHUNJHUNU BYPASS OF NH-11 IN THE STATE OF RAJASTHAN.
599CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM EXISTING KM.0.000 TO KM.55.610 (DESIGN KM. 0.000 TO KM. 54.048) OF NH-124D
600CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER FROM KM.0 TO KM. 80 ON NH 548B (VIJAYAPURA-SANKESWAR SECTION) IN THE STATE OF KARNATAKA ON HYBRID ANNUITY MODE (HAM) BASIS CONTRACT
601CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER HIGHWAY FROM DESIGN CH.0.000 TO CH.49.2OO OF NH-731B ON EPC MODE
602CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF SELLING-DULTE SECTION OF NH-06 (PKG-I)
603CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF SELLING-DULTE SECTION OF NH-06 (PKG-III)
604CONSTRUCTION OF TWO NOS GIRLS HOSTELS AND ONE NO BOYS HOSTEL OF 500 CAPACITY EACH G PLUS 8 STOREYED BUILDING DINING KITCHEN G PLUS 2 SUBSTATION BUILDING G AT IIT KHARAGPUR WEST BENGAL
605CONSTRUCTION OR 4 LANE RANIGANJ BYPASS OF LENGTH 5 261 KM ON NH 60 NEW NH 14 FROM KM 273 00 OF NH TO KM 478 18 OF NH 2 NEW NH 16 IN PASCHIM BARDHAMAN WEST BENGAL IN EPC MODE REG JOB NO 014 WB
606CONSTRUCTION/ UP-GRATION OF FOUR/TWO LANE WITH PAVED SHOULDER OF NH68 FROM TANOT-RAMGARH BHADASAR-JAISALMER(DESIGN CH.0.000-125.573) AND FROM BHADASAR(MOKAL)-SARKARITALA UPTO PAKISTAN BORDER(DESIGN CH
607CONSTRUCTION/UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM RANIPOOL TO PAKYONG FROM KM 0.000 TO KM 16.167 OF NH-717A ON EPC BASIS UNDER SARDP-NE PHASE
608CONSTRUCTION729 QUARTERS (TYPE II-180 TYPE III-364 TYPE IV-112 TYPE V-68 TYPE-VI-5 SHOPS COMMUNITY CENTER,GUEST HOUSE CRECHE/NURSERY AND DISPENSARY IN GPRA NAYARAIPUR. (INCLUDING ALL DEVELOPMEN
609CONSTUCTION/UPGRADATION OF EXISTING HIGHWAY TO 2 LANE WITH PAVED SHOULDER FROM KM 0.00 TO KM 13.00 NH-717A BAGRAKOT-KAFER IV A.
610CONSTUCTION/UPGRADATION OF EXISTING HIGHWAY TO 2 LANE WITH PAVED SHOULDER FROM KM 13.00 TO KM 25.600 NH-717A BAGRAKOT-KAFER IV B.
611CONVERSION OF FLAT BOTTOM SETTLERS AND WASHERS WITH A SINGLE TRAIN OF HRDS AND DCWS IN STREAMS 1 AND 2 AND 3 OF ALUMINA REFINERY PLANT
612CONVERSION OF PARTIALLY EXCAVATED ESCAPE TUNNEL TO UNIDIRECTIONAL TWO LANE TUNNEL (INCLUDING CONSTRUCTION OF CROSS PASSAGES & APPROACH ROAD ON EITHER SIDE OF TUNNEL) FROM KM 12.732 TO KM 14.568 OF KIR
613CORRIDOR EFFICIENCY IMPROVEMENT INCLUDING REMOVAL OF BLACK SPOTS IN LAKHANPUR - SAMBA SECTION OF NH-44 FROM CHAINAGE KM. 16.300 TO KM. 74.100 - N/02007/03002/JK
614CREATION OF GAS DEHYDRATION FACILITIES
615CREATION OF GDU AND DPD FACILITIES AT RAJAHMUNDRY
616DABOKA BYPASS OF DABOKA - PAROKHAOWA PKG -1
617DABOKA KATHKATI PACKAGE-5
618DABOKA KATHKATI PACKAGE-6
619DABOKA KATHKATI PACKAGE-7
620DAHEGAON TO KUHI
621DAHOD-INDORE VIA SARDARPUR, JHABUA AND DHAR (NL)
622DAINADUBI-DARUGIRI PKG-1B
623DAIRYGUJARAT
624DALLIRAJHARA - ROWGHAT (95 KM) {PART OF DALLIRAJHARA-JAGDALPUR (235 KM)}
625DALLIRAJHARA ROWGHAT JAGDALPUR
626DAMAN UPSIDE DEVELOPMENT PROJECT (DUDP) IN TAPTI DAMAN BLOCK
627DARBHANGA:DEVELOPMENT OF NEW CIVIL ENCLAVE AT DARBHANGA, BIHAR. SH- CONSTRUCTION OF NEW TERMINAL BUILDING, ALLIED STRUCTURE, AND EXTERNAL DEVELOPMENT WORKS ON ENGINEERING PROCUREMENT AND CONSTRUCTION
628DAUND - MANMAD (236 KM)
629DAVUALAPALLY TO MALLAPALEM SECTION {DESIGN CH. KM 133+922 TO KM 154+216 (EXISTING CH. KM 133+922 TO KM 154+900)} OF NH-565
630DAYAPAR WIND ENERGY PROJECT 150MW
631DAYAPAR WIND ENERGY PROJECT 200MW
632DAYAPAR WIND- III (HYBRID TRANCHE-V)
633DCU REVAMP PROJECT
634DEBOTTLENECKING AND AUGMENTATION OF CRYOGENIC FACILITIES AT URAN LPG IMPORT TERMINAL
635DEDICATED TEST TRACK FOR RDSO (PHASE II)
636DELHI AMRITSAR KATRA EXPRESSWAY (PHASE-II PKG XVIII) DEVELOPMENT AND UPGRADATION OF FOUR LANE ACCESS CONTROL EXPRESSWAY FROM DESIGN CHAINAGE KM 530.00 TO KM 545.300 (SIDHRA TO DOMEL SECTION OF NH-44)
637DELHI AMRITSAR KATRA EXPRESSWAY PHASE I SPUR III FROM JUNCTION WITH AMRITSAR JALANDHAR ROAD NH3 NEAR BHISHAMBARPURA TO JUNCTION WITH AMRITSAR ANJALA ROAD NH354 NEAR AMRITSAR AIRPORT KM 71+000 TO KM 99
638DELHI GHAZIABAD MEERUT RRTS CORRIDOR
639DELHI METRO PHASE IV THREE PRIORITY CORRIDORS
640DELHI MRTS PHASE-III
641DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 26
642DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 27
643DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 28
644DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 30
645DELHI VADODARA GREENFIELD ALIGNMENT SECTION OF NH 148N PACKAGE 31
646DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-XI) FROM JUNCTION WITH JALANDHAR - KAPURTHALA ROAD (NH-703A) NEAR KHOJEWAL VILLAGE TO JUNCTION WITH AMRITSAR-MEHTA-SRIHARGOBINDPUR-TANDA ROAD (NH-503A) NEA
647DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I PKG-XII) FROM JUNCTION WITH AMRITSAR-MEHTA-SRIHARGOBINDPUR-TANDA ROAD (NH-503A) NEAR SRIHARGOBINDPUR TO JUNCTION WITH PATHANKOT-GURDASPUR ROAD (NH-54) NEAR GUR
648DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-I SPUR-I) FROM JN. WITH KAPURTHALA - SULTANPUR LODHI ROAD (NH-703A) NEAR ISHARWAL VILLAGE TO JN. WITH KAPURTHALA - TARN TARAN ROAD (NH-703AA) NEAR GOINWAL SAHIB
649DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-II PKG-XIV) FROM JUNCTION WITH PATHANKOT-GURDASPUR ROAD (NH-54) NEAR BALSUA TO JUNCTION WITH HIRANAGAR ROAD NEAR VILLAGE GURHA BAILDARAN (KM 423+500 TO KM 468+10
650DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-II PKG-XV) [JUNCTION WITH HIRANAGAR ROAD NEAR VILLAGE GURHA BAILDARAN TO JUNCTION WITH JAMMU RING ROAD (NH-244A) NEAR JAKH VILLAGE FROM KM 468+100 TO KM 503+250]
651DELHI-AMRITSAR-KATRA EXPRESSWAY (PHASE-II PKG-XVI) EXISTING JAKH (VIJAYPUR)-KUNJWANI SECTION OF NH-44 INCLUDING SPUR CONNECTIVITY TO JAMMU AIRPORT ( NH-144A) [KM 503+500 TO KM 514+500] - N/01004/01022
652DELHI-AMRITSAR-KATRA EXPRESSWAY FROM CH.KM 303+900 TO KM 319+400 OF MAIN EXPRESSWAY) AND AMRITSAR CONNECTIVITY CH.KM 0+000 TO KM 24+000. – PKG X
653DELHI-AMRITSAR-KATRA EXPRESSWAY FROM JUNCTION WITH LUDHIANA-MALERKOTLA ROAD (SH-11) NEAR BHOGIWAL VILL. TO JUNCTION WITH LUDHIANA-MOGA ROAD (NH-5) NEAR MULLANPUR DAKHA (KM 225+770 TO KM 260+860)ON EPC
654DELHI-AMRITSAR-KATRA EXPRESSWAY FROM JUNCTION WITH LUDHIANA-MOGA ROAD (NH-5) NEAR MULLANPUR DAKHA TO JUNCTION WITH JALANDHAR-MOGA ROAD (NH-703) NEAR KANG SAHIBU VILLAGE (KM 260+860 TO KM 303+900) ON E
655DELHI-AMRITSAR-KATRA EXPRESSWAY FROM JUNCTION WITH PATIALA-BATHINDA ROAD (NH-7) NEAR BHAWANIGARH TO JUNCTION WITH LUDHIANA-MALERKOTLA ROAD (SH-11) NEAR BHOGIWAL VILL. (KM 188+830 TO KM 225+770) ON EPC
656DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-09) (CH. 247.310 TO CH. 292.950) [JUNCTION WITH MDR-1 (BAONLI-JHALAI ROAD) TO END OF INTERCHANGE ON NH-166 NEAR VILLAGE MUI]
657DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-10) (CH. 292.950 TO CH. 319.400) [END OF INTERCHANGE ON NH-166 NEAR VILLAGE MUI TO HARDEOGANJ VILLAGE NEAR INDERGARH]
658DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-14) (CH. 388.420 TO CH. 419.000) [JUNCTION WITH NH- 76 TO JUNCTION WITH NH-12 NEAR VILLAGE UMMEDPURA]
659DELHI-VADODARA GREENFIELD ALIGNMENT (NH-148N) (PKG-15) (CH. 419.000 TO CH.427.300) [JUNCTION WITH NH-12 NEAR VILLAGE UMMEDPURA TO MAJOR BRIDGE OVER TAKLI RIVER NEAR NAYAGAON JAGEER VILLAGE]
660DEMO FOR NITI AAYOG
661DEMO PLANT FOR PRODUCTION OF BIO-ATF
662DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-6)
663DEOGARH (NEAR DHANDHANIYA)-RAJASTHAN/GUJARAT BORDER (PHASE-I) (AJ/DRGB-PACKAGE-7)
664DETAIL, DESIGN AND CONSTRUCTION OF B.G. NEW RAILWAY LINE FROM DHARAM TO QAZIGUND (KM 100.88 TO KM 168)IN J K. SCOPE COVERS CONSTRUCTION OF 09 NOS. TUNNELS, 14 NOS. MAJOR BRIDGES, 30 NOS. MINOR BRIDGES
665DEVELOPMENT OF 6 LANE ACCESS CONTROLLED GREENFIELD HIGHWAY FROM KM. 97.000 TO KM. 162.500 MARADGI S ANDOLA TO BASWANTHPUR SECTION OF NH-150C (PACKAGE-III OF AKKALKOT-KNT/TS BORDER) ON HYBRID ANNUITY M
666DEVELOPMENT OF 6 LANE JALANDHAR BYPASS FROM KAHLWAN NATIONAL HIGHWAY 03 DESIGN KM 0.00 ENDING AT KANG SAHBU NATIONAL HIGHWAY 703 DESIGN KM. 46.500 VIA SARMASTPUR NATIONAL HIGHWAY 44 MADARA NH03 KHA
667DEVELOPMENT OF 6L UER II [PACKAGE - II] (KARALA KANJHAWALA ROAD TILL NANGLOI - NAJAFGARH ROAD) FROM KM. 15.00 TO KM.28.45
668DEVELOPMENT OF 6L UER-II (PACKAGE-I) (NH-1 NEAR BAKOLI TILL KARALA KANJHAWALA ROAD) FROM KM. (-)0.70 TO KM. 15.07
669DEVELOPMENT OF EXTERNAL TRUNK CONNECTIVITY AND INTERNAL INFRASTRUCTURE WORKS AT MULTI MODEL LOGISTICS PARK AT JOGIGHOPA IN THE STATE OF ASSAM
670DEVELOPMENT OF FOUR LANNING OF ANGUL-SAMBALPUR SECTION OF NATIONAL HIGHWAY NH-42 (NEW NH-55 IN THE STATE OF ODISHA UNDER NATIONAL HIGHWAY DEVELOPMENT PROJECT (NHDP) PHASE-IV ON ENGINEERING PROCUREMEN
671DEVELOPMENT OF JHARIA CBM BLOCK (PHASE-1)
672DEVELOPMENT OF MULTIMODAL LOGISTICS PARK AT BANGALORE AND EXTERNAL CONNECTIVITY TO THE MULTI MODEL LOGISTIC PARK
673 DEVELOPMENT OF NEW GREENFIELD AIRPORT AT DHOLERA, AHMEDABAD (GUJARAT). PHASE-1.
674DEVELOPMENT OF NEWLY DECLARED NH-527C FROM MAJHAULI TO CHAROUT SECTION TO 2 LANE WITH PAVED SHOULDERS NATIONAL HIGHWAY STANDARD IN THE STATE OF BIHAR (KM 0.000 TO KM 63.655)
675DEVELOPMENT OF SIX LANE ACCESS CONTROLLED GREEN FIELD HIGHWAY FROM KAVULAKUNTLA (KM.196+000) TO NARAYANAMPET (KM 203+500) OF NH 544G BENGALURU-VIJAYAWADA ECONOMIC CORRIDOR ON HAM MODE IN THE STATE OF
676DEVELOPMENT OF SIX LANE BASANWAHI-MARANGPURI OF NH 130 CD FROM KM.99+500 TO 124+661 UNDER RAIPUR VISAKHAPATTNAM EC
677DEVELOPMENT OF SIX LANE JHANKI SARGI OF NH 130 CD FROM KM.0+000 TO 42+800 UNDER RAIPUR VISAKHAPATTNAM EC
678DEVELOPMENT OF SIX LANE SARGI-BASANWAHI OF NH 130 CD FROM KM.42+800 TO 99+500 UNDER RAIPUR VISAKHAPATTNAM EC
679DEVELOPMENT OF SIX-LANE ACCESS CONTROLLED HIGHWAY FROM ADHOYA MUSALMANA (AMBALA DISTRICT) TO SADOPUR (AMBALA DISTRICT) (FROM CH. 84+400 TO 121+786) OF SHAMLI - AMBALA SECTION OF BAREILLY - LUDHIANA EC
680DEVELOPMENT OF SIX-LANE ACCESS CONTROLLED HIGHWAY FROM GOGWAN JALALPUR (SHAMLI DISTRICT) TO RANIPUR BARSI (SAHARANPUR DISTRICT) (FROM CH. -(000+600) TO 45+500) OF SHAMLI - AMBALA SECTION OF BAREILLY -
681DEVELOPMENT OF SIX-LANE ACCESS CONTROLLED HIGHWAY FROM RANIPUR BARSI (SAHARANPUR DISTRICT) TO ADHOYA MUSALMANA (AMBALA DISTRICT) (FROM CH. 45+500 TO 84+400) OF SHAMLI - AMBALA SECTION OF BAREILLY - LU
682DEVELOPMENT OF SURFACE FACILITIES FOR PRODUCTION AND EVACUATION OF CRUDE OIL AND NATURAL GAS FROM NADUA AND EAST KHAGORIJA
683DEVELOPMENT OF VISHAKHAPATNAM AIRPORT
684DEVELOPMENT TO 4/6-LANNING OF NH-31 (NEW NH-10) WITH BOTH SIDE SERVICE ROADS FROM KM 569.258 TO KM 581.030 (END OF AH-02 PROJECT ON NH- 31 NEAR SHIVMANDIR TO SEVOKE ARMY CANTONMENT) IN DISTRICTS OF DA
685DEVELOPMENT/WIDENING OF TALEGAON – CHAKAN – SHIKRAPUR – NHAVARA SECTION OF NH 548DG (NHAVARA TO CHOUFULA SECTION) OF STATE HIGHWAY IN THE STATE OF MAHARASHTRA” ON EPC MODE (LENGTH 24.037 KM).
686DHAMRA HALDIA PIPELINE PROJECT
687DHARAMPURI-LONAND FROM KM. 117.00 TO 166.40 (PKG-IV) ON MOHOL-ALANDI SECTION
688DHAULASIDH HYDROELECTRIC PROJECT (66 MW)
689DHOLPUR-SIRMUTTRA WITH EXTENSION TO GANGAPURCITY AND MOHARI-TANTPUR AND TANPUR-BANSI PAHARPUR
690DHULE (BORVIHIR)-NARDANA (UMBRELLA WORK)
691DHUPTALA OC(SASTI UG TO OC)
692DIBANG MULTIPURPOSE PROJECT 2880 MW ARUNACHAL PRADESH
693DIBRUGARH-LAHOAL-CHABUA BYPASS PACKAGE-3
694DIGRAS DARWAH KARANJA
695 DINESH (MAKARDHOKDA-III) OC (8.0 MTY)
696DIPKA OC EXPANSION 40 MTY
697DLW GM 4000 / 3000 HP DIESEL LOCOS
698DOMINGARH - GORAKHPUR - GORAKHPUR CANTT - KUSUMHI - 3RD RUNNING LINE (21.15 KM)
699DORNALA TO KUNTA JUNCTION FROM DESIGN CHAINAGE KM 244+000 TO 267+990 SECTION OF NH-765 (PACKAGE-2)
700DOUBLING BETWEEN BHIWANI-DOBH BAHALI
701DOUBLING BETWEEN GOOTY-PENDAKALLU (29.225)
702DOUBLING BETWEEN JAUNPUR JN-ZAFFARABAD (6.28 KM)
703DOUBLING BETWEEN REWARI-KATHUWAS (27.73 KM)
704DOUBLING OF BORIDAND - AMBIKAPUR ( SURAJPUR)
705DOUBLING OF PRADHANKHUNTA JN -PATHERDIH BAZAR-BHOJUDIH
706DULTE- KWALKULH - CHAMPAI PKG.2
707DUMMY PROJECT IN URBAN DEVELOPMENT
708DUMMY RINKI
709DUMMYPROJECT
710DUMMY_ASSAM1
711DUMMY_BHARTI
712DUMMY_BISWAS
713DUMMY_GOYAL
714DUMMY_JAIPUR
715DUMMY_KARNATAKA
716DUMMY_KK
717DUMMY_OJHA
718DUMMY_PANI
719DUMMY_RAJASTHAN
720DUMMY_SIDDHARTHA
721DUMMY_THIND
722DUMMY_WATI
723DURGAPUR-HALDIA PIPELINE PROJECT
724DWARKA EXPRESSWAY FROM KM -0.600 TO KM 5.300 - PKG-I (SHIVMURTI CHOWK-RUB NEAR DWARKA SECTOR 21)
725EASTERN REGION EXPANSION SCHEME XXIX
726EASTERN REGION EXPANSION SCHEME: 43 [ERES: 43]
727EASTERN REGION EXPANSION SCHEME: 44 [ERES: 44]
728ELEVATED CORRIDOR IN RANCHI CITY FROM KM 0.00 TO KM 3.260 OF NH-75 INCLUDING DOWN RAMP ON NH-23 FROM KM 0.100 TO KM 0.600
729EPC- CORRIDOR APPROACH WORKS - NH (O): WIDENING EXISTING 2 LANE TO 2 LANE WITH PAVED SHOULDERS IN KM 67/2 TO 109/0 INCLUDING INTERMEDIATE LANES OF NH 363 (WARANGAL)
730EPR PUNDI OCP
731EPR ROHINI KARKATA OCP
732EPR TAPIN SOUTH OCP
733ERNAKULAM-KUMBALAM - PATCH DOUBLING (7.71 KM)
734ESTABLISHMENT OF CENTRAL ARMED POLICE FORCE INSTITUTE OF MEDICAL SCIENCES(CAPFIMS) AT NEW DELHI
735ESTABLISHMENT OF KHAVDA POOLING STATION 3 (KPS3) IN KHAVDA RE PARK
736ESTABLISHMENT OF NATIONAL ANIMAL RESOURCE FACILITY FOR BIOMEDICAL RESEARCH AT HYDERABAD
737ESTABLISHMENT OF PERMANENT CAMPUS PHASE 1 OF IIM SIRMAUR
738ESTIMATE FOR IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER FROM RAMNAGAR TO ROSEDA FROM (KM 3.500 TO 43.000) OF NH 527 E ON EPC MODE IN STATE OF BIHAR. (JOB NO. NH-527E/2021-22/BR/50)
739ESTIMATE FOR WIDENING TWO LANE TO FOUR LANE FROM FROM KM.129.00 TO 144.00 OF NH-63 ANKOLA-GOOTY SECTION PASSING THROUGH HUBBALLI CITY LIMITS (JOB NO:NH-63-KNT-2016-17-838)
740ETHYLENE CRACKER PROJECT AT BINA REFINERY INCLUDING DOWNSTREAM PETROCHEMICAL PLANTS AND EXPANSION OF REFINERY
741EXPANSION OF ASHOK OCP
742EXPANSION OF CRYOGENICS GROUP BY SETTING UP NEW MANUFACTURING FACILITY
743EXPANSION OF GUWAHATI REFINERY FROM 1 TO 1.2 MMTPA ALONG WITH INSTALLATION OF CATALYTIC REFORMING UNIT (CRU) AND ASSOCIATED FACILITIES
744EXPANSION OF KARO OCP
745EXPANSION OF KONAR OCP
746EXPANSION PR OF JHANJRA UG (5.00 MTY)
747EXPANSION PROJECT AMRAPALI OCP
748 EXTENSION OF EXISTING INTEGRATED TERMINAL BUILDING AND ALLIED WORKS AT GOA AIRPORT.
749EXTENSION OF MRTS FROM VELACHERY TO STN. THOMAS, MTP
750FATUHA-ISLAMPUR INCL. MM FOR EXTENSION OF NEW LINE FORM BIHARSHARIF-BARBIGHA, DANIYAWAN-BIHARSHARIF, BARBIGHA-SHEIKHPURA AND NEORA-DANIYAWAN.
751FLY OVER AT AGARTALA
752FOUR LANING OF AMRITSAR BYPASS FROM NEW TARN TARAN ROAD TO AJNALA ROAD FROM DESIGN KM. 0.750 TO DESIGN KM. 43.750 AND UPGRADATION OF EXISTING AMRITSAR KHEMKARAN ROAD NH354 TO FOUR LANE CONFIGURATION
753FOUR LANING OF AURANGABAD-PAITHAN SECTION OF NH-752E ON EPC MODE IN THE STATE OF MAHARASHTRA .
754FOUR LANING OF BAKHTIYARPUR - MOKAMA SECTION OF NH-31
755FOUR LANING OF BASUKINATH-DEOGHAR SECTION OF NH-114A FROM KM 85.081 TO KM 130.240 UNDER NHDP PHASE-IV IN THE STATE OF JHARKHAND ON HAM
756FOUR LANING OF BETTADAHALLI TO SRIRAMPURA SECTION FROM KM. 166+100 (DESIGN KM. 170+415) TO KM. 217+000 (DESIGN KM. 226+750) OF NH-206 ON HAM UNDER BHARATHMALA PARIYOJANA, IN THE STATE OF KARNATAKA. (P
757FOUR LANING OF BHOGU TO SANKHA FROM KM 147.450 TO KM 196.870 ON NH-75 PKG SEC-III
758FOUR LANING OF EXISTING DIMAPUR KOHIMA ROAD FROM DESIGN KM 152.490 TO KM 166.700 (EXISTING KM 156.000 TO KM 172.900) EXCLUDING DIMAPUR AND KOHIMA BYPASS IN THE STATE OF NAGALAND
759FOUR LANING OF GAYA-HISUA-RAJGIRI-NALANDA-BIHARSHARIF SECTION (KM0.00 TO 92.935) ON NH-82 IN BIHAR
760FOUR LANING OF JAMMU-AKHNOOR PKG-1
761FOUR LANING OF JHANJHI JN TO DEMOW SECTION FROM KM. 491.050 TO KM. 535.250(DESIGN KM 490.800 TO KM 534.800) (WITH TOLL PLAZA)
762FOUR LANING OF JITTANDAHALLI TO DHARMAPURI SECTION OF NH-844 (PKG-III) FROM KM.60+100 TO KM.94+460
763FOUR LANING OF KAGAVADAR - UNA SECTION OF NH-8E FROM KM 139.915 TO KM 180.478 (PACKAGE-IV) IN THE STATE OF GUJARAT
764FOUR LANING OF KARIMNAGAR-WARANGAL SECTION OF NH-563 FROM DESIGN CH.48.860 KM NEAR SH-1 CH.170.400 KM AT MANAKONDUR BYPASS TO DESIGN CH.116.875 KM EXISTING CH. 144.050 KM AT PALVELPULA NEAR HANAMKONDA
765FOUR LANING OF KHAJURI TO WYNDHAMGANJ FROM KM 219.600 TO KM 260.483 ON NH-75 PKG SEC-V ON HAM
766FOUR LANING OF KIRATPUR NEAR CHOUK SECTION (73.20 KM TO186.50 KM)
767FOUR LANING OF LEFT OVER WORKS OF HOSPET BELLARY KARNATAKA/ AP BORDER FROM KM.280.080 TO KM. 375.450 OF NH-63 (NEW NH-67) IN THE STATE OF KARNATAKA
768FOUR LANING OF MAMALLAPURAM TO MUGAIYUR SECTION OF NH332A FROM KM 0.000 TO KM 31.000
769FOUR LANING OF MEHGAMA HANSDIHA SECTION OF NH-33 FROM EXISTING KM 41.900 TO 93.000 IN THE STATE OF JHARKHAND ON HAM
770FOUR LANING OF MOGA TO BAJAKHANA LAMBWALI SECTION OF 105B GREENFIELD ALIGNMENT FROM DESIGN CHAINAGE FROM KM 0.000 TO KM 43.319 UNDER BHARATMALA PARIYOJNA IN THE STATE OF PUNJAB
771FOUR LANING OF MUGAIYUR TO MARAKKANAM SECTION OF NH-332A FROM KM 31.000 TO KM 62.000
772FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM KHARIA VILLAGE JUNCTION TO START OF EXISTING BHAGALPUR BYPASS DESIGN CHAINAGE KM KM 95+580 TO KM 125+000 (PACKAGE 02) ON HYBRID ANNUITY MODE I
773FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM MUNGER TO KHARIA VILLAGE JUNCTION DESIGN CHAINAGE KM 69+520 TO KM 95+580 (PACKAGE 01) ON HYBRID ANNUITY MODE IN THE STATE OF BIHAR
774FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM NEAR RASULPUR TO MIRZACHAUKI (DESIGN CHAINAGE KM 157+350 TO KM 193+931) (PACKAGE 04) ON HYBRID ANNUITY MODE IN THE STATE OF BIHAR
775FOUR LANING OF MUNGER TO MIRZACHAUKI (NH-80) SECTION FROM START OF EXISTING BHAGALPUR BYPASS TO RASULPUR (DESIGN CHAINAGE KM 125+000 TO KM 157+350)(PACKAGE 03)ON HYBRID ANNUITY MODE IN THE STATE OF BI
776FOUR LANING OF NERALURU TO THORAPALLI AGRAHARAM SECTION OF NH-844 (PKG-I) FROM KM.0+000 TO KM.23+350
777FOUR LANING OF OTTANCHATRAM TO PALANI SECTION FROM KM 30/700 TO KM 55/000 OF NH 209(NEW NH-83) INCLUDING FOOTPATH FOR PEDESTRIAN AND WAY SIDE AMENITIES EXCEPT FROM KM 37/870 TO 38/130,KM 39/2 TO KM 41
778FOUR LANING OF PARARIA TO MOHANIA SECTION OF NH 319 (OLD NH 30) FROM KM. 54+530 (DESIGN CHAINAGE) TO KM. 115+330 (DESIGN CHAINAGE) ON EPC MODE IN THE STATE OF BIHAR (PACKAGE II)
779FOUR LANING OF PATNA TO KOILWAR
780FOUR LANING OF POONDIYANKUPPAM TO SATTANATHAPURAM (DESIGN CH KM. 67.000 TO KM. 123+800) SECTION OF NH-45A
781FOUR LANING OF PUDUCHERRY - POONDIYANKUPPAM SECTION OF NH 45 A (NEW NH 332) FROM KM 29.000 TO KM 67.000 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA PHASE I (RESIDUAL NHDP IV WORKS)
782FOUR LANING OF PURULIYA BYPASS SECTION OF NH 32 IN THE STATE OF WEST BENGAL ON EPC MODE
783FOUR LANING OF RAGHOGARH (DESIGN CH.29.300/EXISTING CH. 29.555) TO NANASA (DESIGN CH.92.971/EXISTING CH. 95.000) OF NH-47 (OLD NH-59A) (INDORE-HARDA, PACKAGE-II)
784FOUR LANING OF RAMBAN - BANIHAL SECTION OF NH-1A
785FOUR LANING OF SATTANATHAPURAM (KM.123/800) TO NAGAPATTINAM (KM.179/555) SECTION OF NH-45A ON HAM UNDER BHARATMALA PARIYOJANA PHASE -1 (RESIDUAL WORKS UNDER NHDP) OF TAMIL NADU
786FOUR LANING OF SOLAN-KAITHLIGHAT SECTION OF NH-22 (NOW NH-5) FROM KM 106.139 TO KM 129.050, ON EPC MODE
787FOUR LANING OF SONAULI GORAKHPUR SECTION OF NH 29E (NEW NH 24) FROM DESIGN CH. 0.000 TO DESIGN CH. 79.540 (FROM EXISTING CH. 0.000 TO EXISTING CH. 80.295) ON HYBRID ANNUITY MODE IN THE STATE OF UTTAR
788FOUR LANING OF SRIRAMPUR-DHUBRI PKG-2
789FOUR LANING OF THORAPALLI AGRAHARAM TO JITTANDAHALLI SECTION OF NH-844 (PKG-II) FROM KM.23+350 TO KM.60+100
790FOUR LANING OF UDHAMBUR - RAMBAN SECTION OF NH-1A
791FOUR LANING OF VILLUKURI KANNIYAKUMAR ROAD OF KM 70.250 TO 96.700 AND NAGERCOIL TO KAVALKINARU OF NH 47 B KM 0.00 TO 16.314
792FOUR LANING OF VILUPPURAM - PUDUCHERRY SECTION OF NH 45 A (NEW NH 32) FROM KM 0.000 TO KM 29.000 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA PHASE I (RESIDUAL NHDP IV WORKS)
793FOUR LANING WITH PAVED SHOULDER OF SECTION FROM KM 53.600 (GOLA ON NH-320) TO KM 81.446 (ORMANJHI ON NH-320B) IN THE STATE OF JHARKHAND ON HYBRID ANNUITY MODE
794FOUR LANINIG OF CHETTIKULAM TO NATHAM SECTION OF NH-785 FROM CHETTIKULUM (KM 7.300) TO NATHAM (KM. 36.690)
795FOUR LANNING OF BADARPUR BYPASS FROM DESIGN CHAINAGE KM 27+300 AT CROSSING WITH NH-6
796FOUR LANNING OF CHOLOPURAM-THANJAVUR
797FOUR LANNING OF NERCHOWK-PANDOH BYPASS SECTION OF NH-21(PACKAGE-I KM 190.000 TO KM 221.305) UNDER NHDP-IVB ON EPC MODE IN THE STATE OF HIMACHAL PRADESH
798FOUR LANNING OF TAMIL NADU KERALA BORDER TO VILLUKURI FROM KM. 43.00 TO 70.25 OF NH-47 UNDER NHDP-PH III ON EPC MODE IN STATE OF TAMIL NADU
799FOUR LANNING OF VIKRAVANDI-SETHIYAHOPU FROM KM 0.000 TO KM 60.250(DESIGN CHAINAGE KM 0.000 TO KM 65.960) SECTION OF NH-45C IN THE STATE OF TAMIL NADU UNDER NHDP –IV ON EPC MODE
800FOUR LANNING OF VILLUKURI TO KANYAKUMARI SECTION FROM KM 70.25 TO 96.714 OF NH-47 AND NAGERCOIL TO KAVALKINARU SECTION FROM 0.00KM TO 16.736 KM
801FOUR LANÌNG OF PUDUCHERRY (KM.29/000) TO POONDIYANKUPPAM (KM.67/000) SECTION OF NH-45A ON HAM UNDER BHARATMALA PARIYOJANA PHASE -1 (RESIDUAL WORKS UNDER NHDP) OF TAMIL NADU
802FOUR OF SIMARIA - KHAGARIA SECTION OF NH-31
803FOUR SIX LANING OF PIMPALGAON NASHIK GONDE FROM KM 380.00 TO KM 440.00 SECTION OF NH-3
804Field Development Plan of Madanam NELP-IV Block CY-ONN-2002
805GADAG-WADI NL
806GANDHAMARDAN IRON ORE MINES TO GOALDIH STATION
807GANDHIGRAM UG MINE
808GARHMUKTESHWAR (KM. 83.200 OF NH-24) TO MEERUT (KM. 9.860 OF NH-235) INCLUDING CONNECTOR TO NH-119
809GAURI CENTRAL OCM
810GC OF NATHDWARA - DEVGARH MADARIYA (82.5KM)
811GEVRA EXPANSION OCP (SECL) (35-70) MTY
812GHONSA EXPANSION DEEP OC
813GODAVARIKHANI COAL MINE
814GODRA-INDOREDEWAS-MAKSI
815GOHA-KHELLANI PKG-3
816GOKUL EXPANSION OC
817GOLETI OPENCAST MINE
818GOMOH - FLYOVER FOR DOWN TRAINS
819GOPALJI-KANIHA OCP
820GRASS ROOT POL TERMINAL AT VALLUR, CHENNAI
821GRASS ROOT RAIL FED DEPOT AT SEKERKOTE, AGARTALA AS RESITEMENT OF EXISTING DHARMANAGAR DEPOT
822GRASS-ROOT TERMINAL AT MIRZAPUR UTTAR PRADESH
823GUDHA THATHANA MITHRI TEST TRACK FOR RDSO
824GUDIWADA TOWN 2 LANE ROB AND ROAD IMPROVEMENT OF NH165 IN REPLACEMENT OF LC NO 3ESPL3 AT KM 231.700 OF NH165 AND CONSTRUCTION OF 2 LANE ROB IN REPLACEMENT OF LC NO. 52 ON AT KM 230.600 OF NH165
825GUJARAT 200 MW (GUVNL TENDER)
826GUNTUR-GUNTAKAL
827GURDASPUR JAMMU PIPELINE
828GWALIOR-SEOPURKALA WITH EXTENSION TO KOTA (GC)
829Gauge conversion of Raipur(Kendri)-Dhamtari and Abhanpur-Rajim branch (67.20 km)
830HADLA LIGNITE MINE PROJECT(1.90 MTPA)
831HAJIPUR-SUGAULI VIA VAISHALI (NL), ECR
832HALDIA PANAGARH PIPELINE PROJECT
833HARIDWAR DEHRADUN APPROVED LENGTH 69
834HARIHARGANJ TO PARWA MODE SECTION FROM KM 23.284 TO KM 57.049 OF NH-98
835HASSAN (ALUR) - BELUR (32 KM) (UMBRELLA WORK PB#23/2018-19/NR)
836HIMMATNAGAR-KHEDBRAHMA (54.83 KM)
837HOSPET-HUBLI-LONDA-VASCODAGAMA DL
838HOTGI-KUDGI-GADAG
839HP CRUDE TO OLEFINS AND AROMATICS TECHNOLOGY DEMO UNIT AT VISAKH REFINERY
840HP TDAE UNIT IN MUMBAI REFINERY
841HP TRIJET UNIT IN VR
842HUBBALI AIRPORT - CONSTRUCTION OF NEW DOMESTIC TERMINAL BUILDING AND MISCELLANEOUS WORKS
843HUNLI TO HAYULIANG PKG-1
844HUNLI TO ITHUN BRIDGE SECTION
845HURA C OC
846HYDERABAD-BANGALORE SEC.(NS COR.PH.-II)[KM.418-463.16],NH-7
847I AND D AND STP WORKS FOR BHAGALPUR
848IMPHAL - KHONGSANG - JIRIBAM PKG-2
849IMPHAL - KHONGSANG PKG-3
850IMPHAL - KHONGSANG PKG-4
851IMPHAL - KHONGSANG PKG-5
852IMPHAL - KHONGSANG PKG-6
853IMPHAL-KOHIMA ROAD PKG-4B
854IMPHAL-KOHIMA ROAD PKG-5A
855IMPLEMENTATION AND EXECUTION OF NEW TECHNOLOGY
856IMPLEMENTATION OF LILO OF BOTH CIRCUITS OF 400KV VIDHYACHAL PS TO SASAN D/C LINE AT HINDALCO SWITCHYARD
857IMPROVEMENT , UP-GRADATION OF NH-734 SECTION OF MORADABAD - THAKURDWARA - KASHIPUR: “PACKAGE-I: MORADABAD BYPASS” (LENGTH= 33.724 KM), START FROM CH. 0+00 (KM. 144+381 OF NH-24) AND ENDS AT CH. 33+724
858IMPROVEMENT AND RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS FROM KM 489.845 (NEW KM.58.125) AND KM. 537.500 (NEW KM 105.780) OF CHIKKAMAGALURU TO BILIKRE SECTION OF NH-373 IN THE STATE OF KARNAT
859IMPROVEMENT AND UP-GRADATION OF EXISTING ROAD TO 2/4L PS FROM KM 40.000 TO 88.750, START OF KHUTAR BYPASS TO START OF SHAHJAHANPUR BYPASS OF NH 731(PKG-I)
860IMPROVEMENT AND UP-GRADATION OF EXISTING ROAD TO 4L PS FROM KM 123.650 TO 175.080, FROM START OF SHAHABAD BYPASS TO END OF HARDOI BYPASS OF NH 731 (PKG-2B)
861IMPROVEMENT AND UP-GRADATION OF EXISTING ROAD TO 4L PS FROM KM 229.070 TO 260.800, END OF HARDOI DISTRICT TO LUCKNOW RING ROAD OF NH 731 (PKG-4)
862IMPROVEMENT AND UP-GRADATION OF NH-227B (84 KOSI PARIKRAMA MARG) PACKAGE –I, FROM KM 228.920 (JAGARNATHPUR) TO KM 235.960/0.000 (MAKHAUDADHAM) TO KM 29.000 (SARPUR) IN THE STATE OF UTTAR PRADESH ON EP
863IMPROVEMENT AND UP-GRADATION OF NH-227B (84 KOSI PARIKRAMA MARG) PACKAGE –III, FROM KM.47.800 (GOSAIGANJ) TO KM.73.300 (BIKAPUR) IN THE STATE OF UTTAR PRADESH ON EPC BASIS.
864IMPROVEMENT AND UP-GRADATION TO TWO LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM. 420.00 (SHOHRATHGARH) TO KM. 454.00 (USKA BAZAR) OF NH-730 IN THE STATE OF UTTAR PRADESH (EPC) BASIS
865IMPROVEMENT AND UP-GRADATION TO TWO LANE WITH PAVED SHOULDER/FOUR LANE CONFIGURATION FROM EXISTING KM 130.000 TO KM 191.000 (DESIGN KM 131.500 TO KM 188.735, DESIGN LENGTH 57.235 KM) OF NH-227A (NEAR
866IMPROVEMENT AND UPGRADATION TO TWO LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM 55.00 TO KM 90.00 (DESIGN LENGTH 34.76) OF NH-227A (NEAR CHHAPIA VILLAGE TO NEAR SIKRIGANJ) IN THE STATE OF U
867IMPROVEMENT AND UPGRADATION TO TWO LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM 90.00 TO 130.00 (DESIGN LENGTH 39.15) OF NH-227A ( NEAR SIKRIGANJ TO BARHALGANJ) IN THE STATE OF UP ON EPC MO
868IMPROVEMENT AND WIDENING TO 2-LANE WITH EARTHEN PAVED SHOULDER FROM UDAIPUR TO SRIMANTAPUR
869IMPROVEMENT AND WIDENING TO 2-LANE WITH PAVED SHOULDER OF ROAD FROM KM 101.300 TO KM 127.319 (TOTAL LENGTH 26.019 KM) I.E. THE KHOWAI –TELIAMURA-AMARPUR-HARINA-SABROOM
870IMPROVEMENT AND WIDENING TWO LANNIG WITH PAVED SHOULDER OF NATIONAL HIGHWAY 127B FROM KM 31.500 (GOERAGRE) TO KM 63.224 PACKAGE-II IN STATE OF MEGHALAYA
871IMPROVEMENT OF 2 LANE WITH PAVED SHOULDER OF STRETCH FROM BIKRAMGANJ DAWATH MELAYABAGH NAWANAGR -DUMROW OF NH-120(CH-201.665 TO KM 240.200) EXCLUDING DAWATH BYPASS UNDER EPC MODE IN THE STATE OF BIHAR
872IMPROVEMENT OF EXISTING ALIGNMENT OF PANDHARPUR TOWN PART BYPASSED SECTION FROM WAKHARI TO LORD VITTHAL TEMPLE LENGTH 8 KM UNDER BHARATMALA PARIYOJANA ON EPC MODE
873IMPROVEMENT OF GEOMETRICS OF THONDUPALLY TO KOTHUR FROM KM 22.300 TO KM 34.14 OF NH-44-RCW
874IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER FROM JUNCTION OF NH-22 NEAR HAJIPUR TO JUNCTION OF NH-122 AT BACHHWARA VIA MAHNAR AND MOHIUDDIN NAGAR FROM KM 0.00 TO 29+730 OF NH 122B IN THE STATE OF BIHA
875IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF BH/WBBORDER-AMDABAD-MANIHARI SECTION FROM DESIGN KM 0+000 TO KM23+945 OF NH-131 A (TOTAL LENGTH-23.945 KM) ON EPC MODE INTHE STATE OF BIHAR. (JOB NO. NH
876 IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF NH 122B FROM KM 29.730 TO KM 72.348 IN STATE OF BIHAR UNDER EPC MODE
877 IMPROVEMENT TO TWO LANE WITH PAVED SHOULDERS OF NH-319A FROM KM 0 TO KM 45 IN STATE OF BIHAR UNDER EPC MODE
878IMPROVEMENT/CONSTRUCTION OF EXISTING CLASS 5 ROAD TO NH INTERMEDIATE LANE SPECIFICATION WITH HARD SHOULDER FROM EXISTING KM 76+340 TO KM 134+940 (DESIGN CHAINAGE FROM KM 76+300 TO KM 133+000) OF NH-50
879IMPROVEMENT/CONSTRUCTION OF EXISTING CLASS-5 ROAD TO NH INTERMEDIATE LANE SPECIFICATION WITH HARD SHOULDER FROM EXISTING KM 134+940 TO KM 169+970 (DESIGN CHAINAGE FROM KM 133+000 TO KM 166.000) OF NH
880IMPROVEMENT/UPGRADATION OF EXISTING 2-LANE TO 4-LANE DIVIDED HIGHWAY FROM DAILI TO KURAOPOKPI SECTION OF IMPHAL-KOHIMA ROAD (DESIGN CH.: KM 274.610 TO 287.00 ) (PKG-4B)
881IMPROVEMENT/UPGRADATION OF EXISTING 2-LANE TO 4-LANE DIVIDED HIGHWAY FROM KURAOPOKPI TO SEKMAI SECTION OF IMPHAL-KOHIMA ROAD (DESIGN CH.: KM 287.00 TO 297.700) (PKG-5A)
882IMPROVEMENT/UPGRADATION OF EXISTING 2-LANE TO 4-LANE DIVIDED HIGHWAY FROM TAPHOU KUKI TO DAILI SECTION OF IMPHAL-KOHIMA ROAD (DESIGN CH.: KM 262.175 TO 274.610) (PKG-4A)
883IMPROVEMENT/WIDENING TO 2-L WITH PAVED SHOULDER FROM (DESIGN KM 0.00 TO KM 10.670) / 4-LANING FROM (DESIGN KM 0.00 TO KM 0.930) BETWEEN SHILLONG-DAWKI (PKG-1)
884IMPROVEMENT/WIDENING TO 2-LANE WITH PAVED SHOULDER / 4-LANING FROM (DESIGN KM 63.530 TO KM 71.520) BETWEEN SHILLONG-DAWKI (PKG-5)
885IMPROVEMENT/WIDENING TO 2-LANE WITH PAVED SHOULDER FROM (DESIGN KM 10.670 TO KM 37.550) BETWEEN SHILLONG-DAWKI (PKG-2)
886IMPROVEMENT/WIDENING TO 2-LANE WITH PAVED SHOULDER FROM (DESIGN KM 45.760 TO KM 63.530) BETWEEN SHILLONG-DAWKI (PKG-4)
887IMPROVEMENTS AND RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS FROM KM 243.20 TO KM 290.20 OF NH-234 IN THE STATE OF KARNATAKA THROUGH EPC MODE ( JOB NO NH234/KNT/2016-17/815)
888INDAPUR TO VADPALE
889INDIA INTERNATIONAL CONVENTION AND EXPO CENTRE
890INDIAN INSTITUTE OF SCIENCE EDUCATION AND RESEARCH BERHAMPUR
891INDORE - EDLABAD (PKG-II) [TEJAJINAGAR TO BALWARA]
892INDORE - HARDA (PKG-I) [INDORE TO RAGHAV GARH FROM KM. 0.25 TO KM. 26.903]
893INDORE - HARDA (PKG-III) [NANASA TO PIDGAON SECTION FROM KM 95.000 TO KM 142.445]
894INDORE BUDNI (INDORE JABALPUR)
895INDORE METRO RAIL
896INSTALLATION OF 4TH SLAB CASTER ALONG WITH ITS AUXILIARIES AND A NEW LADLE FURNACE IN SMS-II AT RSP
897INSTALLATION OF BITUMEN MANUFACTURING UNIT ALONG WITH ALLIED FACILITIES AT BARAUNI
898INSTALLATION OF INDEPENDENT DE- AROMATIZED SOLVENTS PRODUCTION FACILITIES AT MUMBAI REFINERY
899INSTALLATION OF NEW BAR MILL AT DURGAPUR STEEL PLANT
900INSTALLATION OF NEW BITUMEN UNIT ALONG WITH ALLIED FACILITIES AT GUJARAT
901INTEGRATED DEVELOPMENT OF 4 CONTRACT AREAS UNDER DSF2
902INTEGRATED KULDA GARJANBAHAL OCP
903INTEGRATED LAKHANPUR-BELPAHAR-LILARI OCP
904INTEGRATED PARA XYLENE (PX) AND PURIFIED TEREPHTHALIC ACID (PTA) PROJECT AT PARADIP REFINERY
905INTERCEPTION AND DIVERSION WITH STP AT HUGHLY-CHINSURAH
906INTERCEPTION AND DIVERSION WORKS AND STP AT MUZAFFARNAGAR UTTAR PRADESH
907INTERCEPTION AND DIVERSION WITH STP AT MAHESHTALA
908INTERCEPTION DIVERSION TREATMENT WORKS AT TOLLYS NULLAH ADI GANGA
909IRUGUR-DEVANGONTHI POL PIPELINE
910ITAPARA OC
911ITARSI-NAGPUR (BAL.) - 3RD LINE (267 KM)
912JAGADALPUR-KORAPUT DOUBLING
913JAGANNATHPUR OC RCE (3.0 MTY)
914JAL MARG VIKAS PROJECT
915JALANDHAR-HOSHIARPUR SECTION OF NH-70 [NEW NH NO. 3] FROM EXISTING KM 11.400 TO KM 49.200
916JAMMU - AKHNOOR SECTION OF NH 144A PKG-3B
917JAMMU - CONSTRUCTION OF NEW CIVIL ENCLAVE
918JAMPALI OCP RCE
919JANGHAI PRATAPGARH AMETHI DOUBLING
920JANGHAI-PHAPHAMAU - DOUBLING WITH ELECTRIFICATION (46.79 KM)
921JARANGDIH OCP
922JARAPADA - BUDHAPANK WITH FLY OVER AT TALCHER ROAD 3RD AND 4TH LINE
923JAWAHAR KHANI OPENCAST (JK OC) MINE
924JAYNAGAR-BIJALPURA INCLUDING EXTENSION BIJALPURA-BARDIBAS(NEPAL) GC
925JESSAMI TO LAYNEN BRIDGE UKHRUL - JESSAMI PKG-7
926JEYPORE MALKANGIRI NEW LINE
927JEYPORE NABARANGPUR NEWLINE
928JHAJHA - BATIA (UMBRELLA WORK PB#23/2018-19/NR)
929JHANSI BINA DOUBLING
930JHANSI MANIKPUR AND KHAIRAR BHIMSEN DOUBLING
931JHARKHAND LAIYO OCP
932JHARSUGUDA-BILASPUR 4TH LINE
933JHIRIA WEST OPENCAST PROJECT
934JIRIBAM TO IMPHAL (TUPUI)(NL)(NEFR)
935JOGIGHOPA BRIDGE
936JORAM – KOLORIANG ROAD FROM EXISTING KM 50.050 TO KM 70.00 (PKG-3)
937JORAM – KOLORIANG ROAD FROM EXISTING KM122.600 TO KM138.00 (PKG-7)
938JUNAGARH -VISAVADAR (42.28) KM
939KADAPPA AIRPORT- CONSTRUCTION OF NEW DOMESTIC TERMINAL BUILDING AND MISCELLANEOUS WORKS INCLUDING MAINTENANCE, OPERATION AND AICMC
940KADUR CHIKMAGALUR SAKLESHPUR NEW LINE (93 KM)
941KAILASHAHAR TO KHOWAI PKG-4
942KAKATIYAKHANI OPENCAST III PROJECT PHASE-1
943KALIPAHARI - BAKHTARNAGAR 5TH LINE (17.61 KM)
944KALOL REDEVELOPMENT PROJECT
945KALYAN-KASARA 3RD LINE
946KALYAN-MURBAD VIA ULHASNAGAR (UMBRELLA WORK)
947KANCHAN OC EXPANSION
948KANPUR LUCKNOW EXPRESSWAY PKG-1 CONSTRUCTION OF 6-LANE TO EIGHT LANE OF KANPUR LUCKNOW EXPRESSWAY (NE-6), INCLUDING SPUR FROM KM. 10.980 TO KM. 28.500 IN THE STATE OF UTTAR PRADESH ON HAM MODE UNDER B
949KANPUR METRO RAIL PROJECT
950KANTE TO WAKED
951KARAD PATAN CHIPLUN GUHAGAR
952KARAIPETTAI TO WALAJAPET FROM KM 71.015 TO 107.091
953KARGIL-ZANSKR PACKAGE-1
954KARGIL-ZANSKR PACKAGE-2
955KARGIL-ZANSKR PACKAGE-3
956KARGIL-ZANSKR PACKAGE-8
957KARIMGANI - SUTARKANDI SECTION ON SILCHAR-CHURAIBARI PKG-7
958KARWANDI TO RAJURI
959KATIHAR-KUMEDPUR AND KATIHAR-MUKURIA (64.5 KM) (UMBRELLA WORK PB#57/2019-20/NR)
960KATKONA RO UG PROJECT (1.74 MTY)
961KATNI - SINGRAULI DOUBLING PROJECT
962KATNI BYPASS FROM KM. 359.50 TO KM. 378.50
963KATNI GRADE SEPARATOR/BYE PASS
964KAZIPET-BALHRSHA
965KAZIPET-VIJAYAWADA 3RD LINE WITH ELECTRIFICATION
966KEIFANG - TUVAI PKG-3
967KG-DWN-98-2 CLUSTER II DEVELOPMENT PROJECT
968KHADIA EXPANSION OCP
969KHAGARIA-KUSHESHWAR ASTHAN (NL) (ECR)
970KHAMMAM DEVARAPALLE PKG II 4L ACCESS CONTROLLED (GREENFIELD) FROM SOMAVARAM VILLAGE TO CHINTAGUDEM VILLAGE (DESIGN CHAINAGE 33+604 TO 63+117) N/05011/02003/TS
971KHAMMAM-DEVARAPALLE PKG I [4L ACCESS CONTROLLED (GREENFIELD) FROM THALLAMPADU VILLAGE TO SOMAVARAM VILLAGE (DESIGN CHAINAGE 0+000 TO 33+604)] - N/05011/02002/TS
972KHAMMAM-DEVARAPALLE PKG III [4L ACCESS CONTROLLED (GREENFIELD) FROM CHINTAGUDEM VILLAGE TO RECHERLA VILLAGE (DESIGN CHAINAGE 63+117 TO 105+236)] - N/05011/02004/TS
973KHARAGPUR-ADITYAPUR - 3RD LINE (132 KM)
974KHARSIA DHARAMJAIGARH WITH SPUR LINE EAST CORRIDOR-PHASE I
975KHAVDA 1200MW (4X300MW) IN KHAVDA RE PARK
976KHAVDA PHASE-II-PART B, GUJARAT- TRANSMISSION SCHEME FOR EVACUATION OF 4.5 GW RE INJECTION AT KHAVDA P.S. UNDER PHASE-II –PART B
977KHAVDA PHASE-II-PART C, GUJARAT- TRANSMISSION SCHEME FOR EVACUATION OF 4.5 GW RE INJECTION AT KHAVDA P.S. UNDER PHASE-II – PART C
978KHAVDA-2, GUJARAT- ESTABLISHMENT OF KHAVDA POOLING STATION-2 (KPS2) IN KHAVDA RE PARK
979KHAWDA 1255MW SOLAR PROJECT (KHAWDA SOLAR PARK)
980KHELLANI-KHANABAL PKG-1
981KHELLANI-KHANABAL PKG-2
982KHELLANI-KHANABAL PKG-3
983KHELLANI-KHANABAL PKG-4
984KHELLANI-KHANABAL PKG-5
985KHOWAI –TELIAMURA-AMARPUR-HARINA-SABROOM PACKAGE-2
986KHOWAI –TELIAMURA-AMARPUR-HARINA-SABROOM PACKAGE-3
987KHOWAI –TELIAMURA-AMARPUR-HARINA-SABROOM SECTION PKG-4
988KHURDA ROAD-BOLANGIR(NL)ECOR
989KHURJA SUPER THERMAL POWER PROJECT
990KIRANDUL - JAGDALPUR DOUBLING
991KIRU HYDRO ELECTRIC PROJECT
992KOCHI METRO RAIL PROJECT PHASE II FROM JLN STADIUM TO INFOPARK VIA KAKKANAD
993KOCHI-KOOTTANAD-BANGALORE-MANGALORE PIPELINE PHASE-II
994KODERMA-TILAIYA (NL), ECR
995KODINGAMALI BAUXITE MINES TO SINGARAM RAILWAY STATION
996KOLARPIMPRI EXPANSION OCM (2.50 MTY)
997KOLGAON EXPANSION (DEEP) OC
998KOLKATA METRO RAIL WEST BENGAL
999KOPARGAON TO SAVALI VIHIR SECTION
1000KORAPUT - SINGAPUR ROAD DOUBLING
1001KOTLPALLI-NARASAPUR (NL) (SCR)
1002KOTRE BASANTPUR PACHMO OCP
1003KOTTAVALSA - KORAPUT DOUBLING
1004KUMBALAM-THURAVUR - PATCH DOUBLING (15.59 KM)
1005KURNOOL/KADAPA BORDER-JAMMALAMADUGU SECTION OF NH-167K I.E. DESIGN CH. KM 248+010 TO KM 269+900
1006KWAR HE PROJECT
1007LALITPUR - BIRARI WITH FLYOVER AT LALITPUR
1008LALITPUR-SATNA-REWA-SINGRULI NL, (NCR)
1009LARA SUPER THERMAL POWER PROJECT, STAGE-II (2X800 MW)
1010LATA-TAPOVAN HYDRO ELECTRIC POWER PROJECT 3X57 MW
1011LAYING OF NATURAL GAS PIPELINE FROM HAZARIBAGH TO RANCHI
1012LAYING OF POL PIPELINES IN COMMON CORRIDOR FOR PROPOSED GRASS ROOT TERMINAL AT VALLUR (CHENNAI)
1013LIFE EXTENSION OF WALL PLATFORMS OF MUMBAI HIGH AND HEERA FIELDS
1014LMPHAL TO JIRIBAM PKG-7
1015LODHMA TO PISKA LINK LINE BY PASSING HATIA/RANCHI WITH Y CONNECTION (17.2 KM)
1016LUBE MODERNIZATION AND BOTTOM UPGRADATION PROJECT
1017LUCKNOW-BYPASS (EW) (NS AND EW-PH-I) NH-25 AND NH-28 VIA NH-56
1018LUDHIANA KILA RAIPUR (19 KMS) WITH FREIGHT LINE AT GILL STATION ON LDH-JHL SECTION
1019LUDHIANA MULLANPUR DOUBLING
1020LUHRI HYDROELECTRIC PROJECT (STAGE1)
1021MAHAMAYA OPENCAST PROJECT
1022MAJOR BRIDGE OVER MIDDLE STRAIT CREEK
1023MAKARDHOKDA I EXPANSION OC
1024MALUGUR-PALASAMUDRAM (17.98 KM) (PB#29/NR/2022-23)
1025MANMAD - JALGAON - 3RD LINE (160 KM)
1026MANOHARABAD-KOTHPALL NEW LINE(SCR)
1027MANU-SIMLUNG ( PKG 4)
1028MARAM - PEREN PKG-3
1029MARIAM - PEREN (PKG 1B)
1030MARIAM - PEREN PKG-1A
1031MARIKUPPAM - KUPPAM
1032MARREM KHULLEN TO JESSAMI SECTION IMPHAL- UKHRUL - JESSAMI PKG-6 (DESIGN CHAINAGE KM 95.700 TO KM 140.180)
1033MATHURA-JHANSI-3RD LINE (273.80 KM)
1034MERANGKONG-TAMLU-MON (MTM) PKG-5
1035MHASWAD TO TEMBHURNI
1036MHN TCPP PGC BGC PROJECT (MTPBP)
1037MIYAGAM-KARJAN-DABHOI-SAMLAYA (GC)
1038MODASA- SHAMLAJI NEW LINE ( MM OF AHMEDABAD-HIMMATNAGAR-UDAIPUR (299.2 KM))
1039MODIFICATION OF STROM WATER DRAINS IN OPERATINAL AREA AT CHENNAI AIRPORT
1040MOHANPUR EXPANSION OC PHASE II
1041MOONIDIH XV SEAM UG
1042MORAPPUR-DHARMAPURI
1043MPLS-IP BASED ACCESS AND AGGREGATION NETWORK (MAAN) IN BSNL ALONG WITH TEST AND MEASURING EQUIPMENT
1044MUGHALSARAI - ALLAHABAD - 3RD LINE
1045MULTI MODAL LOGISTICS PARK AT SWARUPGANJ
1046MULTI-PRODUCT PIPELINE FROM KRISHNAPATNAM COASTAL INSTALLATION TO THE PROPOSED INSTALLATION AT HYDERABAD
1047 MUMBAI AHMEDABAD HIGH SPEED RAIL PROJECT
1048MUMBAI CENTRAL VIRAR VADODARA AHMEDABAAD TRAIN PROTECTION SYSTEM 500 RKM
1049MUMBAI METRO LINE 3 (COLABA-BANDRA-SEEPZ)
1050MUMBAI NAGPUR JHARSUGUDA PIPELINE PROJECT
1051MUMBAI URBAN TRANSPORT PROJECT IIIA
1052MUMBAI URBAN TRANSPORT PROJECT PHASE-II
1053MURAIDIH UG TURN-KEY PROJECT
1054MURARAI - BARHARWA 3RD LINE (48.90 KM)
1055MURKONGSELEK-PASIGHAT NL
1056MUZAFFARPUR SAGAULI DOUBLING 100.60 KM
1057NADIAD-PETLAD (37.26 KM)
1058NADIKUDE-SRI KALAHASTI
1059NAGAPATTINAM THIRUTURAIPUNDI (38KM)- NEW LINE PROJECT
1060NAGPUR METRO RAIL PROJECT PHASE II
1061NAGPUR RING ROAD PACKAGE-2
1062NAGPUR- NAGBHIR RAILWAY LINE GAUGE CONVERSION PROJECT
1063NAHATI - RANAGHAT 3RD LINE (MM OF KALINARAYANPUR - KRISHNANAGAR)
1064NAINI COAL MINE
1065NAKRAKONDA KUMARDIH B OCP
1066NANDED TO JALKOT
1067NANGALDAM-TALWARA(NL),NR
1068NARAYANGARH TO BHADRAK 3RD LINE (155 KM)
1069NARROW BAND RAS (BSNL)
1070NASRATPUR TO BARASGAON
1071NATIONAL INDUSTRIAL CORRIDOR PROJECT
1072NEW B.G. LINE FROM ARARIA TO GALGALIA (THAKURGUNG), NEFR
1073NEW BG LINE BETWEEN NALIYA-JAKHAU PORT
1074NEW BG LINE FROM BALURGHAT TO HILLY NFR
1075NEW BG LINE FROM JAGBANI TO BIRATNAGAR
1076NEW BG LINE INTERSECTION (5 NOS) BETWEEN GERATPUR-SANAND AND BOTAD-AHMEDABAD (16.51 KM) (PB29/NR/2022-23)
1077NEW LINE FROM DIMAPUR TO ZUBZA(KOHIMA) NATIONAL PROJECT (NEFR)
1078NEW MAJARI UG TO OC (3.0 MTY)
1079NEW MUNDRA-PANIPAT CRUDE OIL PIPELINE
1080NEW SINTER PLANT AT BOKARO STEEL PLANT
1081NEW WORK FOR CONSTRUCTION OF METRO RAILWAY FROM BARANAGAR TO BARRACKPORE AND DAKSHINESHWAR (MTP)
1082NEW WORK FOR CONSTRUCTION OF METRO RAILWAY FROM JOKA TO BINOY BADAL DINESH BAGH.
1083NEW WORK FOR CONSTRUCTION OF METRO RAILWAY FROM NOAPARA-BARASAI VIA BIMANBANDER (MTP)
1084NEW WORK FOR CONSTRUCTION OF METRO RAILWAY FROM NSCB AIRPORT TO NEW GARIA VIA RAJARHAT (MTP)
1085NEYVELI UTTAR PRADESH POWER PROJECT LIMITED 1980 MW
1086NH 167 B KADAPA NELLORE BORDER TO CSPURAM I.E. FROM KM 58.635 TO KM 99.409
1087NH-30-BHADRACHALAM TO KONTA SECTION 2LPS
1088NH165 FROM KM 0.000 TO KM 64.020 PAMARRU TO AKIVEEDU SECTION TO TWO LANE WITH PAVED SHOULDERS
1089NH167AD FROM MACHERLA TO DACHEPALLI FROM KM.0.000 TO 43.659 TO 2LPS
1090NH440 RAYACHOTY TOVEMPALLI 2LPS
1091NIGAHI EXPANSION OCP (15 TO 25 MTPA)
1092NILJAI EXPANSION (DEEP) OC (3.5 MTY)
1093NIMACH BADI SADRI NEW LINE PROJECT
1094NIMACH-RATLAM (133 KM)
1095NIPANIA-BHATAPRA (14.4 KM) 4TH LINE (PB#72/NR/2022-23)
1096NLC TALABIRA THERMAL POWER PROJECT (PHASE-1: 3 X 800 MW)
1097NLCIL 300 MW SOLAR POWER PROJECT (PART OF 510 MW CPSU SCHEME)
1098NMDC SLURRY PIPE LINE PROJECT - PHASE-1
1099NOKH SOLAR PV PROJECT 735 MW
1100NORTH EAST GAS GRID
1101NORTH EASTERN REGION POWER SYSTEM IMPROVEMENT PROJECT (NERPSIP) FOR SIX (6) STATES
1102NORTHERN EXTENSION OF MUNGOLI NIRGUDA DEEP OC
1103NSCBI AIRPORT KOLKATA: RE-CONSTRUCTION OF RIGID POSITIONS OF SECONDARY RUNWAY, 'K' AND 'A' TAXIWAY AND STRENGTHENING OF ‘C’ TAXIWAY
1104NUMALIGARH REFINERY EXPANSION PROJECT 6 MMTPA REFINARY
1105NUMALIGARH REFINERY EXPANSION PROJECT COIT AND PIPELINES
1106OLD PIPE LINE REPLACEMENT (OPRP) GROUP-A
1107ONSTRUCTION OF 4-LANE FLYOVER AT AMBERPET-X ROAD, HYDERABAD ON NH-202 IN THE STATE OF TELANGANA
1108OPTICAL TRANSPORT NETWORK (OTN) PH-4 IN BSNL
1109PACHORA-JAMNER WITH EXTENSION UPTO MALKAPUR NG TO BG
1110PACHWARA SOUTH COAL BLOCK
1111PACKAGE-3A
1112PACKAGE-3B
1113PADERU BYPASS (KM 0+000 TO KM 13+000) OF 2- LANE WITH PAVED SHOULDER ON NH-516E
1114PAITHAN TO SHIRUR
1115PAKAL DUL HYDRO ELECTRIC PROJECT (1000 MW)
1116PAKYONG AIRPORT- WIDENING OF BASIC STRIP AT WESTERN SIDE OF RUNWAY CHAINAGE 80M TO 920M I/C SLOPE STABILIZATION MEASURES (BALANCE WORK) OF UPHILL AND IMPROVEMENT OF STORM WATER DRAINAGE SYSTEM AT PAKY
1117PALPHATA TO PHULAMBARI
1118PANCHARAL TO MANDANGHAR
1119PANGAON TO DHARMAPURI AND PARALI TO INJEGAON 2L+PS
1120PANGO TO JORGING ROAD PKG-1
1121PANIKHOLI-RIMOLI
1122PANVEL-INDAPUR
1123PARASCOLE JAMBAD OCP
1124PART REPLACEMENT PIPELINE PROJECT (PRPP)
1125PATHERDIH 2.5 NLW COAL WASHERY
1126PATNA METRO RAIL CORPORATION LIMITED
1127PATNA-MUZZAFFARPUR
1128PATRATU STPP-I (3X800MW)
1129PCMC NIGDI PROJECT EXTENSION OF CORRIDOR 1 OF PUNE METRO PHASE 1
1130PELMA OCP(15.00MTY)
1131PEN TO KHOPOLI
1132PENUKONDA-DHARMAVARAM, EXCL. DHARMAVARAM (41.5 KM)
1133PEREN-DIMAPUR PKG-5
1134PEREN-DIMAPUR PKG-3
1135PEREN-DIMAPUR SECTION PKG-2
1136PERMANENT CAMPUS FOR IIM BODH GAYA
1137PERMANENT RECTIFICATION OF 3 NOS. OF BLACK SPOTS IN PROJECT HIGHWAY NH-27 OF U.P BORDER - DEWAPUR - KOTWA SECTION, PERMANENT RECTIFICATION OF 5 NOS. OF BLACK SPOTS OF PROJECT HIGHWAY NH-27 OF KOTWA -
1138PERMANENT RECTIFICATION OF 4 NOS. OF BLACKSPOTS ON NH 27 OF KOTWA MEHSI MUZAFFARPUR SECTION FROM 4 NOS. OF BLACKSPOT ON NH-27 OF MUZAFFARPUR DARBHANGA PURNIA SECTION 1 NO OF AT GRADE JUNCTION REM
1139PETLAD-BHADRAN (22.5 KM)
1140PETROCHEMICAL AND LUBE INTEGRATION PROJECT AT GUJARAT REFINERY
1141PHASE-I OF CONSOLIDATION OF EXISTING CDR DATA CENTERS AND NIB-P3 DATA CENTERS WITH STATE OF THE ART DATA CENTERS (AT HYDERABAD AND PUNE AS ELABORATED IN THE TENDER DOCUMENT) WITH REPLACEMENT OF ALL TH
1142PIPELINE NETWORK PROJECT RUDRASAGAR
1143PIRPAINTI-JASIDIH
1144PKG NAME: 4L OF KATHLIGHAT TO SHAKRAL VILLAGE FROM KM 128.835 TO KM 146.300 OF NH- 5 (SHIMLA BYPASS - PKG I)
1145PLANNIN ENGINEERING SUPPLY INSTALLATION TESTING COMMISSIONING INTEGARTION and ANNUAL MAINTENANCE OF 4G MOBILE NETWORK AT 1 LAKH SITES ON PAN INDIA BASIS INCLUDING MUMBAI and DELHI LSA ON TURNKEY BA
1146POL AND LOBS INSTALLATIONS WITH RECEIPT PIPELINES AT RASAYANI
1147POLAVARAM IRRIGATION PROJECT
1148POLY BUTADIENE RUBBER PLANT AT PANIPAT
1149PORDA CHIMTAPANI OCP (10 MTY)
1150POTTANGI BAUXITE MINES
1151POWER RECOVERY TURBINE IN PFCCU
1152POWER SYSTEM UPGRADATION PROJECT
1153PRAYAGRAJ AIRPORT - CONSTRUCTION OF NEW TERMINAL BUILDING, SECOND LINK TAXI TRACK, APRON EXPANSION, AND ASSOCIATED WORKS
1154PREPATION OF FEASIBILITY/DPR OF CONSTRUCTION OF NEW 4-LANE ELEVATED ROAD FROM CHENNAI PORT TO MADURAVOYAL IN THE STATE OF TAMIL NADU
1155PROCUREMENT OF 24 F OF CABLE.
1156PROCUREMENT, AND CONSTRUCTION OF REHABILITATION AND UPGRADING TO 2 LANES/2 LANE(FOR LOT-III-KM 156.500 TO KM 219.945) WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF SITAMARHI-JAYNAGAR-NARAHIA
1157PROJECT RAJENDRA
1158PROJECT TO CONSTRUCT A FIELD GAS GATHERING STATION AT BAGHJAN AREA FOR COLLECTION,PROCESSING
1159PROJECTS- REHABILITATION AND UPGRADATION OF NH-731A FROM KM 0.00 TO KM.35.00
1160PROJECT_1 DUMMY
1161PROJECT_2 DUMMY
1162PROJECT_TRIPURA1
1163PROVISION OF DYNAMIC REACTIVE COMPENSATION AT KHAVDA POOLING STATION 1 [KPS1] AND KHAVDA POOLING STATION 3 [KPS3]
1164PRP-VIII GROUP B (NH AND BS ASSET)
1165PUNE METRO PHASE-1 EXTENSION FROM SWARGATE TO KATRAJ
1166PUNE RAIGARH DISTRICT BORDER TO MANGAON
1167PUNE-MIRAJ-LONDA (467 KM)
1168QUADRUPLING BETWEEN GANDHIDHAM - ADIPUR WITH Y CONNECTION AT ADIPUR FOR PROVIDING DIRECT ENTRY TOWARDS MUNDRA PORT AND BHUJ AND HIGH LEVEL PLATFORM AT GOPALPUR (10.69 KM)
1169R and D CAMPUS II AT FARIDABAD
1170R/U TO 2-LANE WITH PS OF BEWAR TO ALLAHGANJ SECTION OF NH-730C FROM KM.0.00 TO 52.770 UNDER GNHCP
1171RAJAHMUNDRY AIRPORT: CONSTRUCTION OF NEW DOMESTIC TERMINAL BUILDING AND MISCELLANEOUS WORKS INCLUDING MAINTENANCE, OPERATION AND AICMC
1172RAJASTHAN REFINERY PROJECT
1173RAJASTHAN REZ PH-V (PART-1: 4 GW) [SIROHI/NAGAUR] COMPLEX
1174RAJKOT-KANALUS (111.20 KM)
1175RAJNANDGAON - NAGPUR - 3RD LINE (SECR)
1176RAJRAPPA RCE OCP ( 3.0 MTY)
1177RAMGANJMUNDI-BHOPAL (NL),WCR
1178RAMMAM-III HEPP (3X40 MW)
1179RAMPUR BATURA OC (4.0 MTY)
1180RAMPUR DUMRA - TAL - RAJENDRAPUL DOUBLING INCLUDING GANGA BRIDGE
1181RANGIT IV HE PROJECT
1182RANIGANJ MASTER PLAN
1183RANIKOR- MAHESHKHOLA- BAGHMARA PKG-2
1184RATLAM-MHOW-KHANDWA-AKOLA (GC)
1185RATLE HE PROJECT
1186RAYADURGA-TUMKUR NL
1187RCE OF INDARAM OPENCAST PROJECT
1188RCE OF KAKATHIYAKHANI OC - 2 PROJECT
1189RCE OF KALYANIKHANI OPENCAST PROJECT
1190RCE OF RAMAGUNDAM OPENCAST II EXTENSION PROJECT
1191REBUILDING OF COKE OVEN BATTERY NO.4 OF DURGAPUR STEEL PLANT
1192REBUILDING OF COKE OVEN BATTERY NO.6 OF BOKARO STEEL PLANT
1193REBUILDING OF COKE OVEN BATTERY NO.7 AND 8 OF BHILAI STEEL PLANT
1194REBUILDING OF COKE OVEN BATTERY-2 ALONGWITH AUGMENTATION OF COKE HANDLING AND GAS HANDLING FACILITY AT RSP
1195RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS FROM DS. CH. 442+180 (EX. KM 448.00) TO DS. CH.485+240 (EX. KM 494.000) OF HULIYAR TO KB CROSS SECTION AND FROM KM DS. CH. 532+100 (EX.KM 533.150) TO DS
1196RECONSTRUCTION WITH GEOMETIC IMPROVEMENT OF EXISTING TWO LANE TO 2- LANE WITH PAVED SHOULDERS CONFIGURATION FROM EXISTING KM. 126.73 TO 135.075 KM.143.75 TO 163.00(PITHORAGARH-TANAKPUR PROJECT ROAD)
1197RECONSTRUCTION WITH GEOMETIC IMPROVEMENT OF SINGLE LANE TO 2- LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM. 163.00 TO KM 194.800(DESIGN CHAINAGE 160.88 TO 192.320) OF NH-125 IN THE STATE OF
1198RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM. 52.200 TO KM 92.880 OF NH-125 IN THE STATE OF UTTARAKHAND UN
1199RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM KM. 268.00 TO 300.00 OF NH-58 IN THE STATE OF UTTARAKHAND UNDER EPC MODE
1200RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM KM. 300 TO 338 OF NH-58
1201RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING 2 LANE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM KM. 300 TO 338 OF NH-58 IN THE STATE OF UTTARAKHAND UNDER EPC MODE
1202RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING SINGLE/INTERMEDIATE LANE TO 2 LANE WITH EARTHEN SHOULDER CONFIGURATION FROM EXISTING KM 16.545 TO KM 33.130 KM 41.260 TO KM 57.975 (DESIGN CH
1203RECONSTRUCTION WITH GEOMETRIC IMPROVEMENT OF EXISTING SINGLE/INTERMEDIATE LANE TO 2LANE WITH PAVED SHOULDER CONFIGURATION FROM EXISTING KM. 92.880 TO KM 121.550 (DESIGN CHAINAGE KM 91.550 TO KM 120.45
1204RECONSTRUCTION WITH GEOMETRIC IMPROVMENT OF EXISTING INTERMEDIATE LANE TO 2 LANE WITH PAVED SHOULDER CONFIGURATION FROM KM. 1.95 TO 28.600N (EXCLUDING THE STRTC H FROM KM 13.800 TO KM 18.550 OF NH-94
1205REDEVELOPMENT OF GPRA COLONY AT NAUROJI NAGAR
1206REDEVELOPMENT OF LINCH FIELD
1207REDEVELOPMENT OF SANTHAL FIELD
1208REDEVELOPMENT OF SOBHASAN COMPLEX
1209REHABILITATION / UPGRADATION TO 4 LANE WITH PAVED SHOULDER OF EXISTING SECTION IN SILLOD TOWN WITH DESIGN CH. (KM54+500 TO KM 60+679) [LENGTH=6.179 KM] SECTION OF NH 753F (AURANGABAD-JALGAON ROAD) ON
1210REHABILITATION AND UP GRADATION FROM 4 TO 8 LANING OF CHANDIKHOLE PARADIP SECTION OF NH 53 FROM KM.39.000 TO KM.60.00 (PACKAGE 3)
1211REHABILITATION AND UP GRADATION FROM 4 TO 8 LANING OF CHANDIKHOLE PARADIP SECTION OF NH 53 FROM KM 18.00 TO KM 39.00 IN THE STATE OF ODISHA ON HAM MODE (PACKAGE 2)
1212REHABILITATION AND UP GRADATION FROM 4 TO 8 LANING OF CHANDIKHOLE PARADIP SECTION OF NH 53 FROM KM.0.00 TO KM.18.00 (PACKAGE 1)
1213REHABILITATION AND UP GRADATION FROM 4 TO 8 LANING OF CHANDIKHOLE – PARADIP SECTION OF NH-53 (OLD NH – 5A) FROM KM.60.000 TO KM.76.646 (PACKAGE-4)
1214REHABILITATION AND UP GRADATION FROM KM. 121/0 TO 154/0 OF NAKAREKAL – MALLAMPALLY SECTION OF NH-365 TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF TELANGANA
1215REHABILITATION AND UP GRADATION OF 2 LANE/ 2 LANE WITH PAVED SHOULDER FROM EXISTING KM. 172.900 TO KM. 194.150 (DESIGN CHAINAGE KM. 49.300 TO KM. 70.300) ON DHARASU TO YAMUNOTRI ROAD OF NH- 134 (OLD N
1216REHABILITATION AND UP GRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER CONFIGURATION IN PURULIA (JH/WB BORDER) TO KM. 84.400 (NEAR SIMULIA JUNCTION, PURULIA) TO KM. 153.705 (NEAR CHANDIL, JUNC
1217REHABILITATION AND UP GRADATION OF SECTION FROM KM 206.00 TO KM 242.00 (NIMBUTALA TO AUSTIN CREEK) OF NH 223 (NEW NH 4) (PACKAGE IV)
1218REHABILITATION AND UP GRADATION TO 2 LANE WITH PAVED SHOULDER OF NH-703A FROM MAKHU (DESIGN CH 0 000)
1219REHABILITATION AND UP-GRADATION FOR TALERE A?? GAGANBAWDAA?? KOLHAPUR ROAD (NH-166G) STRETCHES START FROM DESIGN CH. 6.00 KM TO DESIGN CH. 11.00 KM AND DESIGN CH.19.300 KM (START OF KARUL GHAT) TO DES
1220REHABILITATION AND UP-GRADATION FROM KM. 0.000 TO KM. 40.390 OF NH-730S (MAHARAJGANJ – NICHLOUL – THUTHIBARI) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
1221REHABILITATION AND UP-GRADATION OF EXISTING 2-LANE TO 4 LANE OF DUBURI (KM 388.376) TO CHANDIKHOLE (KM 428.074) PKG-III ON EPC MODE
1222REHABILITATION AND UP-GRADATION OF EXISTING 2-LANE TO FOUR LANE FROM TALCHAR TO END OF KAMAKHYANAGAR BYPASS SECTION OF (KM. 8.844 – KM. 15.725) OF NH 23 (NEW NH – 149) AND (KM. 301.875 – KM. 335.946
1223REHABILITATION AND UP-GRADATION OF EXISTING ROAD TO 2L PS FROM END OF HAMIRPUR BYPASS (NEAR CHILBAHAL) TO BHANGBAR SECTION FROM KM. 138.295 TO KM.175.270 OF NH-88 (PKG-IV)
1224REHABILITATION AND UP-GRADATION OF JINTUR- SHIRAD SHAHAPUR SECTION KM 258.300 TO KM 306.300 [DESIGN CHAINAGE KM 0/00 (JINTUR) TO KM 48/00 (SHIRAD SHAHPUR) (LENGTH - 48.00 KM)] OF NH-752 I TO TWO LANES
1225REHABILITATION AND UP-GRADATION OF MUDKHED TO NANDED SECTION FROM KM. 372+000 TO KM 388+400 OF NH 161A I.E. NANDED-BHOKAR-HIMAYATNAGAR-KINWAT-MAHUR-ARANI ROAD (DESIGN CHAINAGE FROM KM 372+000 (MUDKHED
1226REHABILITATION AND UP-GRADATION OF ROAD FROM DESIGN KM 25.250 TO KM 36.460 (TOTAL LENGH: 11.210 KM) OF KAILASHAHAR-KURTI BRIDGE SECTION ON NH-208A TO 2-LANE WITH PAVED SHOULDER (PACKAGE-III)
1227REHABILITATION AND UP-GRADATION OF SABALKHED TO ASHTI SECTION FROM KM 37+900 TO KM 55+100 AND CHINCHPUR TO JAMKHED SECTION FROM KM 70+000 TO KM 72+922 OF NH-561 TO TWO LANE WITH PAVED SHOULDER/ FOUR L
1228REHABILITATION AND UP-GRADATION OF VALIGONDA TO THORRUR SECTION TO TWO LANE WITH PAVED SHOULDERS FROM KM 39.180 TO KM 108.300 OF NH-930P IN THE STATE OF TELANGANA ON ENGINEERING, PROCUREMENT AND CONST
1229REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION OF MAHUD SANGOLA ROAD NH 965 G 159+400 TO 161+900AND 162+400 TO 183+960 (DESIGN CHAINAGE FROM KM. 32/300 TO KM. 34/800 AND K
1230REHABILITATION AND UP-GRADATION TO 4 LANE ROAD WITH PAVED SHOULDER CONFIGURATION OF SECTION FROM UNDEWADI KADE PATHAR (CH. 102+050)- DESHMUKH CHOWK (CH. 113+400) AND DHAWAN PATIL CHOWK (BARAMATI) (CH.
1231REHABILITATION AND UP-GRADATION TO 4-LANING OF RAJAMUNDA-BARKOTE SECTION OF NH-23 (NEW NH NO. 143) (KM. 287.200 TO KM. 337.185) IN THE STATE OF ODISHA UNDER NHDP-IV
1232REHABILITATION AND UP-GRADATION TO 4L CONFIGURATION AND STRENGTHENING OF THANPURI TO PAROR SECTION FROM KM 85.135 TO KM 100.840 OF NH-154 (PKG IIC)
1233REHABILITATION AND UP-GRADATION TO TWO LANE WITH PAVED SHOULDERS FROM KM 0/0 TO 72/6 OF NH-365 (NAKREKAL TO THANAMCHERLA SECTION) IN THE STATE OF TELANGANA
1234REHABILITATION AND UPGRADATION FROM KM 51.600 TO KM 75.700 OF NH-321G (NUHKHAS TO ETAH SECTION) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
1235REHABILITATION AND UPGRADATION OF 2 LANE WITH PAVED SHOULDER FROM EXISTING KM. 195.175 TO KM. 220.000 (DESIGN CHAINAGE KM71.300 TO KM. 95.947) EXCLUDING EXISTING CHAINAGE KM 200.300 TO KM 202.400 (DES
1236REHABILITATION AND UPGRADATION OF CUTTACK ANGUL SECTION OF NH-42 (NEW NH-55) TO 4 LANE (KM. 0+400 TO KM. 60+200) IN THE STATE OF ODISHA UNDER NHDP PHASE-III ON EPC MODE, PKG-1
1237REHABILITATION AND UPGRADATION OF CUTTACK-ANGUL SECTION TO 4 LANE (KM 60.20) TO (KM 112.0) PKG II ON EPC MODE
1238REHABILITATION AND UPGRADATION OF EXISTING NH-167 FROM KM 14.900 TO KM 70.00 (DESIGN CH.14.900 TO 69.700) CHINTAKUNTA TO ADONI SECTION TO TWO LANE WITH PAVED SHOULDERS EPC MODE
1239REHABILITATION AND UPGRADATION OF EXISTING NH-565 FROM KM 425.400 TO KM 509.400 (PENCHALAKONA TO ERPEDU) TO TWO LANE WITH PAVED SHOULDER IN THE STATE OF ANDHRA PRADESH UNDER NHDP –IV THROUGH ENGINEERI
1240REHABILITATION AND UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT OF SECTION FROM START OF RABANGLA KM33.600 TO KM58.540 (PKG- IV)
1241REHABILITATION AND UPGRADATION OF JAMKHED TO SAUTADA SECTION OF NH548 D (FROM KM 195.375 TO KM 208.774, LENGTH – 13.399 KM) TO 2L +PS /4L CONFIGURATION WITH RIGID PAVEMENT IN THE STATE OF MAHARASHTRA
1242REHABILITATION AND UPGRADATION OF KARNATATKA/AP BORDER-GOOTY SECTION FROM KM 368.920 TO KM 424.225 OF NH-63(NEW NH-67) TO FOUR LANE WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS
1243REHABILITATION AND UPGRADATION OF KURWAI–MUNGAOLI–CHANDERI ROAD SECTION OF NH-346, FROM DESIGN CHAINGE 0.000 TO 81.300 KM
1244REHABILITATION AND UPGRADATION OF LB-NAGAR TO MALKAPUR SECTION TO 6-LANE MAIN CARRIAGEWAY WITH SERVICE ROADS, DRAINS CUM FOOTPATH, INCLUDING VUPS AND WIDENING OF MINOR BRIDGE & ROAD SAFETY PROVISIONS
1245REHABILITATION AND UPGRADATION OF NEW NH-544DD FROM DESIGN CHAINAGE KM 56.00 TO 102.20 OF KALYANDURG-MOLAKALMURU SECTION TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE
1246REHABILITATION AND UPGRADATION OF NH -565 FROM KM 1.00 TO 86.057 (NAKREKAL TO NAGARJUNSAGAR DAM SECTION) TO TWO-LANES WITH PAVED SHOULDERS UNDER NHDP-IV ON EPC BASIS.(HYDERABAD)
1247REHABILITATION AND UPGRADATION OF NH 216 FROM KM 3.800 TO 90.460 RAIGARH TO SARAIPALLI SECTION
1248REHABILITATION AND UPGRADATION OF NH 43 KANKER TO BEDMA SECTION KM. 130 TO 180
1249REHABILITATION AND UPGRADATION OF NH 78 FROM KM 373.505 TO 469.300 AMBIKAPUR TO PATHALGAON SECTION
1250REHABILITATION AND UPGRADATION OF NH 78 FROM KM 469.000 TO 531.000 PATTHALGAON TO KUNKURI
1251REHABILITATION AND UPGRADATION OF NH-167 FROM DESIGN KM.113.900 TO 154.479 (MALLEPALLY - HALIYA SECTION) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF TELANGANA
1252REHABILITATION AND UPGRADATION OF NH-167 FROM DESIGN KM.187.723 TO 234.434 (MIRYALAGUDA TO KODAD SECTION) TO TWO LANE WITH PAVED SHOULDERS ON EPC MODE IN THE STATE OF TELANGANA
1253REHABILITATION AND UPGRADATION OF NH-221 FROM KM 121/0 TO 165/00 (OF VIJAYAWADA-JAGDALPUR RUDRAMPUR TO SARAPAKA) (WARANGAL)
1254REHABILITATION AND UPGRADATION OF NONGSTOIN TO WAHKAJI SECTION OF PROJECT ROAD KM 0.000 TO KM 43.060 TO INTERMEDIATE LANE WITH EARTHERN SHOULDER UNDER SARDP NE PHASE A IN THE STATE OF MEGHALAYA ON EP
1255REHABILITATION AND UPGRADATION OF PARLI TO SIRSALA SECTION OF NH-361F (KM 136+700 TO 115+000) (LENGTH=21.70 KM) TO TWO LANES WITH PAVED SHOULDER /FOUR LANE CONFIGURATIONS ON EPC MODE IN THE STATE OF M
1256REHABILITATION AND UPGRADATION OF ROAD FROM KM 0.00 TO KM 18.600 OF KUMARGHAT-KAILASHAHAR SECTION
1257REHABILITATION AND UPGRADATION OF SATANA TO MANGRUL (CHANDWAD) SECTION OF NH752 G DESIGN CH: KM 64.000 TO CH: KM 101.140 TWO LANE WITH PAVED SHOULDER/FOUR LANE CONFIGURATION IN THE STATE OF MAHARASHTR
1258REHABILITATION AND UPGRADATION OF SHIRAPUR JUNCTION TO SHIVAJI CHOWK (DESIGN CHAINAGE KM. 130+00 TO KM.144+500) SECTION OF NH-561 AND BARSHI NAKA TO JARUD PHATA (DESIGN CHAINAGE KM. 49+500 TO 59+500)
1259REHABILITATION AND UPGRADATION OF SIX LANING OF BHADRAK BALESHWAR SECTION (KM 136.50) TO (KM 199.141) ON HAM.
1260REHABILITATION AND UPGRADATION OF TWO LANING OF MAHESHKHUNT - SAHARSA - PURNEA SECTION PKG - I
1261REHABILITATION AND UPGRADATION TO 2 LANE WITH PS OF RADHAITA TO PILIBHIT SECTION OF 46.130 KM
1262REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM DESIGN CHAINAGE KM 162.800 TO KM 198.18 UNDER 31 BRTF ON AKHNOOR POONCH ROAD NH 144A IN THE UT OF JAMMU AND KASHMIR UNDER PROJECT SA
1263REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 102 TO KM 134 DESIGN CHAINAGE KM 90 TO KM 116 UNDER 31 BRTF ON AKHNOOR POONCH ROAD NH 144A UNDER PROJECT SAMPA
1264REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 134.95 TO KM 166.100 (DESIGN CHAINAGE KM 116.98 TO KM 146.700) (PACKAGE-VI) UNDER 31 BRTF ON AKHNOOR-POONCH ROA
1265REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 30.000 TO KM 49.150 DESIGN CHAINAGE KM 30.000 TO KM 46.450 INCLUDING KANDI TUNNEL UNDER 31 BRTF ON AKHNOOR PO
1266REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 64.535 TO KM 85.385 (DESIGN CHAINAGE KM 55.800 TO KM 74.350) (PACKAGE-III) UNDER 31 BRTF ON AKHNOOR-POONCH ROA
1267REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 166.100 TO KM 192.98 (DESIGN CHAINAGE KM 146.700 TO KM 162.800) INCLUDING CONSTRUCTION OF BHIMBER GALI TUNNEL (TO
1268REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 49.150 TO KM 64.535 (DESIGN CHAINAGE KM 46.450 TO KM 55.800) INCLUDING CONSTRUCTION OF SUNGAL TUNNEL (TOTAL LENG
1269 REHABILITATION AND UPGRADATION TO 2 LANE WITH PS OF MIRANPUR KATRA TO RADHAITA SECTION OF NH-730C FROM KM
1270REHABILITATION AND UPGRADATION TO 2-LANE CONFIGURATION OF ASHYARI-SHRI KYARI SECTION (KM 50.000 TO KM 75.000) OF NH-707 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
1271REHABILITATION AND UPGRADATION TO 2-LANE CONFIGURATION OF HAMIRPUR-KARNOHAL SECTION (KM 141.000 TO KM 181.000) OF NH-70 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
1272REHABILITATION AND UPGRADATION TO 2-LANE CONFIGURATION OF HEWNA-ASHYARI SECTION (KM 25.000 TO KM 50.000) OF NH-707 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHC
1273REHABILITATION AND UPGRADATION TO 2-LANE CONFIGURATION OF KALWAHAN-MANDI SECTION (KM 208.950 TO KM 250.592) OF NH-70 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT WIT
1274REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION OF JIRAPUR-SUSNER-MP-RJ BORDER ROAD (FROM KM 0+000 TO KM 40+400, EXCLUDING 1.1KM LENGTH FROM KM 26.400 TO KM 27.500) AND INCL
1275REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS CONFIGURATION OF PADERU-GONDIGUDA SECTION (KM 2.400 TO KM 27.480) OF NH-516E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
1276REHABILITATION AND UPGRADATION TO 2-LANE/2-LANE WITH PAVED SHOULDERS/4-LANE CONFIGURATION OF PAONTA SAHIB-HEWNA SECTION (KM 000.000 TO KM 25.000) OF NH-707 IN THE STATE OF HIMACHAL PRADESH UNDER GN
1277REHABILITATION AND UPGRADATION TO 4L CONFIGURATION and STRENGTHENING OF SIHUNI TO RAJOL FROM KM 51.000 TO KM 72.000 OF NH-154
1278REHABILITATION AND UPGRADATION TO FOUR LANE ROAD FROM KM 70.500 TO KM 78.600 OF NH-92 UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
1279REHABILITATION AND UPGRADATION TO INTERMEDIATE LANE CONFIGURATION OF SHRI KYARI-GUMMA SECTION (KM 75.000 TO KM 94.900) OF NH-707 IN THE STATE OF HIMACHAL PRADESH UNDER GNHCP WITH THE LOAN ASSISTANCE
1280REHABILITATION AND UPGRADING FROM 2 L TO 4 L FROM BHANGBAR(NEAR RANITAL) TO KANGRA BYPASS SECTION OF NH-88 (NEW NH-303, 503) UP TO INTERSECTION WITH NH-154 (DESIGN CH. KM. 175.270 TO CH. KM. 193.400)
1281REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS (KM 40 TO KM 219.945) OF NH-104
1282REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHING OF MADHUGIRI- CHIKKABALLAPUR- MULUBAGAL SECTION (KM 343.80 TO 483.151) OF NH-234 IN THE STATE OF KARNA
1283REHABILITATION AND UPGRADING TO 2 LANES/2 LANE WITH PAVED SHOULDERS CONFIGURATION OF BIRPUR - BIHPUR SECTION ( KM 0 TO KM 106) OF NH-106 IN THE STATE OF BIHAR
1284REHABILITATION OF SECTION FROM KM 298.00 TO KM 330.662 PKG-8
1285REHABILITATION and UP-GRADATION TO 2L+PS FROM KM. 0.0 TO KM. 7.80 AND KM. 35.400 TO KM. 52.345 (DESIGN LENGTH 24.745 KM. EXCEPT BIHAR PORTION) OF NH-727B (TAMKUHIRAJ TO BIHAR BORDER and BIHAR BORDER TO M
1286REHABILITATION and UPGRADATION FROM 2 LANE TO 4 LANE OF NH STRETCH UNDER BHARATMALA PARIYOJANA FOR UNNAO-LALGANJ SECTION OF NEW NH-31 (OLD NH-232A) ON HYBRID ANNUITY MODE IN THE STATE OF UTTAR PRADESH
1287REHABILITATION, UPGRADATION AND WIDENING OF EXISTING HIGHWAY TO RIGID PAVEMENT 2 LANE WITH PAVED SHOULDER OF NH 965DD FROM LONAND A??SHIRVAL-BHOR A??MANDANGAD-PCHRAL SECTION SHINDEWADIPHATA TO VARANDAH
1288REHABILITATION/ UPGRADATION OF EXISTING HIGHWAY TO FOUR LANE STANDARDS IN KURKHEDA TOWN FROM (KM.413+257 TO KM 410+775), TWO LANE IN SHANKARPUR €“GURNULI (KM 424+00 TO KM 431+00) SECTION AND RECONSTR
1289REHABILITATION/UP GRADATION OF KARANJA “ KHERDA - MURTIZAPUR SECTION TO  4LANE+PAVED SHOULDER STANDARDS FROM DESIGN KM 74+351 TO KM 102+331 (EXCLUDING OVERLAPPING PORTION WITH SAMARUDDHI MAHAMARG FROM
1290REHABILITATION/UPGRADATION OF EXISTING HIGHWAY TO 2L+PS/4 LANE OF DHAWALI TO RAJOLI FROM DESIGN KM.149+476 TO 163+476 (EXISTING KM.150+000 TO 164+000), PANDHASALA TO MOHADONGRI FROM DESIGN KM.170+476
1291REHABITITATION AND UP GRADATION OF NONGSTOIN-RAMBRAI-KYRSHAI ROAD UP TO MEGHALAYA-ASSAM BORDER FROM KM 0.335 TO KM 34.039 TO 2-LANE UNDER NH(O) - NE IN THE STATE OF MEGHALAYA PACKAGE-1
1292RENIGUNTA - POYYA - NAIDUPETA KM 124.60 TO KM 183.4 OF NH 71 - N/04027/06001/AP
1293RENIGUNTA WADI GOOTY - BYPASS
1294REORGANISATION OF BHARATPUR OCP EXPANSION
1295REPANPALLI TO SIRONCHA
1296REPLACEMENT AND EXTENSION OF JETTY PIPELINES AT KOCHI REFINERY
1297REPLACEMENT OF CONVERTER VESSELS, TRUNNION RINGS, SUPPORT SYSTEM AND INSTALLATION OF SECONDARY EMISSION CONTROL SYSTEM FOR THREE CONVERTERS IN SMS-II AT BSP
1298REPLACEMENT OF EXISTING GRINDERS IN CRM-I & II AT BOKARO STEEL PLANT
1299REPLACEMENT OF HOT LEVELLER-1 OF PLATE MILL AT BHILAI STEEL PLANT
1300REPLACEMENT OF REMAINING 04 NOS. OF BATTERY CYCLONES WITH 04 NOS. OF ESPS IN SINTER PLANT-1 AT BSL
1301RESITEMENT OF RANCHI AND DHANBAD OLD POL DEPOT AT BOKARO
1302RESTORATION OF GAS TERMINAL, PHASE-I (PART-A), HAZIRA PLANT
1303REVAMPING OF AIR POLLUTION CONTROL SYSTEMS OF SP-1 AT DURGAPUR STEEL PLANT
1304REVAMPING OF FACILITIES AT EXISTING GUWAHATI TERMINAL, ASSAM
1305REVAMPING OF OLD SUB SYSTEM OF BLAST FURNACE 3 AT BOKARO STEEL PLANT
1306REVAMPING OF SV STATIONS, GAS TERMINAL AND KRIBHCO TERMINAL
1307REVAMPING, AUGMENTATION OF FACILITIES AT EXISTING PORT TERMINAL AT MANGALORE
1308REVISED PROJECT REPORT MAGADH EXPANSION OCP
1309RISHI BORDER- ROLEP- MENLA PKG- 3B
1310RISHIKESH - KARNAPRAYAG NEW LINE
1311ROAD_HARYANA
1312ROURKELA-BONDAMUNDA A-CABIN 5TH LINE (10 KM) (UMBRELLA WORK PB#57/2019-20/NR)
1313RPR OF HINGULA EXPANSION OCP
1314RRM FOR IMP.OFDRAUGHT
1315Rehabilitation and up gradation to 2 lane with paved shoulder configuration from existing km. 122.00 to km 147.230 NH-94
1316SAGAULI VALMIKINAGAR DOUBLING 109.7 KM
1317SAHJANWA - DOHRIGHAT
1318SAKRI-HASANPUR ROAD (NL)
1319SAMASTIPUR-DARBANGHA
1320SAMLAYA-TIMBA ROAD (53.53 KM)
1321SAMNI-JAMBUSAR (24.08 KM)
1322SANCHORE - SANTALPUR FROM KM 67.000- KM 99.000 OF NH-754K (AJ-RGBS-PACKAGE-3)
1323SANCHORE - SANTALPUR FROM KM 99.000- KM 130.073 OF NH-754K (AJ-RGBS-PACKAGE-4)
1324SAONER UG MINE I EXPANSION
1325SARSAM TO KOTHARI
1326SASTI EXPANSION OC
1327SASTI EXPANSION OC1
1328SATARA TO MHASWAD
1329SATNA - REWA (50 KM)
1330SAWAIMADHOPUR - BYPASS LINE (6.98 KM) (UMBRELLA WORK PB#57/2019-20/NR)
1331SCREENING PLANT-II, DONIMALAI
1332SCREENING PLANT-III AT KIRANDUL
1333SECOND GENERATION ETHANOL BIOREFINERY PROJECT, BATHINDA, PUNJAB
1334SECONDARY EMISSION CONTROL IN CONVERTERS OF SMS-II AT BOKARO STEEL PLANT
1335SENAPATI- IMPHAL PKG-5B
1336SETTING UP 500KTPA PROPANE DEHYDROGENATION INTEGRATED WITH POLYPROPYLENE UNIT ALONG WITH OFFSITE AND ASSOCIATED PIPELINE AT USAR MAHARASHTRA
1337SETTING UP A COMMON USER PETROLEUM TERMINAL AT JAMMU FOR RE-SITEMENT OF EXISTING DEPOTS OF PSU OMCS FROM JAMMU CITY
1338SETTING UP OF NEW RAIL FED POL FACILITY AT KAMARDANGA, ASSAM
1339SETTING UP OF PETROCHEMICAL EVACUATION MARKETING TERMINAL (PEMT) AT BARMER
1340SETTING UP PHYSICAL INFRASTRUCTURE FOR THE NATIONAL INSTITUTE OF COMMUNICATION FINANCE(NICF) AT GHITORNI NEW DELHI
1341SETTING UP POLYPROPYLENE UNIT AT KOCHI REFINERY
1342SEVOK RANGPO, NEFR
1343SEWER NETWORK SPS AND STP BEGUSARAI
1344SEWER NETWORKS SPS AND STP HAJIPUR
1345SEWERAGE SCHEME INTERCEPTION AND DIVERSION WITH STP WORKS AT MEERUT UTTAR PRADESH
1346SEWERAGE SYSTEM AND STP FOR DIGHA ZONE, PATNA
1347SEWERAGE SYSTEM AND STP FOR KANKARBAG ZONE PATNA
1348SHAHGANJ-BHATNI-PHEPHNA-INDARA, MAU-SHAHGANJ (EXCL. MAU-INDARA) PATCH DOUBLING.
1349SHAJAPUR 325MW SOLAR PV PROJECT
1350SHARDA UG
1351SHILLONG WESTERN BYPASS PACKAGE-2
1352SHIMLA KANGRA HIGHWAY
1353SHIMLA KANGRA HIGHWAY
1354SHIMOGA-SHIKARIPURA-RANEBENNUR (UMBRELLA WORK PB#23/2018-19/NR)
1355SHIRUR TO KHARDA
1356SHYAMSUNDARPUR UG INCLUDING SAPI UNIT
1357SIARMAL OCP (40.00MTY)
1358SIDULI MINE (OC AND UG)
1359SILCHAR VAIRENGTE SAIRANG ROAD PKG-1
1360SILCHAR VAIRENGTE SAIRANG ROAD PKG-2
1361SILCHAR- CHURAIBARI PKG-5
1362SILCHAR-JIRIBAM PKG-1
1363SILLOD TO FARDAPUR
1364SINGHORI DEEP OC
1365SINGRAULI SUPER THERMAL POWER PROJECT, STAGE-III (2X800 MW)
1366SIRKA OCP
1367SITARAMPUR BYE - PASS LINE (6.59 KM)
1368SIX LANE ACCESS CONTROLLED OF DELHI SAHARANPUR HIGHWAY FROM AKSHARDHAM NH 9 JUNCTION TO DELHI UP BORDER CH.0.00 TO CH. 14.750 IN THE STATE OF DELHI ON EPC MODE UNDER ECONOMIC CORRIDOR IN PHASE 1 OF BH
1369SIX LANE ACCESS CONTROLLED OF DELHI SAHARANPUR HIGHWAY FROM DELHI UP BORDER TO EPE JUNCTION CH.14.750 TO CH. 31.200 IN THE STATE OF UTTAR PRADESH ON EPC MODE UNDER ECONOMIC CORRIDOR IN PHASE 1 OF BHAR
1370SIX LANE OF PALSIT TO DANKUNI SECTION FROM 588.870 TO KM. 652.700
1371SIX LANING FROM KAPPIRIKKAD TO THALIKULAM SECTION OF NH – 66 (OLD NH-17) FROM DESIGN CH. 335+850 (EX. KM 349.260) TO DESIGN CHAINAGE 369+015 (EX. KM 382.300) IN THE STATE OF KERALA ON HYBRID ANNUITY M
1372SIX LANING FROM KODUNGALLUR TO EDAPALLY SECTION OF NH –66 (OLD NH-17) FROM DESIGN CHAINAGE 397+750 (EX. KM 411.850) TO DESIGN CHAINAGE 423+780 (EX. KM 343.330 OF NH 47: NEAR 438.600 OF NH- 17) IN THE
1373SIX LANING FROM START OF VALANCHERY BYPASS TO KAPPIRIKKAD-SECTION OF NH-66(OLD NH-17) FROM DESIGN CH-298+500 FEX.KM 304.250) TO DESIGN CH.335+850(EX.KM 349.260) IN THE STATE OF KERALA ON HYBRID ANNUIT
1374SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF NH – 66 (OLD NH-17) FROM DESIGN CH.369+015 (EX. KM 382.300) TO DESIGN CH. 397+750 (EX. KM 411.850) IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UN
1375SIX LANING OF AURANGABAD TO BIHAR - JHARKHAND BORDER (CHORDAHA) SECTION
1376SIX LANING OF BIHAR - JHARKHAND BORDER (CHORDAHA) TO GORHAR SECTION
1377SIX LANING OF CHENGALA TO NEELESHWARAM SECTION OF NH-17 (NEW NH-66) FROM CH. 56+200 (EXISTING KM 57+200) TO CH. 93+468 (EXISTING KM 95+650) TOTAL LENGTH 37.268 KM IN THE STATE OF KERALA ON HYBRID ANNU
1378SIX LANING OF HAPUR BYPASS TO MORADABAD SECTION INCLUDING HAPUR BYPASS FROM KM 50.000 (DESIGN CHAINAGE 50.000) TO KM 148.277 (DESIGN CHAINAGE 149.867) OF NH-24 (NEW NH-9)
1379SIX LANING OF KADAMBATTUKONAM TO KAZHAKKOOTTAM SECTION OF NH-66(OLD NH-47) FROM KM. 517+250 TO KM.547+080 IN THE STATE OF KERALA ON EPC MODE UNDER BHARATMALA PARIYOJANA
1380SIX LANING OF KOTTUKULANGARA (DESIGN KM. 454+500) TO START OF KOLLAM BYPASS (DESIGN KM. 486+000) SECTION OF NEW NH-66 (OLD NH-47) IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJ
1381SIX LANING OF KT/KL BORDER (THALAPPDY) TO CHENGALA SECTION OF NH17 (NEW NH-66) FROM CH. 17.200 TO CH. 57+200 IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJNA
1382SIX LANING OF NATIONAL CORRIDOR NH19 FROM PANAGARH TO PALSIT IN THE STATE OF WEST BENGAL UNDER BHARATMALA PARIYOJANA TO BE EXECUTED ON BOT TOLL BASIS
1383SIX LANING OF NEELESHWARAM TO THALIPARAMBHA SECTION FROM CH. 94+540 (EXISTING KM 96+450) TO CH. 134+650 (EXISTING KM 137+900) (TOTAL LENGTH 40.11 KM) IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UND
1384SIX LANING OF PARAVOOR(DESIGN KM. 417+000) TO KOTTUKULANGARA(DESIGN KM. 454+500) SECTION OF NEW NH-66 (OLD NH-47) IN THE STATE OF KERALA ON EPC MODE UNDER BHARATMALA PARIYOJANA
1385SIX LANING OF RAMANATTUKARA JUNCTION TO START OF VALANCHERY BYPASS SECTION OF NH-66 (OLD NH-17) FROM DESIGN CH.258+818 (EX.KM 27.840 OF KOZHIKODE BYPASS) TO DESIGN CH.298+500 (EX.KM 304.250) IN THE ST
1386SIX LANING OF START OF KOLLAM BYPASS (KM.486+000) KADAMBATTUKONAM (KM.517+250) SECTION OF NEW NH-66 (OLD NH-47) IN THE STATE OF KERALA ON HAM UNDER BHARATMALA PARIYOJANA
1387SIX LANING OF THALIPARAMBHA- MUZHAPILANGAD SECTION FROM KM 137.900 TO KM. 170.600 OF NH-17 (NEW NH-66) (PROJECT LENGTH 29.948 KM) IN THE STATE OF KERALA ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIY
1388SIX LANING OF THURAVOOR (DESIGN KM. 378+612) TO PARAVOOR (DESIGN KM.417+000) SECTION OF NEW NH-66 (OLD NH-47) IN THE STATE OF KERALA ON EPC MODE UNDER BHARATMALA PARIYOJANA
1389SIX LANING OF TUTICORIN PORT ROAD SECTION OF NH-7A (NEW NH-138) FROM KM 0.000 TO KM 6.140 [EFFECTIVE LENGTH – 5.16 KM] ON EPC MODE IN THE STATE OF TAMIL NADU ON EPC MODE
1390SIX LANNING FROM KM. 401.200 TO 494.410 OF NH-8 ON HYBRID ANNUITY MODE UNDER NHDP-V(PKG VI)REG.
1391SIX LANNING OF AUNTA-SIMARIA(GANGA BRIDGE WITH APPROACH ROADS) SECTION OF NH-31
1392SIX LANNING OF AURANGABAD TO BIHAR/JHARKHAND BORDER SECTION OF NH-19 (OLD NH-2) FROM KM. 209.827 TO 249.525 (PKG-II) IN THE STATE OF BIHAR ON EPC MODE.
1393SIX-LANING OF BARWA ADDA-PANAGARH
1394SOLAPUR-TULJAPUR-OSMANABAD (UMBRELLA WORK)
1395SOMAYAJULAPALLI – DHONE SECTION OF NH – 340B FROM KM.0/0 TO 56/200 [DESIGN CH. KM 0/00 TO KM 53/33]
1396SONENAGAR BYE PASS LINE FROM CHIRALAPOTHU TO BAGHA BISHUNPUR
1397SONEPUR BAZARI EXPANSION OC
1398SOURCING OF BAUXITE ARRANGEMENT FOR 5TH STREAM ALUMINA REFINERY FROM SOUTH BLOCK MINING LEASE OF PANCHPATMALI MINES AT DAMANJODI KORAPUT ODISHA
1399SPECIAL PROTECTION WORK ON REHABILITATION AND RESTORATION OF SLIDING AND SINKING ZONE FROM RANGPO TO RANIPOOL SECTION
1400SPUR OF MEERUT-GARH-MUKTESHWAR SECTION(NH-709A) CONNECTING NH-119 AND NH-58 BYPASSING MEERUT TOWN
1401SRIKAKULAM ANGUL PIPELINE PROJECT
1402SRIRAMPUR - DHUBRI PKG-1
1403STAND ALONE SIGNALLING TRANSFER POINT (BSNL)
1404STRENGTHENING AND WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM.106.00 TO 153.00 OF NH-218 BIJAPUR HUBLI SECTION IN THE STATE OF KARNATAKA
1405STRENGTHENING OF 2L+PS FROM KM 17/8 – 18/2, CONSTRUCTION OF 2L+PS FROM KM 18/2 TO KM 20/0 AND CONSTRUCTION OF 4L+PS FROM KM 20/0 TO KM 35/6 OF SALEM- THIRUPATHUR – VANIYAMBADI ROAD (NH 179A)
1406STRENGTHENING OF EXISTING 4L AYODHYA BYPASS SECTION FROM DESIGN KM.121.600 TO KM. 144.020 OF NH 28 (NEW NH 27) (PKG-3)
1407SUBANSIRI LOWER H.E.P (8X250 MW) (NHPC)
1408SUBHADRA OCP
1409SUNNI DAM HYDRO ELECTRIC PROJECT
1410SUPER EDGE ROUTERS FOR BSNL INTERNET PROTOCOL - MULTI PROTOCOL LEBEL SWITCHING (IPMPLS) NETWORK and 4G ROLLOUT
1411SURAT METRO RAIL PROJECT
1412SURFACE TRIANGLE LINE BETWEEN BHADURA STATION AND NEW CROSSING STN KARMA DOUBLING
1413SYL_HARYANA
1414SYSTEM STRENGTHENING AT KOPPAL-II AND GADAG-II FOR INTEGRATION OF RE GENERATION PROJECTS
1415Sagwara Bypass and Garhi- Partapur Bypass of NH-927A in the State of Rajasthan.
1416TADIPATRI BYPASS (KM 0+000 TO KM 6+285) OF 4-LANE ON NH-67 IN ANANTAPURAMU
1417TALCHER - ANGUL NEW LINE WITH Y CONNECTION AT TALCHER
1418TALCHER THERMAL POWER PROJECT STAGE III(2X660 MW)
1419TALCHER-BIMALAGARH(NL)(ECOR)
1420TAMENGLONG - MAHUR PKG-1
1421TAMENGLONG - MAHUR PKG-2
1422TAMENGLONG - MAHUR PKG-3
1423TAMENGLONG - MAHUR PKG-4
1424TAMENGLONG - MAHUR PKG-5
1425TAMENGLONG - MAHUR PKG-6
1426TAMENGLONG- MAHUR ROAD PKG-7
1427TAPOVAN-VISHNUGAD HEP (4X130MW)
1428TARAKESWAR - BISHNUPUR NEW BG LINE (NL), ER
1429TARANGA HILL ABU ROAD VIA AMBAJI NEW LINE
1430TAWA III UG MINE
1431TEESTA VI HE PROJECT
1432TEHRI PUMPED STORAGE PLANT(1000MW)
1433TEST DUMMY
1434TEST_NEW
1435TETARIAKHAR EXPANSION OCP
1436THIRD LADLE FURNACE IN SECONDARY REFINERY UNIT AT IISCO STEEL PLANT
1437THOPPUR METTUR BHAVANI ERODE SECTION OF NH 544H FOR A LENGTH OF 85 KM
1438TIDIVANAM-NAGARI (NL)
1439TIKAK EXTENSION OCP - 0.2 MTY
1440TIRAP OCP
1441TLABUNG - LUNGLEI PKG-A
1442TLABUNG - LUNGLEI PKG-B
1443TRANSMISSION NETWORK EXPANSION IN GUJARAT TO INCREASE ATC FROM ISTS: PART B
1444TRANSMISSION SCHEME FOR EVACUATION OF POWER FROM RATLE HEP (850 MW) AND KIRU (624 MW): PART B
1445TRANSMISSION SCHEME FOR INTEGRATION OF DAVANAGERE / CHITRADURGA AND BELLARY REZ IN KARNATAKA
1446TRANSMISSION SCHEME FOR SOLAR ENERGY ZONE IN ANANTHPURAM (2500MW) AND KURNOOL (1000MW)
1447TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM POTENTIAL RENEWABLE ENERGY ZONE IN KHAVDA AREA OF GUJARAT UNDER PHASE-IV [7GW] PART B [SPV NAME POWERGRID SOUTH OLPAD TRANSMISSION LIMITED]
1448TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM POTENTIAL RENEWABLE ENERGY ZONE IN KHAVDA AREA OF GUJARAT UNDER PHASE-V [8 GW] PART A [SPV NAME POWERGRID KHAVDA V-A POWER TRANSMISSION LIMITED]
1449TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH -IV [PART-2 5.5 GW] [JAISALMER/BARMER COMPLE] PART F [SPV NAME POWERGRID BARMER I TRANSMISSION LIMITED]
1450TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV (PART-4: 3.5 GW): PART A
1451TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV [PART-2 5.5GW] [JAISALMER/BARMER COMPLEX] PART H1
1452TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV [PART-3 (6 GW)] [BIKANER COMPLEX] PART B [SPV NAME POWERGRID BIKANER B POWER TRANSMISSION LIMITED]
1453TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV [PART-3 (6GW)] [BIKANER COMPLEX] PART A [SPV NAME POWERGRID BIKANER A POWER TRANSMISSION LIMITED]
1454TRANSMISSION SYSTEM FOR INTEGRATION OF KURNOOL-IV REZ PHASE-I (FOR 4.5 GW)
1455TRANSMISSION SYSTEM FOR KURNOOL WIND ENERGY ZONE SOLAR ENERGY ZONE (AP) PART-A PART B
1456TRANSMISSION SYSTEM FOR STRENGTHENING TO FACILITATE EVACUATION OF POWER FROM BHADLA/BIKANER COMPLEX
1457 TRANSMISSION SYSTEM SCHEME FOR EVACUATION OF POWER FROM REZ RAJASTHAN (8.1 GW) UNDER PHASE-II PART E
1458TRANSMISSION SYSTEM STRENGTHENING AT KURNOOL- III PS FOR INTEGRATION OF ADDITIONAL RE GENERATION PROJECTS
1459TRANSMISSION SYSTEM STRENGTHENING FOR INTERCONNECTIONS OF BHADLA-III AND BIKANER III COMPLEX [SPV NAME POWERGRID BHADLA III AND BIKANER III TRANSMISSION LIMITED]
1460TRANSMISSION SYSTEM STRENGTHENING FOR SRINAGAR-LEH TRANSMISSION SYSTEM
1461TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHAN (8.1 GW) UNDER PHASE-II PART G1
1462TRANSMISSION SYSTEM STRENGTHENING SCHEME FOR EVACUATION OF POWER FROM SOLAR ENERGY ZONES IN RAJASTHAN (8.1 GW) UNDER PHASE-II- PART G
1463TRANSMISSION SYSTEM UNDER ISTS FOR EVACUATION OF POWER FROM KUDANKULAM UNIT - 3 AND 4 (2X1000 MW)
1464TRIVANDRUM-KANYAKUMARI DOUBLING
1465TS FOR EVACUATION OF 7GW RE INJECTION AT KHAVDA PS UNDER PHASE-IV PART E4
1466TS FOR EVACUATION OF ADDITIONAL 7GW RE POWER FROM KHAVDA RE PARK UNDER PHASE-III PART B [VATAMAN TRANSMISSION LIMITED]
1467TS FOR EVACUATION OF POWER FROM 7GW REZ IN KHAVDA AREA UNDER PHASE-IV PART E2
1468TS FOR EVACUATION OF POWER FROM PAKALDUL HEP IN CHENAB VALLEY HEPS - LTA SYSTEM
1469TS FOR EVACUATION OF POWER FROM POTENTIAL RE ZONE IN KHAVDA AREA OF GUJARAT UNDER PH-IV PART E3
1470TS FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV (PART-1) [BIKANER COMPLEX] PART A [BIKANER III NEEMRANA TRANSMISSION LTD]
1471TS FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV (PART-1) [BIKANER COMPLEX] PART D [NEEMRANA II BAREILLY TRANSMISSION LTD]
1472TS FOR EVACUATION OF POWER FROM REZ IN RAJASTHAN (20GW) UNDER PH-III PART D [SIKAR KHETRI TRANSMISSION LTD]
1473TS FOR EVACUATION OF POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III, PART E1
1474TS FOR EVACUATION POWER FROM RAJASTHAN REZ PH-IV (PART-2:5.5GW) (JAISALMER/BARMER COMPLEX) PART-C
1475TS FOR EVACUATION POWER FROM RAJASTHAN REZ PH-IV (PART-2:5.5GW) (JAISALMER/BARMER COMPLEX) PART-E
1476TS FOR EVACUATION POWER FROM RAJASTHAN REZ PH-IV (PART-2:5.5GW) PART-B (JAISALMER/BARMER COMPLEX)
1477TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART B1
1478TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART C1
1479TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART E2
1480TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART H
1481TS FOR EVACUATION POWER FROM REZ IN RAJASTHAN (20GW) UNDER PHASE-III PART J
1482TS FOR EVACUATION POWER RAJASTHAN REZ PH-IV (PART-2:5.5GW) (JAISALMER/BARMER COMPLEX): PART-C
1483TS FOR INTRGRATION OF RE ZONE (PHASE II) IN KOPPAL II (PHASE A and B) AND GADAG II (PHASE A) IN KARNATAKA [KOPPAL II GADAG II TRANSMISSSION LIMITED]
1484TS FOR SOLAR ENERGY ZONE IN BIDAR (2500MW), KARNATAKA [BIDAR TRANSMISSION LTD]
1485TULUNGIA-JOGIGHOPA-PAIKAN ROAD PKG-7
1486TUMKUR - NELAMANGALA(6L)
1487TUMKUR-CHITRADURGA-DAVENGERE NL
1488TUNNEL AT KHAMBATAKI GHAT SECTION AND ITS APPROACHES FROM EXISTING KM. 771.730 TO EXISTING KM. 782.000
1489TWO / FOUR LANING OF RAEBARELI - JAGDISHPUR SECTION OF NH-330A FROM KM. 0.000 TO KM. 47.800 (DESIGN LENGTH – 46.020 KM) INCLUDING JAGDISHPUR BYPASS (3.52 KM.) IN THE STATE OF UTTAR PRADESH UNDER NH(O)
1490TWO LANING OF JORAM KOLORIANG ROAD (NH 713) ON EPC BASIS FROM DESIGN KM. 138+000 TO KM. 154+036 [EXISTING KM 138.00 TO KM 158.00] IN THE STATE OF ARUNACHAL PRADESH
1491TWO LANING WITH PS OF NAGAPATTINAM - THANJAVUR
1492TWO LANNING WITH FORMATION OF FOUR LANE OF PROPOSED SHIMLA BYPASS
1493TWO-LANING OF HAYULIANG– HAWAI BYPASS ROAD ON EPC BASIS FROM DESIGN KM. 51.825 TO KM. 63.131 EXISTING KM 45.050 OF HAYULIANG – HAWAI ROAD TO HAWAI TOWN IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-
1494TWO-LANNING WITH PAVED SHOULDER OF MAHSHKUNT-SAHARSA-PURNEA SECTION FROM EXISTING KM.89.020 (DESIGN CHAINAGE 90.000) TO EXISTING KM 179.470 ) PKG-II
1495UCE OF EPR OF NORTH URIMARI OCP
1496UCE OF PARASEA BELBAID REORGANISATION UG
1497UCE OF TILABONI UG
1498UDAIPUR AIRPORT- CONSTRUCTION OF NEW INTEGRATED PASSENGER TERMINAL BUILDING
1499UKHRUL TOLOI TADUBI PKG-2
1500UKNI DEEP OC
1501UMARIYA TO SHAHDOL SECTION OF NH-78 IN MADYA PRADESH KM 68/4 TO 142/200
1502UP GRADATION OF NH 130C ABHANPUR TO PAUND FROM NK KM 0.000 TO KM. 40.380 TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF CHHATTISGARH ON EPC
1503UP GRADATION OF NH 930 SHERPAR TO KOHKA FROM KM 67.880 TO KM 114.860 TO TWO LANE WITH PAVED SHOULDER IN THE STATE OF CHHATTISGARH CONFIGURATION UNDER ENGINEER PROCUREMENT CONSTRUCTION EPC MODE.
1504UP-GRADATION OF BLAST FURNACE NO. 3 AT DURGAPUR STEEL PLANT
1505UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FROM CHARBHUJA AT DESIGN KM 0.00 (EXISTING KM 150.00) TO NEECHLI ODEN (NATHDWARA) AT DESIGN CH. KM 88.800 (EXISTING KM 55.950) OF NH-162E ON EPC MODE.
1506UP-GRADATION TO 2-LANE WITH PAVED SHOULDER FROM KM 12.850 TO KM20.300 OF 7.450KM LENGTH ON GOHA-KHELLANI SECTION AND A LINK ROAD TO GOHA VILLAGE OF 2.016 KM ON NH-244 (PACKAGE I)
1507UP-GRADATION TO 2-LANE WITH PAVED SHOULDER FROM KM 20.300 TO KM 29.030 OF 8.730 KM LENGTH ON GOHA-KHELLANI SECTION ON NH-244 (PACKAGE II)
1508UP-GRADATION TO 2-LANE WITH PAVED SHOULDERS OF NGOPA - PAWLRANG SECTION OF NH 102B OF AIZAWL - IMPHAL ECONOMIC CORRIDOR FROM EXISTING CHAINAGE KM 32.796 TO KM 72.030 [DESIGN CHAINAGE KM 31.280 TO KM 6
1509UP-GRADATION TO 4 LANE CONFIGURATION FOR THE WORK OF PETH NAKA TO SANGLI ROAD, NH-166H, FROM KM 0+000 TO KM 41+250 (DESIGN LENGTH = 41.25 KM) IN THE STATE OF MAHARASHTRA ON EPC MODE.
1510UP-GRADATION TO 4 LANING OF DAULTABAD T-POINT TO MALIWADA [FROM DESIGN KM.0.000 TO KM 4.000] AND UPGRADATION TO 2 LANE WITH PAVED SHOULDERS CONFIGURATION OF DEVGAON RANGARI TO SHIVOOR [FROM DESIGN KM
1511UP-GRADATION TO 4-LANE WITH PAVED SHOULDER OF BHIMASAR JUNCTION OF NH-41 TO ANJAR BHUJ UPTO AIRPORT JUNCTION FROM KM. 0.000 TO KM. 65.478 OF NH-341 TO BE EXECUTED ON HYBRID ANNUITY MODE IN THE STATE O
1512UP-GRADATION TO 4-LANE WITH PAVED SHOULDER OF JAMMU-AKHNOOR ROAD SECTION OF NH-144A FROM GANESH VIHAR (KM 6.000) TO KHATI CHOWK (KM 26.350) OF 20.35 KM LENGTH IN THE STATE OF JAMMU AND KASHMIR TO BE E
1513UP-GRADATION TO FOUR LANE/ TWO LANE WITH PAVED SHOULDERS CONFIGURATION OF KALYAN - MURBAD - MALSHEJ GHAT - NIRMAL ROAD NH- 61 KM 15/200 TO KM 38/00 AND FROM KM. 58/00 TO KM 84/00 (DESIGN LENGTH = 48.5
1514UP-GRADATION TO TWO LANE WITH PAVED SHOULDER CONFIGURATION OF NH-354 SECTION ARIFKES-FEROZEPUR-MUKTSAR-MALAUT FROM KM 201.500 TO KM 212.500 & KM 229.690 TO KM 269.960 AND STRENGTHENING OF EXISTING PAV
1515UPGRADATIOBN AND REHABILITATION OF SECTION OF NH 361 F FROM PARLI (00/000) TO GANGAKHED (30/400) TO TWO LANES WITH PAVED SHOULDER / FOUR LANE CONFIGURATIONS ON EPC MODE IN THE STATE OF MAHARASHTRA.
1516UPGRADATION 2/4 LANE NH CONNECTIVITY UNDER SAGARMALA SCHEME SH 2 HAVERI YEKAMBI SH 69 YEKAMBI KUMTA BELEKERE UNDER STATE OF KARNATAKA
1517UPGRADATION AND 4L OF HARIDWAR BYPASS FROM KM 0.000 (KM 188.100 OF NH-58) TO KM. 15.100 (KM 5.100 OF NH 74) (PKG-1)
1518UPGRADATION AND STRENGTHENING TO 2 LANE PS FROM KM 95/500 TO KM 129/775 OF NH 168 G IDAR BHILODA SAMLAJI IN THE STATE OF GUJARAT
1519UPGRADATION AND WIDENING OF BILASPUR TO MUNGELI SECTION NH-130A
1520UPGRADATION OF ADHALGAON-JAMKHED SECTION OF NH-548 D FROM KM 132/600 TO KM 195/375 TO TWO LANE WITH PAVED SHOULDER/FOUR LANE STANDARDS ON EPC MODE IN THE STATE OF MAHARASHTRA.
1521UPGRADATION OF DHORAJI JAMKANDORNA KALAVAD SECTION OF NH 927D FROM DESIGN CHAINAGE KM 00 TO KM 58.115 TO TWO LANE WITH PS CONFIGURATION IN THE STATE OF GUJARAT ON EPC
1522UPGRADATION OF DINDORI-SAGARTOLA-KABICHABUTRA (MP-CG BORDER) SECTION OF NH -45 FROM KM 0+00(DESIGN) TO KM 77.00 (DESIGN) TO TWO LANE WITH PAVED SHOULDER CONFIGRATION ALONG WITH ONE TIME IMPROVEMENT IN
1523UPGRADATION OF EXHISTING 2 LANE FLEXIBLE PAVEMENT TO 2 LANE PAVED SHOULDERS RIGID PAVEMENT FROM DESIGN CHAINAGE KM 66.00 TO DESIGN KM 82.440 (START OF KOLHAPUR MUNICIPAL CORPORATION NEAR PHULEWADI TO
1524UPGRADATION OF EXISTING 4 LANE ISMAILABAD-AMBALA SECTION (KM. 0+000 TO KM 42+500) (PART OF AMBALA-KOTPUTLI CORRIDOR) TO 4-LANE ACCESS CONTROLLED STRETCH BY PROVIDING GRADE SEPARATED STRUCTURES AND SER
1525UPGRADATION OF FACILITIES OF NUMALIGARH-SILIGURI PRODUCT PIPELINE (NSPL) FOR TRANSPORTATION OF ADDITIONAL PRODUCTS FROM EXISTING 1.72 MMTPA TO 5.5 MMTPA
1526UPGRADATION OF NASRULLAGANI-REHTI-BUDHNI SCCTION TO 2-LANE WITH PAVED SHOULDER FROM KM 0+150 TO KM 50+500 OF NH-146B IN THE STATE OF MADHYA PRADESH ON EPC MODE.
1527UPGRADATION OF NH 130A MUNGELI TO PONDI FROM NH KM. 51.600 TO KM. 77.870 KM. 80.970 TO 96.970 TO 2 LANE WITH PAVED SHOULDERS IN THE STATE OF CHHATTISGARH ON EPC MODE
1528UPGRADATION OF NH-81 WITH A MINIMUM OF 2-LANE WITH PAVED SHOULDER CONFIGURATION STARTING FROM KM 19.205 TO KM 46.550 IN THE DISTRICT OF MALDA INCLUDING COST OF LAND ACQUISITION, ON EPC MODE IN THE STA
1529UPGRADATION OF TWO LANE PAVED SHOULDER FROM SHAHPURA TO THANAGAZI OF NH-248A ON EPC MODE IN THE STATE OF RAJASTHAN.
1530UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM NEECHLI ODEN (NATHDWARA) AT DESIGN KM 88.800 TO BHATEWAR AT DESIGN KM 142.028 OF NH 162E IN THE STATE OF RAJASTHAN ON EPC MODE
1531UPGRADATION TO 2 LANE WITH PAVED SHOULDER OF HANUMANGARH TO KENCHIYAN OF NH 54 ON EPC MODE IN THE STATE OF RAJASTHAN
1532UPGRADATION TO 4L PS DIVIDED CARRIAGEWAY FROM PATAN (NEAR RAJPUR) TO GOJARIYA FROM KM 52.000 TO KM 128.940 OF NH-68
1533UPGRADATION TO TWO LANE PAVED SHOULDER OF KOTHUN-LALSOT-KAROLI-DHOLPUR ROAD NH-23 (OLD NH-11B) IN THE STATE OF RAJASTHAN.
1534UPGRADATION TO TWO LANE WITH PAVED SHULDER CONFIGUARATION FROM KM 00 TO 47 OF NH 351 MAHUVA TO BADHADA SECTION IN THE STATE OF GUJARAT
1535UPGRADATION and WIDENING OF JHARKHEDA- BERASIA - DHOLKHEDI FROM DESIGN KM 0+000 TO KM 87+900 (DESIGN LENGTH 87.90KM) OF NH-346 (INCLUDING 3 NOS. BYPASSES OF 13.10 KM) IN THE STATE OF MADHYA PRADESH UN
1536URDHAN OC
1537UTKAL D AND E COAL BLOCK
1538VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XI) [KM. 77.000 TO KM. 103.400] (GANJAD - TALSARI)
1539VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XII) [KM. 50.700 TO KM. 77.000] (MASVAN - GANJAD)
1540VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XIII) [KM. 26.582 TO KM. 50.700] (SHIRSAD - MASVAN)
1541VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XIV) [KM. 3.000 TO KM. 20.200 OF SPUR] (SHIRSAD - AKLOLI)
1542VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XV) [KM. 20.200 TO KM. 43.000 OF SPUR] (AKLOLI - AMNE)
1543VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XVI) [KM. 43.000 TO KM. 69.800 OF SPUR] (AMNE - BHOJ)
1544VADODARA MUMBAI EXPRESSWAY (PHASE II - PKG XVII) [KM. 69.800 TO KM. 79.783 OF SPUR] (BHOJ - MORBE)
1545VARANASI RING ROAD (PKG-II) CONNECTING SANDAHA VILLAGE (KM 11.70 / NH-29) WITH REVASA VILLAGE (KM 818.80 / NH-2)
1546VARANASI-AURANGABAD KM.786 TO KM.978.40
1547VARANASI: DEVELOPMENT OF LAL BAHADUR SHASTRI INTERNATIONAL AIRPORT, VARANASI.
1548VENKATESH KHANI COAL MINE
1549VIJAPUR-AMBLIYASAN (41.53 KM)
1550VIJAYAWADA KAZIPET BYEPASS LINE
1551VIJAYAWADA-GUDUR
1552VISAKHA RAIPUR PIPELINE PROJECT
1553VISHNUGAD PIPALKOTI HYDRO ELECTRIC PROJECT
1554VISHNUPURI UG TO OC
1555VITA TO NAGAJ
1556VIZIANAGARAM -SAMABALPUR 3RD LINE
1557VODAREVU-CHILAKALURIPET SECTION (DESIGN CHAINAGE 0+00 TO 47+000) OF NH-167A (PACKAGE-I)
1558WADI TO ASOLA
1559WADSA-GADHCHIROLI NEW LINE (52.36 KM)
1560WAGHODA UG
1561WARDHA - NAGPUR - 4TH LINE (76 KM)
1562WARDHA-BALHARSHAH - 3RD LINE (132 KM)
1563WARDHA-NANDED MAHARASHTRA
1564WARDHA-SEWAGRAM NGP 3RD LINE
1565WATER_HARYANA
1566WEST BENGAL
1567WESTERN DEDICATED FREIGHT CORRIDOR
1568WESTERN REGION EXPANSION SCHEME XXV
1569WIDEINING TO TWO/FOUR LANE WITH PAVED SHOULDERS FROM EXISTING KM 180.60 TO KM 223.00 OF NH-63 ON NIZAMABAD-JAGADALPUR ROAD IN THE STATE OF TELANGANA
1570WIDEINING TO TWO/FOUR LANE WITH PAVED SHOULDERS FROM EXISTING KM 182.120 TO KM 227.600 OF NH-167 ON HAGGIRI-JADCHERLA ROAD IN THE STATE OF TELANGANA
1571WIDENING FROM 2L+PS TO 4L/4L+PS AND IMPROVEMENTS THE SELECTED STRETHCES FROM KM 26/5 - 81/2 INCLUDING CD WORKS OF NH 81 (COIMBATORE – CHIDAMBARAM)(OLD NH-67) (NAGAPATTINAM-TRICHY-COIMBATORE-GUDALUR
1572WIDENING 2 LANE TO 4-LANE FROM KM 92/320 TO KM 115/320 (VAV CHOKDI-SATLASANA TO TO VRUNDAVAN CHOKDI, KHERALU) ON NH-58 IN THE STATE OF GUJARAT.
1573WIDENING AND IMPROVEMENT OF EXISTING CARRIAGE WAY TO 2 LANE WITH PAVED SHOULDERS FROM KM. 86/160 TO 131/730 OF JANGAON-DUDDEDA SECTION OF NH-365B IN THE STATE OF TELANGANA ON EPC MODE
1574WIDENING AND PAVED SHOULDER OF TOHANA (IN HARYANA) PUNJAB/HARYANA BORDER TO MOONAK-JAKHAL-BUDHLADA-BHIKHI FROM KM 236.600 TO 287.710 OF NH-148B
1575WIDENING AND STRENGTHENING FROM DESIGN KM. 67.280 TO KM. 88.622 OF NH-727A (SALEMPUR-MAIRWA ROAD) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UTTAR PRADESH
1576WIDENING AND STRENGTHENING FROM KM 0.00 TO KM 15.089 OF NH-334A (PURKAJI-LAKSAR-HARIDWAR ROAD) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION UNDER EPC MODE IN THE STATE OF UP.
1577WIDENING AND STRENGTHENING OF EXISTING 2 LANE WITH PAVED SHOULDER TO 4 LANE WITH PAVED SHOULDER FROM KM 150/0 TO 159/0 AND KM 165/4 TO 186/0 OF NH-163 (OLD NH-202) UNDER NH(O)-TSP FOR THE YEAR 2020
1578WIDENING AND STRENGTHENING OF EXISTING 2-LANE TO 2-LANE WITH PAVED SHOULDERS FROM KM.159/0 TO 165/4 AND 186/0 TO 215/0 OF NH-163 ON EPC MODE IN THE STATE OF TELANGANA
1579WIDENING AND STRENGTHENING OF EXISTING CARRIAGEWAY IN 2 LANE WITH PAVED SHOULDERS FROM KM.25/0 TO 59/2 (DESIGN CH. KM.25.467 TO 59.200) OF NH-353C ON EPC MODE IN THE STATE OF TELANGANA
1580WIDENING AND STRENGTHENING OF EXISTING PAVEEMNT TO TWO LANE WITH PAVED SHOULDERS FROM KM 116.00 TO KM 176.355 OF NH-75E IN THE STATE OF JHARKHAND ON EPC MODE.
1581WIDENING AND STRENGTHENING OF RAFIABAD-KUPWARA-CHOWKIBAL-TANGDHAR-CHAMKOT (NH-701) ROAD FROM DESIGN CH. FROM 0+000 TO 51+000 TO TWO LANES WITH PAVED SHOULDERS UNDER PROJECT BEACON IN THE UT OF JAMMU &
1582WIDENING AND STRENGTHENING OF SECTION FROM BHARTHANA CHOWK TO KODARKOOT (KM. 0.00 TO KM. 40.00) OF NH-91A ON EPC MODE
1583WIDENING AND STRENGTHENING TO 2/4 LANE WITH PAVED SHOULDERS OF MAHABUBNAGAR – CHINCHOLI SECTION FROM KM 0/0 TO KM 60/255 OF NH-167N IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE(PACK
1584WIDENING AND STRENGTHENING TO 2L+PS INCLUDING LA OF KANDARPUR-BALIKUDA FROM KM 277/500 TO 318/970 OF NH-55 IN THE STATE OF ODISHA UNDER ANNUAL PLAN 2021-22.
1585WIDENING AND STRENGTHENING TO 4 LANE / 2-LANE WITH PAVED SHOULDERS OF MAHABUBNAGAR-CHINCHOLI SECTION FROM KM 60/255 TO KM 102/834 OF NH-167N IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC
1586WIDENING AND STRENGTHENING TO 4L+PS/2L+PS FROM KM 0.000 TO 35.800 (KUAKHIA - MANGALPUR SECTION) OF NH 20 IN THE STATE OF ODISHA ON ANNUAL PLAN 2021-22."
1587WIDENING AND STRENGTHENING TO TWO LANE WITH PAVED SHOULDER/TWO LANE+ PAVED SHOULDER WITH SERVICE ROAD FROM KM 98+000 TO KM 176+310 OF NH-320G IN THE STATE OF JHARKHAND UNDER EPC MODE
1588WIDENING AND STRENGTHENING/ RECONSTRUCTION OF EXISTING PAVEMENT TO FOUR ALNE WITH PAVED SHOULDERS FROM KM 266.348 TO KM 283.000 OF MAHABUBNAGAR-JADCHERLA SECTION OF NH-167 ON EPC MODE IN THE STATE OF
1589WIDENING AND STRENGTHENING/RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDER/ TWO LANE WITH PAVED SHOULDERS WITH SERVICE ROAD FROM KM 0+000 TO KM 42+250 (EXCLUDING DESIGN CH. 03+220 TO 04+200 & 28+350 TO
1590WIDENING AND STRENGTHENLNG TO 2L+PS FROM KM 0.000 TO 40.000 (DHAUGAON- PODAMARI SECTION) OF NH 326 IN THE STATE OF ODISHA UNDER ANNUAL PLAN 2021.22.
1591WIDENING AND STRENTHENING FROM KM 70.15 TO KM 121.025 OF NH-80
1592WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 125.00 TO KM 166.00 (PACKAGE-3) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
1593WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 166.00 TO KM 208.00 (PACKAGE-4) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON
1594WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 208.00 TO KM 250.00 (PACKAGE-5) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
1595WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 250.00 TO KM 298.00 (PACKAGE-6) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
1596WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 298.00 TO KM 339.00 (PACKAGE-7) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
1597WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 339.00 TO KM 380.00 (PACKAGE-8) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON E
1598WIDENING AND UP-GRADATION TO 2-LANE WITH PAVED SHOULDER CONFIGURATION AND GEOMETRIC IMPROVEMENTS FROM KM 8.00 TO KM 65.00 (PACKAGE-1) ON AIZAWL-TUIPANG SECTION OF NH-54 IN THE STATE OF MIZORAM ON EPC
1599WIDENING AND UPGRADATION TO FOUR LANE CONFIGURATION FROM KM.34.900 (BHADOHI) TO KM.73.134 (JAUNPUR) OF NH-135A ON EPC MODE
1600WIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN THE STATE OF ASSAM STARTING FROM KM 116.480 NEAR HANGRUM TO KM 136.500 NEAR HEJAICHAK (PACKAGE-8)
1601WIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN THE STATE OF ASSAM STARTING FROM KM 136.500 NEAR HEJAICHAK TO KM 156.489 NEAR P. LEIKUL (PACKAGE-9)
1602WIDENING AND UPGRADATION TO TWO LANES WITH PAVED SHOULDERS ROAD FROM TAMENGLONG TO MAHUR (NH-137) IN THE STATE OF ASSAM STARTING FROM KM 156.489 NEAR P. LEIKUL TO KM 176.410 NEAR BOROWAPU (PACKAGE-10)
1603WIDENING OF EXISTING SINGLE LANE / INTERMEDIATE LANE ROAD TO 2 LANE FROM KM 101 TO KM 125 OF NH 61 IN THE STATE OF NAGALAND
1604WIDENING OF EXISTING SINGLE LANE ROAD TO INTERMEDIATE LANE ROAD FROM MOKOKCHUNG TO CHARE VIA DIKHU IN THE STATE OF NAGALAND
1605WIDENING OF EXISTING SINGLE LANE ROAD TO TWO LANE WITH PAVED SHOULDERS CONFIGURATION FROM KM. 235.000 TO KM. 268.000 OF NH-58 INCLUDING 600M MARINE DRIVE VIADUCT PORTION NEAR BYASI
1606WIDENING OF PACHPADRA-BAGUNDI SECTION TO 4 LANE FROM KM 73/60 TO 95/70 OF NH-25 ON EPC MODE IN THE STATE OF RAJASTHAN.
1607WIDENING TO 2 LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-I (DESIGN CHAINAGE 0+000 KM TO 34+795 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE
1608WIDENING TO 2 LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-II (DESIGN CHAINAGE 34+795 KM TO 69+875 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (0)-NE
1609WIDENING TO 2 LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-III (DESIGN CHAINAGE 69+875 KM TO 106+816 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE
1610WIDENING TO 2 LANE WITH PAVED SHOULDERS AND GEOMETRIC IMPROVEMENT OF NH-114A FROM KM 141 TO KM 184 IN THE STATE OF JHARKHAND UNDER EPC MODE
1611WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM DESIGN KM 103.200 (EXISTING KM 103.200) TO DESIGN KM 116.700 (EXISTING KM 118.470) ON AP/KNT BORDER TO SIRA SECTION OF NH 544E IN THE STATE OF KARNATAKAON
1612WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM DESIGN KM 103.200 (EXISTING KM 103.200) TO DESIGN KM 116.700 (EXISTING KM 118.470) ON AP/KNT BORDER TO SIRA SECTION OF NH544E IN THE STATE OF KARNATAKA ON
1613WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM KM 0 TO 54 OF NH-50 UNDER EPC MODE IN THE STATE OF KARNATAKA
1614WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM KM 116.800 TO 149.070(DESIGN CHANGES) ON HOSADURGA HOLALKERE SECTION OF NH173 IN THE STATE OF KARNATAKA ON EPC MODE UNDER ANNUAL PLAN 2021-22 (JOB NO. NH1
1615WIDENING TO 2 LANE WITH PAVED SHOULDERS FROM KM 34.00 TO 70.900 OF NH-150 UNDER EPC MODE IN THE STATE OF KARNATAKA
1616WIDENING TO 2 LANE WITH PAVED SHOULDERS OF SIDDIPET-ELKATHURTHY SECTION FROM KM 69/978 TO KM 133/619 OF NH-765DG IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE
1617WIDENING TO 2 LANE WITH PAVED SHOULDERS OF MEDAK - SIDDIPET SECTION FROM KM 0/0 TO KM 69/978 OF NH-765DG IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE
1618WIDENING TO 2 LANE, RE-ALIGNMENT AND GEOMETRIC IMPROVEMENT FROM KM 11/00 TO KM 114/618 OF NH-44A IN MIZORAM UNDER PHASE A OF SARDP-NE
1619WIDENING TO 2 LANES WITH PAVED SHOULDERS FROM KM 24.400 TO 27.270, 40.500 TO 41.900, 84.300 TO 88.200, 105.250 TO 112.710, 161.550 TO 166.350, 174.120 TO 176.120 AND 186.550 TO 191.900 OF NH 766C IN T
1620WIDENING TO 2 LANES WITH PAVED SHOULDERS FROM KM.87/000 TO 133/720 (NATTUKAL TO THANAU JN. IN PALAKKAD) OF NH-966 (OLD NH-213) ON EPC MODE BASIS UNDER NH(O) ANNUAL PLAN 2016-17 IN THE STATE OF KERALA
1621WIDENING TO 2-LANE WIH PAVED SHOULDER FROM KM. 544.20 TO 594.00 (HOSAMANE CROSS TO PANDAVAPURA) SECTION OF NH 150A
1622WIDENING TO 2-LANE WITH GEOMETRIC IMPROVEMENTS OF TURA DALU ROAD UNDER JICA FUNDING FROM KM 85.000 TO 95.000 101.000 TO 145.000 TO 2-LANES WITH PAVED SHOULDER OF TURA–DALU SECTION OF NH-51 IN THE ST
1623WIDENING TO 2-LANE WITH PAVED SHOULDER FROM KM 0.00 TO 44.00 (KURU-GHAGHRA SECTION) OF NH-143A INCLUDING RE-CONSTRUCTION OF CULVERTS AND BRIDGES.
1624WIDENING TO 2-LANE WITH PAVED SHOULDERS FROM KM 119/017 TO KM 161/300 ON NH 85 (OLD NH 49)
1625WIDENING TO 2L+PS FROM KM 71.00 TO 104.00 (EXISTING CHAINAGES) (SARJAPUR TO PATTADKALLU) ON BHANAPUR TO GADDANAKERI SECTION NH-367 IN THE STATE OF KARNATAKA
1626WIDENING TO 2LPS FROM 0/0 TO 119/0 OF NH-157 IN THE STATE OF ODISHA.
1627WIDENING TO 2LPS FROM 239/9 TO 294/3 OF NH-57 (NAYAGARH TO KHURDA) IN THE STATE OF ODISHA
1628WIDENING TO 2LPS FROM 269/30 TO 328/20 OF NH-49 IN THE STATE OF ODISHA
1629WIDENING TO 2LPS OF RAMPACHODAVARAM - KOYYURU SECTION OF NH516E FROM KM.43.700 TO KM 113.820
1630WIDENING TO 4 LANE FROM KM 51.60 TO 76.20 (HEBRI TO PARKALA) AND FROM KM 85.20 TO 88.90 (KARAVALI JUNCTION TO MALPE) OF THIRTHAHALLI UDUPI-MALPE SECTION OF NH169A IN THE STATE OF KARNATAKA ON EPC MODE
1631WIDENING TO 4 LANE FROM KM. 133.00 TO 158.04 (DESIGN CHAINAGE KM. 130.88 TO 155.145) (SHIRUR CROSS TO GADDANKERI) OF NH367 IN THE STATE OF KARNATAKA ON EPC MODE. (JOB NO. NH367 KNT 2021 22 930)
1632WIDENING TO 4L FROM KM.108.50 TO 139.00 OF NH-135A PKG-II (JAUNPUR TO AKBARPUR SECTION) ON HAM IN THE STATE OF UTTAR PRADESH
1633WIDENING TO 4L RIGID PAVEMENT CONFIGURATION FROM KM 90.00 TO KM 100.800 OF NH-96 (KM 42.O TO KM 53.300 AS PER NEW NH-330), UNDER EPC MODE
1634WIDENING TO 4L/4L+PS AND STRENGTHENING IN SELECTED STRETCHES FROM KM 0/8 TO 50/570 OF NH 532 INCLUDING CENTRE MEDIAN IN SELECTED STRETCHES, CONSTRUCTION OF CD WORKS, WIDENING AND RECONSTRUCTION OF CD
1635WIDENING TO 6L OF EXISTING 4L JETPUR - GONDAL - RAJKOT SECTION FROM KM. 117.600 TO KM. 185.00 ON NH-27
1636WIDENING TO EXISTING 2 LANE WITH PAVED SHOULDER TO 4 LANE WITH PAVED SHOULDER FROM DESIGN KM 153.00 TO 168.27 (MALA GATE TO KARKALA) OF NH 169 ON SHIMOGA - MANGALORE SECTION IN THE STATE OF KARNATAKA
1637WIDENING TO EXISTING SINGLE LANE /INTERMEDIATE LANE TO 2 LANE FROM KM185.00 TO KM 220.00 OF NH-61 (NEW NH-02) IN THE STATE OF NAGALAND.
1638WIDENING TO EXISTING SINGRE/INTERMEDIATE RANE TO 2 LANE FROM KM 135 TO KM 147 AND FROM KM 156.00 TO KM 168 OF NH-61 (NEW NH-2) IN THE STATE OF NAGALAND
1639WIDENING TO FOUR LANE WITH PAVED SHOULDER FROM DESIGN KM.49.200 TO KM.89.285 OF NH-731B ON EPC MODE IN THE STATE OF UTTAR PRADESH
1640WIDENING TO INTERMEDIATE/TWO LANE TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHANAGES KM 112.750 TO 142.00 (LIINGASUR TO MUDABAL CROSS) & FROM KM. 147.070 TO KM. 149.070 (MASKI CITY LIMIT) OF JEWARGI
1641WIDENING TO TWO LANE WITH PAVED SHOULDER FROM KM 194.900 TO KM 243.200 OF NH-234 BANAVARA-HULIYAR SECTION IN KARNATAKA STATE UNDER EPC MODE’’.(JOB NO. NH-234-KNT-2017-18-870)
1642WIDENING TO TWO LANE WITH PAVED SHOULDER FROM KM 4.40 TO KM 56.00 OF NH-218 BIJAPURA-HUBLI SECTION UNDER EPC MODE IN THE STATE OF KARNATAKA (JOB NO.NH-218-KNT-2016-17-836)
1643WIDENING TO TWO LANE WITH PAVED SHOULDER FROM KM 544.200 TO KM 594.000 OF NH-150A HOSMANE CROSS – PANDAVAPURASECTION ON EPC MODE IN THE STATE OF KARNATAKA(JOB NO.NH-150A-KNT-2016-17-835).
1644WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM 24.600 TO 70.063 OF MUDIGERE TO KADUR SECTION OF NH-173” ON EPC MODE IN THE STATE OF KARNATAKA (JOB.NO.NH-173-KNT-2017-18-873)
1645WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 0.00 (DESIGN CHAINAGE 0.00) TO KM 23.338 (DESIGN CHAINAGE 23+310) OF NH-166E (MH/KNT BORDER- KANAMADI- BIJJARGI- TIKOTA SECTION) IN THE STATE OF KARNA
1646WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 0/000 TO KM 79/300 OF KALWAKURTHY - KOLLAPUR SECTION OF NH-167K IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE UNDER NH(O)
1647WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 0/970 TO KM 40/410 OF JANAGAON-THIRUMALAGIRI OF NH-365B (ERSTWHILE SECTION OF SH-16) IN THE STATE OF TELANGANA
1648WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 15.525 TO KM 62.880 OF JADCHERLA-KALWAKURTHY SECTION OF NH-167 (ERSTWHILE SH-18) IN THE STATE OF TELANGANA
1649WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 20.150 TO KM 40.00 OF BC ROAD KOTTIGEHARA SECTION OF NH-234 ON EPC MODE IN THE STATE OF KARNATAKA (JOB.NO.NH-234-KNT-2017-18-875)
1650WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 40.00 TO KM 75.00 (EXISTING CHAINAGES) OF MANGALORE - TUMKUR SECTION OF NH-73 IN THE STATE OF KARNATAKA ON EPC MODE UNDER ANNUAL PLAN 2021-22 (JOB NO
1651WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 40/410 TO KM 84/037OF THIRUMALAGIRI TO SURYAPET SECTION OF NH-365B (ERSTWHILE SECTION OF SH-16) IN THE STATE OF TELANGANA
1652WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 67.00 TO 114.425 OF KALWAKURTHY-MALLEPALLY SECTION OF NH-167 (ERSTWHILE SH-18) IN THE STATE OF TELANGANA
1653WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM. 33.13 TO KM. 40.23 AND KM. 52.00 TO KM. 71.00 (EXISTING CHAINAGES) OF BHANAPUR GADDANKERI SECTION OF NH367
1654WIDENING TO TWO LANE WITH PAVED SHOULDERS OF 'BODHAN BASAR BHAINSA ' SECTION FROM KM 38/900 TO 95/300 OF NH-161BB IN THE STATE OF TELANGANA UNDER ANNUAL PLAN 2021-22 ON EPC MODE UNDER NH ( O).
1655WIDENING TWO LANE WITH PAVED SHOULDERS FROM FROM KM.56.00 TO 106.00 OF NH-218 (218-KNT-2014-15-775) EPC
1656WIDENING and STRENTHENING FROM KM132.895 TO KM 190.15 NH-80
1657WIDENING/DEVELOPMENT OF EXISTING NH-85 FROM KM 0.000 TO KM 124.636 SECTION TO 2L/@L+PS SECTION IN THE STATE OF KERALA ON EPC MODE UNDER BHARATMALA PARIYOJANA
1658WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 0+800 (KANDULIJAN GAON) TO KM 27+701 (SIMEN CHAPORI) OF NH-515 IN THE STATE OF ASSAM ON EPC MODE UNDER BMP (DIBRUGARH-OYAN, PACKAGE-1)
1659WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 27+701 (SIMEN CHAPORI) TO KM 55+000 (NAGABANG GAMSUK) IN DHEMAJI DISTRICT IN THE STATE OF ASSAM ON EPC MODE UNDER BHARATMALA (PACKAGE-2)
1660WIDENING/IMPROVEMENT TO 4-LANE WITH PAVED SHOULDER FROM KM 55+000 (NAGABANG GAMSUK) TO KM 82+514 (OYAN) (PACKAGE-3)
1661WORK OF DEVELOPMENT AND CONSTRUCTION OF ELEVATED CORRIDORFROM KM 38/660 TO KM 42/690 (ISCON JUNCTION TO START POINT OF APPROACH OF SANAND FLYOVER) OF NH-147 IN THE SATE OF GUJARAT
1662WORK OF WIDENING/UPGRADATION OF 2-LANE WITH PAVED SHOULDER OF SRI MUKTSAR SAHIB TO MALOUT ROAD FROM KM 279.400 TO KM 307.060 SECTION OF NH-354 IN THE STATE OF PUNJAB ON EPC MODE. (JOB NO. NH-354-PB-20
1663YESHVANTHPUR-CHANNASANDRA (21.7 KM)
1664ZORINPUI- HMAWNGBU-LONGMASU (NH-502A)

Back